Activity ID Activity Name Original Duration Start Finish 14234-3 Egbaoma Gas Processing Plant - New 586 05-Aug-14 A 04-Apr-16 14234-3.Contract About Contract 459 05-Aug-14 A 04-Apr-16 A21270 Kick Off Meeting 0 05-Aug-14 A A21280 Commencement of Project Work 0 05-Aug-14 A A21790 HAZOP 8 17-Dec-14 A 24-Dec-14 A A21800 Engineering Completion 0 21-Sep-15 A21810 Procurement Completion 0 26-Oct-15 A21820 Site Modification, Construction & Erection Works Completion 0 24-Feb-16 A21830 Pre-Commissioning & Commissioning Works Completion 0 29-Feb-16 A21840 First Gas In & Successful Test Run 0 29-Feb-16 A21940 Performance Test 3 29-Feb-16 03-Mar-16 A21950 Reliability Test 30 03-Mar-16 04-Apr-16 A21960 Project Closing 0 04-Apr-16 14234-3.Engineering Engineering 398 18-Aug-14 A 02-Oct-15 14234-3.Engineering.1 Process 341 18-Aug-14 A 19-Apr-15 A A21350 Process Design Completion 0 19-Apr-15 A 14234-3.Engineering.1.1 Documents and Reports 341 18-Aug-14 A 19-Apr-15 A 14234-3.Engineering.1.2 Drawings 326 27-Aug-14 A 25-Mar-15 A 14234-3.Engineering.2 Mechanical Static 377 21-Aug-14 A 15-Apr-15 A A21360 Mechanical Static Design Completion 0 15-Apr-15 A 14234-3.Engineering.2.2 Design Calculation Book 286 17-Sep-14 A 15-Apr-15 A 14234-3.Engineering.2.3 Drawings 367 21-Aug-14 A 09-Apr-15 A 14234-3.Engineering.2.4 Datasheet 295 17-Sep-14 A 09-Apr-15 A 14234-3.Engineering.2.1 Documents 277 11-Sep-14 A 10-Mar-15 A 14234-3.Engineering.4 Piping 366 11-Sep-14 A 04-May-15 A A21380 Piping Design Start 0 11-Sep-14 A A21670 Piping Design Completion 0 30-Mar-15 A 14234-3.Engineering.4.3 Skid General Arrangement Drawing 366 02-Oct-14 A 30-Mar-15 A 14234-3.Engineering.4.1 Documents 81 03-Nov-14 A 04-Feb-15 A 14234-3.Engineering.4.2 General Drawings 292 11-Sep-14 A 04-May-15 A 14234-3.Engineering.3 Mechanical Rotating 177 06-Jan-15 A 19-Apr-15 A A21370 Mechanical Rotating Design Completion 0 19-Apr-15 A 14234-3.Engineering.3.1 Datasheets 177 06-Jan-15 A 19-Apr-15 A 14234-3.Engineering.5 Electrical 202 02-Oct-14 A 02-Oct-15 A A21390 Electrical System Design Completion 0 14-Apr-15 A 14234-3.Engineering.5.2 Documents 194 02-Oct-14 A 02-Oct-15 A 14234-3.Engineering.5.1 Data Sheets 101 07-Jan-15 A 03-Feb-15 A 14234-3.Engineering.5.3 Drawings 103 26-Jan-15 A 14-Apr-15 A 14234-3.Engineering.6 Instrumentation 314 05-Nov-14 A 09-Jul-15 A A21400 Instrumentation System Design Completion 0 15-Apr-15 A 14234-3.Engineering.6.2 Documents 186 05-Nov-14 A 09-Jul-15 A 14234-3.Engineering.6.1 Data Sheets 176 07-Jan-15 A 12-May-15 A 14234-3.Engineering.6.30 Layouts & Drawings 183 25-Feb-15 A 22-Apr-15 A 14234-3.Engineering.7 Civil & Structure 360 21-Aug-14 A 12-Aug-15 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 2014 2015 2016 04-Apr-16, 04-Apr-16, Kick Off Meeting, 05-Aug-14 A Commencement of Project Work, 05-Aug-14 A HAZOP Engineering Completion, Procurement Completion, Site Modification Pre-Commissi o First Gas In & Performance T Reliability T Project Cl o 02-Oct-15, 14234-3.Engineering 19-Apr-15 A, 14234-3.Engineering.1 Process Process Design Completion, 19-Apr-15 A, 14234-3.Engineering.1.1 Documents a 25-Mar-15 A, 14234-3.Engineering.1.2 Drawings 15-Apr-15 A, 14234-3.Engineering.2 Mechanical Stat Mechanical Static Design Completion, 15-Apr-15 A, 14234-3.Engineering.2.2 Design Calcul 09-Apr-15 A, 14234-3.Engineering.2.3 Drawings 09-Apr-15 A, 14234-3.Engineering.2.4 Datasheet 10-Mar-15 A, 14234-3.Engineering.2.1 Documents 04-May-15 A, 14234-3.Engineering.4 Piping Piping Design Start, 11-Sep-14 A Piping Design Completion, 30-Mar-15 A, 14234-3.Engineering.4.3 Skid General Ar 04-Feb-15 A, 14234-3.Engineering.4.1 Documents 04-May-15 A, 14234-3.Engineering.4.2 General Dr 19-Apr-15 A, 14234-3.Engineering.3 Mechanical Rot Mechanical Rotating Design Completion, 19-Apr-15 A, 14234-3.Engineering.3.1 Datasheets 02-Oct-15 A, 14234-3.Engineeri n Electrical System Design Completion, 02-Oct-15 A, 14234-3.Engineeri n 03-Feb-15 A, 14234-3.Engineering.5.1 Data Sheets 14-Apr-15 A, 14234-3.Engineering.5.3 Drawings 09-Jul-15 A, 14234-3.Engineering.6 Instrum Instrumentation System Design Completion, 09-Jul-15 A, 14234-3.Engineering.6.2 Docu 12-May-15 A, 14234-3.Engineering.6.1 Data Shee 22-Apr-15 A, 14234-3.Engineering.6.30 Layouts & D 12-Aug-15, 14234-3.Engineering.7 Ci v Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25 Actual Level of Effort Actual Work Remaining Work Critical Remaini... Page 1 of 7 TASK filter: All Activities © Oracle Corporation

