Vol. 5 No. 6 l September 15, 2009 India’s Project Database

Indian Edition: Annual Subscription Rates: Print Edition: Rs. 1950/-, Frequency: Fortnightly (1st & 15th of every month)

131131

ProjectsProjects

Page 3: Project Reporter 15 Sept,2009

Project Reporter • 1 • September 15, 2009

Highlights

www.ProjectReporter.co.in

Published by: ASAPP Media Pvt Ltd, A-303, Navbharat Estates, Zakaria Bunder Road, Sewri (West), Mumbai-400 015. Tel: 022-24193000. Fax: 022-2417 5734.

Editor-in-Chief Pratap Vijay PadodeE-mail: [email protected]

Sr.Manager Research & Web OperationsSandeep SharmaE-mail: [email protected]

Research AssistantNipa Kamat, Sunita Andhe

Sr. Vice President, MarketingKammal C. BhagtaniE-mail: [email protected]

Regional Manager, Sales & MktgRajendra SadhaleE-mail: [email protected]

Sales & MarketingMilind Joglekar, Sushma Patil Production ManagerTarun Pal

Graphic DesignerYaswant Raj Mali

General Manager-Subscription & Circulation Rajeev Nambiar

Subscription & Circulation TeamPoonam Shewale, Mithila , Subhash BhogaleE-mail: [email protected]

Branch Offi ces• Delhi• Bengaluru• Pune

Representative Offi ces • UAE: Ikan Media E-mail: [email protected]

Project information is being provided for the reference of readers. However, readers are cautioned to make inquiries and take their decisions on investment after consulting experts on the subject. Contact Information provided should not be treated as an invitation to solicit information from the respective company. PROJECT REPORTER bears no responsibility for any decision taken by readers on the basis of information provided herein.

All rights reserved. While all efforts are made to ensure that the information published is correct, Project Reporter hold no responsibility for any unlikely errors that might occur. Printed and Published by Pratap Padode on behalf of ASAPP Media Pvt Ltd, Published from A - 303, Navbharat Estate, Zakaria Bunder Road, Sewri (West), Mumbai - 400 015, and printed at Jayant Printery, 352/54, Girgaum Road, Murlidhar Temple Compound, Mumbai 400 002. Editor- Pratap Padode. Subject to Mumbai Jurisdiction only.

India’s Project DatabasePROJECT SNO.SECTOR

Airports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1)Development of 4 new airports in A.P. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Automobile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (2, 41, 64)Sanand Nano plant project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64Automotive Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (3)Engine testing facility in Hosur. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3Aviation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (42, 43, 65 to 67)Raipur Airport Project. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42Cargo complex project at Chennai airport . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67Barcode Solutions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (68)Smart card project under the RSBY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68Boilers/Turbines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (69)Ragunathpur Thermal Power Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69Canal/Dam/Irrigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (29, 44)Pranahitha - Chevella lift Irrigation Scheme . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44Cement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (4, 5)Cement plant in Kutch district . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 MTPA cement plant in orissa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Coal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (30, 45)Rajmahal coal project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45Coke. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (1)Construction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (7, 31 to 34, 46 to 48, 70, 71)Residential accommodation at Mundka Depot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46Azadpur Metro Station Complex Project. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47C/o of station box at the Dhaula Kuan metro station . . . . . . . . . . . . . . . . . . . . . . . . . . 48Lab and Residential Campus at Beas Amritsar . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70New campus for Indian Institute of Chemical Biology Salt Lake, Kolkata . . . . . . . . . . 71e-Governance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (49)Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (50)Food Park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (8, 72)Mega Food Parks at Chaigaon in Assam . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8Mega Food Park at Dharmapuri in Tamil Nadu. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72Healthcare. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (9, 51, 73, 74)Hospital Building at Katewara Village . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9500 bedded New Ward Block at GTB Hospital Shahdara . . . . . . . . . . . . . . . . . . . . . . 74Hospitality. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (52, 53, 54)Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (39)Iron & Steel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (10, 11, 12, 55)Steel plant in Chhattisgarh . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100.5 million tonne steel plant in Jharkhand. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .112 million tonne steel plant in Orissa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12It park . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (35)It/ites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (13)Research and development centre in Kerala . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13Oil & Gas. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (56)Pipes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (75, 76)Spiral welded and steel pipe plant in Anjar taluk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (14, 15, 16, 57, 58)Expansion of Vadinar oil terminal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14Bulk terminal project at Salaya in Gujarat. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15Deep-sea port in the Bhadrak district of Orissa . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58Power. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (17, 18, 36, 59)1,200 mw power project in Chhattisgarh. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59Railways. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (37, 38)High-speed ballastless track in india. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37Real Estate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (19, 20, 77 to 87)Roads/Highways . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (88, 89, 90)SEZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (21 to 27, 40, 60, 61, 91 to 96)Multi-product SEZ in Himachal Pradesh . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24Aerospace SEZ on 250 acre in Ranga Reddy district . . . . . . . . . . . . . . . . . . . . . . . . . 92Setting up single-product SEZ near Pipavav . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93Textiles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (62)Titanium . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (63)Township. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (97)Transport. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (98)Tyres . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (28)Warehousing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (99 to 101)Setting up its warehouse in Chimbli village near Pune . . . . . . . . . . . . . . . . . . . . . . . . 99

Focus: Ports . . . . . . . . . . . . . . . . . . . . . . . . Pg 9-13

PROJECTS ARE CLASSIFIED AS FOLLOWS:

Conceptual / Planning Stage (1 to 28)

Contract Award (29 to 38)

Joint Venture (39 to 40)

Project Update / Commissioned Projects (41 to 63)

Under Implementation Stage (64 to 101)

Tenders / Bids (102 to 131)

Highlights.indd 2 08/09/2009 01:30:42 PM

Page 4: Project Reporter 15 Sept,2009

Project Reporter • 2 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

*Figures are approximate (Rs. Crore)

Conceptual/Planning Stage

1 Infrastructure Corporation of Andhra Pradesh (Incap), Government of Andhra Pradesh

The Government of Andhra Pradesh (GoAP) has identifi ed Orvakal in Kurnool, Jakranpalli in Nizamabad, Ramagundam in Karimnagar and Tadepalligudem in West Godavari for the development of new airports. The Airports Authority of India has already submitted the feasibil-ity reports of these places. (Incap) is the nodal agency designated for inviting expression of interest and request for pro-posal from prospective developers. Each of these airports will come up in 1,500 acre and will be developed on build, own, operate and transfer (BOOT) basis. The projects would be completed in 36 months from the date of award of contract.

Andhra Pradesh

NA R Rajanikanth, Sr Manager, # 10-2-1, III Floor, FDC Complex, AC Guards, Hyderabad - 500028, Andhra Pradesh. T: 040-23321771/2 F: 23321773, M: 09701450778. [email protected].

Airports

2 Mahindra & Mahindra (M&M)

Plans to build a new plant at Chakan and roll out three new vehicles. Out of Rs 5,000 crore, about half is going into phase I of the Chakan facility

Chakan Maharashtra

5000.00 Roma Balwani, Head-Corp Comm, Mahindra Towers, 5th Floor, Dr G M Bhosle Marg Worli, Mumbai - 400018. T: 022-24901441, F: 24900830

Automobile

3 TVS Motor Company Ltd

Plans to set up an engine testing facility at its R&D centre in Hosur.

Bangalore Karnataka

NA Y Ramachandra Babu, Vice President, TVS Motor Company, Post Box No. 4, Harita,Hosur - 635109. T: 04344-276780, F: 276878, [email protected]

Automotive Components

4 Surya Roshni Ltd

Lighting and steel-pipe solutions provider plans setting up a cement plant in Kutch with a capacity of 20 lakh TPA. The plant is expected to commence commercial production by 2012. The land is not yet allotted by the Government.

Kutch District Gujarat

1100.00 Mahendra K Sancheti, Chief General Manager, Survey No. 188 / 189 / 190, Village Bhuvad, Anjar, Kutch, Gujarat - 370110. T: 02836-289504, 310067, M: 09327005655, [email protected]

Cement

5 SR Rungta Group

Plans to set up a one million tonne cement plant in Orissa. The project is currently in the evaluation stage. The company is in talks with the State Govern-ment for allocation of limestone reserves to execute the cement project. The project will be funded through a mix of debt and internal accruals.

Orissa 600.00 Siddharth Rungta, President, Rungta House, Chaibasa - 833201, Singhbhum (W), Jharkhand, T: 06582-256621, 256861, 56761, 56661, F: 56442

Cement

6 Austral Coke & Projects Ltd

The company has decided to set up 2 plants of Coke, each having capacity of 1.5 Lac MT / Annum totaling to 3 Lac MT / annum, and 8 MW waste heat Gener-ated power plant at Gadhinglaj, Kolhapur through SPV (Special purpose vehicle) Company.

