EDUCATION 363 Ripple Road, Essex. IG1 19PN 020 8594 2594 020 8591 1213 [email protected] www.carmelcrest.co.uk Tel: Fax: Email: Website: Project: School Extension with featured timber domed roof Head Teacher: Architect: George Potrykus Stewart Maclachlan, LBN This prestigious project involved the erection of a steel framed building with a featured timber domed roof. The building designed by Stewart Maclachlan of London Borough of Newham (LBN) incorporates an innovative vaulted and domed semi-circular timber roof. The roof was manufactured on site with traditional craft hand skills. The finished inside is a beautiful array of circular timber. RONALD OPENSHAW NURSERY VALUE: £457,000 ELMHURST PRIMARY SCHOOL VALUE: £350, 000 Project: Refurbishment of School toilets Head Teacher: Site Contact: Shahed Ahmed Maxine Dixon - 020 8472 1062 This project involved the complete strip out and refurbishment of 27 toilets. We used the time leading up to the project start date to develop the design. We assisted the school in selecting the design, colours and appliances they required. Works were carried out over a ten month period including school term- time on a rolling programme without a hitch. This is because our tradesmen are specially trained to work in school environments. The school was very pleased with the outcome. The Head Teacher is available to give reference. Project: Refurbishment of School toilets Head Teacher: Lorna Jackson - 020 8534 8135 The project comprised the complete strip out and refurbishment of boys, girls and staff toilets. The time leading up to the start was used to develop the design. We engaged the school heads in the process of working up a design together until they were satisfied. The project was completed during the summer holidays and the school was very pleased with the outcome. The Head teacher is available for reference. MARYLAND PRIMARY SCHOOL VALUE: £63, 700 Our team ensured the highest standards of quality, as the tightest of tolerances were required for the domed end to accurately meet the vaulted section. The finished project is a unique quality piece of work not often seen on construction sites these days. The quality and precision achieved in this project is testament to our teamwork and co-operation.

Upload: carmelcrest

Post on 12-Jul-2015

327 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Project summary education

EDUCATION

363 Ripple Road, Essex. IG1 19PN 020 8594 2594 020 8591 [email protected] www.carmelcrest.co.uk

Tel: Fax:Email: Website:

Project: School Extension with featured timber domed roofHead Teacher:Architect:

George PotrykusStewart Maclachlan, LBN

This prestigious project involved the erection of a steelframed building with a featured timber domed roof. Thebuilding designed by Stewart Maclachlan of LondonBorough of Newham (LBN) incorporates an innovativevaulted and domed semi-circular timber roof. The roof wasmanufactured on site with traditional craft hand skills. Thefinished inside is a beautiful array of circular timber.

RONALD OPENSHAW

NURSERY

VALUE: £457,000

ELMHURST PRIMARY

SCHOOL

VALUE: £350, 000

Project: Refurbishment of School toilets

Head Teacher:

Site Contact:

ShahedAhmed

Maxine Dixon - 020 8472 1062

This project involved the complete strip out and

refurbishment of 27 toilets. We used the time leading

up to the project start date to develop the design. We

assisted the school in selecting the design, colours

and appliances they required. Works were carried

out over a ten month period including school term-

time on a rolling programme without a hitch. This is

because our tradesmen are specially trained to work

in school environments.

The school was very pleased with the outcome. The

Head Teacher is available to give reference.

Project: Refurbishment of School toilets

Head Teacher: Lorna Jackson - 020 8534 8135

The project comprised the complete strip out and

refurbishment of boys, girls and staff toilets. The

time leading up to the start was used to develop

the design. We engaged the school heads in the

process of working up a design together until they

were satisfied.

The project was completed during the summer

holidays and the school was very pleased with the

outcome. The Head teacher is available for

reference.

MARYLAND PRIMARY

SCHOOL

VALUE: £63, 700

Our team ensured the highest standards of quality, as the tightest of tolerances were required for the domedend to accurately meet the vaulted section. The finished project is a unique quality piece of work not oftenseen on construction sites these days. The quality and precision achieved in this project is testament to ourteamwork and co-operation.