Upload: makrand-kulkarni-pmp-2750

Post on 22-Feb-2017

368 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-3 Eg14234-3 Egbaoma Gas Processing Plant - New 586 05-Aug-14 A 04-Apr-16

14234-3.Co14234-3.Contract About Contract 459 05-Aug-14 A 04-Apr-16

A21270 Kick Off Meeting 0 05-Aug-14 AA21280 Commencement of Project Work 0 05-Aug-14 AA21790 HAZOP 8 17-Dec-14 A 24-Dec-14 AA21800 Engineering Completion 0 21-Sep-15A21810 Procurement Completion 0 26-Oct-15A21820 Site Modification, Construction & Erection Works Completion 0 24-Feb-16A21830 Pre-Commissioning & Commissioning Works Completion 0 29-Feb-16A21840 First Gas In & Successful Test Run 0 29-Feb-16A21940 Performance Test 3 29-Feb-16 03-Mar-16A21950 Reliability Test 30 03-Mar-16 04-Apr-16A21960 Project Closing 0 04-Apr-16

14234-3.En14234-3.Engineering Engineering 398 18-Aug-14 A 02-Oct-15

14234-3.En14234-3.Engineering.1 Process 341 18-Aug-14 A 19-Apr-15 AA21350 Process Design Completion 0 19-Apr-15 A

14234-3.E14234-3.Engineering.1.1 Documents and Reports 341 18-Aug-14 A 19-Apr-15 A14234-3.E14234-3.Engineering.1.2 Drawings 326 27-Aug-14 A 25-Mar-15 A

14234-3.En14234-3.Engineering.2 Mechanical Static 377 21-Aug-14 A 15-Apr-15 AA21360 Mechanical Static Design Completion 0 15-Apr-15 A

14234-3.E14234-3.Engineering.2.2 Design Calculation Book 286 17-Sep-14 A 15-Apr-15 A14234-3.E14234-3.Engineering.2.3 Drawings 367 21-Aug-14 A 09-Apr-15 A14234-3.E14234-3.Engineering.2.4 Datasheet 295 17-Sep-14 A 09-Apr-15 A14234-3.E14234-3.Engineering.2.1 Documents 277 11-Sep-14 A 10-Mar-15 A

14234-3.En14234-3.Engineering.4 Piping 366 11-Sep-14 A 04-May-15 AA21380 Piping Design Start 0 11-Sep-14 AA21670 Piping Design Completion 0 30-Mar-15 A

14234-3.E14234-3.Engineering.4.3 Skid General Arrangement Drawing 366 02-Oct-14 A 30-Mar-15 A14234-3.E14234-3.Engineering.4.1 Documents 81 03-Nov-14 A 04-Feb-15 A14234-3.E14234-3.Engineering.4.2 General Drawings 292 11-Sep-14 A 04-May-15 A

14234-3.En14234-3.Engineering.3 Mechanical Rotating 177 06-Jan-15 A 19-Apr-15 AA21370 Mechanical Rotating Design Completion 0 19-Apr-15 A

14234-3.E14234-3.Engineering.3.1 Datasheets 177 06-Jan-15 A 19-Apr-15 A14234-3.En14234-3.Engineering.5 Electrical 202 02-Oct-14 A 02-Oct-15 A

A21390 Electrical System Design Completion 0 14-Apr-15 A

14234-3.E14234-3.Engineering.5.2 Documents 194 02-Oct-14 A 02-Oct-15 A14234-3.E14234-3.Engineering.5.1 Data Sheets 101 07-Jan-15 A 03-Feb-15 A14234-3.E14234-3.Engineering.5.3 Drawings 103 26-Jan-15 A 14-Apr-15 A

14234-3.En14234-3.Engineering.6 Instrumentation 314 05-Nov-14 A 09-Jul-15 AA21400 Instrumentation System Design Completion 0 15-Apr-15 A

14234-3.E14234-3.Engineering.6.2 Documents 186 05-Nov-14 A 09-Jul-15 A14234-3.E14234-3.Engineering.6.1 Data Sheets 176 07-Jan-15 A 12-May-15 A14234-3.E14234-3.Engineering.6.30 Layouts & Drawings 183 25-Feb-15 A 22-Apr-15 A

14234-3.En14234-3.Engineering.7 Civil & Structure 360 21-Aug-14 A 12-Aug-15

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

04-Apr-16,

04-Apr-16,

Kick Off Meeting, 05-Aug-14 ACommencement of Project Work, 05-Aug-14 A

HAZOPEngineering Completion,

Procurement Completion, Site ModificationPre-CommissioFirst Gas In & Performance T

Reliability TProject Clo

02-Oct-15, 14234-3.Engineering

19-Apr-15 A, 14234-3.Engineering.1 ProcessProcess Design Completion, 19-Apr-15 A, 14234-3.Engineering.1.1 Documents a

25-Mar-15 A, 14234-3.Engineering.1.2 Drawings15-Apr-15 A, 14234-3.Engineering.2 Mechanical StatMechanical Static Design Completion, 15-Apr-15 A, 14234-3.Engineering.2.2 Design Calcul09-Apr-15 A, 14234-3.Engineering.2.3 Drawings09-Apr-15 A, 14234-3.Engineering.2.4 Datasheet

10-Mar-15 A, 14234-3.Engineering.2.1 Documents04-May-15 A, 14234-3.Engineering.4 Piping

Piping Design Start, 11-Sep-14 APiping Design Completion, 30-Mar-15 A, 14234-3.Engineering.4.3 Skid General Ar