Kolhapur Maharashtra

NA Vijay Swami, Gremach House, I & II Floor, Killedar Building #1, Opp. MTNL, Near 24 Karat Cinema, S.V. Road, Jogeshwari (W), Mumbai - 400102. T: 022-67240000, F: 67420100, www.australcoke.com

Coke

7 AP Educational Welfare Infrastructure Development Corporation

The Andhra Pradesh Government plans to construct 467 integrated social welfare hostels in two years. An amount of Rs 500 crore would be allocated in 2010-11, while the balance Rs 644.15 crore would be provided during 2011-12. Tendering process will be initiated soon and the work is likely to start by February 2010.

Andhra Pradesh

1144.15 Ramkrishna Kumar, Chief Engineer, Near Lal Bahadur Stadium, Sert Com-pound, RVM Bldg, 4th Floor Hyderabad. Andhra Pradesh. T: 040-23240994. M: 09704701502

Construction

8 LMJ International Ltd

The company plans setting up Mega Food Parks at Chaigaon in Assam under the public-private partnership model. Land acquisition for the parks is complete and the construction will commence shortly.

Assam 125.00 Hitesh Arora, Business Development Manager (Logistics),15B, Hemant Basu Sarani Kolkata- 700001. T: 033- 39839999, F: 033-39839900, [email protected]

Food Park

9 Public Works Department (PWD). Government of NCT of Delhi

Plans construction of Hospital Building at Katewara Village on Panchayat Land. Land has not been fi nalised so far.

Delhi NA S D Sankhyan, Asst Director(Works), PWD , 12th Floor MSO Building Delhi Police Headquater New Delhi -110001. T: 011-23490323. [email protected], [email protected]

Healthcare

Project Reporter.indd 2 08/09/2009 01:32:09 PM

Page 5: Project Reporter 15 Sept,2009

Project Reporter • 3 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

10 Surya Roshni Ltd

The company plans to setup a steel plant in Chhattisgarh and had signed an MoU with the State Government at Raipur recently.

Chhattisgarh NA Mahendra K Sancheti, Chief General Manager, Survey No. 188 / 189 / 190, Village Bhuvad, Anjar, Kutch, Gujarat - 370110. T: 02836-289504, 310067.

Iron & Steel

11 SR Rungta Group

The company plans to setup 0.5 million tonne steel plant in Jharkhand along with 40 MW captive power plant. The plant will be operational in another 3-4 years.

Jharkhand NA Rungta House, Chaibasa - 833201, Singhbhum (W), Jharkhand, T: 06582-256621, 256861, 56761, 56661, F: 56442

Iron & Steel

12 SR Rungta Group

The company plans to setup 2 million tonne steel plant in Orissa along with 40 MW captive power plant. The land acqui-sition is on. The plant will be operational in another 3-4 years.

Orissa NA S Harikant, Manager-HR, Rungta Mines, Birbhum, Keonjhar District, Orissa. T: 06767-275221, 277441. M: 09437308131.

Iron & Steel

13 Kerala State Information Technology Mission

The Government of Kerala (GoK) plans to set up dedicated research and develop-ment centre in Kerala to encourage devel-opment of free and open source software.

Kerala NA K S Anil Kumar, Head-E Governance, ICT Campus Vellayambalam, Thiruvana-nthapuram, Kerala-695033. T: 0471-2726881, F: 2314284.

IT/Ites

14 Essar Shipping Ports and Logistics Ltd (ESPLL)

The company is expanding Vadinar oil terminal in Gujarat. The company is likely to achieve fi nancial closure for this project by mid-October.The project will be funded through debt and equity. The construc-tion has already started and completion is expected by end of 2010.

Vadinar Gujarat

939.00 Mohan Nair, CCM, Essar House, 11, Keshavrao Khadye Marg, Mahalaxmi, Mumbai - 400034, Maharashtra. T: 022-50011100 / 66601100,F: 66601809. M: 09833945775, [email protected]

Ports

15 Essar Shipping Ports and Logistics Ltd (ESPLL)

The company plans bulk terminal project at Salaya in Gujarat. The 10.5-million-tonne port facility will handle import of coal and export of pet coke for power plants, especially for Essar Power. The facility is slated to be commissioned by 2011. The company is likely to achieve fi nancial closure for this project by October 2009. The project will be funded through debt and equity.

Salaya Gujarat

860.00 Mohan Nair, CCM, Essar House, 11, Keshavrao Khadye Marg, Mahalaxmi, Mumbai - 400034, Maharashtra. T: 022-50011100 / 66601100, F: 66601809. M: 09833945775, [email protected]

Ports

16 Department of Com-merce and Industries, Government of West Ben-gal (GoWB)

The GoWB is planning to build deep-sea port project along West Bengal’s coastline. Several corporate houses like Videocon, Sajjan Jindal-controlled JSW Group, and Prasoon Mukherjee promoted New Kolkata International Development Pvt Ltd (NKID) has shown interest in developing the port.

West Bengal

2000.00 Writers’ Building, B.B.D. Bagh, Kolkata-700001, West Bengal. T: 91-33-22145487, F: 22144371, [email protected]

Ports

17 Government of Uttarakhand, Department of Irrigation

The 72-MW Tiuni Plasu is being devel-oped on the river Tons, a tributary of Yamuna at Tiuni area. The run-of-the-river project would have three units of 24 MW each and generate 273.67 million units (MU) of power at 90 per cent availability. The head race tunnel of the project would be 4.3 km long. The survey work is going on and is in the fi nal stage.

Uttarkashi District Uttarakhand

NA Amir Ul Hassan, Chief Engineer, Yamuna Colony, Dehradun 248001. T: 0135-2530219, F: 2530219, [email protected]

Power

18 Government of Uttarakhand, Department of Irrigation

The 81-MW Arakot Tiuni would come up at Pabar river, a tributary of Yamuna at Purola area of Uttarkashi district. The project will have three units of 27 MW each with a 11.08-km long head race tun-nel. The project would produce 404 MU of power. The survey work is going on and is in the fi nal stage.

Uttarkashi District Uttarakhand

NA Amir Ul Hassan, Chief Engineer, Yamuna Colony, Dehradun 248001. T: 0135-2530219, F: 2530219, [email protected]

Power

19 TDI Infrastructure Ltd

Delhi-based realty fi rm is building 700 homes in Kundli over the next three years. TDI has tied up with architectural fi rms Drew Dickson Associates of Australia and HO Partners of Hong Kong for develop-ment of its 1600-acre Kundli township.

Delhi 1000.00 Ashish Agarwal, DGM (Market-ing), 9, Kasturba Gandhi Marg, New Delhi - 110001. T: 011- 23731666 / 177, 42166600 / 66, F: 23324555, M: 09811012031, [email protected]

Real Estate

Project Reporter.indd 3 08/09/2009 01:32:10 PM

Page 6: Project Reporter 15 Sept,2009

Project Reporter • 4 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Conceptual/Planning Stage

20 Shreedham Group

Plans to develop ‘Shreedham Splendour’ a commercial complex near Mega Mall complex on Link Road at Andheri. The project comprises a commercial block providing spaces for corporate offi ces. The construction is to start shortly and complete by May 2011.

Mumbai Maharashtra

NA Pramod, Sales Executive, 105/106, Vijay Industrial Estate, 1st Floor, New Link Road, Chincholi Bunder Road, Malad - West, Mumbai - 400064. T: 022-65241730, 28711562, [email protected], www.shreedhamgroup.com

Real Estate

21 Chiripal Group

Ahmedabad based company has plans for setting up a polypropelene production unit in their existing textile park at Bareja around 11 km far from Ahmedabad. Fund-ing not yet done.

Ahmedabad Gujarat

250.00 S Chatterjee, Director, Chiripal House, Shivranjani Cross Roads, Satellite, Ahmedabad - 380015. T: 079-26734660 - 63, F: 26768656, M: 09879201672, [email protected]

SEZ

22 Anant Raj Industries Ltd

Plans to develop an IT SEZ on 65 acre of land near NH8 in Manesar. The project will house technology tower, software zone, service apartments and commercial area. The works are likely to start soon and would complete by December 2010.

Manesar Haryana

50.00 Ajay Pathania, AGM - Projects, H-65, Connaught Place, New Delhi - 110001. T: 011-43652328, 23323880, 23324127, www.anantraj.com

SEZ

23 Anant Raj Industries Ltd

Plans to develop an IT SEZ on 100 acre of land near NH8 near Manesar. Project will house technology tower, service apart-ments, software zone and commercial area. The works are likely to start by end of 2009 and complete by March 2011.

