San Bernardino Associated Governments MAJOR PROJECTS PROJECT STATUS REPORT April – June 2016 1170 West Third Street, Second Floor San Bernardino, California 92410-1715 Telephone: (909) 884-8276 www.sanbag.ca.gov

Upload: trinhxuyen

Post on 09-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

San Bernardino Associated GovernmentsMAJOR PROJECTS

PROJECT STATUS REPORTApril – June 2016

1170 West Third Street, Second FloorSan Bernardino, California 92410-1715

Telephone: (909) 884-8276www.sanbag.ca.gov

Page 2: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Page No. P1 M2 In3 G

P M4 I-5 I-6 I-7 I-8 I-9 S10 S11 U

In12 I-13 I-14 I-15 I-16 I-17 I-18 I-19 I-20 I-21 I-22 I-23 I-24 I-25 S26 S27 S28 S

Env

roject Locat

Mainline Projenterchange PrGrade Separat

roject Name

Mainline Proje10 Corridor 15 Corridor 215 Bi-Count215 Widening215 WideningR-210 ConstrR-210 Lane A

US-395

nterchange P10 and Cherr10 and Citrus10 and Rivers10 and Tippe10 and Tippe10 and Ceda10 and Peppe10 and Unive10 Mt. Verno15 & I-215 Im15 and Ranch15 and Basel215 and BartR-210 and PeR-210 Base LR-60 and CeR-60 and Arc

vironmen

SAN BERNMAJ

P

ORDE

ion Maps cts rojects tion Projects

ects

ty HOV Gap Cg – Central g – South ruction Addition

Projects ry Avenue s Avenue side Avenue

ecanoe Phaseecanoe Phaser er Avenue

ersity Street n

mprovement (Dhero Road line Avenue on Road epper AvenueLine ntral Avenue chibald

ntal

Desi

NARDINO ASJOR PROJEPROJECT ST

ER OF PR

TABLE O

Closure

e I e II

Devore)

e

ign

R

SSOCIATEDCTS – GARTATUS – JU

ROJECT D

OF CONT

Phase

EnvironmentEnvironmentConstructionLandscapeLandscapeLandscapeEnvironmentDesign & RO

LandscapeLandscapeLandscape Landscape ConstructionDesign / ROConstructionEnvironmentPlanningDesign / BuilClose-OutConstructionDesign/ROWDesign/ROWEnvironmentPlanningPlanning

Right‐of‐W

D GOVERNMRRY COHOEUNE 2016

DELIVER

TENTS

tal tal n

tal OW

n OW n tal

ld

n W W tal

Way

Con

MENTS E

RY

Corrid

I-10 I-15 I-215 I-215 I-215 SR-21SR-21US 39

I-10 I-10 I-10 I-10 I-10 I-10 I-10 I-10 I-10 I-15 &I-15 I-15 I-215 SR-21SR-21SR-60SR-60

nstruction

dor

10 10 95

& I-215

10 10 0 0

n

Page 3: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

TABLE OF CONTENTS (Continued)

Grade Separation Projects 29 Monte Vista and UPRR Design/ROW Local Streets 30 Palm Avenue and BNSF Close-Out Local Streets 31 Lenwood Road and BNSF Close-Out Local Streets 32 Laurel Street and BNSF Construction Local Streets 33 South Milliken and UPRR Construction Local Streets 34 Vineyard Avenue and UPRR Construction Local Streets 35 Mt. Vernon Viaduct Design Local Streets

Special Projects 36 Metrolink ATP Design Local Streets

Page 4: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

PROJECT STATUS -DEFINITIONS-

Complete for Beneficial Use: Satisfactory completion of the project's stated purpose to allow public use of

facilities without restrictions

Construction: Project phase after Construction Notice to Proceed (NTP) through end of Project Design & ROW: Project phase after Project Report (PR) Approval and before Construction NTP PS&E: Development of the final Plans, Specifications and Estimates for use in bidding the construction "Early": Work along a Mainline or Segment that is performed first to assist execution of a major project EEP: Establish Existing Planting Environmental Clearance: Project phase after Project Initiation Document (PID) approval. Includes

development of Project Approval (PA) documentation, and Environmental Documents (ED) Final Design Approved: Completion of all design activities and environmental certifications and ROW.

Grade Separation: Work to change elevations of road and/or rail intersections to expedite traffic flow

HOV: High Occupancy Vehicle (i.e. car pool) Interchange: Connectors between Interstates and/or major roads Interstate Highway: Federally monitored high speed roads Local Streets: State/City owned and maintained streets Mainline: Interstate freeway corridor project that is new and/or widened (added lanes - general purpose,

HOV, auxiliary, etc.)

NTP: Notice to Proceed. Planning: Project phase after Start of Project and before Project Study Report (PSR) Approval

Preliminary Engineering: Part of the Environmental Clearance phase that includes the design effort required to sufficiently define the project's alternatives and support the development of the Environmental Documentation (ED). Completion of preliminary engineering will approximate 30% of the overall design effort of the project.

End of Project: Final completion of all construction activities and formal close-out of construction contracts and ROW activities

Project Report (PR): Report documenting the Preliminary Engineering (up to 30% of Design) to recommend the preferred alternative used for Project Approval (PA). All Environmental Documentation (ED) is contained in this report.

Project Initiation Document (PID): Report documenting the early scoping definition of a project used to determine viability of proceeding with Preliminary Engineering and Environmental approvals, project alternatives and preliminary project costs by phase.

Right-of-Way (ROW) Certification: Identification, appraisal and purchase of required land parcels for the project. Also includes the right of possession of land through condemnation. ROW Certification is a prerequisite for Construction bidding.

RTL: Ready to List. Segment: A specified portion of an Interstate freeway corridor project that is widened (added lanes - general purpose, HOV, auxiliary, etc.)

Sound Walls: Self supported walls that are of sufficient height to reduce roadway noise to an acceptable level

Start of Project: Board action to begin project. Utility Relocation: Modification of all utilities (i.e. Electrical, Gas, Water, Sewer, Communications, etc.) to

alleviate conflicts with project's construction or use. Utility Certification is a prerequisite for Construction bidding.

Closeout: Construction complete and completing formal close out of all contracts.

Page 5: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

PROJECT STATUS

-FUNDING PROGRAM DESCRIPTIONS-

FEDERAL

ARRA – American Recovery and Reinvestment Act CMAQ – Congestion Mitigation & Air Quality Program STP – Surface Transportation Program TIGER – Transportation Investment Generating Economic Recovery TEA – Transportation Enhancement Activity TE – Transportation Enhancement DEMO – Demonstration Project PNRS – Project of National & Regional Significance IMD – Interstate Maintenance Discretionary

STATE

CMIA – Corridor Mobility Improvement Account TCRP – Traffic Congestion Relief Program RIP – Regional Improvement Program STIP – State Transportation Improvement Program ITIP – Interregional Transportation Improvement Program LLP/IIP – Interregional Improvement Program TCIF – Trade Corridor Improvement Fund SHOPP – State Highway Operation and Protection Program TLSP – Traffic Light Synchronization Program SLPP – State Local Partnership Program PUC – Public Utilities Commission

LOCAL

DIF – Developer Impact Fees IVDA – Inland Valley Development Agency

Page 6: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

PROJECT LOCATION MAP MAINLINE

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

1

Page 7: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

PROJECT LOCATION MAP INTERCHANGE

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

2

Page 8: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

PROJECT LOCATION MAP GRADE SEPARATION

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

3

Page 9: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnCoPHCoPHCoEn

 

CoStPrFiROCo

FuFeFeStToM

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved (by othnvironmental Construction NTH I) onstruction NTH II) omplete for Bend of Project

Budgetary Es

ost Item tudy Report roject Report nal Design OW Certificatioonstruction

Funding

unding Sourceederal - CMAQederal - STP tate – RIP oll Revenue easure I

ct:

Schedule Sum

Document (PIhers)

Clearance (PA/ETP (Design Buil

TP (Design Buil

eneficial Use

stimate Summ($ 000’s

on

g Summary (E($ 000’s

e Q

SAN BERNMAJ

P

mmary Ac

[ ForJuly

D) June

ED) [ 2d [ 2

d [ 2

[ 2[ 2

mary (Express s)

Am- C

$1Total $1

Express Laness)

Am

Total $1

NARDINO ASJOR PROJEPROJECT ST

I-10 C

ctualrecast ] y 2007 e 2005

2017 ] 2018 ]

2020 ]

2023 ] 2028 ]

Lanes)

mountCaltrans -

$28,127$130,386$184,891

1,267,0671,610,471

s)

mount$55,171$27,100

$122,620$764,900$640,680

1,610,671

SSOCIATEDCTS – GARTATUS – JU

4

CORRIDO

Project ScoThis project

1. Alte2. Alte

Occto F

3. Alteknoline

Project Ben Constructionincrease ca

Project Sta SANBA

lanes asto the e

The ma

been coApprova

The Dr

May 20 Coordin

continue

Project Not

Assembly BOctober 9, authority onmove forwa

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

OR

ope Summart consists of th

ernative One: ernative Twocupancy VehiFord Street, aernative Threown as high o to Ford Stree

nefit:

n of additionpacity and im

atus: AG Board ofs the Locally nvironmental

ajority of the eompleted andal Drawings a

raft Environm16, and three

nation with Ces for the pro

tes of Interes

Bills 914 an2015. AB 9

n Interstates 1ard with the Ex

ncy:

anager:

edia Contact:

MENTS E

ry: hree alternati

‘No Build’ Ao: Includes icle (HOV) lapproximately ee: Providesccupancy tollet, approxima

nal lanes willmprove travel

f Directors aPreferred Alt

l review.

environmentald approved bare being dev

mental Docume public meeti

Caltrans Los Aoject transition

st:

nd 194 were914 provides10 and 15 shxpress Lanes

SANBAG

Chad Cosccostello@

: Tim Watkitwatkins@

Phase: Env

Type

ves under stu

lternative. extending

ne from Have25 miles.

s express lal lanes, from ately 33 miles

decrease ctime reliability

approved theternative (LPA

l technical stuby Caltrans. veloped.

ment was cirings were hel

Angeles Distrn at the Coun

e signed int SANBAG would the Boa

s alternative.

tello 909 [email protected]

ns (909) [email protected]

vironmental

e: Mainline

udy:

a High en Avenue

anes, also LA County

s.

ongestion, y.

e express A), subject

udies have Geometric

rculated in d.

rict 7 staff ty line.

to law on with tolling ard elect to

4-8276 gov

-8276 ov

Page 10: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Environmental

I-15 Corridor Type: Mainline

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

5

I-15 CORRIDOR Map of Project:

  

Schedule Summary

Milestone Actual

[ Forecast ] Start of Project Oct 2012 Project Initiation Document (PID) Approved

Sept 2014

Environmental Clearance (PA/ED) [Feb 2018] Construction NTP (Design Build) [2021] Complete for Beneficial Use [2024] End of Project [2028]

 

Budgetary Estimate Summary ($ 000’s)

Cost Item AmountProject Report and Env Document $13,000

Final Design $16,000Right of Way $5,000Construction Support $64,218Construction Capital $276,470

Total $374,688

Total $374,688  

Funding Summary ($ 000’s)

Funding Source AmountFederal - CMAQ $63,562Federal - STP $7,938State – STIP/RIP $11,456Toll Revenue $266,173Measure I $25,559

Project Scope Summary: Study the addition of 2 express lanes in each direction on the I-15 from SR-60 to SR-210.

Project Benefit: Provide reliable travel times, manage traffic, and increase capacity.

Project Status and Continuing Activities:

A Project Study Report was completed in the fall of 2014.

Currently working on traffic studies, geometric design, field surveys, and environmental technical studies.

Project Notes of Interest: This project ties to the I-15 Express Lanes project in Riverside County which extends from SR-60 to south of SR-91 in Corona.

Lead Agency: SANBAG

Project Manager: Dennis Saylor (909) 884-8276 [email protected]

Public/Media Contact: Tim Watkins (909) 884-8276 [email protected]

Page 11: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-21

Ma

M

StPrApEnFiCoCoEn

 

CoPr

FiROCoCo

 

FuFe

StStStRi

M

  

tive

15 Corridor

I-215 Bap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budg

ost Item roject Report a

nal Design OW onstruction Suonstruction Ca

unding Sourceederal - CMAQ

tate – STIP/RIPtate - CMIA tate- IIP verside County T

easure I

BI-COUNTct:

Schedule Su

Document (PI

Clearance (PA/proved – (RTL)tice to Proceed

eneficial Use

getary Estima($ 000’s

and Env Docum

pport pital

T

Funding Sum($ 000’s

e Q

P

Trans Commissio

T

SAN BERNMAJ

P

TY HIGH

mmary A

[ FoFebru

D) -incl. i

ED) Ma) Jund Jan

Jun[2

te Summary s)

Amment

Total

mmary s)

Am

on

Total

NARDINO ASJOR PROJEPROJECT ST

OCCUPA

Actualrecast ]

uary 2009 n PA/ED-

ar 2011 ne 2012 n 2013

ne 2015 2017]

mount$6,120

$11,000$14,461$16,631

$142,151$189,227

mount$49,003

$65,469$18,548$4,961$1,305

$49,941$189,227

SSOCIATEDCTS – GARTATUS – JU

6

ANCY VE

Project Sco This projecsystem in eRoad in thethe SR-60/S

Project Ben Project will of San Bern

Project Sta

Constrlanes a

Projectresolut

InstallaCadenconstruOperat

Constradvertiin July

Project Not

Lead Agenc

Project Man

Public/Med

D GOVERNMRRY COHOEUNE 2016

EHICLE (H

ope Summar

ct will add aeach directio

e City of San SR-91/I-215 ju

nefit:

provide a conardino to the

atus and Con

ruction of theare open for u

t is in Constrution of outstan

ation of signaa Drive is puction cost wtion and Proteruction contrased in April 22016.

tes of Interes

cy: CS

nager:

dia Contact: T

T

MENTS E

HOV) GAP

ry:

a High Occuon of I-215 b

Bernardino aunction in the

ontinuous carpe City of River

ntinuing Activ

e project is cuse.

uction and Rinding items.

als at I-215 planned in 2ill be funded ection Prograact for the sig2016. Contra

st:

Caltrans – CoSANBAG – S

Paul Melocotpmelocoton@

Terri KasingaTerri.kasinga

Phase: C

Type

P CLOSU

upancy Vehicbetween Oranand Spruce Se City of River

pool lane fromrside.

vities:

complete and

ght of Way cl

Iowa Avenu016. A portithrough State

am (SHOPP) fgnal improvemact award is a

onstruction Signal Project

ton (909)[email protected]

a (909) [email protected]

onstruction

e: Mainline

URE 

cle (HOV) nge Show

Street near rside.

m the City

d the HOV

loseout for

ue and La ion of the e Highway funds. ments was anticipated

-8276 gov

646

Page 12: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

On

I-21

Ma

M

StPrApEn(PFiCoCoEn

 

CoFiROROCoCoLa

 

FuFe F F F FStStM

 

-Hold

15 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved (by othnvironmental C

PA/ED) nal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item nal Design OW OW Support onstruction Suonstruction andscape

unding Sourceederal – CMAQ

Federal - PNRSFederal – ARRAFederal - TEA Federal – DEMOtate - RIP tate – TCRP easure I

I-215ct:

Schedule Su

Document (PIhers)

Clearance

proved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

pport

Tot

Funding Sue

Q S (IVDA Co-op)A

O

Tot

SAN BERNMAJ

P

5 WIDENI

ummary Ac

[ ForJuly

D) June

Dec

) Mayd Oct

Jan[2

Summary ($ 00Am

als

mmary ($ 000Am

)

als

NARDINO ASJOR PROJEPROJECT ST

ING – CE

ctualrecast ] y 1988 e 1992

c 2005

y 2009 t 2009 n 2014 2022]

00’s)mount

$27,609 $67,233 $10,090 $37,903

$174,924 $8,158

$326,250

’s) mount

$29,006 $31,303

$128,227 $3,597

$271 $91,640 $8,887

$33,319 $326,250

SSOCIATEDCTS – GARTATUS – JU

7

ENTRAL S

Project Sco This projectI-215 freewgeneral-purAvenue andreconfigure Street, Base

Project Ben The added traffic opera

Project Not The constru The landscato the State

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

SAN BER

ope Summar

t will build or way through S

pose lane id Massachus

ramps at Seline, and SR

nefit:

lanes will eaations.

tes of Interes

uction phase w

ape portion of of California

ncy:

anager:

edia Contact:

MENTS E

RNARDINO

ry:

replace 16 bSan Bernardiin each diresetts AvenueSecond Stre

R-259 intercha

ase traffic co

st:

was complete

f this project iwater conser

Caltrans –SANBAG Brian Smitbsmith@s

: Tim Watkitwatkins@

Phase:

Type

O

bridge structuno, add a caection betwee. The projecet, Third St

anges.

ongestion an

ed in 2014.

is currently onrvation manda

– Landscape D– Landscape Constructioth (909) 884-8

sanbag.ca.gov

ns (909) [email protected]

Landscape

e: Mainline

res on the arpool and een Rialto ct will also reet, Fifth

d improve

n hold due ates.

Design e on 8276 v

-8276 ov

Page 13: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

On

I-21

Ma

M

StPrApEnFiCoCoEn

 

CoStFiROROCoCoLa

 

FuFeFeFeFeStM

 

-Hold

15 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report / Pnal Design OW OW Support onstruction Suonstruction andscape

Budgetaunding Sourceederal - CMAQederal - STP ederal - PNRS ederal - ARRA tate - RIP easure I

I-21ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

Project Report

pport

Tot

ary Estimate Se

Q

(IVDA Co-op)

To

SAN BERNMAJ

P

15 WIDEN

ummary 

[ FJ

D) C

ED) D) Ad D

A

Summary ($ 00Am

als

Summary ($ 00Am

otal

NARDINO ASJOR PROJEPROJECT ST

NING – S

ActualForecast ] uly 1988

Caltrans

Dec 2005 April 2007 Dec 2007 Aug 2010

[2022]

00’s)mount

- Caltrans - $8,323

$59,749 $4,676

$14,603 $89,433 $3,525

$180,309

00’s)mount

$23,176 $29,307 $22,107

$0 $103,767

$1,952 $180,309

SSOCIATEDCTS – GARTATUS – JU

8

OUTH SA

Project Sco

Project will in each dire

Project Sta Constru

construc 

RequesCaltranssuspend

Project Not The constru The landscato the State

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

AN BERN

ope Summar

add one carction, and bu

atus and Con

uction Manctability revie

st for Authorizs for landscaded due to wa

tes of Interes

uction phase w

ape portion of of California

ncy:

anager:

edia Contact:

MENTS E

NARDINO

ry:

rpool and oneild/replace 6

ntinuing Activ

nagement ew of the land

zation (RFA)ape construcater mandate

st:

was complete

f this project iwater conser

Caltrans –LandscapeSANBAG Constructi Brian Smitbsmith@s

: Tim Watkitwatkins@

Phase:

Type

O

e general-purbridge structu

vities:

firm compscape plans.

package suction fundinge.

ed in 2010.

is currently onrvation manda

– Constructione Design – Landscapeion

th (909) 884-8sanbag.ca.gov

ns (909) [email protected]

Landscape

e: Mainline

rpose lane ures.

pleted a

bmitted to , but was

n hold due ates.

n &

e

8276 v

-8276 ov

Page 14: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

SR

Ma

M

StPrApEnFiCoCoEn

 

 

FuFeStMTo

 

CoPrFiCoTo

tive

-210 Corrido

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Landscaping

unding Sourceederal – STP tate – RIP-TE Seasure I otal

Landscape

ost Item roject Report nal Design onstruction otals

or

SR-2ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

Segments 8-1

($ 000’se

STP-RIP

e Budgetary E($ 000’s

SAN BERNMAJ

P

210 FREE

ummary A

[ Fo1

D)

ED) 199) Apd Jan

Jul[Sep

11 Funding Sus)

Am

Estimate Summs)

Am

NARDINO ASJOR PROJEPROJECT ST

EWAY EX

Actualorecast ] 1980 N/A

96/2004 pr 2004 n 2005 y 2007 pt 2020]

ummary

mount$1,707$4,127

$13,901$19,735

mary

mount$80

$720$18,935$19,735

SSOCIATEDCTS – GARTATUS – JU

9

XTENSION

Overall ProThis project Los AngelesI-215 Interchlanes and o Current ProThis project

Overall ProConstructionprovides ancongestion Current ProLandscape Avenue in Bernardino.and native wwater use.

Project StaSegments 8maintenancMay 2017, a Project NotThe plantinthrough 11maintenancimplementa Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

N CONST

oject Scope St extends the s-San Bernarhange (Segm

one HOV (i.e.

oject Summat is in the land

oject Benefitn of the SR-

n additional eon I-10, SR-6

oject Benefitbeautification

Fontana to Use of drowildflower se

atus and Con8 through 11 ace with Segmand Segment

tes of Interesng concepts 1 projects ce costs andation of efficie

ncy:

anager:

edia Contact:

MENTS E

TRUCTIO

Summary: existing SR-2

rdino County ment 11) with t

“car pool”) la

ary: dscape phase

: -210 through east/west free60 and other l

t: n of the SR-2o the I-215 ought toleranteding to mini

ntinuing Activare in a four ent 8 schedut 11 completin

st: developed

are intended help consnt irrigation s

LandscapeProject Ad Tim Kirkletkirkley@s

: Tim Watkitwatkins@

Phase:

Type

N

210 freeway fline (Segmenthree generalne in each di

e on Segment

San Bernardeway, therebylocal arterial r

210 corridor frInterchange

t plants, dripimize mainten

vities: (4) year exten

uled to be comng in Septem

for the Seed to reducserve water trategies.

e Design – Cdmin. – SANB

ey (909) 884-8sanbag.ca.go

ins (909) [email protected]

Landscape

e: Mainline

from the nt 1) to the l-purpose rection.

ts 8-11.

dino valley y relieving routes.

rom Sierra e in San irrigation, nance and

nded plant mpleted in ber 2019.

gments 8 ce overall

with the

altrans BAG

8276 ov

4-8276 ov

Page 15: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

SR

S

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiROROCoCo

 

FuFeStM

 

tive

-210

SR 210 LA

ap of Projec

ilestone

tart of Project roject Initiation pproved (by Canvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW OW Support onstruction Suonstruction

Budgetaunding Sourceederal - STP tate - RIP easure I

ANE ADD

ct:

Schedule Su

Document (PIaltrans)

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

pport

Tot

ary Estimate Se

To

SAN BERNMAJ

P

ITION –H

ummary 

[ F

D) M

ED) [O) [ Fd [A

[M

Summary ($ 00Am

als

Summary ($ 00Am

otal

NARDINO ASJOR PROJEPROJECT ST

IGHLAND

ActualForecast ]

2011

May 2008

Oct 2016] Feb 2018] Aug 2018] May 2020]

[2025]

00’s)mount

Caltrans $3,052 $8,818 $4,000

$768 $16,525 $99,000

$132,163

00’s)mount

$43,523 $25,000 $63,640

$132,163

SSOCIATEDCTS – GARTATUS – JU

10

D AVENUE

Project Sco This gap cloflow lane in generally beBernardino Redlands.

Project Ben The improvetraffic period

Project Sta

Environ

Award

anticipa Project Not As the SR-2Interchangedelivery schright of wayschedule.

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

E TO SAN

ope Summar

osure project each directio

etween Highlaand San Bern

nefit:

ements will dds and improv

atus and Con

nmental appr

of contracated.

tes of Interes

210 Lane Adde projects alighedules, they y, and constru

ncy:

anager:

edia Contact:

MENTS E

N BERNAR

ry:

includes the on within the mand Avenue, nardino Aven

ecrease congve traffic ope

ntinuing Activ

roval schedule

ct for final

st:

dition and SRgn geographic

will be combuction phases

SANBAG

Brian Smitbsmith@s

: Tim Watkitwatkins@

Phase: Env

Type

RDINO AV

addition of onmedian of SRin the City of

nue in the City

gestion duringrations.

vities:

ed for Fall-20

design se

-210 Base Lincally and sharined for the d to save cost

th (909) 884-8sanbag.ca.gov

ns (909) [email protected]

vironmental

e: Mainline

VENUE 

ne mixed R-210

San y of

g peak

016.

ervices is

ne re similar design,

and

8276 v

-8276 ov

Page 16: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Design/ROW

US-395 Type: Mainline

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

11

US-395 WIDENING PROJECT – PHASE I Map of Project:

 Schedule Summary 

Milestone Actual

[ Forecast ] Start of Project July 2002 Project Initiation Document (PID) Approved

Aug 2005

Environmental Clearance (PA/ED) Dec 2009 Final Design Approved – (RTL) [Mar 2018] Construction Notice to Proceed [Dec 2018] Complete for Beneficial Use [Sept 2020] End of Project [July 2021]

 

Budgetary Estimate Summary ($ 000’s)Cost Item AmountProject Report and Env Document

$2,000

Final Design $6,015 ROW $12,189 Construction $32,520

Total $52,724  

Budgetary Estimate Summary ($ 000’s)Funding Source AmountFederal – STP $32,698 Federal-DEMO $360 State - RIP $5,550 Measure I $13,187 Local Funds $929

Total $52,724  

Project Scope Summary:  Widen US-395 between SR 18 and Chamberlain from two lanes to four lanes. Install turn lanes and signals at various intersections within the project limits

Project Benefit: The project will relieve congestion and enhance the operational efficiency of US-395.

Project Status and Continuing Activities:

65% Plans were submitted to Caltrans for review.  

ROW appraisal maps are finalized and appraisal preparation has begun. 

 

Utility potholing began in June.  

Project Notes of Interest:   Environmental clearance was approved for all phases in

December, 2009. Future phases call for widening between I-15 and SR 18

and between Chamberlain Way and Desert Flower Road.

Lead Agency: SANBAG

Project Manager: Andrea Nieto (909) 884-8276 [email protected]

Public/Media Contact: Tim Watkins (909) 884-8276 [email protected]

Page 17: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiROCo

 

CoFeFeStCoMCi

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW onstruction

Fuost Item ederal – TCIF ederal - IMD tate - STIP/RIPounty of San Beasure I ity of Fontana

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

To

unding Summa

P Bernardino

To

SAN BERNMAJ

P

I-1

ummary 

[ F

D)

ED) F) Sd O

J

Summary ($ 00Am

C

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

0 AND C

ActualForecast ]

1998 2001

Feb 2009 ept 2011

Oct 2012 an 2015 [2020]

00’s)mountCity/Caltrans

$781 $6,600

$13,003 $60,281 $80,665

mount$30,520 $1,215 $3,908

$18,035 $16,897 $10,090 $80,665

SSOCIATEDCTS – GARTATUS – JU

12

HERRY A

Project Sco This projectbridge with ramp.

Project Ben This projectand greatly at Cherry Av

Project Sta The new

2015.

Constru

A new

contract Project Not

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

AVENUE

ope Summar

t will replace tan eight-lane

nefit:

t will make opreduce trafficvenue.

atus and Con

w bridge wa

uction is comp

four-year Et was awarde

tes of Interes

ncy:

anager:

edia Contact:

MENTS E

ry:

the existing fie bridge and

perational anc congestion

ntinuing Activ

s opened to

plete and in fe

Establish Exed in May 201

st:

SANBAG

Mike Barnmbarnum@

: Tim Watkitwatkins@

Phase:

Type: I

ive-lane Cher add one lan

nd safety imprat the I-10 in

vities:

traffic on Ja

ederal close o

xisting Planti16 and is ongo

num (909) [email protected].

ns (909) [email protected]

Landscape

Interchange

rry Avenue ne to each

rovements nterchange

anuary 17,

out phase.

ng (EEP) oing.