04-Feb-15 A, 14234-3.Engineering.4.1 Documents04-May-15 A, 14234-3.Engineering.4.2 General Dr

19-Apr-15 A, 14234-3.Engineering.3 Mechanical RotMechanical Rotating Design Completion, 19-Apr-15 A, 14234-3.Engineering.3.1 Datasheets

02-Oct-15 A, 14234-3.EngineerinElectrical System Design Completion,

02-Oct-15 A, 14234-3.Engineerin03-Feb-15 A, 14234-3.Engineering.5.1 Data Sheets

14-Apr-15 A, 14234-3.Engineering.5.3 Drawings09-Jul-15 A, 14234-3.Engineering.6 Instrum

Instrumentation System Design Completion, 09-Jul-15 A, 14234-3.Engineering.6.2 Docu

12-May-15 A, 14234-3.Engineering.6.1 Data Shee22-Apr-15 A, 14234-3.Engineering.6.30 Layouts & D

12-Aug-15, 14234-3.Engineering.7 Civ

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 1 of 7 TASK filter: All Activities© Oracle Corporation

Page 2: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

A21410 Civil & Structure Design Completion 0 12-Aug-1514234-3.E14234-3.Engineering.7.2 Drawings 360 21-Aug-14 A 12-Aug-1514234-3.E14234-3.Engineering.7.1 Document 78 03-Nov-14 A 29-Jan-15 A

14234-3.En14234-3.Engineering.8 HSE 306 20-Aug-14 A 22-Jun-15 AA21420 HSE Documentation Completion 0 22-Jun-15 A14234-3.E14234-3.Engineering.8.1 Document 306 20-Aug-14 A 22-Jun-15 A

14234-3.En14234-3.Engineering.9 QAQC 147 20-Aug-14 A 10-Mar-15 AA21430 QAQC Documentation Completion 0 10-Mar-15 A

14234-3.E14234-3.Engineering.9.1 Document 59 20-Aug-14 A 10-Mar-15 A14234-3.En14234-3.Engineering.10 Commissioning 244 05-Nov-14 A 21-Sep-15

A21440 Commissioning Documentation Completion 0 21-Sep-15

14234-3.E14234-3.Engineering.10.1 Documents 244 05-Nov-14 A 21-Sep-1514234-3.En14234-3.Engineering.11 General 194 15-Sep-14 A 25-Mar-15 A

A21450 General Documentation Completion 0 25-Mar-15 A14234-3.E14234-3.Engineering.11.1 Documents 107 15-Sep-14 A 25-Mar-15 A

14234-3.Pr14234-3.Procourment Procurement 310 19-Oct-14 A 26-Oct-15

A21460 Procurement Completion 0 26-Oct-15

14234-3.Pr14234-3.Procourment.1 Issuance of PO for major buyout Items 216 19-Oct-14 A 22-Jan-15 AA21570 PO Placed for all Major Items 0 22-Jan-15 A

14234-3.P14234-3.Procourment.1.2 Deethanizer OH Condenser E-401 71 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.3 Condensate Stabilization Column C-3001 7 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.6 Gas/Gas Exchanger E-300A 7 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.7 Gas/Gas Exchanger E-300B 7 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.8 Gas/Liquid Exchanger E-302A 54 19-Oct-14 A 08-Dec-14 A14234-3.P14234-3.Procourment.1.10 Regeneration Gas Cooler E-303 54 19-Oct-14 A 04-Jan-15 A14234-3.P14234-3.Procourment.1.11 Water Degassing Boot V-3401 7 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.12 CPI Separator V-3402 7 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.13 On Spec Condensate Storage Tank T-3301 7 21-Jan-15 A 22-Jan-15 A14234-3.P14234-3.Procourment.1.14 Off Spec Condensate Storage Tank T-3302 7 21-Jan-15 A 22-Jan-15 A14234-3.P14234-3.Procourment.1.15 Bulk Materials 17 08-Dec-14 A 08-Dec-14 A14234-3.P14234-3.Procourment.1.9 Gas/Liquid Exchanger E-302B 54 19-Oct-14 A 08-Dec-14 A14234-3.P14234-3.Procourment.1.1 Chiller E-301 46 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.5 Condensate Reboiler E-3001 7 19-Oct-14 A 19-Oct-14 A14234-3.P14234-3.Procourment.1.4 Propane Receiver V-706 7 19-Oct-14 A 19-Oct-14 A

14234-3.Pr14234-3.Procourment.2 Receipt of Head & Shell Materials at SPEC Facility 253 19-Oct-14 A 22-Feb-15 AA21560 Fabrication Material Received @ SPEC Fabrication Facility 0 22-Feb-15 A

14234-3.P14234-3.Procourment.2.1 Chiller E-301 17 19-Oct-14 A 02-Dec-14 A14234-3.P14234-3.Procourment.2.2 Deethanizer OH Condenser E-401 17 19-Oct-14 A 02-Dec-14 A14234-3.P14234-3.Procourment.2.3 Condensate Stabilization Column C-3001 17 19-Oct-14 A 02-Dec-14 A14234-3.P14234-3.Procourment.2.4 Propane Receiver V-706 17 19-Oct-14 A 02-Dec-14 A14234-3.P14234-3.Procourment.2.5 Condensate Reboiler E-3001 17 19-Oct-14 A 02-Nov-14 A14234-3.P14234-3.Procourment.2.6 Gas/Gas Exchanger E-300A 40 19-Oct-14 A 02-Dec-14 A14234-3.P14234-3.Procourment.2.7 Gas/Gas Exchanger E-300B 40 19-Oct-14 A 02-Dec-14 A14234-3.P14234-3.Procourment.2.8 Gas/Liquid Exchanger E-302A 47 19-Oct-14 A 30-Dec-14 A14234-3.P14234-3.Procourment.2.9 Gas/Liquid Exchanger E-302B 47 19-Oct-14 A 30-Dec-14 A14234-3.P14234-3.Procourment.2.10 Regeneration Gas Cooler E-303 47 19-Oct-14 A 05-Jan-15 A