Manesar Haryana

1525.00 Ajay Pathania, AGM - Projects, H-65, Connaught Place, New Delhi - 110001. T: 011-43652328, 23323880, 23324127, www.anantraj.com

SEZ

24 Skil Infrastructure Ltd

The company proposal for airport based multi-product SEZ in Himachal Pradesh received in-principle approval from the Board of Approval (BoA) for SEZ. The area required is 4000 acre, out of which 1000 acre will be for govt use. The land acquisition process is still going on. The civil works would start within 5-6 months and complete in 3 years.

Una District Himachal Pradesh

NA Vijay Sen, President, SKIL House, 209, Bank Street Cross Lane, Off Shahid Bhagat Singh Road, Fort, Mumbai - 400023. T: 022-66199000, 66696000, F: 22659939, M: 09816403000, [email protected], www.skilgroup.co.in

SEZ

25 Marathon Group

The company plans to build Nexzone an IT/ ITeS Special Economic Zone on 26 acre, near the proposed international airport at Navi Mumbai. In Phase I, 3 mil-lion sq ft of high-end IT spaces residential, retail and hospitality space would be developed.

Navi Mumbai Maharashtra

900.00 Alam Sheikh, Planning Engineer, Marathon House, Devidayal Road, Mulund (W), Mumbai - 400080. T: 022-67248484, 25612999, 25600783, F: 25646008. www.marathonrealty.com, [email protected]

SEZ

26 PS Group Kolkata based real estate developer plans to develop IT SEZ in Chandigarh spread over 27 acre. Formal approval received. Land acquisition is in progress. The work may start in 2-3 months.

Chandigarh Punjab

300-500 Saurav Duggar, VP - Sales & Mktg, BDO, Trinity Towers, 83, Topsia Rd, Kolkata 700046, T: 033-22852285, F: 22852339, [email protected]. (Pradeep Chopra, Chairman)

SEZ

27 PS Group Kolkata based real estate developer plans to develop SEZ in Jaipur spread over 250 acre. The civil works are expected to start soon.

Jaipur Rajasthan

3000-3500

Saurav Duggar, VP - Sales & Mktg, BDO, Trinity Towers, 83, Topsia Rd, Kolkata 700046, T: 033-22852285, F: 22852339, [email protected].

SEZ

28 Bridgestone India Private Ltd

Japanese tyre manufacturer plans to setup a second facility near Pune at an in-vestment of Rs 2,050 crore. The company currently has a plant at Pithampur, near Indore. Pune region, comprising Chakan, Ranjangaon and Talegaon, is home to auto majors, including Mahindra Interna-tional, Tata-Fiat, General Motors India, Volkswagen and Bajaj Auto.

Maharashtra 2050.00 Plot No. 12, Kheda Growth Centre, Sagore, Pithampur, Dhar- 454774. Madhya Pradesh. T: 07292 - 423333, 423423, F: 255039

Tyres

Contract Award (Sno. 29 to 38)29 IVRCL Infra-

structures & Projects Ltd

Bagged lift irrigation project, which includes drawal and lifting of 6.00 TMC of water in 120 days (every year) from Mid Manair Reservoir to Upper Manair Res-ervoir. The civil work is expected to start shortly and will complete by June 2011.

Karimnagar District Andhra Pradesh

NA Raja Ravindra Babu, Manager - Ten-ders, M-22/3 RT, Vijayanagar Colony, Hyderabad - 500057, Andhra Pradesh. T: 040-30931999 / 128, 23343678, F: 23345004 (E Sudhir Reddy CMD)

Canal/Dam/Irrigation

Project Reporter.indd 4 08/09/2009 01:32:10 PM

Page 7: Project Reporter 15 Sept,2009

Project Reporter • 5 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Contract Award

30 McNally Bharat Engineering Company Ltd

The company has received an order from BHEL, Chennai for design, engineering, erection & commissioning of Coal Han-dling Plant for 1x500 MW TPS Stage-2 at Bellary.

Bellary Karnataka

151.50 Shamul Kumar Das, AVP, 4th, 5th & 7th Floor, 4, Mangoe Lane, Kolkata-700001, West Bengal, T: 033- 65500725, 22138905, 22138906 F: 22480340, 22485016. (Srinivas Singh, MD)

Coal

31 Ahluwalia Contracts India Ltd

The company has got civil and structural work contract for IBIS Accor Hotel includ-ing commercial area DIAL at Indira Gan-dhi International Airport Hospitality District, Asser-9 New Delhi. The work is expected to start in 15 days and completion will take around 15 months.

New Delhi Delhi

23.19 Vipin Kumar Tiwari, DGM (Corporate) & Company Secretary, M-1, Saket, New Delhi - 110017. T: 011-40504500, F: 40504558, www.acilnet.com, (B Ahluwalia, CMD)

Construction

32 Ahluwalia Contracts India Ltd

The company has got contract to con-struct Hotel-Millennium Plaza Resorts & Hotels at Sector-47, District Centre. The work will start shortly and take 18 months to complete.

Gurgaon Haryana

31.00 Vipin Kumar Tiwari, DGM (Corporate) & Company Secretary, M-1, Saket, New Delhi - 110017. T: 011-40504500, F: 40504558, www.acilnet.com, (B Ahluwalia, CMD)

Construction

33 Ahluwalia Contracts India Ltd

Bagged order for construction of Insti-tutional Bldg, Hostels and Residential Accommodation etc for Indian Institution of Corporate affairs, MCA, Govt of India at Manesar. The work will start shortly and complete in 18 months.

Manesar Haryana

105.64 Vipin Kumar Tiwari, DGM (Corporate) & Company Secretary, M-1, Saket, New Delhi - 110017. T: 011-40504500, F: 40504558, www.acilnet.com(B Ahluwalia, CMD)

Construction

34 Ahluwalia Contracts India Ltd

Bagged contract for construction of pro-posed Institute of Chartered Accountants of India bldg at Mumbai. The work has started and complete in 15 months.

Mumbai Maharashtra

18.08 M Triveni, Secretary to Sr Deputy Secretary, ICAI BHAWAN, ‘Anveshak’, 27, Cuffe Parade, Colaba, Mumbai - 400005. T: 022- 39802905 39893989

Construction

35 Ahluwalia Contracts India Ltd

The company has got the order from Delhi Metro Rail Corporation Ltd for Electrical, LV System and Fire fi ghting works of IT Park block-3, Shastri park.

Delhi 21.65 Vipin Kumar Tiwari, DGM (Corporate) & Company Secretary, M-1, Saket, New Delhi - 110017. T: 011-40504500, F: 40504558, www.acilnet.com

IT Park

36 ABB Ltd The company has won an order from Power Grid Corp of India for a gas insulated substation in Navsari, Gujarat. The project is expected to be completed in 2011.

Navsari Gujarat

128.30 Deepak Sood, CCM 2nd Floor, Khanija Bhavan, East Wing, 49, Race Course Road, Bangalore-560001. Karnataka. T: 080-22949124, 22949106 / 24, 22949150- 4, F: 22949148.

Power

37 Patil Rail Infrastructure Pvt Ltd (PRIL)

Bagged the contract for building the fi rst high-speed ballastless track in India. The project has been awarded by Delhi Airport Metro Express Pvt Ltd. The company will design, manufacture, supply and supervise the laying of Ballastless Track Solution for the Delhi Airport Metro Ex-press Link.

Delhi NA Anand, Project Dept, 3rd & 4th Floor, 6-3-1090/B/4, Raj Bhavan Road, So-majiguda, Hyderabad 500082, Andhra Pradesh. T: 040-44556700/6800, F: 44556890 [email protected]

Railways

38 Stone India The company has received the fi rst bulk order for supply of Air Spring for passen-ger coaches from Rashtriya Coach Fac-tory, Kapurthala for 123 coach sets. The recently announced ‘Duranta Express’ will use this new generation pneumatic suspension system which will provide superior air cushion ride for passengers for trains running at a higher speed.

Kapurthala Punjab

4.90 Paresh Mathur, Manager-Corp Comm, 16 Taratalla Road , Kolkata - 700088. T: 033-24014661(8 lines), F: 24014886, [email protected]

Railways

Joint Venture (Sno. 39 to 40)39 Coromandel

Engineering Company Ltd (CECL)

The company, part of the Murugappa group plans foray into infrastructure space like construction of metro rail, roads and ports. The company is scouting for a joint venture partner from India or abroad.

NA NA Uma Maheshwaran, Manager (Business Development), Parry House, 3rd Flr, 43 Moore Street, Chennai - 600001. T: 044-25341513, 25340306, F: 25342822, [email protected]

Infrastructure

40 TIDCO / AMRL International Tech City Ltd.

The JVC is setting up multi-product SEZ in Tirunelveli District spread over an area of 1,020 hectare. The proposal received nod from Board of Approval for SEZ. The construction has recently started.