4-8276 gov

-8276 ov

Page 18: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiROCo

 

CoFeFeStMCoCi

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW onstruction

Fuost Item ederal - STP ederal - CMAQtate – STIP/RIPeasure I ounty of San Bity of Fontana

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

To

unding Summa

Q P

Bernardino

To

SAN BERNMAJ

P

I-1

ummary 

[ F

D)

ED) F) Jud A

M

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

10 AND C

ActualForecast ]

1998 2001

Feb 2009 une 2011 Apr 2012 May 2014

[2019]

00’s)mount

City $1,138 $5,609

$10,755 $40,232 $57,734

mount$24,419 $2,243 $3,238 $5,663

$118 $22,053 $57,734

SSOCIATEDCTS – GARTATUS – JU

13

CITRUS A

Project Sco This project10 with a se

Project Ben This projecsafety.

Project Sta A new four-was awarde Project Not Constructionhas been su

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

AVENUE

ope Summar

t will replace teven-lane brid

nefit:

ct will reduc

atus and Con

-year Establised in June 20

tes of Interes

n is completeubmitted.

ncy:

anager:

edia Contact:

MENTS E

ry:

the existing fodge and add o

ce traffic con

ntinuing Activ

sh Existing P15 and is ong

st:

e and the fed

SANBAG

Mike Barnmbarnum@

: Tim Watkitwatkins@

Phase:

Type: I

our-lane bridgone lane to ea

ngestion and

vities:

Planting (EEPgoing.

deral close ou

num (909) [email protected].

ns (909) [email protected]

Landscape

Interchange

ge over I-ach ramp.

d improve

P) contract

ut package

4-8276 gov

-8276 ov

Page 19: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEn

FiCoCoEn

 

CoStPrFiROCo

 

CoMCi

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental C

nal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW onstruction

Fuost Item easure I ity of Rialto

ct:

Schedule Su

Document (PI

Clearance (PA/E

proved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

To

unding Summa

To

SAN BERNMAJ

P

I-10

ummary 

[ F

D) M

ED) MF

) Jd S

N[D

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

0 AND RIV

ActualForecast ]

1995 Mar 1997

May 1999 Feb 2008

un 2009 ept 2009

Nov 2011 Dec 2018]

00’s)mount

- Rialto - - Rialto -

$2,324 $2,000

$35,700 $40,024

mount$3,425

$36,599 $40,024

SSOCIATEDCTS – GARTATUS – JU

14

VERSIDE

Project Sco This projecAvenue brid

Project Ben This project Project Sta The p

establisDecemb

Project Not Landsca

provided

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

AVENUE

ope Summar

ct will replacdge over I-10

nefit:

t will improve

atus and Con

project is cshment periober 2018.

tes of Interes

aping is beid by the City

ncy:

anager:

edia Contact:

MENTS E

E

ry:

ce the existiwith a nine-la

traffic flow an

ntinuing Activ

currently inod schedule

st:

ing irrigated of Rialto.

SANBAG

Tim Kirkletkirkley@s

: Tim Watkitwatkins@

Phase:

Type: I

ng five-lane ane bridge.

nd safety.

vities:

a four-yeed for comp

with reclaim

y (909) 884-8sanbag.ca.go

ns (909) [email protected]

Landscape

Interchange

Riverside

ear plant pletion in

med water

8276 v

-8276 ov

Page 20: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnFiCoCoEn

 

CoPrFiCo

 

CoStMLo

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item roject Report nal Design onstruction

Fuost Item tate - CMIA easure I

ocal - STPL

I-ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

Tot

unding Summa

To

SAN BERNMAJ

P

10 AND T

ummary 

[ FM

D) A

ED) J) Jd A

MJ

Summary ($ 00Am

als

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

TIPPECA

ActualForecast ] May 1997 Aug 2002

an 2011 Jan 2012 Aug 2012 Mar 2014 un 2016

00’s)mount

$1,866 $6,388

$16,650 $24,904

mount$10,000 $12,244 $2,660

$24,904

SSOCIATEDCTS – GARTATUS – JU

15

NOE AVE

Project Sco Project will and add turSan Timotedrainage ch

Project Ben This projectramp, result

Project Sta Constr

packag The 4-y

Project Not The fo

(EEP) 10/Tipp

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

ENUE – P

ope Summar

widen the I-rn lanes. To o Creek Bridg

hannel will be

nefit:

t will improve ting in reduce

atus and Con

ruction is coge has been syear landscap

tes of Interes

llow up four phase will

pecanoe PH I

ncy:

anager:

edia Contact:

MENTS E

PHASE I

ry:

10/Tippecanoaccommodatge will be widenclosed.

operations ofed congestion

ntinuing Activ

mplete and submitted. pe maintenan

st:

(4) year Estabe complete

II project.

SANBAG

Ghassan D(909) 884-gdagher@

: Tim Watkitwatkins@

Phase:

Type: I

oe eastboundte these lanesdened and the

f the eastboun.

vities:

the federal

nce project is

ablish Existined as part

Dagher -8276

@sanbag.ca.g

ns (909) [email protected]

Landscape

Interchange

d off-ramp, s of travel, e adjacent

nd off-

close out

ongoing.

g Planting of the I-

ov

-8276 ov

Page 21: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnFiCoCoEn

 

CoStFiROLaCo

 

CoFeMStLoCiCi

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report nal Design OW andscape Mainonstruction

Fuost Item ederal easure I tate – IIP ocal – IVDA ity of San Bernity of Loma Lin

I-1ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

ntenance

Tot

unding Summa

nardino da

To

SAN BERNMAJ

P

10 AND T

ummary 

[ FD

D) D

ED) J) Sd F

M[O

Summary ($ 00AmInc

als

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

TIPPECAN

ActualForecast ] Dec 2005 Dec 2008

an 2011 ept 2014

Feb 2015 May 2016 Oct 2021]

00’s)mountcl in Phase I

$2,532 $34,176

$610 $16,914 $54,232

mount$30,337 $7,518

$11,691 $1,562 $1,562 $1,562

$54,232

SSOCIATEDCTS – GARTATUS – JU

16

NOE AVE

Project Sco This projecAvenue inte

Project Ben This projecinterchangereduced con

Project Sta The new The 1 y

Project Not Constru Final ele

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

ENUE – P

ope Summar

ct will reconerchange.

nefit:

ct will improe and the angestion.

atus and Con

w westbound year plant esta

tes of Interesuction is approectrical testin

ncy:

anager:

edia Contact:

MENTS E

PHASE II

ry:

nfigure the

ove traffic floadjacent inte

ntinuing Activ

off ramp opeablishment st

st: oximately 95%g and punchl

SANBAG

Ghassan D8276 gdagher@

: Tim Watkitwatkins@

Phase: C

Type: I

I-10 and T

ow and safersections, re

vities:

ened in May 2tarted in May

% complete.list work is on

Dagher (909

@sanbag.ca.g

ns (909) [email protected]

onstruction

Interchange

ippecanoe

ety of the esulting in

2016. 2016.

ngoing.

) 884-

ov

-8276 ov

Page 22: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Design/ROW

I-10 Corridor Type: Interchange

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

17

I-10 / CEDAR AVENUE INTERCHANGE Map of Project:

  

Schedule Summary 

Milestone Actual

[ Forecast ] Start of Project Nov 2001 Project Initiation Document (PID) Approved (by others)

Mar 1997

Environmental Clearance (PA/ED) July 2013 Final Design Approved – (RTL) [Jan 2019] Construction Notice to Proceed [Aug 2019] Complete for Beneficial Use [July 2021] End of Project [May 2026]

 

Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report County Project Report $493 Final Design $4,300 ROW $12,954 Landscaping $0 CM and Construction $54,200

Total $71,947  

Funding Summary ($ 000’s) Cost Item AmountState - STP $4,200 Measure I $50,928 County $16,819

Total $71,947  

Project Scope Summary: Reconstruction of the interchange includes widening the I-10 overcrossing, roadway improvements along Cedar Avenue from Bloomington Avenue to Slover Avenue, and adding lanes to the ramps.

Project Benefit: The improvements will decrease congestion and improve traffic operations during peak traffic periods.

Project Status and Continuing Activities: Caltrans has completed initial project survey and base

maps for the preliminary design plans. Caltrans has initiated the preliminary geometric plans

and structure designs. Project Development Team (PDT) and stakeholder

meetings are ongoing.

The County of San Bernardino Right-of-Way team is performing an initial review of the preliminary ROW requirements.

Project Notes of Interest: Caltrans is responsible for the PS&E, and the County is

responsible for the Right-of-Way phase. Agreements are being negotiated between the County

of San Bernardino and Caltrans. Subsequent agreements are being developed between

the County and SANBAG for each phase.

Lead Agency: County of San Bernardino

Project Manager: Chad Costello (909) 884-8276 [email protected]

Public/Media Contact:

Tim Watkins (909) 884-8276 [email protected]

Page 23: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiCoTo

 

CoFeFeStMCiByTo

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design onstruction Caotal

Fuost Item ederal - Demo ederal - IMD tate - TCIF easure I ity of Colton y Others otal

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

pital

unding Summa

SAN BERNMAJ

P

I-10/PEP

ummary 

[ FMa

D)

ED) F) Jud M

[A[A

Summary ($ 00Am

ary ($ 000’s) Am

NARDINO ASJOR PROJEPROJECT ST

PPER AV

ActualForecast ] arch 2013

N/A

Feb 2015 une 2015

Mar 2016 Aug 2017] Apr 2018]

00’s)mount

$358 $120 $506

$9,580 $10,565

mount$6,128

$904 $1,158

$697 $842 $836

$10,565

SSOCIATEDCTS – GARTATUS – JU

18

VENUE IN

Project Sco The reconsta 5-lane brid

Project Ben The projeccongestion

Project Sta Federal

and pro

Project for the FLabor H

Approxi

Improveallocate

Project Not Contrac

January2016.