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

Civil & Structure Design Completion, 12-Aug-15, 14234-3.Engineering.7.2 D

29-Jan-15 A, 14234-3.Engineering.7.1 Document22-Jun-15 A, 14234-3.Engineering.8 HSEHSE Documentation Completion, 22-Jun-15 A, 14234-3.Engineering.8.1 Docum

10-Mar-15 A, 14234-3.Engineering.9 QAQCQAQC Documentation Completion, 10-Mar-15 A, 14234-3.Engineering.9.1 Document

21-Sep-15, 14234-3.Engineering.1Commissioning Documentation Co21-Sep-15, 14234-3.Engineering.1

25-Mar-15 A, 14234-3.Engineering.11 GeneralGeneral Documentation Completion, 25-Mar-15 A, 14234-3.Engineering.11.1 Documents

26-Oct-15, 14234-3.Procourm

Procurement Completion, 22-Jan-15 A, 14234-3.Procourment.1 Issuance of PO for majoPO Placed for all Major Items,

19-Oct-14 A, 14234-3.Procourment.1.2 Deethanizer OH Condenser E-4019-Oct-14 A, 14234-3.Procourment.1.3 Condensate Stabilization Column 19-Oct-14 A, 14234-3.Procourment.1.6 Gas/Gas Exchanger E-300A19-Oct-14 A, 14234-3.Procourment.1.7 Gas/Gas Exchanger E-300B

08-Dec-14 A, 14234-3.Procourment.1.8 Gas/Liquid Exchanger E-3004-Jan-15 A, 14234-3.Procourment.1.10 Regeneration Gas Coo

19-Oct-14 A, 14234-3.Procourment.1.11 Water Degassing Boot V-340119-Oct-14 A, 14234-3.Procourment.1.12 CPI Separator V-3402

22-Jan-15 A, 14234-3.Procourment.1.13 On Spec Condensate22-Jan-15 A, 14234-3.Procourment.1.14 Off Spec Condensate

08-Dec-14 A, 14234-3.Procourment.1.15 Bulk Materials08-Dec-14 A, 14234-3.Procourment.1.9 Gas/Liquid Exchanger E-30

19-Oct-14 A, 14234-3.Procourment.1.1 Chiller E-30119-Oct-14 A, 14234-3.Procourment.1.5 Condensate Reboiler E-300119-Oct-14 A, 14234-3.Procourment.1.4 Propane Receiver V-706

22-Feb-15 A, 14234-3.Procourment.2 Receipt of Head & SFabrication Material Received @ SPEC Fabrication Facility,

02-Dec-14 A, 14234-3.Procourment.2.1 Chiller E-30102-Dec-14 A, 14234-3.Procourment.2.2 Deethanizer OH Condenser02-Dec-14 A, 14234-3.Procourment.2.3 Condensate Stabilization Co02-Dec-14 A, 14234-3.Procourment.2.4 Propane Receiver V-706

02-Nov-14 A, 14234-3.Procourment.2.5 Condensate Reboiler E-300102-Dec-14 A, 14234-3.Procourment.2.6 Gas/Gas Exchanger E-300A02-Dec-14 A, 14234-3.Procourment.2.7 Gas/Gas Exchanger E-300B

30-Dec-14 A, 14234-3.Procourment.2.8 Gas/Liquid Exchanger E30-Dec-14 A, 14234-3.Procourment.2.9 Gas/Liquid Exchanger E05-Jan-15 A, 14234-3.Procourment.2.10 Regeneration Gas Coo

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 2 of 7 TASK filter: All Activities© Oracle Corporation

Page 3: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-3.P14234-3.Procourment.2.11 Water Degassing Boot V-3401 21 19-Oct-14 A 07-Dec-14 A14234-3.P14234-3.Procourment.2.12 CPI Separator V-3402 21 19-Oct-14 A 07-Dec-14 A14234-3.P14234-3.Procourment.2.13 On Spec Condensate Storage Tank T-3301 49 22-Jan-15 A 22-Feb-15 A14234-3.P14234-3.Procourment.2.14 Off Spec Condensate Storage Tank T-3302 49 22-Jan-15 A 22-Feb-15 A14234-3.P14234-3.Procourment.2.15 Bulk Materials 21 08-Dec-14 A 30-Dec-14 A

14234-3.Pr14234-3.Procourment.3 Successful Vessel Hydro Test 22 02-Apr-15 A 16-Aug-15A21550 Hydrotesting of Vessels Completion 0 16-Aug-1514234-3.P14234-3.Procourment.3.1 Chiller E-301 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.2 Deethanizer OH Condenser E-401 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.3 Condensate Stabilization Column C-3001 1 03-Apr-15 A 03-Apr-15 A14234-3.P14234-3.Procourment.3.4 Propane Receiver V-706 1 03-Apr-15 A 03-Apr-15 A14234-3.P14234-3.Procourment.3.5 Condensate Reboiler E-3001 1 03-Apr-15 A 03-Apr-15 A14234-3.P14234-3.Procourment.3.6 Gas/Gas Exchanger E-300A 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.7 Gas/Gas Exchanger E-300B 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.8 Gas/Liquid Exchanger E-302A 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.9 Gas/Liquid Exchanger E-302B 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.10 Regeneration Gas Cooler E-303 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.3.11 Water Degassing Boot V-3401 1 02-Apr-15 A 02-Apr-15 A14234-3.P14234-3.Procourment.3.12 CPI Separator V-3402 1 02-Apr-15 A 02-Apr-15 A

14234-3.Pr14234-3.Procourment.4 Equipment FAT at SPEC Facility 41 16-Aug-15 25-Oct-15A21540 Equipment FAT Completion 0 25-Oct-15