Tirunelveli Tamil Nadu

NA AMRL: N Vishwanathan, G.M., Flat # 6, First Floor, Crystal Cove, Door No. 93/59, Sachdev Ave, MRC Ngr Main Rd, R A Puram, Chennai - 600 028. T: 044 - 42316662, F: 42316661.

SEZ

Project Reporter.indd 5 08/09/2009 01:32:10 PM

Page 8: Project Reporter 15 Sept,2009

Project Reporter • 6 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update / Commissioned Project

41 Volkswagen The German carmaker Volkswagen plans investment towards expansion of its Chakan plant. The recently commissioned facility has just begun producing the Skoda Fabia and is gearing for the 2010 launch of the VW Polo.

Chakan Maharashtra

2200.00 Sujan Roy, 3, North Avenue, Level 4, Maker Maxity, BKC, Bandra (E), Mumbai-51. T: 22-40547000, F: 40547100.

Automobile

42 Era Infra Engineering Ltd

The company in JV with KMB, Ukraine is executing a contract from Airports Author-ity of India (AAI) for the construction of a new expandable modular integrated ter-minal building at Raipur Airport. The work on this project started in September 2008 and will complete in October 2009.

Raipur Madhya Pradesh

129.65 Jivan Singh, Sr Manager, 370 - 371 / 2,Sahi Hospital Road, Jungpura, New Delhi - 110014. T: 011-43637000, F: 24378784, (H S Bharana,CMD)

Aviation

43 Era Infra Engineering Ltd

KMB-ERA is a joint venture between Era and KYIVMETROBUD, Ukraine. The JV company is constructing a new expand-able modular Integrated Terminal Building at Devi Ahilya Bal Holkar Airport, Indore by Airports Authority of India (AAI). The work has started in October, 2008 and will complete in November 2009.

Indore Madhya Pradesh

113.02 Raheja, Executive Director, Rajiv Gandhi Bhawan, 3rd fl oor, Block, Safdarganj Airport, New Delhi - 110003. T: 011-24693417, 24693697, 24632950, F: 24620287.

Aviation

44 Kirloskar Brothers Ltd

The company as part of a JV from the Govt of AP - Irrigation and CAD Dept. in respect of Pranahitha - Chevella lift Irriga-tion Scheme-Link VII-Package No.22 for investigation, design, execution of Lift Ir-rigation Scheme for drawal / lifting of 11.5 TMC of water in 120 days from foreshore of Kondam Cheruvu near Manchippa Village, Nizamabad (M), Nizamabad District by water conveyor system with all associated components such as approach channel, gravity lined canal, tunnels, lifts, pressure main, CM & CD works, distribu-tory system and all other allied works to irrigate an ayacut of 1,56,000 acre. Work started in March 09 and completion period is 36 months

Nizamabad Andhra Pradesh

1446.48 U Vijay, AVP Offi cer - Corporate Communications, Yamuna, Plot. 98, Baner, Pune - 411045. T: 020-27214444, 4598, M: 0985003516 (Sanjay C Kirloskar, CMD)

Canal/Dam/Irrigation

45 Eastern Coalfi elds Ltd

The cabinet committee on infrastructure approved plans to expand capacity at Rajmahal coal project. With this expan-sion the company would be able to supply up to 17 MT of coal from present capacity of 10.5 MT, mainly to NTPC.

Lalmatia District Jharkhand

150.00 P K Tiwari, DGM, (Projects) Sanctoria, Dishergarh, Burdwan-713333, West Bengal. T: 91-341-2521341-43. F: 2523574, M: 09434132819.

Coal

46 Parsvnath Developers Ltd (PDL)

The company is executing DMRC contract for construction of residential accommo-dation at Mundka Depot for Phase II of Delhi MRTS project. The project involves construction of 130 fl ats which will be constructed in fl oor plan of G+7 storied building. The total construction area shall be 1, 29, 728 sq. ft. The work has started and completion is expected in 15 months.

Delhi 19.86 Chief Engineer/Tender, Delhi Metro Rail Corporation Limited, 5th Floor, Metro Bhawan, Fire Brigade Lane, Barakham-ba Road, New Delhi -110001. T: 011-23415838.

Construction

47 Parsvnath Developers Ltd (PDL)

The company is executing DMRC contract for construction Azadpur Metro Station Complex Project. The project completion by October 2009.

Delhi NA Ram Prakash, Sr Manager (Market-ing), 6th Floor, Arunachal Building, 19, Barakhamba Road, New Delhi - 110001. T: 011-23350120, [email protected]

Construction

48 Parsvnath Developers Ltd (PDL)

The company is executing DMRC contract for construction of station box at the Dhaula Kuan metro station that connects Connaught Place to the International Air-port. The project will complete by Oct '09

Delhi NA V K Oberoi, VP (Projects), 6th Floor, Arunachal Building, 19, Barakhamba Road, New Delhi - 110001. T: 011-23350120, 43050160

Construction

Project Reporter.indd 6 08/09/2009 01:32:10 PM

Page 9: Project Reporter 15 Sept,2009

Project Reporter • 7 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Update/Commissioned Project

49 Bartronics India Ltd

Smart card maker Bartronics India Ltd is executing a project from the Municipal Corporation of Delhi, which is expected to generate about Rs 5,000 crore in revenue over nine years. Aapke Dwar is a civic body project to set up and run 2,000 kiosks in Delhi on a build-operate-transfer (BOT) model for a period of nine years.

Delhi NA Mahesh, PS to MD # 5-9-22/B/404, 4th Floor, My Home Sarovar, Near Mediciti Hospital, Secretariat Road, Hyderabad, Andhra Pradesh - 500004. T: 040-23298073 / 74, F: 23298076, [email protected] (Sudhir Rao, M.D)

e-Gover-nance

50 NTPC-BHEL NTPC-BHEL JV is setting up power plant equipment manufacturing facility at Man-navaram. The foundation stone for this project will be laid soon. Around 750 acre of land is allotted by the State Govern-ment in this regard.

Chittoor District Andhra Pradesh

6000.00 N K Demant, PS to CMD, NTPC-BHEL Pvt Ltd, Corantsum bldg, 6th fl oor, Tower-B A-41 sector 62, Noida-201309. T: 0120-4211841, [email protected] (C P Singh, CMD)

Equipment

51 Public Works Department. Govt of NCT of Delhi

The construction of Super Speciality Hos-pital at Tahirpur is completed in August 2009.

Tahirpur Delhi

866.61 S D Sankhyan, Asst Director(Works), PWD , 12th Floor MSO Building, Delhi Police Headquarter, New Delhi -110001. T: 011-23490323.

Healthcare

52 Seasons Hotel and Resorts/ The Grand Bhagwati

The Grand Bhagwati Seasons was recently inaugurated located at Kalavad road in Rajkot. The hotel would have a multi-cuisine restaurant, two banquet halls with 7000 sq.ft of banqueting space, besides lawns with more than 2 lakh sq.ft. Ahmedabad-based Bhagwati Banquets and Hotels are the managing partners.

Rajkot Gujarat

NA Rupesh, Project Manager, 301, Circle P, Prahalad Nagar, Garden Road, S C Highway, Ahmedabad-3834051. T: 079-29296192-93, F: 9725046192.

Hospitality

53 Berggruen Hotels

US-based Berggruen Holdings Inc has recently launched its fi rst mid-market hotel “Keys” in Kerala. The Keys Hotels has 101 rooms, fully equipped business centres and meeting rooms with in-room Internet access and a direct dialling facility to take care of all business needs. The next Keys Hotel is likely to come up in Ludhiana.

Thiruvana-nthapuram Kerala

NA Geetanjali Dipu, Project Co-ordinator, Span Centre, 6th Floor, South Avenue, Santacruz (W), Mumbai - 400054. T: 022-67830100, F: 67109974, [email protected] (Sanjay Sethi, MD)

Hospitality

54 Yum Restaurants India Pvt Ltd

Plans to open 100 KFC outlets by end 2010. The company has recently opened 50th restaurant in India, in Chennai’s Anna Nagar.

Nationwide 150.00 Unnat Verma, Marketing (Director), 12nd Floor, Tower D, Global Business Park, Gurgaon, Haryana-122002. T: 0124- 4025100, 4788507.

Hospitality

55 Electrosteel Integrated

The company, an unlisted group com-pany of Electrosteel Castings is setting up 2.2 MTPA integrated steel project in Jharkhand. The company has recently achieved fi nancial closure of debt for Rs 5,447 crore in this regard. The work is likely to start in 2-3 months and may complete in 1 year.

Jharkhand 7262.00 D Chakraborthy, Asst Executive, G. K. TOWER, 19 Camac Street, Kolkata 700017. T: 033-22839990, F: 22894336-40, [email protected].

