project status report: 2/3/2021 - wccusd

1
Original Scope District Contingency Project Contingency Original Contract Amount Amendment to Scope Amendment to District Contingency Amendment to Project Contingency Amendments to Date Revised Contract Amount District Contingency $145,825 Executed CO 1 $740 1% Remaining Contingency $145,085 99% Project Contingency $0 Executed CO 0 $0 Remaining Contingency $0 Pending PCOs (District) 3 $22,474 Pending PCOs (Project) 0 $0 Rejected PCOs (District) 0 $0 Rejected PCOs (Project) 0 $0 Completed & Stored $ Billed to Date 57% Stop Notices Completed Work: 146 130% Upcoming Work: Project Issues: Schedule Original Project Duration 112 Revised Completion Date 12/31/2020 NTP Calendar Days Lapsed Final Completion Approved Time Extensions Revised Project Duration Project Team Owner WCCUSD Inspector DBE HA Architects Lathrop Construction Construction Manager Swinerton $344,906 $0 Project Status Fire alarm, data cabling, public address system installed. Quality Control Punchlist inspection with Architect completed. Portable vendor will complete punch list corrective work. New transformer scheduled to be delivered and installed for power. Intrusion alarm system to be bid as a separate package for the portables. ADA pathway work and parking lot striping work to start. ADA path of travel through the Staff Parking Lot will require some asphalt demolition and re-paving in order to provide a code compliant level pathway. 9/11/2020 Structure Groups 112 12/31/2020 0 01-119065 04-119532 $0 $0 Project Scope Provide sitework to prepare for two new custom designed portable buildings to serve as the new Health Center at Richmond High School, utilizing the old Building A site. Provide site work to demolish old paving, perform new grading and paving, extend utility services including electrical power, data, sewer, water and storm drain work, provide ADA path of travel, parking lot striping, fire alarm, low voltage and intrusion alarm systems. The new portable buildings will be provided and installed by Class Leasing LLC. Site work provided by Lathrop Construciton Associates. $600,000 Project Status Report: 2/3/2021 Contract Summary $454,175 $145,825 $600,000 $0 $0 Project No: DSA No: Richmond High School Health Center Project 1180 23rd Street Richmond CA 94804 Project Status Reports- RHS Health Center 2.3.2021 0

Upload: others

Post on 29-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Status Report: 2/3/2021 - WCCUSD

Original Scope

District ContingencyProject Contingency

Original Contract Amount

Amendment to Scope

Amendment to District Contingency

Amendment to Project Contingency

Amendments to DateRevised Contract Amount

District Contingency $145,825

Executed CO 1 $740 1%

Remaining Contingency $145,085 99%

Project Contingency $0

Executed CO 0 $0

Remaining Contingency $0

Pending PCOs (District) 3 $22,474

Pending PCOs (Project) 0 $0

Rejected PCOs (District) 0 $0

Rejected PCOs (Project) 0 $0

Completed & Stored $ Billed to Date 57%Stop Notices

Completed Work:

146 130%

Upcoming Work:

Project Issues:

Sche

dule

Original Project Duration 112

Revised Completion Date 12/31/2020

NTP

Calendar Days Lapsed

Final Completion

Approved Time Extensions

Revised Project Duration

Proj

ect T

eam

Owner WCCUSD

Inspector

DBEHA Architects

Lathrop Construction

Construction Manager Swinerton

$344,906$0

Proj

ect S

tatu

s

Fire alarm, data cabling, public address system installed.

Quality Control Punchlist inspection with Architect completed.

Portable vendor will complete punch list corrective work.

New transformer scheduled to be delivered and installed for power.

Intrusion alarm system to be bid as a separate package for the portables.

ADA pathway work and parking lot striping work to start.

ADA path of travel through the Staff Parking Lot will require some asphalt demolition and re-paving in order to provide a code compliant level pathway.

9/11/2020

Structure Groups

112

12/31/2020

0

01-11906504-119532

$0

$0

Proj

ect S

cope

Provide sitework to prepare for two new custom designed portable buildings to serve as the new Health Center at Richmond High School, utilizing the old Building A site. Provide site work to demolish old paving, perform new grading and paving, extend utility services including electrical power, data, sewer, water and storm drain work, provide ADA path of travel, parking lot striping, fire alarm, low voltage and intrusion alarm systems. The new portable buildings will be provided and installed by Class Leasing LLC. Site work provided by Lathrop Construciton Associates.

$600,000

Project Status Report: 2/3/2021

Cont

ract

Sum

mar

y

$454,175

$145,825

$600,000

$0

$0

Project No: DSA No:

Richmond High SchoolHealth Center Project

1180 23rd StreetRichmond CA 94804