14234-3.P14234-3.Procourment.4.1 Gas/Gas Exchanger (E-300A/B) Skid 1 10-Sep-15 13-Sep-1514234-3.P14234-3.Procourment.4.2 Gas Liquid Exchanger (E-302A/B) Skid 1 27-Aug-15 30-Aug-1514234-3.P14234-3.Procourment.4.3 Regeneration Gas Cooler (E-303) Skid 1 10-Sep-15 13-Sep-1514234-3.P14234-3.Procourment.4.4 Gas Metering Package 1 25-Oct-15 25-Oct-1514234-3.P14234-3.Procourment.4.5 NGL Stabilization Package 1 25-Oct-15 25-Oct-1514234-3.P14234-3.Procourment.4.6 NGL Loading Pump Package 1 30-Aug-15 30-Aug-1514234-3.P14234-3.Procourment.4.7 Water Degassing Boot & CPI Separator Package 1 16-Aug-15 16-Aug-1514234-3.P14234-3.Procourment.4.8 ESD/FGS Panel 2 27-Sep-15 28-Sep-15

14234-3.Pr14234-3.Procourment.5 Shipping Readiness of Materials from SPEC Facility 41 17-Aug-15 26-Oct-15A21530 Shipping Readiness of Materials @ SPEC Facility 0 26-Oct-15

14234-3.P14234-3.Procourment.5.1 Gas/Gas & Gas/Liquid Exchangers Package 2 13-Sep-15 16-Sep-1514234-3.P14234-3.Procourment.5.2 Gas Metering Package 1 26-Oct-15 26-Oct-1514234-3.P14234-3.Procourment.5.3 Condensate Stabilization Package 1 26-Oct-15 26-Oct-1514234-3.P14234-3.Procourment.5.4 Condensate Loading Pump Package 1 31-Aug-15 31-Aug-1514234-3.P14234-3.Procourment.5.5 Water Degassing Boot & CPI Separator Package 1 17-Aug-15 17-Aug-1514234-3.P14234-3.Procourment.5.6 ESD/FGS Panel 1 29-Sep-15 29-Sep-15

14234-3.Pr14234-3.Project Constraints Project Constraints 137 09-Jul-15 27-Nov-15

A23989 Project Activities Resumed 0 09-Jul-15A23990 First Shipment Despatch from HFZ 5 15-Aug-15* 20-Aug-15A24000 First Shipment Receiving on Site 65 20-Aug-15 27-Oct-15A24040 Overhaul of Compressors & Generators 80 15-Aug-15* 06-Nov-15A24050 Procurement of MCC Enclosure & Component 5 15-Jul-15* 20-Jul-15A24060 Material Deliveries, Assembly, & FAT 65 20-Jul-15 25-Sep-15A24080 Procurement of Synchornization Controller + Delivery to HFZ 25 15-Aug-15* 10-Sep-15A24100 Pumps Receiving in HFZ 45 09-Jul-15 24-Aug-15

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

07-Dec-14 A, 14234-3.Procourment.2.11 Water Degassing Boot V-307-Dec-14 A, 14234-3.Procourment.2.12 CPI Separator V-3402

22-Feb-15 A, 14234-3.Procourment.2.13 On Spec Conden22-Feb-15 A, 14234-3.Procourment.2.14 Off Spec Conden

30-Dec-14 A, 14234-3.Procourment.2.15 Bulk Materials16-Aug-15, 14234-3.Procourment.3 SHydrotesting of Vessels Completion, 16-Aug-15, 14234-3.Procourment.3.1 16-Aug-15, 14234-3.Procourment.3.2

03-Apr-15 A, 14234-3.Procourment.3.3 Condensate S03-Apr-15 A, 14234-3.Procourment.3.4 Propane Rece03-Apr-15 A, 14234-3.Procourment.3.5 Condensate R

16-Aug-15, 14234-3.Procourment.3.6 16-Aug-15, 14234-3.Procourment.3.7 16-Aug-15, 14234-3.Procourment.3.8 16-Aug-15, 14234-3.Procourment.3.9 16-Aug-15, 14234-3.Procourment.3.10

02-Apr-15 A, 14234-3.Procourment.3.11 Water Degas02-Apr-15 A, 14234-3.Procourment.3.12 CPI Separato

25-Oct-15, 14234-3.ProcourmEquipment FAT Completion,

13-Sep-15, 14234-3.Procourment.430-Aug-15, 14234-3.Procourment.4.2

13-Sep-15, 14234-3.Procourment.425-Oct-15, 14234-3.Procourm25-Oct-15, 14234-3.Procourm

30-Aug-15, 14234-3.Procourment.4.616-Aug-15, 14234-3.Procourment.4.7

28-Sep-15, 14234-3.Procourmen26-Oct-15, 14234-3.ProcourmShipping Readiness of Materia

16-Sep-15, 14234-3.Procourment.26-Oct-15, 14234-3.Procourm26-Oct-15, 14234-3.Procourm

31-Aug-15, 14234-3.Procourment.5.17-Aug-15, 14234-3.Procourment.5.5

29-Sep-15, 14234-3.Procourmen27-Nov-15, 14234-3.Proje

Project Activities Resumed, 09-Jul-15First Shipment Despatch from HFZ

First Shipment Receiving on SOverhaul of Compressors &

Procurement of MCC Enclosure & CompoMaterial Deliveries, Assembly, & F

Procurement of Synchornization CoPumps Receiving in HFZ

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 3 of 7 TASK filter: All Activities© Oracle Corporation