Iron & Steel

56 Essar Energy The Ruias-promoted company will begin production of coal-bed methane (CBM) from Raniganj block in West Bengal from December 2009. It would be producing the gas — which is found in coal seams — from 15 wells in the fi rst phase.

Ranigunj West Bengal

NA Mohar Nair, GM-Corp Comm, Essar House, 11 Keshavrao Khadye Marg, Mahalaxmi (W), Mumbai - 400034. T: 022-66601100, 66601858, F: 24928896, M: 09833945779

Oil & Gas

57 Kandla Port Trust

The cabinet committee on infrastructure has recently approved the development of four multi-purpose cargo berths at Kandla Port in Gujarat.

Kandla Gujarat

756.00 P. D Vaghela, IAS, Chairman, Adminis-trative Offi ce Building, P.O. Box No. 50, Gandhidham, T: 02836-233001/234601, [email protected]

Ports

58 JSW Group The company is setting up deep-sea port in Orissa. The proposed port would handle coal and fi nished steel products, have an initial capacity of 25-30 million tones. The company would take 3-4 years to execute the project.

Bhadrak District West Bengal

2000.00 Shrinivas Patrudu, Sr Manager (Proj-ects), 5A, Dr. G.Deshmukh Marg, Mumbai - 400026, Maharashtra, T: 022- 24917940 / 941, 23513000,F: 23526400, M: 09766613827.

Ports

Project Reporter.indd 7 08/09/2009 01:32:10 PM

Page 10: Project Reporter 15 Sept,2009

Project Reporter • 8 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

page 14�

Project Update/Commissioned Project

59 GMR Energy Ltd

The company plans construction of a 1,200 MW power project in Chhattisgarh. The land acquisition has not yet been completed. Around 1,000 acre of land is required for this project. Out of this, 70% is acquired so far. The construction was expected to start in September 2009 and complete by 2012-13. Due to land acquisi-tion issues, the execution is likely to be delayed.

Raipur district Chhattisgarh

NA Satish Batra GM (corporate relations),Skip House, 25/1, Museum Road, Bangalore, Karnataka - 560025. T: 080-22070100, M: 09980137242, [email protected]

Power

60 Rassai Properties

The company has received in prinicipal approval for developing Multi-Products and Multi-Services SEZ of 2,500 acre. The company plans to develop a SEZ land in 2,250 acre, out of which they have already acquired 1,418 acre and is in process to acquiring additional land of 460 acre from APIIC. The remaining land will be acquired in the next four months. The site of this SEZ is in Hindpur, which is 60 km away from the Bangalore International Airport.The SEZ will have township, info-tech park, media city, leisure, entertain-ment, residential, education, sports and hospitality facilities.

Bangalore Andhra Pradesh

NA Hussain Rassai, Director, 145, S V Road, Opp. Khar Railway Station, Khar (W), Mumbai-400052. T: 022-66989111, F: 66987010, [email protected], (Hussian Rassai, Chairman)

SEZ

61 PS Group Kolkata based real estate developer plans to develop SEZ in New Town Rajarhat area spread over 250 acre. The civil work is expected to start soon.

Kolkata West Bengal

3000-3500

Saurav Duggar, VP - Sales & Mktg, BDO, Trinity Towers, 83, Topsia Rd, Kolkata 700046, T: 033-22852285, F: 22852339, [email protected].

SEZ

62 SRF Ltd The company’s dipping facilities for tyre-cord fabrics with a capacity of 11500 TPA have been commissioned at the Gummidi-poondi plant in Tamil Nadu.

Tamil Nadu

NA Mukund Trivedy, Head-Corp Comm, Block - C, Sector - 45, Gurgaon - 122003, Haryana. T: 0124 - 4354400, F: 4354500, M: 09871709177.

Textiles

63 Titanium Products Pvt Ltd (TPPL)

The company is a JVC between Kolkata-based Saraf Agencies and the Russian Government. The company plans to set up integrated titanium plant in phases near Chhatrapur in south Orissa’s Ganjam district. The construction work will start in a couple of months. The plant aims to produce 1,08,000 tonnes of titanium slag, 68,000 tonnes of high purity pig iron, 40,000 tonnes of dioxide pigment and 10,000 tonnes of titanium sponge per annum. Around 300 acre of land already acquired.

Ganjam District Orissa

2000.00 T K Joargar, GM (Projects), 4/1 red cross place, Kolkata, West Bengal-700001. T: 033-22488883, F: 22487843, [email protected]

Titanium

Project Under Implementation Stage (Sno. 64 To 101)64 Tata Motors

LtdThe work on the Nano plant spread over 1,100 acre in Gujarat is in full swing and will be completed by January 2010. At fi rst stage, the plant will produce more yellow and silver coloured cars as they are in de-mand in the market. This unit will supple-ment the production of the Nano car which is currently produced at the company’s facility at Pantnagar in Uttarakhand.

Sanand Gujarat

NA 1) Debasis Ray, Head (Corporate Com-munications), Tata Motors Ltd. T: 22-66657209, M: 9223366824, [email protected], www.tatamotors.com. 2) R K Kansa, PRO, Indraprastha Estate, Near Income Tax Offi ce, Ring Road, New Delhi - 110003. T: 011-23379295, 23379732, F: 23370877, [email protected]

Automobile

65 Tata Advanced Systems (TAS)

The company is setting up a manufactur-ing facility at the Aerospace SEZ being developed by APIIC at Adibatla. So far around 75 acre of land is allotted to Tata Advanced Systems (TAS) and the com-pany has commenced work on its manu-facturing facility.The unit will manufacture cabins for the Sikorsky S-92 helicopters.

Ranga Reddy District Andhra Pradesh

NA Chava Sambayya, Project Manager, Thapar House Western Wing, 124 Janpath, New Delhi 110001. T: 011- 66222666, 66222730, F: 23311585, [email protected]

Aviation

Project Reporter.indd 8 08/09/2009 01:32:11 PM

Page 11: Project Reporter 15 Sept,2009

Project Reporter • 9 • September 15, 2009

PortsIndia boast of a long coastline of about 7,517 km spread on the western and eastern shelves of the mainland and also along the Islands. The global recession can be a blessing in disguise for India Maritime Development Programme as this is the time to upgrade our port infrastructure and tie up the loose ends in our logistic solution. The Government of India plans to spend Rs 55,803.73 cr in the eleventh fi ve year plan for the upgradation and modernisation of majors ports in India. Government has launched the National Maritime Development Programme (NMDP) involving a total investment of Rs 1,00,339 cr to augment the traffi c handling capacity of all Major Ports in the country.

To expedite the development of major ports in the country, the Ministry of Shipping has fi nalized a National Maritime Development Programme (NMDP) to implement specifi c programme /schemes for the development of the Port Sector. Under the NMDP, 276 projects covering the entire gamut of activities, namely construction/upgradation of berths, deepening of channels, rail/road connectivity projects, equipment upgradation/modernization schemes and other related schemes for creation of back-up facilities have been identifi ed in the Major Ports to be taken up over a period upto 2011-12. The details of the projects currently under operation under public private partnership mode and those developed by private players at the major ports are: 1) Kolkata Port Trust: Multipurpose Berth No. 4A. 2) Paradip Port Trust: Captive Coal Berth to IFFCO. 3) Vishakhapatnam Port Trust: a) Establishment of a Container Terminal and to operate, maintain and manage the same on BOT basis, including supply, installation and operation of container handling equipment at Multipurpose Berth at Outer Harbour at Visakhapatnam Port Trust. b) Construction and license out equipping operation, management and maintenance of two multipurpose berths EQ8 & EQ9 in the Northern Arm of Inner Harbour at Visakhapatnam Port Trust on BOT basis. 4) Chennai Port Trust: Container Terminal at Chennai stage-I 600 mtrs. Berth. Container Terminal at Chennai stage-II 285 mtrs. Berth. 5) Tuticorin Port Trust: Container Terminal Berth No. 7. 6) Cochin Port Trust: Crude Oil handling facility for BPCL Kochi Refi nery

. 7) Jawaharlal Nehru Port Trust (JNPT): a) Construction two berth container terminal (NSICT). b) Construction of Liquid Cargo Terminal. c) Redevelopment of Bulk Terminal into Container Terminal. 8) Kandla Port Trust: a) Fifth Oil Jetty (IFFCO). b) Oil Jetty related facilities at Vadinar (ESSAR). c) Development & Operation of Container Terminal. d) Oil Jetty awarded to IOCL and e) Development of Container Freight Station.

