Project Update for the Muon Ionization Cooling Experiment

(RAL)

Mark PalmerFermilab

December 15, 2014

Page 2: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 2

Ionisation cooling formalism• Exponential decrease in normalised emittance:

• Competition between:– dE/dx [cooling] and MCS [heating]

• Optimum:– Low Z, large X0

– Tight focus

– H2 gives best performance

2

2 30

0.014 GeV

2tn nd dE

dX E dX Em X

December 15, 2014

Page 3: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 3

MICE Steps IV & V

Plan endorsed by MICE Project Board in April 2014

-SS1-

-Tracker1-

-AFC-

-FC-

-Absorber-

-SS2-

-Tracker2-

MICE Step IVConfiguration

-SS2-

-Tracker2-

-SS1-

-Tracker1-

-AFC1-

-FC1-

-Absorber1-

-RFCC-

CCM

-AFC2-

-Absorber2-

-FC2-

MICE Step VConfiguration

December 15, 2014

Operational 2015

Operational 2018

Legend:-SS = Spectrometer Solenoid--FC = Focus Coil--AFC = Absorber-Focus Coil Module- CCM = Coupling Coil Magnet-RFCC = RF-Coupling Coil Module-

Page 4: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 4

Expedited Muon Cooling Demonstration

Plan developed in response to P5 recommendations

-SS1-

-Tracker1-

-AFC-

-FC-

-Absorber-

-SS2-

-Tracker2-

Legend:-SS = Spectrometer Solenoid--FC = Focus Coil--AFC = Absorber-Focus Coil Module--RFA = RF-Absorber Module-

-SS2-

-Tracker2-

-SS1-

-Tracker1-

-AFC1-

-FC1-

-AFC2-

Primary-Absorber-

-FC2-

RFA1- RFA2-

Secondary-Absorber2-

Secondary-Absorber1-

NEW Expedited

MICE CoolingDemonstration

December 15, 2014

Operational 2017

Represents reduced cost and technical risk relative to MICE Step V

Operational 2015

Page 5: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 5

September-November 2014

• August DOE Review of MAP– Detailed report for the new MICE Cooling Demonstration requested on the 1

month timescale

• September 25th

– Report to DOE accepted

• September 29th

– Plan for 3-year MAP Conclusion presented to HEPAP• Supports completion of the MICE Demonstration• And controlled closeout of other activities

• November 24-25– MICE Project Board Review

• Expedited MICE Demonstration endorsed by the review committee and the international Funding Agencies Committee

December 15, 2014

Page 6: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 6

MICE-US Construction Project Scope

• Step IV – Spectrometer Solenoids (2) – Delivered to RAL– LiH Absorber – Delivered RAL– Partial Return Yoke - In Fabrication– Installation and Commissioning

• Spectrometer Solenoids• Fiber Trackers• PRY

• Cooling Demonstration– RF Test and Characterization Program in MTA– 2 Single-Cavity RF Modules

• NO RFCC MODULE

– Final Step PRY– Installation and Commissioning

• Reconfigured Step IV Hardware• RF Systems• Extended PRY

December 15, 2014

Page 7: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 7

MICE Hall: Being readied for PRY Installation

• PRY:– Preparation for installation of bases

and restraints on track:• Expect to be installing first set of

“uprights” starting January 2015

Emphasis now shiftingto commissioning

and operations …December 15, 2014

Page 8: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 8

Step IV Wrapped with Partial Return Yoke (PRY)

December 15, 2014

Page 9: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 9

MICE Steps

• Step IV: Study of material, lattice, momentum and emittance to start Q2 CY2015

• Ionization cooling demonstration:– RF Components under test in the

MTA and at Daresbury Lab– Expect that all necessary hardware

will be deployed by Spring 2017– Full demonstration with RF

commences by Summer 2017

December 15, 2014

Page 10: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting

Cooling demonstration performance

10

Cooling

Transmission

December 15, 2014

Starting Summer 2017

Page 11: Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014

M. A. Palmer | FNAL All Experimenter's Meeting 11

THANK YOU FOR YOUR TIME

December 15, 2014