project site vicinity · b ur eaof l nd mg m t (owned and managed by blm) havasu national wildlife...

1
Colorado River INTERSTATE DEBRIS RAVINE TOPOCK COMPRESSOR STATION FORMER EVAPORATION POND SITE BAT CAVE WASH BNSF RAILROAD MOABI REGIONAL PARK PG&E Metropolitan Water District of Southern California (MWDSC) National Trails Hwy Havasu National Wildlife Refuge (HNWR) (Managed by U.S. Fish and Wildlife Service) PG&E Bureau of Reclamation (Managed by BLM) Bureau of Land Management (Managed by BLM) Leased to San Bernardino County (Managed by BLM) Bureau of Land Management (Owned and Managed by BLM) Havasu National Wildlife Refuge (HNWR) (Managed by U.S. Fish and Wildlife Service) MW-20 BENCH EXISTING EVAPORATION PONDS GROUNDWATER TREATMENT FACILITY Park Moabi Rd. TOPOCK MARINA WESTERN ACCESS EASTERN ACCESS 0 800 1,600 Feet LEGEND Property Boundaries BAO \\ZINFANDEL\PROJ\PACIFICGASELECTRICCO\TOPOCKPROGRAM\GIS\MXD\2006\IM3_SITE_ACCESS.MXD IM3_SITE_ACCESS.PDF 6/14/2006 11:23:14 FIGURE 2 PROJECT SITE VICINITY INTERIM MEASURES NO.3 PG&E TOPOCK COMPRESSOR STATION NEEDLES, CA 1 inch equals 800 feet California State Plane NAD83 Zone 5 US Feet Site Access Route

Upload: hakhuong

Post on 30-Nov-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT SITE VICINITY · B ur eaof L nd Mg m t (Owned and Managed by BLM) Havasu National Wildlife Refuge (HNWR) (Managed by U.S. Fish and Wildlife Service) ... 8/1/2006 3:41:39 PM

Colorado River

INTERSTATE

DEBRIS RAVINE

TOPOCKCOMPRESSORSTATION

FORMEREVAPORATIONPOND SITE

BAT CAVE W

ASH

BNSF RAILROAD

MOABIREGIONALPARK

PG&EMetropolitan

Water District of Southern California

(MWDSC)

National Trails H

wy

Havasu NationalWildlife Refuge

(HNWR)(Managed by U.S. Fish and Wildlife Service)

PG&E

Bureau ofReclamation

(Managed by BLM)

Bureau of Land Management(Managed by BLM)

Leased toSan Bernardino County

(Managed by BLM)

Bureau of Land Management(Owned and Managed by BLM)

Havasu NationalWildlife Refuge

(HNWR)(Managed by U.S. Fish and

Wildlife Service)

MW-20BENCH

EXISTINGEVAPORATIONPONDS

GROUNDWATERTREATMENTFACILITY

Park Moabi R

d.

TOPOCKMARINA

WESTERN ACCESS

EASTERN ACCESS

0 800 1,600Feet

LEGENDProperty Boundaries

BAO \\ZINFANDEL\PROJ\PACIFICGASELECTRICCO\TOPOCKPROGRAM\GIS\MXD\2006\IM3_SITE_ACCESS.MXD IM3_SITE_ACCESS.PDF 6/14/2006 11:23:14

FIGURE 2PROJECT SITE VICINITYINTERIM MEASURES NO.3PG&E TOPOCK COMPRESSOR STATIONNEEDLES, CA

1 inch equals 800 feetCalifornia State Plane NAD83 Zone 5 US Feet

Site Access Route