Project Scheduling Project Scheduling and Crashingand Crashing
Recall the four Recall the four stagesstages
Project Conceptualization and Project Conceptualization and DefinitionDefinition
Project Planning and BudgetingProject Planning and BudgetingProject ExecutionProject ExecutionProject Monitoring and ControlProject Monitoring and ControlProject Termination and Project Termination and
CloseoutCloseout
Recall the four core Recall the four core knowledge areasknowledge areas
Recall the four Recall the four facilitating knowledge facilitating knowledge
areasareas
Recall the four project Recall the four project player typesplayer types
Recall five processes Recall five processes within the scope within the scope knowledge areaknowledge area
1.1. Plan Scope Management Plan Scope Management 2.2. Collect RequirementsCollect Requirements 3.3. Define Define ScopeScope 4.4. Create WBSCreate WBS 5.5. Validate ScopeValidate Scope 6.6. Control Scope Control Scope
Time Management Time Management Knowledge Area - Knowledge Area -
ProcessesProcessesPlan Schedule ManagementPlan Schedule ManagementDefine ActivitiesDefine ActivitiesSequence ActivitiesSequence ActivitiesEstimate Activity DurationsEstimate Activity DurationsDevelop ScheduleDevelop ScheduleControl ScheduleControl Schedule
Activity DefinitionActivity DefinitionDecomposition –top down….Decomposition –top down….
– What has to happen in order to What has to happen in order to create a WBScreate a WBS
Composition from the bottom Composition from the bottom upup
Use of a templateUse of a template– A list from a previous project A list from a previous project
that is that is similarsimilar
Consider the 2004 Consider the 2004 Construction EstimatorConstruction Estimator
ExcavationExcavation FoundationFoundation FlatworkFlatwork Brick hearth & veneerBrick hearth & veneer Rough hardwareRough hardware Finish hardwareFinish hardware Rough lumberRough lumber Finish lumberFinish lumber Rough carpentry Rough carpentry
laborlabor Finish carpentry laborFinish carpentry labor
Rough carpentry Rough carpentry laborlabor
Finish carpentry Finish carpentry laborlabor
CountertopsCountertops CabinetsCabinets InsulationInsulation RoofingRoofing PaintingPainting Shower & tub Shower & tub
Activity SequencingActivity SequencingInterview CIO
Interview Manager A
Interview Manager B
Interview Manager C
Interview Manager D
Compile interview data and analyze
Prepare report
Prepare and deliver presentation
Sequence Sequence RelationshipsRelationships
Finish/StartFinish/StartStart/StartStart/StartFinish/FinishFinish/FinishStart/FinishStart/Finish
Project NetworksProject NetworksActivity on nodeActivity on node
–Most popularMost popularActivity on arrowActivity on arrow
–Not used Not used
From project networks, From project networks, we determinewe determine
The project durationThe project duration The critical pathThe critical path Tasks on the critical pathTasks on the critical path Tasks not on the critical pathTasks not on the critical path Slack associated with non-critical Slack associated with non-critical
taskstasks Earliest start, earliest finish, Earliest start, earliest finish,
latest start and latest finish latest start and latest finish timestimes
Tabular formatTabular formatNAME DURATION PREDECESSORS
A 5
B 10
C 5 A, B
D 20 A, B
E 5 C
F 10 D, E
The AON NetworkThe AON Network
A/5
D/20B/10
E/5
F/10
C/5
The AOA NetworkThe AOA Network
Start and Finish Start and Finish DatesDates
ES EF
N/K
LS LF
NotationNotation ES – earliest start for the node, assumed ES – earliest start for the node, assumed
to be at the beginning of the dayto be at the beginning of the day EF – earliest finish for the node, assumed EF – earliest finish for the node, assumed
to be at the end of the dayto be at the end of the day LS – latest start for the node, assumed to LS – latest start for the node, assumed to
be at the beginning of the daybe at the beginning of the day LF – latest finish for the node, assumed to LF – latest finish for the node, assumed to
be at the end of the daybe at the end of the day N -- the label of the node (task, step, N -- the label of the node (task, step,
activity)activity) K -- the duration of the node ( number K -- the duration of the node ( number
following the slash)following the slash)
Start and Finish Start and Finish DatesDates
ES EF
N/KLS LF
Precedence Precedence RelationsRelations
With FS (FINISH/START) With FS (FINISH/START) relationships, a successor relationships, a successor activity does not start until activity does not start until all of its predecessors are all of its predecessors are
ExampleExample 1 1
A/6
B/7
C/8
D/10
Example 2Example 2
A/6
B/7
C/8
D/10
Example 3Example 3