Sectoral Performance (2008-09)The three basic effi ciency parameters at major ports viz:

turnaround time, pre-berthing detention time or output per ship per berth-day have all shown improvement since the beginning of the decade. The average turnaround time (in days) was 2.44 in 2008-09 compared to 2.63 in 2007-08. The average pre-berthing detention time (in hours) was 9.95 in 2008-09 compared to 11.4 in 2007-08. The average output per-ship per berth day (in tonnes) was 10464 in 2008-09 compared to 10071 in 2007-08. (fi gures for 2008-09 is provisional). About 72 per cent of seaborne trade is handled by the major ports and the rest by non-major ports. Traffi c has increased at a CAGR of 7.4 per cent over a ten-year period, from a volume of 227.26 million tonnes (MT) in 1996-97 to 463.78 MT in 2006-07 — in the Tenth Plan period alone, the traffi c volume has increased at a CAGR of 10 per cent, from 287.59 MT in 2001-02 to 463.78 MT in 2006-07. Despite the global slowdown the cargo handled by major Indian ports in 2008-09 was 530.35 MT — a 2.1 per cent increase compared to the volume of 519.3 MT handled the previous year. The non-major ports handled 185 MT in 2006-07, or 28 per cent of the overall seaborne trade.

Focus: Ports

Port (State)Traffi c Handled (In 000 Tonnes)

2006-07 2007-08 2008-09 2009-10 (up June)

Kolkata (West Bengal) 12596 13741 12428 2894

Haldia (West Bengal) 42454 43588 41623 8285

Paradip (Orissa) 38517 42438 46412 14169

Visakhapatnam (A.P.) 56385 64597 63908 16724

Ennore (Tamil Nadu) 14714 11563 11500 2919

Chennai (Tamil Nadu) 53414 57154 57491 14139

Tuticorin (Tamil Nadu) 18001 21480 22011 5686

Cochin (Kerala) 15257 15810 15228 3579

New Mangalore (Karnataka) 32042 36019 36691 9025

Mormugao (Goa) 34241 35128 41681 12498

Mumbai (Maharashtra) 52364 57038 51876 12904

Jawaharlal Nehru Port (Maharastra) 44815 55838 57281 14961

Kandla (Gujarat) 52982 64920 72225 18807

Total 463782 519314 530355 136589

Traffi c Handled at Major Ports State-wise

PortsFocus.indd 9 08/09/2009 01:31:23 PM

Page 12: Project Reporter 15 Sept,2009

Project Reporter • 10 • September 15, 2009

Coastal ShippingThe responsibility to develop non-major ports vests with

respective State Government as per the Indian Ports Act, 1908. However, one non-major port from each Maritime State, including Magdalla in Gujarat, was identifi ed for development for promoting coastal shipping under the National Maritime Development Programme. Tata Consultancy Services also submitted a report in December, 2003, on the development of

Focus: Ports

Growth Rate of Traffi c at Major Ports

Port (State)Traffi c % change over previous year2006-07 2007-08 2008-09

Kolkata (West Bengal) 16.56 9.09 -9.56

Haldia (West Bengal) 0.28 2.67 -4.51

Paradip (Orissa) 16.33 10.18 9.36

Visakhapatnam (A.P.) 1.05 14.56 -1.07

Ennore (Tamil Nadu) 16.86 7.92 -0.54

Chennai (Tamil Nadu) 13.05 7.00 0.59

Tuticorin (Tamil Nadu) 5.03 19.33 2.47

Cochin (Kerala) 9.87 3.6 -3.68

New Mangalore (Karnataka) (-)6.99 12.41 1.87

Mormugao (Goa) 8.06 2.59 18.65

Mumbai (Maharashtra) 18.5 8.93 -9.05

Jawaharlal Nehru (Maharashtra) 18.45 24.6 2.58

Kandla (Gujarat) 15.41 22.53 11.25

Total 9.49 11.97 2.13

Capacity utilization of major ports during the years 2006-07 to 2008-09, is:

PORTCAPACITY UTILISATION (%)

2006-07 2007-08 2008-09

KOLKATA 70.37 72.09 65.2

HALDIA 97.6 93.34 89.13

PARADIP 69.14 75.78 65.37

VIZAG 96.38 105.64 104.51

ENNORE 82.42 88.95 71.88

CHENNAI 106.83 107.13 107.76

TUTICORIN 87.6 103.52 96.75

COCHIN 75.72 55.73 53.68

NEW MANGALORE 77.58 82.8 84.35

MORMUGAO 114.14 106.29 126.11

MUMBAI 103.38 114.08 102.32

JAWAHARLAL NEHRU 85.52 102.76 105.41

KANDLA 85.18 102.24 107.64

TOTAL 89.85 95.56 93.53

coastal shipping and non-major ports. With a view to develop coastal shipping the following two schemes had been proposed in the working group report on XI Five Year Plan document of Ministry of Shipping – (i) Coastal Shipping Development Fund for soft lending for the purpose of acquisition of coastal vessels. (ii) Centrally Sponsored Scheme for development of coastal shipping infrastructure. The budgetary support required in XI Five Year Plan for above two

PortsFocus.indd 10 08/09/2009 01:31:25 PM

Page 13: Project Reporter 15 Sept,2009

Project Reporter • 11 • September 15, 2009

Focus: Ports

Port ProjectsDeep Draught Iron Ore Berth at Paradip

At present, the Concession Agreement for Deep Draught iron ore berth has been signed. The project is awarded on BOT basis to Blue Water Iron Ore Terminal Pvt Ltd, a consortium of Noble Group Ltd, Gammon Infrastructure Project Ltd and MMTC. The terminal will be developed by the Concessionaire at an estimated cost of Rs 506.30 cr. Paradip Port will provide supporting facilities like dredging of Channel & Berth, Railway lines and back-up area at an estimated cost of Rs 85.05 cr. Besides this, the Port will also incur an expenditure of Rs 20 cr towards shifting of CISF complex and Rs 15 cr towards upgradation of Electrical reception facilities in order to facilitate implementation of the project. Besides the above project the port plans (i) Development of Deep Draught Coal Berth. (ii) Construction of Multipurpose Cargo Berth for handling clean cargo including containers. These projects are to be completed within 30-36 months from the date of award of concession.

2nd Container Terminal at Chennai PortLicence awarded to Consortium of Port of Singapore

Authority (PSA) and South India Corporation Agencies Ltd (SICAL).

Coal Terminal at Ennore PortDevelopment of Coal Terminal to handle 8 MTPA Coal

for users other than TNEB. The Licence awarded on BOT basis to Chetinad International Coal Terminal Private Ltd., a consortium of South India Corporation Ltd, Portia Management Services Ltd and Navayuga Engineering Ltd.

Construction of Iron Ore Terminal at EnnoreThe Licence is awarded on BOT basis to SICAL Iron Ore Terminals Ltd, a consortium of SICAL Logistics Ltd, L&T Infrastructures Development Projects Ltd and MMTC Ltd.

Captive LNG Terminal at Cochin PortCaptive LNG Port and Re-Gasifi cation Terminal is coming up at Puthuvypeen. The contract is awarded on BOT basis to Petronet LNG Ltd (PLL).

Off Shore Container Terminal at Mumbai PortConstruction of Off Shore Container Terminal. The

Licence is awarded on BOT basis to the consortium of Gammon India Ltd, Gammon Infrastructure Ltd and Dragados Spain which formed a Company viz: Indira Container Terminal Pvt Ltd.

Container Terminal at KandlaDevelopment, Operation, Management and Maintenance

of Berth No.11 & 12 as Container Terminal. The project is awarded to ABG Kandla Container Terminal Ltd.

schemes was Rs 500 crore each. But since no fund could be allotted for the purpose in the XI Five Year Plan, the development of non-major ports may be taken up by the respective states themselves with public private participation.

Private Sector Investment in Port InfrastructureThe opportunity lies in the private sector participation in the

port sector development. The Government has allowed participation of private sector parties in setting up Captive Cargo Handling Berths at some of the major ports in the past as per the guidelines issued by the Ministry of Shipping on Private Sector Participation for development of port infrastructure in 1996. These guidelines include broad parameters on development of captive berths at Major Ports under the administrative control of the Ministry. The policy for the Captive Use of Major Ports is at present under consideration in the Ministry under a Committee constituted for recommending various steps for increasing the effi ciency of the ports and for encouraging the private enterprise to take part in the functioning of the ports. To attract and encourage private sector investment in the Port sector, the Government of India has fi nalized model Request for Qualifi cation (RFQ), Request for Proposal (RFP) and Model Concession Agreement (MCA) to ensure uniformity and transparency in the bid process. New guidelines for upfront fi xation of tariff have also been issued for berths and terminals to be bid out to private operators so that prospective bidders are aware of the projected revenue fl ows from the concerned project.