Construthe conValley W

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

TERCHA

ope Summar

truction of thdge and inter

nefit:

ct will improalong Pepper

atus and Con

l authorizationoject was adve

includes provFederal HighwHiring Initiative

imately $1.2Mement Fund ped to the proje

tes of Interes

ct for constry and constru

uction of a ponstruction conWater District

ncy:

anager:

edia Contact:

MENTS E

ANGE

ry:

e interchangersection impro

ove traffic or Avenue.

ntinuing Activ

n to proceed ertised for a c

visions for a feway Administe.

M of State Traprogram (TCIFect 

st:

ruction serviuction Notice

otable water ntract to be t.

SANBAG

Paul Melopmelocoto

: Tim Watkitwatkins@

Phase: C

Type: I

e includes coovements.

perations an

vities:

(E-76) was reconstruction c

federal pilot ptration (FHWA

ade Corridor F) funding wa

ces was awe to Proceed

pipeline is inpaid for by

coton (909) [email protected]

ns (909) [email protected]

onstruction

Interchange

onstructing

nd reduce

eceived contract.

rogram A) Local

as

warded in in March

ncluded in the West

884-8276 ca.gov

-8276 ov

Page 24: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-10

Ma

M

StPrApEnFiCoCoEn

 

CoStPEFiROCoTo

 

CoMCiTo

 

tive

0 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report EER/ED nal Design OW onstruction otal

Fuost Item easure I ity of Redlandsotal

I-ct:

Schedule S

Document (PI

Clearance (PA/proved – (RTLtice to Proceed

eneficial Use

ary Estimate S

unding Summ

s

SAN BERNMAJ

P

10 / UNIV

Summary 

[

D)

ED) [J) [Md [S

[J[J

Summary ($ 00A

$$

mary ($ 000’s) A$$$

NARDINO ASJOR PROJEPROJECT ST

VERSITY

ActualForecast ] Dec 2014

N/A

July 2016 ] May 2017 ] Sept 2017] July 2018 ] July 2023 ]

00’s)mountN/A

$200 $270 $290

$4,440 $5,200

mount$4,187 $1,012 $5,200

SSOCIATEDCTS – GARTATUS – JU

19

STREET

Project Sc The projeinterchangand also lanes, traffexisting rig

Project Be The projeoperationsand Centra 

Project St The Fi

approv Field in

been c The en

complework h

Project No

The interchRedlands a

Lead Age Project M

Public/M

D GOVERNMRRY COHOEUNE 2016

INTERCH

cope Summa

ect will impre, between implement m

fic signals anght of way.

enefit:

ect will redus along Univeal Avenue.

tatus:

nal Traffic Stuved by Caltran

nvestigation wcompleted.

nvironmental eted. The prehave been init

otes of Intere

hange servesand Redlands

ency:

Manager:

edia Contac

MENTS E

HANGE

ary:

rove UniversCitrus Avenu

minor ramp d operational

uce congestiersity Street

udy Report hns and the Ci

work and geo

technical studeliminary destiated.

est:

s as the gatews High Schoo

SANBAG

Chad Coccostello

ct: Tim Wattwatkins

Phase: Env

Type: I

sity Street ue and Cenwidening, adl improvemen

ion and impbetween Ci

as been revieity of Redland

otechnical bor

dies have beeign plans and

way for the Unol.

G

ostello 909 [email protected]

tkins (909) [email protected].

vironmental

Interchange

at the I-10 tral Avenue, dded turning nts within the

prove traffic trus Avenue

ewed and ds.

rings have

en d field survey

niversity of

84-8276 a.gov

84-8276 .gov

Page 25: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Planning

I-10 Corridor Type: Interchange

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

20

I-10 / MOUNT VERNON Map of Project:

 Schedule Summary 

Milestone Actual

[ Forecast ] Start of Project Jan 2016 Project Initiation Document (PID) Approved

[Nov 2017]

Environmental Clearance (PA/ED) [Dec 2019 ] Final Design Approved – (RTL) [Mar 2021 ] Construction Notice to Proceed [Nov 2021] Complete for Beneficial Use [Aug 2023 ] End of Project [2028 ]

 

Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report $100 PA/ED $1,901 Final Design $1,862 ROW $6,907 Construction $26,455 Total $37,225

 

Funding Summary ($ 000’s) Cost Item AmountMeasure I $32,095 DIF $5,130 Total $37,225

 

Project Scope Summary: The project will replace the existing bridge over I-10 and Mount Vernon and will provide local circulation improvements.

Project Benefit: This project will make operational and safety improvements and reduce local traffic congestion at the I-10 interchange.   

Project Status: Procurement for Professional Services for the Planning

Phase is anticipated to be complete in July 2016. Project Notes of Interest: SANBAG will lead the Planning Phase.

Lead Agency:

SANBAG

Project Manager:

Brian Smith 909 884-8276 [email protected]

Public/Media Contact: Tim Watkins (909) 884-8276 [email protected]

Page 26: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-15

Ma

M

StPrApEnFiCoCoEn

 

CoStPrPrROCo

 

CoFeFeFeStStStMPaMPr

 

tive

5/I-215

I

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report reliminary EngiOW onstruction

Fuost Item ederal- STP ederal - DEMOederal IMD tate - CMIA tate – SHOPP tate - RIP easure I (2010 ass easure I (Majorivate Utility Co

-15 AND

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

ineering

To

unding Summa

O

– 2040) Cajon

or Projects) ompanies

To

SAN BERNMAJ

P

I-215 INT

ummary 

[ FJ

D) M

ED) F) Jd A

Ju

Summary ($ 00Am

In

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

TERCHAN

ActualForecast ] uly 2007

Mar 2009

Feb 2012 Jan 2016 Aug 2013 une 2016 [2017]

00’s)mountncl in PA/ED

$10,295 $6,580

$41,877 $266,253 $325,005

mount$65,708 $2,000 $3,341

$53,743 $83,865 $45,145 $53,696

$10,490 $7,017

$325,005

SSOCIATEDCTS – GARTATUS – JU

21

NGE IMPR

Project Sco This projectlanes in eacadding truBoulevard.

Project Ben This projectthe I-15 correconnectio

Project Sta Final

underw

Project Not Project is co

Lead Agen

Project Ma

Public/MeContact:

D GOVERNMRRY COHOEUNE 2016

ROVEME

ope Summar

t will reconfigch direction ock by-pass

nefit:

t will reduce rridor, and im

on of Cajon Bo

atus and Con

punch-list away.

tes of Interes

omplete for be

ncy: CS

anager: d

edia Tt

MENTS E

ENTS (DEV

ry:

gure the interon the I-15. Th

lanes and

congestion amprove local oulevard.

ntinuing Activ

activities and

st:

eneficial use.

Caltrans – DeSANBAG impright of way, u

Dennis Saylodsaylor@san

Tim Watkins twatkins@san

Phase: D

Type: I

VORE)

rchange to prhe project als reconnectin

at the bottlencirculation th

vities:

d close out

esign Build plementing agutilities, and r

or (909) 884-8nbag.ca.gov

(909) 884-82nbag.ca.gov

Design/Build

Interchange

rovide four so includes ng Cajon

neck along hrough the

work is

gency for railroad.

8276

76

Page 27: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-15

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiROROCoCo

 

CoFeStLo

 

tive

5 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW OW Capital onstruction Suonstruction Ca

Fuost Item ederal (IM, IMDtate (CMIA, STocal (Meas. I, S

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

pport pital

To

unding Summa

D funds) TIP/RIP) SLPP, Hesperia

To

SAN BERNMAJ

P

I-15/RAN

ummary 

[ FM

D) J

ED) M) Md N

F[O

Summary ($ 00Am

C

C

otal

ary ($ 000’s) Am

a)

otal

NARDINO ASJOR PROJEPROJECT ST

NCHERO

ActualForecast ] Mar 2012 Jul 2006

Mar 2010 May 2012 Nov 2012 Feb 2015 Oct 2016]

00’s)mountCity Funded

1,056 $4,129

City Funded $9,204 $7,700

$36,254 $58,343

mount$3,006

$35,293 $20,044

$58,343

SSOCIATEDCTS – GARTATUS – JU

22

ROAD IN

Project Sco The projecconnects Man 8-lane ov

Project Ben Project proHesperia congestion

Project Sta

Project is 10 Project Not The Ci

environproject.