Page 4: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

A24101 Procurement of Commissioning Spare 5 01-Sep-15* 05-Sep-15A24102 Commissioning Spares Receiving In HFZ 25 05-Sep-15 01-Oct-15A24150 Procurement of Electrical & Instrumentation Cables 5 30-Jul-15* 04-Aug-15A24160 Electrical & Instrumentation Cables Ex. Works Readiness & Receiving on Site 92 04-Aug-15 07-Nov-15A24161 DPR Visit - Hydro for 2nd Lot of Vessels and FAT for 1s t lot Skid Packages 14 25-Aug-15* 08-Sep-15A24162 Punch List Close Out + Shipping Readiness 3 08-Sep-15 11-Sep-15A24170 2nd Shipment Dispatch from UAE 5 11-Sep-15 16-Sep-15A24180 2nd Shipment Receiving on Site 50 16-Sep-15 06-Nov-15A24181 DPR Visit - FAT for 2nd Lot of Skid Packages 13 15-Sep-15* 28-Sep-15A24182 Punch List Close Out + Shipping Readiness 3 28-Sep-15 01-Oct-15A24190 3rd Shipment Dispatch from UAE 5 01-Oct-15 07-Oct-15A24200 3rd Shipment Receiving on Site 50 07-Oct-15 27-Nov-15

14234-3.Co14234-3.Construction Site Modification, Construction & Erection W 222 21-Jan-15 A 24-Feb-16

A21880 Site Modification, Construction & Erection Completion 0 24-Feb-16

14234-3.C14234-3.Construction.2 Site Construction & Erection Works 222 21-Jan-15 A 24-Feb-16A21510 Site Construction & Erection Works Completion 0 24-Feb-16

14234-3.C14234-3.Construction.2.1 Foundation for Gas Metering Package 56 12-Aug-15 09-Oct-1514234-3.C14234-3.Construction.2.2 Foundation for Water Degassing Boot & CPI Separator Sk 56 12-Aug-15 09-Oct-1514234-3.C14234-3.Construction.2.3 Foundation for NGL Storage Tank T-3101 56 21-Jan-15 A 05-Sep-1514234-3.C14234-3.Construction.2.4 Foundation for Condensate Stabilization Skid 56 12-Aug-15 09-Oct-1514234-3.C14234-3.Construction.2.5 Foundation for Condensate Transfer Pump Skid 56 12-Aug-15 09-Oct-1514234-3.C14234-3.Construction.2.6 Foundation for Gas/Gas Exchanger (E-300A/B) Skid 42 21-Sep-15 03-Nov-1514234-3.C14234-3.Construction.2.7 Foundation for Gas Liquid Exchanger (E-302(A/B Skid 56 12-Aug-15 09-Oct-1514234-3.C14234-3.Construction.2.8 Foundation for Regeneration Gas Cooler (E-303) Skid 42 21-Sep-15 04-Nov-1514234-3.C14234-3.Construction.2.9 Foundation for Lighting Poles 56 12-Aug-15 09-Oct-1514234-3.C14234-3.Construction.2.26 Erection of Gas Metering Skid 5 14-Nov-15 20-Nov-1514234-3.C14234-3.Construction.2.10 Foundation for NGL Storage Tank T-3102 56 09-Jul-15 05-Sep-1514234-3.C14234-3.Construction.2.28 Erection of NGL Storage Tank T-3101 126 09-Jul-15 16-Nov-1514234-3.C14234-3.Construction.2.27 Erection of NGL Storage Tank T-3102 126 09-Jul-15 16-Nov-1514234-3.C14234-3.Construction.2.11 Erection of Water Degassing Boot & CPI Separator Skid 7 14-Nov-15 23-Nov-1514234-3.C14234-3.Construction.2.12 Erection of Condensate Stabilization Skid 14 27-Nov-15 11-Dec-1514234-3.C14234-3.Construction.2.13 Erection of NGL Transfer Pump Skid 7 27-Nov-15 04-Dec-1514234-3.C14234-3.Construction.2.14 Erection of Gas/Gas Exchanger (E-300A/B) Skid 7 09-Dec-15 17-Dec-1514234-3.C14234-3.Construction.2.15 Erection of Gas Liquid Exchanger (E-302(A/B Skid 7 27-Nov-15 04-Dec-1514234-3.C14234-3.Construction.2.16 Erection of Regeneration Gas Cooler (E-303) Skid 7 10-Dec-15 17-Dec-1514234-3.C14234-3.Construction.2.17 Erection of Lighting Poles 7 14-Nov-15 23-Nov-1514234-3.C14234-3.Construction.2.18 Cable Pulling - Instrument Cables 21 07-Nov-15 28-Nov-1514234-3.C14234-3.Construction.2.19 Cable Pulling - Electrical Cables 21 07-Nov-15 28-Nov-1514234-3.C14234-3.Construction.2.20 Electrical Cables Termination in MCC 14 19-Jan-16 02-Feb-1614234-3.C14234-3.Construction.2.21 Erection of ESD/FGS Panel 7 27-Nov-15 04-Dec-1514234-3.C14234-3.Construction.2.22 Instruments Cable Termination in DCS Panel 14 04-Dec-15 19-Dec-1514234-3.C14234-3.Construction.2.23 Instruments Cable Termination in ESD/FGS Panel 14 07-Nov-15 21-Nov-1514234-3.C14234-3.Construction.2.24 Interconnecting Cables - DCS to ESD/FGS Panel 14 19-Dec-15 02-Jan-1614234-3.C14234-3.Construction.2.25 Interconnecting Piping Works 64 19-Dec-15 24-Feb-16

14234-3.C14234-3.Construction.1 Site Modification Works 103 04-Sep-15 19-Dec-15

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

Procurement of Commissioning SpaCommissioning Spares Receiving

Procurement of Electrical & InstrumentaElectrical & Instrumentation C

DPR Visit - Hydro for 2nd Lot of VesPunch List Close Out + Shipping Re2nd Shipment Dispatch from UAE

2nd Shipment Receiving on SDPR Visit - FAT for 2nd Lot of SkiPunch List Close Out + Shipping 3rd Shipment Dispatch from UAE