International ShipyardsThe National Maritime Development Programme (NMDP)

envisages setting up of two international size shipyards, one on the East Coast and another on the West Coast of India. The basic requirement would be: (i) The minimum land requirement of 1000-1500 acre and waterfront of about 2.5 km in length. (ii) Water draft of 10 to 12 mtrs. (iii) The site location for the proposed shipyards to have good rail and road connectivity and (iv) Contiguity to a Major Port situated within the State.

The Government of Gujarat has proposed a few stretches such as Salaya, Jodiya, Mundra, Chanch and Pipavav and Tuna. The Government of Orissa has suggested (i) Nuagarh (Astaranga) Distt. Puri. (ii) Palur, Distt. Ganjam. (iii) Gopalpur Port at Arjipalli, Chatrapur, Distt. Ganjam and (iv) Bahuda Muhana (Sonepur), Distt. Ganjam. The Government of Kerala has suggested Poovar in Thiruvananthapuram District on Kerala-Tamil Nadu Border. The Government of Karnataka proposed Tadri Port (Kundle Beach) and Honne Beach under Belekeri Port for this project.

Future ProjectionsThe capacity of the 12 Major Ports under the Central

Government is projected to be increased to 1016.55 million MT by the end of the XI Five Year Plan i.e. 2011-12, which is more than double the capacity of these Ports at 504.75 million MT in 2006-07.

� Sandeep Sharma

PortsFocus.indd 11 08/09/2009 01:31:25 PM

Page 14: Project Reporter 15 Sept,2009

Project Reporter • 12 • September 15, 2009

Focus: Ports

Ajeya Babu Kallam, Chairman, Visakhapatnam Port Trust (VPT) responded to Sandeep Sharma’s queries on the current challenges, competitive scenario and initiatives taken by the Port of Visakhapatnam to meet the growing requirements of modern and resurging India.

“Port of Visakhapatnam proposes to invest Rs 2,621 crore under NMDP

by 2011-2012”

Can you tell us about your port’s achievements in last one year?

The port of Visakhapatnam has been serving the maritime trade during last 75 years and is making relentless efforts to render quality services year upon year. During the year 2008-09 the Port handled 63.91 MT of traffi c which constitute 12.05% of the total traffi c handled by major ports.

Following is the list of important achievements. 1. During the year 2008-09 highest quantity of coking coal i.e. 7.56 MT (28% of quantity handled by all major ports) was handled by port of Visakhapatnam. 2. During the year 2008-09 highest quantity of 3.4 MT of fi nished fertilizers among east coast ports (28% of quantity handled by all major ports) was handled by port of Visakhapatnam. 3. Permissible draft of panamax vessels increased from 10.3 mts. to 10.8 mts. for panamax vessels and for Handymax vessels from 10.7 mts. to 11 mts. at inner harbour berths. 4.Two number of harbour mobile cranes of 140 Ton rated capacity were installed at West Quay berths of inner harbour to facilitate higher discharge rate for coal and bulk cargoes. 5. The facility of night berthing for suezmax tankers at Off Shore Tanker Terminal (OSTT) was introduced w.e.f June 2009 for import of crude and products. 6. The night navigation of vessels has been improved by permitting the vessels of maximum LOA 200 mts. in ballast condition to sail and to shift from inner harbour during night with two pilots in calm weather condition w.e.f 05.08.2009 7. E-payment/ E-receipts and related measures have been implemented.

Can you comment on the initiatives taken by the port to optimise and increase the cargo handling capacity?

For optimising and increasing cargo handling capacity, port of Visakhapatnam is taking several measures as furnished hereunder: 1. Port of Visakhapatnam contemplated perspective plan for 20 years and action plan for 7 years by International Consultants. 2. Various schemes have been contemplated and are in process for enhancing capacity of the port which includes: a) Construction and development of additional berths. b) Deepening of channels and strengthening of berths. c) Mechanisation of existing cargo handling facilities. d) Improvement of Rail road connectivity and Logistic improvements etc.

For improving the cargo handling capacity, the following schemes are taken up through PPP mode and through internal resources of port which include the following: 1. Upgradation of outer harbour to handle 200,000 DWT vessels of iron ore funding through loan assistance from Japan International Co-operative Agency (JICA). 2. Installation of mechanised coal-handling facilities at General Cargo Berth of outer harbour for handling 200,000 Ton vessels on DBFOT basis. 3. Installation of mechanised handling facilities for fertilizers at EQ-7 berth of inner harbour on DBFOT basis. 4. Development of WQ-6 berth in Northern arm of inner harbour for handling bulk cargoes on DBFOT basis. 5. Development of EQ-10 berth at Northern arm of inner harbour for handling liquids and chemicals on DBFOT basis. 6. Development of two (2) berths WQ-7 and WQ-8 at inner harbour for handling Alumina and other dry bulk on DBFOT basis. 7. Development of East Quay 1-A berth on the South of EQ with mechanized handling facilities for dry cargoes on DBFOT basis. 8. Upgradation of Oil handling facilities at inner harbour. 9.Deepening of inner harbour entrance channel and turning circle to accommodate 12.5 mtrs draft vessels.

Additional measures: Work order placed for procurement of two numbers of 50 Ton Tugs Procurement of 3100 HP Loco in July 2009. Revamping and upgradation of railway lines/roads is in progress at various operational areas of the port. Procurement of Harbour Mobile Cranes etc.

Due to emergence of ports like Gangavaram, Krishnapatnam and competition from existing ports like Paradip and Kakinada, are you facing any decline in Cargo throughput and revenue stream?

There was some diversion of part of coking coal traffi c and other bulk traffi c on economic considerations to Gangavaram Port which is located within 20 km of the port vicinity. No decline in traffi c is anticipated due to Krishnapatnam Port as the hinterland for port of Visakhapatnam and Krishnapatnam are not the same. There is a shift of part of transhipment cargo to Paradip port consequent on commissioning of SBM facility. As far as Kakinada Port is concerned no competition is anticipated as Kakinada is serving mostly AP hinterland whereas VPT serves states located in central India Bihar, Chattisgarh, Jharkhand and parts of Maharashtra, UP and

PortsFocus.indd 12 08/09/2009 01:31:25 PM

Page 15: Project Reporter 15 Sept,2009

Project Reporter • 13 • September 15, 2009

Focus: Ports

Orissa. However, VPT is confi dent of facing competition, if any, with upgradation of our facilities and by providing quality of service. The growth in economy will generate additional traffi c to cover some diversion of cargoes and fair share will be retained by this port.

What are the current challenges before the port administration and the investment map for future?

The current challenges before the port administration are as under: 1. Sharing of navigational channel with Indian Navy is the main constraint. As this channel is very narrow with lot of bends and curves, only one movement is possible at a time. To obviate this constraint widening the entrance channel to facilitate the free movement of vessels is in progress. 2. At present the inner harbour can accommodate vessels of 10.8 mts draft due to limitations in the draft. Deepening of inner harbour and entrance channel are taken up to accommodate vessels of 12.5 mtrs and 14 mts draft vessels in phases. 3. The cargo prevailing at this port comprises predominantly bulk cargo leading to environmental pollutions. All required measures are under implementation by Visakhapatnam port to overcome this problem. 4. At present coking coal is being handled through fl oating cranes/ ship crane resulting in low output rates. Action is initiated for mechanisation of coal handling facilities. Similarly, for handling of fertilizers mechanised handling facilities are provided on DBFOT basis. 5. There are other constraints like shortage in supply of railways wagons by railways/slow evacuation of cargo and inadequate feeding of the cargo by the trade etc. As port of Visakhapatnam is located adjacent to the city development of stacking has some limitations.

As regards to investment map, port of Visakhapatnam proposes to invest Rs 2621 crore under NMDP by 2011-2012 through PPP (Rs 1,165 cr), Internal Resources (Rs 1,179 cr) and Soft loan assistance by JICA (Rs 277 cr).

What is percentage of automation in place as far as port services are concerned?

As far as Visakhapatnam is concerned, about 55 to 60% cargo is handled by mechanical means. Proposals for upgradation of existing mechanised handling facilities for iron and providing mechanised handling facilities for coal/fertilizers have been taken up. Harbour mobile cranes have been installed at inner harbour berth. For import of crude by VLCCS, SBM facilities have been taken up by M/s. HPCL as a Joint Venture with Port.

Can you comment on the future of the port sector in India? What needs to be done to increase India’s share In International Maritime Business?

The port sector in India is poised for a big leap in the maritime trade. But I personally feel that there is an imminent need for the major ports to align themselves to the changing environ and take all out efforts to improve effi ciency, cut down delays and simplify the process. All the major ports are working in this direction. The long term solution for major ports to retain the competitive edge would be the landlord port model as is practiced at International Ports.

Regular port users composition in the total cargo. (more than 1 MT.)