A fire onerected

Bridge Februar

As of Dehave ta

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

NTERCHA

ope Summar

ct provides ariposa Roadvercrossing in

nefit:

vides a newand surrounon the adjace

atus and Con

00% complete

tes of Interes

ty of Hespemental, desig

n May 5, 201 for the bridgeand ramps wry 20, 2015. ecember 201ken over mai

ncy:

anager:

edia Contact:

MENTS E

ANGE

ry:

a new freed and Calientncluding turn

w interchangending area,ent interchang

ntinuing Activ

e and in close

st:

eria was thegn, and right

4 damaged the. were opened

5, Caltrans antenance of t

SANBAG

Mike Barnmbarnum@

: Tim Watkitwatkins@

Phase:

Type: I

eway interchae Road by colanes.

e to serve th which wiges.

vities:

e out.

lead agencof way phas

he temporary

d for benefici

and the City othe facility.

num (909) [email protected].

ns (909) [email protected]

: Close-Out

Interchange

ange and onstructing

he City of ill relieve

cy for the ses of this

y falsework

ial use on

f Hesperia

4-8276 gov

-8276 ov

Page 28: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-21

Ma

M

StPrApEnFiCoCo

En 

CoPrDoFiROCo

 

CoFeFeFeStMCi

 

tive

15 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item roject Report aocument nal Design OW onstruction Ca

Fuost Item ederal – Bridgeederal – Demo ederal – IMD tate – SLPP easure I ity of Rancho C

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

nd Env

pital To

unding Summa

e Disc SAFETEA-LU

Cucamonga To

SAN BERNMAJ

P

I-15 BAS

ummary 

[ F

D) A

ED) N) Od A

[S

[O

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

SE LINE

ActualForecast ]

1999 Apr 2002

Nov 2011 Oct 2014 Aug 2014 ept 2016]

Oct 2017]

00’s)mount

$1,178

$4,630 $1,430

$43,421 $50,480

mount$419

$3,600 $3,754 $1,000

$20,854 $20,853 $50,480

SSOCIATEDCTS – GARTATUS – JU

23

ROAD IN

Project Sco The project reconfigure

Project Ben Increased cflow deman

Project Sta Constr

 

Project 

Contraelectricinstallinpavem

Project Not The City of design phaslead on mproject.

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

NTERCHA

ope Summar

t will widen Bthe north and

nefit:

capacity to mds as well as

atus and Conruction began

t is 73% comp

actor is concal work onng retaining

ment on new fr

tes of Interes

Rancho Cucase and right-

management

ncy:

anager:

edia Contact:

MENTS E

ANGE

ry:

Base Line Rod south bound

meet current as improved sa

ntinuing Activ on October 2

plete. 

ntinuing util Base Line

walls, andreeway ramps

st:

amonga was -of-way acquiof the cons

SANBAG

Mike Barnmbarnum@

: Tim Watkitwatkins@

Phase: D

Type: I

oad and Eastd on and off r

as well as futafety and effic

vities: 22, 2014. 

ity relocatioand East

d installing s and city stre

the lead agenisition. SANB

struction phas

num (909) [email protected].

ns (909) [email protected]

Design/ROW

Interchange

t Avenue, ramps.

ure traffic ciencies.

ons and Avenue, concrete eets. 

ncy for the BAG is the se of the

4-8276 gov

-8276 ov

Page 29: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

I-21

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiROCoTo

 

CoFeFeFeFeFeM

 

tive

15 Corridor

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW onstruction otals

Fuost Item ederal RIP ederal - STP ederal Section ederal Section ederal DEMO easure I

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

unding Summa

112 115

To

SAN BERNMAJ

P

I-2

ummary 

[ FJu

D) A

ED) M) [Ad [A

[M

Summary ($ 00Am-Inc

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

215 AND

ActualForecast ] une 2006

April 2007

Mar 2014 Apr 2017] Aug 2017]

May 2019] [2025]

00’s)mountcl in PA/ED-

$2,794 $5,797

$27,508 $51,863 $87,962

mount$22,611 $28,941 $1,980

$501 $6,480

$27,448 $87,962

SSOCIATEDCTS – GARTATUS – JU

24

BARTON

Project Sco This projecincreasing tultimate maround-about

Project Ben The projectreduced con

Project Sta Design

 

Resolut

Nine pro Project Not Caltrans

Phase a This int

CorridoFreewa

The prprojectsmethodimprove

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

N ROAD

ope Summar

ct will reconthe length of ainline wident.

nefit:

t will improvengestion.

atus and Conand Right-of-

tion of Necess

operties have

tes of Interes

s is leadingand ROW engterchange pror project. Ty Program.

roject was ss to use the , the contract

e constructab

ncy:

anager:

edia Contact:

MENTS E

ry:

nstruct the f the structurening. This p

e traffic flow

ntinuing Activ-Way (ROW)

sity hearings

e been acquir

st:

g the develogineering. oject was se

The Measure

selected as CM/GC delivtor will assist ility.

Caltrans - SANBAG Andrea Nianieto@sa

: Tim Watkitwatkins@

Phase: D

Type: I

interchange, e to accomm

project also i

and safety re

vities: work is ongo

are ongoing.

red.

opment of th

parated from I funds are

one of six very method. Caltrans with

Design - ROW eto (909) 884anbag.ca.gov

ns (909) [email protected]

Design/ROW

Interchange

including modate the

ncludes a

esulting in

ing. 

he Design

m the I-215 e from the

statewide With this

h design to

4-8276 v

-8276 ov

Page 30: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

SR

Ma

M

StPrApEnFiCoCoEn

 

CoStPrFiROROCoCo

 

CoFeM

 

tive

210

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project

Budgetaost Item tudy Report roject Report nal Design OW Support OW Capital onstruction Suonstruction Ca

Fuost Item ederal STP easure I

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

pport pital

To

unding Summa

To

SAN BERNMAJ

P

SR-2

ummary 

[ FJan

D)

ED) J) Jd [F

[D

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

210 AND

ActualForecast ] nuary 2011

N/A

uly 2015 un 2016

Feb 2017] Dec 2017]

[2022]

00’s)mount

N/A $1,250 $1,250

$100 $3,792 $1,994

$15,384 $23,770

mount$13,131 $10,639 $23,770

SSOCIATEDCTS – GARTATUS – JU

25

PEPPER

Project Sco This projectthe City of R

Project Ben The projecttransportatio

Project Sta 100% d

final rev The Rig

2016 A Not

issued bimpactsRat (SBSection

Project Not The stru

This primprove

The proone yeconstrucwill thenprogram

Construproject, Water Dfacilitate

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

R AVENUE

ope Summar

t will provide Rialto.

nefit:

will provide fon system.

atus and Con

design plans hview. ght of Way fo

Likely to Adby the Uniteds to the endaBKR). Purcha 7 consultatio

tes of Interes

ucture was coroject compleements. oject will inclear plant esction roadwan be followed

m uction of a 30

which woulDistrict, will be construction

ncy:

anager:

edia Contact:

MENTS E

E

ry:

a new freewa

freeway acces

ntinuing Activ

have been su

or the projec

dversely Affed States Fish angered Sanase of mitigaon was compl

st:

ompleted withetes the ram

lude landscastablishment

ay improvemed by a four-y

0” potable wald be fundede included inn.

SANBAG

Paul Melopmelocoto

: Tim Watkitwatkins@

Phase: D

Type: I

ay interchang

ss to and from

vities:

ubmitted to C

ct was certifie

ect determinand Wildlife S

n Bernardino ation credits leted in June

h the freewayps and othe

ape constructperiod star

ents are comyear plant ma

ater line as pd by the We

n the project c

coton (909) [email protected]

ns (909) [email protected]

Design/ROW

Interchange

ge to serve

m the local

Caltrans for

ed in June

ation was Service for Kangaroo as part of 2016.

y mainline. er ancillary

tion and a rting after plete, and

aintenance

part of the est Valley contract to

884-8276 ca.gov

-8276 ov

Page 31: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Planning

SR-60 Type: Interchange

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

26

SR-210 AND BASELINE Map of Project:

  

Schedule Summary 

Milestone Actual

[ Forecast ] Start of Project February 2013 Project Initiation Document (PID) Approved

Environmental Clearance (PA/ED) [Oct 2016] Final Design Approved – (RTL) [Mar 2018] Construction Notice to Proceed [Dec 2018] Complete for Beneficial Use [Sept 2020] End of Project [July 2021]

 

Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report 214 Project Report $1,253 Final Design $1,507 ROW $199 Construction Support $0 Construction Capital $12,600

Total $15,773  

Funding Summary ($ 000’s) Cost Item AmountMeasure I $9,165 City of Highland $6,608

Total $15,773  

Project Scope Summary: The project will widen Baseline at the SR-210 Interchange as well as widen the existing westbound on and off-ramps, and eastbound on-ramp to the SR-210.

Project Benefit: This project will make operational and safety improvements and reduce local traffic congestion at the SR-210 interchange.

Project Status and Continuing Activities:

The Draft Environmental Document was circulated for public comments from May 9, 2016 to June 7, 2016 and a public hearing was held on May 25, 2016.

Environmental approval is scheduled for Fall 2016.

A contract for final design services was awarded in June 2016.

Project Notes of Interest: As the SR-210 Baseline Interchange and SR-210 Lane Addition projects align geographically and share similar delivery schedules, they will be combined for the design, right of way, and construction phases to save cost and schedule.

Lead Agency: SANBAG

Project Manager: Brian Smith (909) 884-8276 [email protected]

Public/Media Contact: Tim Watkins (909) 884-8276 [email protected]

Page 32: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

SR

Ma

M

StPrApEnFiCoCo

En 

CoPrDoFiROCoCo

 

CoMCi

 

tive

-60

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item roject Report aocument nal Design OW/Utilities Caonstruction Suonstruction Ca

Fuost Item easure I ity of Chino

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

nd Env

apital pport pital

To

unding Summa

To

SAN BERNMAJ

P

SR

ummary 

[ FM

D) [A

ED) [J) [Jud [F

[Ju

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

R-60 / CE

ActualForecast ] May 2014 Aug 2016]

uly 2017] une 2018] Feb 2019] une 2020]

[2025]

00’s)mount

$938

$875 $876

$1,151 $16,751 $20,591

mount$8,097

$12,494 $20,591

SSOCIATEDCTS – GARTATUS – JU

27

NTRAL A

Project Sco The projecintersectionsfreeway acc

Project Ben The projecentering the60/Central standard robicycle featu

Project Sta

The enapprov 

The Pr(PSR-P 

Traffic  Project Not High Occupadded to bo

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

AVENUE

ope Summar

ct will imprs, and wide

cess.

nefit:

ct will provide freeway andAvenue Brid

oadway shouures.

atus and Con

nvironmental ved by the Bo

roject Study RPDS) is antici

studies are u

tes of Interes

pancy Vehicleoth on-ramps.

ncy:

anager:

edia Contact:

MENTS E

ry:

rove the fren the existi

de additionald improve trafdge. The prlders, and im

ntinuing Activ

and design oard in March

Report – Projeipated to be a

underway. 

st:

e (HOV) prefe. 

