Projects Implemented: 1- Submarine Cables Troubleshooting ( Installing submarine cable , ALCATEL Submarine cable closure ). 2- 200 ELIFE sites (Connecting Power to Customer Premises). 3- 20 KM installing 144 F.O.C for MOBILY in all JEDDAH. 4- Installing of 288 fiber splice closure MOBILY in all MANHOLES in JEDDAH. 5- Installing and Testing the Fibre Optical Network for ARAMCO Buildings. 6- Installing 144 F.O.C between shelters and between floors in All MOBILY Exchanges. 7- 800 FTTB Sites (Installing Cable, Connecting Power for all sites). 8- Installing 12 KM of 144 F.O.C direct buried cable between Rabigh and King Abdullah Economic City (KAEC). 9- Survey, plan and Design the OSP route for FTTH connectivity with fiber schematic in a specified area with street cabinet including complete documentation (FDT Design ). 10- Implementation FTTH MOBILY Cabinets. 11- Implementation FTTH MOBILY Telecom Infrastructure in King Abdullah Economic City Covert Resort E-1 (14 KM). 12- Re-Locate Submarine Cables and Troubleshooting From SubCom ( Installing submarine cable , ALCATEL Submarine cable closure ).

Upload: adham-ismail-ahmed-awad

Post on 16-Aug-2015

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Projects Implemented

Projects Implemented:

1- Submarine Cables Troubleshooting ( Installing submarine cable , ALCATEL Submarine cable closure ).2- 200 ELIFE sites (Connecting Power to Customer Premises). 3- 20 KM installing 144 F.O.C for MOBILY in all JEDDAH.4- Installing of 288 fiber splice closure MOBILY in all MANHOLES in JEDDAH. 5- Installing and Testing the Fibre Optical Network for ARAMCO Buildings.6- Installing 144 F.O.C between shelters and between floors in All MOBILY Exchanges. 7- 800 FTTB Sites (Installing Cable, Connecting Power for all sites).8- Installing 12 KM of 144 F.O.C direct buried cable between Rabigh and King Abdullah Economic City (KAEC).9- Survey, plan and Design the OSP route for FTTH connectivity with fiber schematic in a specified area with

street cabinet including complete documentation (FDT Design ).10- Implementation FTTH MOBILY Cabinets.11- Implementation FTTH MOBILY Telecom Infrastructure in King Abdullah Economic City Covert Resort E-1 (14

KM).12- Re-Locate Submarine Cables and Troubleshooting From SubCom ( Installing submarine cable , ALCATEL

Submarine cable closure ).