project timelines 1 september 2010

2
PROJECT TIMELINES Update 1 September 2010 Minotaur Exploration Limited ACN: 108 483 601 ASX: MEP

Upload: minotaur-exploration

Post on 17-Jun-2015

271 views

Category:

Investor Relations


0 download

TRANSCRIPT

Page 1: Project timelines 1 September 2010

PROJECT TIMELINESUpdate

1 September 2010

Minotaur Exploration LimitedACN: 108 483 601

ASX: MEP

Page 2: Project timelines 1 September 2010

Project Timelines

www.minotaurexploration.com.au

MINOTAUREXPLORATION

PROJECT Location Type Sept Oct Nov Dec

Cobequid Nova Scotia IOCG Geophysics Geophysics Drilling Lab Assays

Bass River Nova Scotia Magnetite Geophysics Target generation

Drilling Lab Assays

Cloncurry Qld IOCG Geophysics Drilling Drilling Lab Assays

Aphrodite SA IOCG Drilling Lab Assays Lab Assays Report

Border SA Base metals Geophysics Geophysics Drilling Drilling

Mutooroo SA Magnetite Geophysics Drilling Drilling Lab Assays

Poochera SA KaolinProduct

Specification Marketing MarketingOff Take

discussions

Tunkillia SA GoldStart CSIRO ISL

StudyRegional

BiogeochemRegional

BiogeochemCSIRO ISL Study

ends

Louth NSW Base Metals Drilling Lab Assays Interpretation Report