SANBAG Paul Melopmelocoto

: Tim Watkitwatkins@

Phase

Type: I

reeway ramng bridge to

storage forffic flow acrosroject will alsmprove pede

vities:

services con2015. 

ect Developmapproved in A

erential lanes

coton (909) [email protected]

ns (909) [email protected]

e: Planning

Interchange

ps, ramp o improve

r vehicles ss the SR-so provide strian and

ntract was

ment Study August. 

are being

884-8276 ca.gov

-8276 ov

Page 33: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

SR

Ma

M

StPrApEnFiCoCo

En 

CoStFiROCoLa

 

CoMCi

 

tive

-60

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item tudy Report/Pronal Design OW/Utilities onstruction andscape Main

Fuost Item easure I ity of Ontario

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

oject Report

ntenance To

unding Summa

To

SAN BERNMAJ

P

SR-

ummary 

[ FJu

D) [A

ED) [D) [Jd [N

[M

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

-60 / ARC

ActualForecast ] une 2015

Aug 2016]

Dec 2017] un 2019]

Nov 2019] Mar 2021]

[2021]

00’s)mount

$842 $888

$1,258 $11,125

$300 $14,563

mount$4,869 $9,694

$14,563

SSOCIATEDCTS – GARTATUS – JU

28

CHIBALD

Project Sco The project Avenue in thArchibald Av.

Project BenThe projeccongestion

Project Sta

The PS

An inteby Calt

Project Not This projec2010-2040

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

AVENUE

ope Summar

will reconfiguhe City of Ontvenue to incr

nefit: ct will improat the interch

atus and Con

SR/PR and P

ersection conttrans.

tes of Interes

ct is the ninthFreeway Inte

ncy:

anager:

edia Contact:

MENTS E

E

ry:

ure the rampstario. The pro

rease the left

ove traffic ohange.

ntinuing Activ

EAR are bein

trol evaluatio

st:

h highest prierchange Prog

SANBAG

Andrea Nianieto@sa

: Tim Watkitwatkins@

Phase

Type: I

s on SR-60 atoject will alsoturn capacity

perations an

vities:

ng revised.

n memo was

ority in the Mgram.

eto (909) 884anbag.ca.gov

ns (909) [email protected]

e: Planning

Interchange

t Archibald o widen .

nd reduce

s approved

Measure I

4-8276 v

-8276 ov

Page 34: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Design/ROW

Local Streets Type: Grade Separation

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

29

MONTE VISTA AVENUE AND UNION PACIFIC RAILROAD Map of Project:

  

Schedule Summary 

Milestone Actual

[ Forecast ] Start of Project Apr 2001 Project Initiation Document (PID) Approved (by others)

Environmental Clearance (PA/ED) July 2013 Final Design Approved – (RTL) [July 2016] Construction Notice to Proceed [Mar 2017] Complete for Beneficial Use [Jun 2018]

End of Project [Apr 2019]  

Budgetary Estimate Summary ($ 000’s)Cost Item AmountProject Report Final Design ROW Construction Support $3,315 Construction $23,370

Total $26,685  

Funding Summary ($ 000’s) Cost Item AmountFederal – PNRS $14,715 State – TCIF $2,113 Measure I $2,029 City of Montclair $1,752 UPRR $1,016 PUC Sect. 190 $5,000 Total $26,685

 

Project Scope Summary: This project will bridge Monte Vista Avenue in the City of Montclair over the existing Union Pacific Railroad (UPRR) and State Street.

Project Benefit: This project will improve traffic operations, local circulation, air quality, and safety by eliminating the at-grade crossing between Monte Vista Avenue and UPRR.

Project Status and Continuing Activities: Final design and right-of-way activities are underway

and are being led by the City of Montclair.

Procurement for Construction Management Services was awarded by SANBAG in January 2016.

Ready to List package anticipated in July 2016.

Project Notes of Interest: SANBAG will lead the construction phase.

Lead Agency: City of Montclair – Design/ROW SANBAG – Construction

Project Manager: Brian Smith (909) 884-8276 [email protected]

Public/Media Contact: Tim Watkins (909) 884-8276 [email protected]

Page 35: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

Loc

Ma

M

StPrApEnFiCoCo

En 

CoPrFiROROCoCo

 

CoFeFeFeStMCiBNPU

 

tive

cal Streets

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item roject Report nal Design OW Support OW onstruction Suonstruction Ca

Fuost Item ederal – DEMOederal - CMAQederal – PNRState – TCIF easure I ity of San BernNSF Railroad UC 130 & 190

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

pport pital

To

unding Summa

O Q S

nardino

Funds To

SAN BERNMAJ

P

PALM A

ummary 

[ FJ

D) Ju

ED) Ju) Md O

D

[N

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

AVENUE A

ActualForecast ] an 2008

une 2009

uly 2011 Mar 2013 Oct 2013 Dec 2014

Nov 2016]

00’s)mount

$774 $2,024

$541 $8,314 $2,134

$10,414 $24,201

mount$1,440 $3,925 $1,016 $3,284 $2,681 $1,865

$690 $9,300

$24,201

SSOCIATEDCTS – GARTATUS – JU

30

AND BNS

Project Sco This projecBurlington N

Project Ben This projectcrossing bewill improvedelays at th

Project Sta Constr

Relief o

The Ci

the pro BNSF

of the a Project Not

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

SF RAILR

ope Summar

ct will grade Northern Sant

nefit:

t will improveetween Palm Ae air quality e existing cro

atus and Con

ruction comple

of maintenanc

ity of San Beoject on Septeis completingat-grade cros

tes of Interes

ncy:

anager:

edia Contact:

Ty

MENTS E

ROAD

ry:

separate Pta Fe (BNSF)

e safety by eAvenue and and local cir

ossing.

ntinuing Activ

eted in Augus

ce was grante

ernardino accember 11, 20g track work rsing.

st:

SANBAG

Tim Kirkletkirkley@s

: Tim Watkitwatkins@

Phase

ype: Grade

alm Avenue ) railroad track

eliminating thethe BNSF tra

rculation by e

vities:

st 2015.

ed to the con

cepted respon15. required by th

y (909) 884-8sanbag.ca.go

ns (909) [email protected]

e: Close-Out

Separation

from the ks.

e at grade acks and it eliminating

tractor.

nsibility for

he removal

8276 v

-8276 ov

Page 36: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

Loc

Ma

M

StPrApEnFiCoCo

En 

CoStPrFiROCo

 

CoFeFeFeStMMCoCiBNTo

 

tive

cal Streets

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction

Fuost Item ederal - DEMOederal - STP ederal Section tate - TCIF easure I easure I ounty of San Bity of Barstow NSF Railroad otal

Lct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

on

To

unding Summa

O

125

Bernardino

SAN BERNMAJ

P

LENWOO

ummary 

[ FO

D) J

ED) J) Jd D

S

[J

Summary ($ 00Am

In

otal

ary ($ 000’s) Am

NARDINO ASJOR PROJEPROJECT ST

OD ROAD

ActualForecast ] Oct 2008 an 2010

uly 2011 uly 2013

Dec 2013 ept 2015

uly 2016]

00’s)mount

N/A ncl in Design

$4,409 $5,131

$21,376 $30,916

mount$1,080

$12,339 $238

$8,275 $3,453 $3,453 $2,500 $1,995 $1,036

$30,916

SSOCIATEDCTS – GARTATUS – JU

31

D AND BN

Project Sco This projecBurlington N

Project Ben The project delay at theemergency

Project Sta The c

2013.

Constproce

Project Not The pro

2014. Lenwoo

2015.

Construpackage

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

NSF RAIL

ope Summar

ct will bridge Northern Sant

nefit:

will improve e existing at-response wil

atus and Con

construction c.

truction is cess will conclu

tes of Interes

oject was awa

od Road was

uction is come is in proces

ncy:

anager:

edia Contact:

Ty

MENTS E

LROAD

ry:

Lenwood Rta Fe (BNSF)

operation by-grade crossil be improved

ntinuing Activ

contract was

complete andude in July 20

st:

arded $5 Milli

opened to tr

mplete and ss.