3rd Shipment Receiving on24-Feb-16, 142

Site Modification24-Feb-16, 142Site Constructio

09-Oct-15, 14234-3.Constructio09-Oct-15, 14234-3.Constructio

05-Sep-15, 14234-3.Construction.209-Oct-15, 14234-3.Constructio09-Oct-15, 14234-3.Constructio

03-Nov-15, 14234-3.Constru09-Oct-15, 14234-3.Constructio

04-Nov-15, 14234-3.Constru09-Oct-15, 14234-3.Constructio

20-Nov-15, 14234-3.Const05-Sep-15, 14234-3.Construction.2

16-Nov-15, 14234-3.Constr16-Nov-15, 14234-3.Constr23-Nov-15, 14234-3.Cons

11-Dec-15, 14234-3.Con04-Dec-15, 14234-3.Con

17-Dec-15, 14234-3.Co04-Dec-15, 14234-3.Con

17-Dec-15, 14234-3.Co23-Nov-15, 14234-3.Cons28-Nov-15, 14234-3.Cons28-Nov-15, 14234-3.Cons

02-Feb-16, 1423404-Dec-15, 14234-3.Con

19-Dec-15, 14234-3.Co21-Nov-15, 14234-3.Const

02-Jan-16, 14234-3.C24-Feb-16, 142

19-Dec-15, 14234-3.Co

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 4 of 7 TASK filter: All Activities© Oracle Corporation

Page 5: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

A21520 Site Modification Works Completion 0 19-Dec-1514234-3.C14234-3.Construction.1.1 Three Phase Separator Package 18 27-Nov-15 16-Dec-1514234-3.C14234-3.Construction.1.14 Heat Medium Expansion Tank/Pumps Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.19 LPG Bullets Control Station Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.26 LPG Loading Arm Skid 18 27-Nov-15 16-Dec-1514234-3.C14234-3.Construction.1.27 Distributed Control System (DCS) 35 27-Oct-15 02-Dec-1514234-3.C14234-3.Construction.1.28 Power Generators 19 06-Nov-15 25-Nov-1514234-3.C14234-3.Construction.1.29 LV Switchgear & MCC 15 27-Nov-15 12-Dec-1514234-3.C14234-3.Construction.1.23 Heat Medium Heater Skid 12Mmbtu 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.24 Flare KO Drum Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.25 Propane Loading Arm Skid 18 27-Nov-15 16-Dec-1514234-3.C14234-3.Construction.1.15 Fuel Gas Conditioning Skid 25 27-Oct-15 21-Nov-1514234-3.C14234-3.Construction.1.16 Instrument Air Package 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.17 Depropanizer Reboiler Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.18 Debutanizer Reboiler Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.30 Synchronization Panel 15 07-Nov-15 23-Nov-1514234-3.C14234-3.Construction.1.13 Deethanizer Reboiler Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.3 Inlet Compressor Package - A 26 06-Nov-15 03-Dec-1514234-3.C14234-3.Construction.1.5 Inlet Compressor Package - C 26 06-Nov-15 03-Dec-1514234-3.C14234-3.Construction.1.7 Regeneration Heater Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.8 Deethanizer Reflux Accumulator Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.9 Depropanizer Reflux Accumulator Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.10 Debutanizer Reflux Accumulator Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.11 Condensate Flash Tank Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.12 Cold & LP Separator Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.20 Propane Bullets Control Staion Skid 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.21 LPG Loading Pumps Skid 18 27-Nov-15 16-Dec-1514234-3.C14234-3.Construction.1.22 Heat Medium Heater Skid 6Mmbtu 26 27-Oct-15 23-Nov-1514234-3.C14234-3.Construction.1.4 Inlet Compressor Package - B 26 06-Nov-15 03-Dec-1514234-3.C14234-3.Construction.1.6 Molecular Sieve Filters Package 26 20-Oct-15 16-Nov-1514234-3.C14234-3.Construction.1.2 Booster Compressor Package 42 06-Nov-15 19-Dec-1514234-3.C14234-3.Construction.1.31 UPS System 67 04-Sep-15 12-Nov-15

14234-3.Co14234-3.Commissioning Precommissioning & Commissioning Wo 105 12-Nov-15 29-Feb-16

A21480 Precommissioning & Commissioning Completion 0 29-Feb-16

14234-3.C14234-3.Commissioning.1 Pre-Commissioning Works 57 12-Nov-15 09-Jan-16A21500 Pre-Commissioning Completion 0 09-Jan-16

14234-3.C14234-3.Commissioning.1.1 Three Phase Separator Package 7 11-Dec-15 18-Dec-1514234-3.C14234-3.Commissioning.1.2 Booster Compressor Package 7 19-Dec-15 26-Dec-1514234-3.C14234-3.Commissioning.1.3 Inlet Compressor Package - A 7 03-Dec-15 10-Dec-1514234-3.C14234-3.Commissioning.1.4 Inlet Compressor Package - B 7 03-Dec-15 10-Dec-1514234-3.C14234-3.Commissioning.1.5 Inlet Compressor Package - C 7 03-Dec-15 10-Dec-1514234-3.C14234-3.Commissioning.1.6 Molecular Sieve Filters Package 7 19-Dec-15 26-Dec-1514234-3.C14234-3.Commissioning.1.7 Regeneration Heater Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.8 Deethanizer Reflux Accumulator Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.9 Depropanizer Reflux Accumulator Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.10 Debutanizer Reflux Accumulator Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.11 Condensate Flash Tank Skid 7 02-Jan-16 09-Jan-16

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

Site Modification Works16-Dec-15, 14234-3.Co

23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons

16-Dec-15, 14234-3.Co02-Dec-15, 14234-3.Cons

25-Nov-15, 14234-3.Cons12-Dec-15, 14234-3.Con

23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons

16-Dec-15, 14234-3.Co21-Nov-15, 14234-3.Const23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons03-Dec-15, 14234-3.Cons03-Dec-15, 14234-3.Cons

23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons23-Nov-15, 14234-3.Cons