SANBAG

Hiep Bui 9hbui@san

: Tim Watkitwatkins@

Phase

ype: Grade

Road over th) railroad track

y eliminating ting. Public sd.

vities:

awarded in

d the federal016.

on PUC fund

raffic on Sept

the federal

909 884-8276nbag.ca.gov

ns (909) [email protected]

e: Close-Out

Separation

he existing ks.

the vehicle safety and

December

close-out

ding in July

tember 14,

close out

6

-8276 ov

Page 37: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

Loc

Ma

M

StPrApEnFiCo

Co

En 

CoStPrFiROCo

 

CoStStStMLoBNUP

 

tive

cal Streets

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction No

omplete for Be

nd of Project

Budgetaost Item tudy Report roject Report nal Design OW Support/Construction Su

Fuost Item tate - TCIF tate – TCRP tate - PUC easure I

ocal Funds –CiNSF RailroadsPRR Railroad

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

Capital pport/Capital

To

unding Summa

ty of Colton

To

SAN BERNMAJ

P

LAUREL

ummary 

[ FD

D)

ED) J) Md S

Ju

[F

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

STREET

ActualForecast ] Dec 2010

N/A

an 2012 May 2013

ept 2013

une 2016

Feb 2017]

00’s)mount

N/A $864

$4,656 $12,397 $41,937 $59,854

mount$23,713 $7,690 $5,000 $8,897 $4,960 $4,985 $4,609

$59,854

SSOCIATEDCTS – GARTATUS – JU

32

T AND BN

Project Sco This projectLaurel Stree

Project Ben This projecsafety, and to establish

Project Sta The co

2013.

Project

Current Project Not The new

crossing The new

Compan Ribbon Laurel S

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

NSF RAIL

ope Summar

t will bridge et in the City o

nefit:

ct will improvis part of seva Quiet Zone

atus and Con

nstruction co

is approxima

tly completing

tes of Interesw BNSF Bridgg in August 2w 8th Street ny was openecutting cerem

Street was op

ncy:

anager:

edia Contact:

Ty

MENTS E

ROAD

ry:

the BNSF sof Colton.

ve local traffiveral other proe within the C

ntinuing Activ

ontract was a

ately 99% com

g punch-list an

st: ge was comp015. access bridged on Novemmony was helpened to traffi

SANBAG

Jagdish Pjagdish@s

: Tim Watkitwatkins@

Phase: C

ype: Grade

six railroad tr

ic circulationojects that are

City.

vities:

awarded in S

mplete.

nd close out w

pleted and tra

ge to Williamsmber 11, 2015

d on June10,c on June 21

atel (909) 884sanbag.ca.go

ns (909) [email protected]

onstruction

Separation

racks over

, enhance e intended

September

work...

ains began

s Furnace . , 2016. , 2016.

4-8276 ov

-8276 ov

Page 38: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

Loc

Ma

 

M

StPrApEnFiCoCo

En 

CoStPrFiROCo

 

CoStStMLoLoUP

 

tive

cal Streets

Sap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction

Fuost Item tate - SLPP tate - TCIF easure I

ocal Funds – Cocal Funds – CPRR Railroads

OUTH MIct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

on

To

unding Summa

City of Ontario CCO Repay s

To

SAN BERNMAJ

P

ILLIKEN A

ummary 

[ FJ

D)

ED) Ju) Sd F

[M

[D

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

AVENUE

ActualForecast ] uly 2008

N/A

une 2010 ept 2013

Feb 2014 Mar 2017]

Dec 2017]

00’s)mount

N/A $750

$5,715 $8,297

$57,401 $72,163

mount$7,210

$21,846 $23,568 $13,936 $3,121 $2,482

$72,163

SSOCIATEDCTS – GARTATUS – JU

33

AND UN

Project Sco This projecexisting UniAvenue.

Project Ben Separating eliminates gimproves he

Project Sta SCE ov

Project Not The City

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

NION PAC

ope Summar

ct will bridgeion Pacific R

nefit:

the railroadgate down timeavy truck ac

atus and Con

verhead trans

tes of Interes

y of Ontario is

ncy:

anager:

edia Contact:

Ty

MENTS E

CIFIC RAI

ry:

e South MilliRailroad (UPR

d crossing fme easing comcess to the ca

ntinuing Activ

mission lines

st:

s the lead age

City of On

Andrea Nianieto@sa

: Tim Watkitwatkins@

Phase: C

ype: Grade

LROAD

ken Avenue RR) tracks an

from Millikenmmuter driveargo facilities

vities:

are now inst

ency.

tario

eto (909) 884anbag.ca.gov

ns (909) [email protected]

onstruction

Separation

over the nd Mission

n Avenue e time, and .

alled.

4-8276 v

-8276 ov

Page 39: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

Loc

Ma

M

StPrApEnFiCoCo

En 

CoStPrFiROCo

 

CoStMLoUP

 

tive

cal Streets

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction

Fuost Item tate - SLPP easure I

ocal (City of OnPRR Railroad

VINEYAct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

on

To

unding Summa

ntario)

To

SAN BERNMAJ

P

ARD AVE

ummary 

[ FJuly

D)

ED) J) Sd F

Ma

[J

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

ENUE AN

ActualForecast ] 2008

N/A

un 2010 ept 2013

Feb 2014 arch 2016

an 2017]

00’s)mount

$750

$4,065 $840

$50,800 $56,455

mount$19,490 $24,015 $10,876 $2,074

$56,455

SSOCIATEDCTS – GARTATUS – JU

34

D UNION

Project Sco This projecVineyard Av

Project Ben This projectthe UPRR c

Project Sta Dedicat

 

Constru

Project Not The City of

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

N PACIFIC

ope Summar

ct will bridgevenue.

nefit:

t will reduce crossing.

atus and Con

tion ceremony

uction was co

tes of Interes

Ontario is the

ncy:

anager:

edia Contact:

Ty

MENTS E

C RAILRO

ry:

e the existin

congestion o

ntinuing Activ

y was held on

mplete in Apr

st:

e lead agency

City of On

Andrea Nianieto@sa

: Tim Watkitwatkins@

Phase: C

ype: Grade

OAD

ng UPRR tra

on Vineyard A

vities:

n March 18, 2

ril 2016.

y.

tario

eto (909) 884anbag.ca.gov

ns (909) [email protected]

onstruction

Separation

acks over

Avenue at

2016. 

4-8276 v

-8276 ov

Page 40: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Active Phase: Design

Local Streets Type: Grade Separation

SAN BERNARDINO ASSOCIATED GOVERNMENTS

MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016

35

Mount Vernon Viaduct Map of Project:

 Schedule Summary 

Milestone Actual

[ Forecast ] Start of Project June 2016 Project Initiation Document (PID) Approved

N/A

Environmental Clearance (PA/ED) Feb 2011 Final Design Approved – (RTL) [Oct 2019] Construction Notice to Proceed [June 2020] Complete for Beneficial Use [Feb 2023]

End of Project [2024]  

Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report $1,250 Project Report $95 Final Design $7,289 ROW Certification $3,538 Construction $81,464

Total $93,636  

Funding Summary ($ 000’s) Cost Item AmountState/Federal $82,237 Measure I $6,861 Local $4,538

Total $93,636  

Project Scope Summary: This project will reconstruct the Mount Vernon Viaduct over BNSF Railway intermodal yard in San Bernardino.

Project Benefit: This project will improve safety by replacing the existing bridge.

Project Status and Continuing Activities: A Cooperative Agreement with the City of San

Bernardino was approved in June 2016 to have SANBAG take over this project.

Project Notes of Interest: SANBAG will lead the design, right of way, and construction phases.

Lead Agency: SANBAG

Project Manager: Brian Smith (909) 884-8276 [email protected]

Public/Media Contact: Tim Watkins (909) 884-8276 [email protected]

Page 41: PROJECT STATUS REPORT - SBCTA STATUS REPORT April – June 2016 ... PS&E: Development of the final Plans, ... ict 7 staff ty line. o law on

Act

Loc

Ma

 

M

StPrApEnFiCoCo

En 

CoStPrFiROCo

 

CoATTD

 

tive

cal Streets

ap of Projec

ilestone

tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be

nd of Project

Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction

Fuost Item TP DA Article 3

ct:

Schedule Su

Document (PI

Clearance (PA/Eproved – (RTL)tice to Proceed

eneficial Use

ary Estimate S

on

To

unding Summa

To

SAN BERNMAJ

P

ummary 

[ FS

D)

ED) M) [Md [J

[N

Summary ($ 00Am

otal

ary ($ 000’s) Am

otal

NARDINO ASJOR PROJEPROJECT ST

Metr

ActualForecast ] ept 2015

N/A

Mar 2016 May 2017]

an 2018] Nov 2018]

[2019]

00’s)mount

$125 $125 $576

$0 $4,103 $4,929

mount$4,679

$250 $4,929

SSOCIATEDCTS – GARTATUS – JU

36

rolink AT

Project ScoThis projectaccess to keMontclair, Uand San Be

Project BenThis projecsafety withsidewalks, signalized c

Project Sta Procure

complet

Project Not SANBAG wphases.

Lead Agen

Project Ma

Public/Me

D GOVERNMRRY COHOEUNE 2016

TP

ope Summart includes proey corridors a

Upland, Ranchernardino.

nefit: ct improves ph the incorphigh-visibility

crossings.

atus and Con

ement for Dete in July 201

tes of Interes

will lead both t

ncy:

anager:

edia Contact:

MENTS E

ry: viding safe pe

at Metrolink stho Cucamong

pedestrian anporation of y crosswalks

ntinuing Activ

esign Service6.

st:

he Design an

SANBAG

Brian Smitbsmith@s

: Tim Watkitwatkins@

Pha

Type: Spe

edestrian andtations in the ga, Fontana,

nd bicycle acway finding, bicycle pa

vities:

es is anticipa

nd Constructio

th (909) 884-8sanbag.ca.gov

ns (909) [email protected]

ase: Design

ecial Project

d bicycle Cities of Rialto,

ccess and signage,

arking and

ated to be

on

8276 v

-8276 ov