16-Dec-15, 14234-3.Co23-Nov-15, 14234-3.Cons03-Dec-15, 14234-3.Cons

16-Nov-15, 14234-3.Constr19-Dec-15, 14234-3.Co

12-Nov-15, 14234-3.Constr29-Feb-16, 142

Precommission09-Jan-16, 14234-3.CPre-Commissioning C

18-Dec-15, 14234-3.Co26-Dec-15, 14234-3.C

10-Dec-15, 14234-3.Com10-Dec-15, 14234-3.Com10-Dec-15, 14234-3.Com

26-Dec-15, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 5 of 7 TASK filter: All Activities© Oracle Corporation

Page 6: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-3.C14234-3.Commissioning.1.12 Cold & LP Separator Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.13 Deethanizer Reboiler Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.14 Heat Medium Expansion Tank/Pumps Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.15 Fuel Gas Conditioning Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.16 Instrument Air Package 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.17 Depropanizer Reboiler Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.18 Debutanizer Reboiler Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.19 LPG Bullets Control Station Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.20 Propane Bullets Control Staion Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.21 LPG Loading Pumps Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.22 Heat Medium Heater Skid 6Mmbtu 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.23 Heat Medium Heater Skid 12Mmbtu 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.24 Flare KO Drum Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.25 Propane Loading Arm Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.26 LPG Loading Arm Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.27 Gas Metering Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.28 Water Degassing Boot & CPI Separator Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.29 Condensate Stabilization Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.30 Condensate Transfer Pump Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.31 Gas/Gas Exchanger (E-300A/B) Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.36 Distributed Control System (DCS) 7 19-Dec-15 26-Dec-1514234-3.C14234-3.Commissioning.1.37 Synchronization Panel 7 23-Nov-15 30-Nov-1514234-3.C14234-3.Commissioning.1.32 Gas Liquid Exchanger (E-302(A/B Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.33 Regeneration Gas Cooler (E-303) Skid 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.34 F&G System 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.35 ESD/FGS System 7 02-Jan-16 09-Jan-1614234-3.C14234-3.Commissioning.1.38 LV Switchgear & MCC 7 12-Dec-15 21-Dec-1514234-3.C14234-3.Commissioning.1.39 UPS System 7 12-Nov-15 19-Nov-1514234-3.C14234-3.Commissioning.1.40 Power Generators 7 26-Nov-15 03-Dec-15

14234-3.C14234-3.Commissioning.2 Commissioning Works 48 09-Jan-16 29-Feb-16A21490 Commissioning Completion 0 29-Feb-16

14234-3.C14234-3.Commissioning.2.1 Three Phase Separator Package 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.2 Booster Compressor Package 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.3 Inlet Compressor Package - A 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.4 Inlet Compressor Package - B 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.5 Inlet Compressor Package - C 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.6 Molecular Sieve Filters Package 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.7 Regeneration Heater Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.8 Deethanizer Reflux Accumulator Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.9 Depropanizer Reflux Accumulator Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.10 Debutanizer Reflux Accumulator Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.11 Condensate Flash Tank Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.12 Cold & LP Separator Skid 5 09-Jan-16 15-Jan-1614234-3.C14234-3.Commissioning.2.13 Deethanizer Reboiler Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.14 Heat Medium Expansion Tank/Pumps Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.15 Fuel Gas Conditioning Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.16 Instrument Air Package 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.17 Depropanizer Reboiler Skid 5 24-Feb-16 29-Feb-16

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C

26-Dec-15, 14234-3.C30-Nov-15, 14234-3.Com

09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C09-Jan-16, 14234-3.C

21-Dec-15, 14234-3.Co19-Nov-15, 14234-3.Comm

03-Dec-15, 14234-3.Com29-Feb-16, 142Commissioning29-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 142

15-Jan-16, 14234-329-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 142

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 6 of 7 TASK filter: All Activities© Oracle Corporation

Page 7: Project Schedule - Level IV Schedule

Activity ID Activity Name OriginalDuration

Start Finish

14234-3.C14234-3.Commissioning.2.18 Debutanizer Reboiler Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.19 LPG Bullets Control Station Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.20 Propane Bullets Control Staion Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.21 LPG Loading Pumps Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.22 Heat Medium Heater Skid 6Mmbtu 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.23 Heat Medium Heater Skid 12Mmbtu 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.24 Flare KO Drum Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.25 Propane Loading Arm Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.26 LPG Loading Arm Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.27 Gas Metering Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.28 Water Degassing Boot & CPI Separator Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.29 Condensate Stabilization Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.30 Condensate Transfer Pump Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.31 Gas/Gas Exchanger (E-300A/B) Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.32 Gas Liquid Exchanger (E-302(A/B Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.33 Regeneration Gas Cooler (E-303) Skid 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.34 F&G System 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.35 ESD/FGS System 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.36 Distributed Control System (DCS) 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.37 Synchronization Panel 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.38 LV Switchgear & MCC 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.39 Power Generators 5 24-Feb-16 29-Feb-1614234-3.C14234-3.Commissioning.2.40 UPS System 5 24-Feb-16 29-Feb-16

14234-3.Pe14234-3.Perf & Rel Test Performance and Reliability Test 33 29-Feb-16 04-Apr-16

14234-3.Pe14234-3.Perf & Rel Test.Perf Test Performance Test 3 29-Feb-16 03-Mar-16A24210 Performance Test 3 29-Feb-16 03-Mar-16

14234-3.Pe14234-3.Perf & Rel Test.Rel. Test Reliability Test 30 03-Mar-16 04-Apr-16A24220 Reliability Test 30 03-Mar-16 04-Apr-16

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q32014 2015 2016

29-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 14229-Feb-16, 142

04-Apr-16,

03-Mar-16, 142Performance T

04-Apr-16,Reliability T

Egbaoma Gas Processing Plant - New Level IV Schedule-latest 16-Jul-15 15:25

Actual Level of EffortActual Work

Remaining WorkCritical Remaini...

Page 7 of 7 TASK filter: All Activities© Oracle Corporation