Name Of The User % Composition In The Total Cargo

NALCO 1.61

RCL 1.94

ESSAR Steel Ltd 1.61

ESSEL Mining & Industries Ltd 1.05

Ispat Industries Ltd 2.93

MMTC 4.68

Vikram Ispat 1.08

ESSAR 8.51

HPCL 20.42

TNEB 5.38

RINL 3.97

SAIL 7.48

Indian Potash Ltd 1.92

Indian Oil Corporation Limted 7.93

Coromandal Fertilizer Limited 1.77

Haldia Petro Chemicals 1.91

PortsFocus.indd 13 08/09/2009 01:31:25 PM

Page 16: Project Reporter 15 Sept,2009

Project Reporter • 14 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

66 Consolidated Construction Consortium Ltd (CCCL)

Bagged Chennai Airport Project from Airport Authority of India (AAI) in tie up with Herve Pomerleau International Inc., Canada. The project has been awarded for development of Kamaraj Domestic Terminal Phase II, expansion of exist-ing Anna International Terminal and face lifting of existing terminals at Chennai Airport. The construction on both domestic and international airports has started and will complete within 31 months.

Chennai Tamil Nadu

1212.00 K. Nellaiappan, Manager - Business Development, No 5, Second Link Street, CIT Colony, Mylapore, Chennai-600004, Tamil Nadu. T: 044-23454500, 24661083, F: 24990225.

Aviation

67 Consolidated Construction Consortium Ltd (CCCL)

The company is executing contract for construction of cargo complex project at Chennai Airport. The work has started and will complete in 30 months.

Chennai Tamil Nadu

68.00 K. Nellaiappan, Mgr - Business Dev., No 5, Second Link Street, CIT Colony, Myl-apore, Chennai-600004, Tamil Nadu. T: 044-23454500, 24661083, F: 24990225.

Aviation

68 Bartronics India Ltd

Smart card and barcode solutions provid-er is executing smart card project under the Rashtriya Swasthya Bima Yojana.

Nationwide 400.00 Mahesh, PS to MD # 5-9-22/B/404, 4th Floor, My Home Sarovar, Near Mediciti Hospital, Secretariat Road, Hyderabad, Andhra Pradesh - 500004. T: 040-23298073 / 74, F: 23298076.

Barcode Solutions

69 Petron Engineering Construction Ltd

The company has received Letter of Intent from Utility Energytech and Engineers Pvt Ltd, an associate Company of Reliance Energy Ltd, Mumbai, for erection of boiler proper for DVC Ragunathpur Thermal Power Project (2x600 mw) in West Ben-gal. The work is under execution, it started 3 months back

West Bengal

64.00 Ramesh Babu, Manager, Swastik Cham-bers, 6th Floor, Sion Trombay Road, Chembur, Mumbai-400071, Maharash-tra. T: 022- 40856271, 67973501-06, F: 67973509, 67973510. [email protected] (Thankappan Sadasiva Das, MD)

Boilers/Turbines

70 SuperReligare Laboratories Ltd

The company is building Lab and Resi-dential Campus at Beas Amritsar. The construction contract is given to Ahluwalia Contracts India Ltd. The work has started in July and will take 6 months to complete.

Amritsar Punjab

15.50 Ravi Srivastava, Project Engineer, 6, Devika Tower, Nehru Place, New Delhi – 110019. T: 011 - 42295222, F: 41802121. M: 09650022774, [email protected]

Construction

71 RDB Industries Ltd

The company has got order from HSCC Ltd for construction and development of new campus for Indian Institute of Chemical Biology Salt Lake, Kolkata and its maintenance during the defect liability period. The work has started recently and the completion period is of 18 months.

Kolkata West Bengal

27.41 Sanjeev Sharma, Executive Offi cer, 8/1, Bikaner Building, Lal Bazar Street, Kolkata-700001. West Bengal. T: 033- 22486941, 5146, F: 22485146. M: 09830455501, (Sunder Lal Dugar, CMD)

Construction

72 LMJ International Ltd

The company plans to set up Mega Food Park at Dharmapuri in Tamil Nadu under the public-private partnership model. The land acquisition is complete and the construction work has started. The project will complete in a year.

Dharmapuri Tamil Nadu

125.00 Hitesh Arora, Business Development Manager (Logistics),15B, Hemant Basu Sarani Kolkata- 700001. T: 033- 39839999, F: 033-39839900, [email protected]

Food Park

73 Public Works Department (PWD). Government of NCT of Delhi

Plans construction of 200 Bedded Indira Gandhi hospital at Jeevan Park, Siraspur, Delhi. The work on this project has started and is targeted to complete by end of 2010.

Delhi NA S D Sankhyan, Asst Director(Works), PWD , 12th Floor MSO Building, Delhi Police Headquarter, New Delhi -110001. T: 011-23490323. [email protected], [email protected]

Healthcare

74 Public Works Department (PWD). Government of NCT of Delhi

Construction of 500 bedded New Ward Block at GTB Hospital Shahdara, Delhi is progressing well. So far, 80% of the construction work is overa and the entire project is expected to complete by De-cember 2009.

Delhi 375.00 S D Sankhyan, Asst Director(Works), PWD , 12th Floor, MSO Building, Delhi Police Headquarter, New Delhi -110001. T: 011-23490323. [email protected], [email protected]

Healthcare

75 Surya Roshni Ltd

The company is setting up a spiral welded and steel pipe plant for oil and gas sector in Anjar taluk of Kutch district. The work has started in March 2009 and would complete by November 2009.

Kutch District Gujarat

200.00 Mahendra K Sancheti, Chief General Manager, Survey No. 188 / 189 / 190, Village Bhuvad, Anjar, Kutch, Gujarat - 370110. T: 02836-289504, 310067, M: 09327005655.

Pipes

Project Reporter.indd Sec1:14 08/09/2009 01:32:11 PM

Page 17: Project Reporter 15 Sept,2009

Project Reporter • 15 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

76 Maharashtra Seamless Ltd

The Govt of Maharastra has conferred the status of Mega Project to the company’s project at Vile Bhagad. The company has acquired a seamless plant in Romania having an installed capacity of 2 lakh TPA. The plant has the capacity to manufac-ture seamless pipes upto 6” OD.The site development work for seamless plant is going on as per schedule and is likely to be operational by end of 2010. Around 15% of the work is completed so far.

Raigad District Maharashtra

375.00 S K Singal, VP Commercial, 402, Sarjan Plaza,100, Dr. Annie Besant Road, Opp Telco Showroom, Worli, Mumbai - 400018. T: 022-24902570-80, F: 24925473, 24901700, [email protected]

Pipes

77 Sandwoods Infratech Projects Pvt Ltd

Constructing ‘Spangle Condos’ at Zirakhpur. The project comprises 9 tow-ers of stilt+6 fl oors of 3/4 bhk, total 288 apartments with clubhouse, landscaped gardens, etc. The project is to complete by December 2009.

Mohali Chandigarh

NA Mridula Verma, PR-Executive, 222/223 Sector 34-A, Chandigarh, T: 0172-4634870, 6533062, F: 5003871, [email protected]

Real Estate

78 Sandwoods Infratech Projects Pvt Ltd

Constructing ‘Campton Estate’ at Shimla comprising 3 residential towers of stilt+4 fl oors of 2/3 bhk, total 270 apartments with clubhouse, landscaped gardens, etc. The completion is by December 2011.

Shimla Himachal Pradesh

NA Mridula Verma, PR-Executive, 222/223 Sector 34-A, Chandigarh, T: 0172-4634870, 6533062, F: 5003871, [email protected]

Real Estate

79 Abad Builders

Constructing ‘Aqua Breeze’ at Aluva in Ernakulam comprising of tower having G+13 fl oors of 2/3 and penthouses, total 72 apartments with all modern amenities provided. Completion by Dec 2011.

Ernakulam Kerala

NA K S Somya, Marketing Executive, Abad Plaza Complex, M.G.Road, Cochin-682035. T: 0484- 3294953, 3237102, F: 2384378, [email protected]

Real Estate

80 Abad Builders

Constructing ‘The Chancellor’ on 1.60 acre of land at Kakkanad in Kochi. The project comprises of a tower having G+19 fl oors, 2/3 bhk, total 133 apartments with clubhouse, swimming pool, party hall, etc. The project is to complete by Dec 2010.

Kochi Kerala

NA V R Jayesh, Marketing Executive, Abad Plaza Complex, M.G.Road, Cochin-682035. T: 0484- 3294953, 3237102, F: 2384378, [email protected]

Real Estate

81 HDIL Developing ‘Premier Residencies’ a resi-dential complex at Vidyavihar. The project comprises 3 level car parking + Basement + G + 9 fl oor, 11 towers having 2-4 bhk apartments. Amenities like clubhouse, garden, swimming pool, health club will be provided. Architects: Bidco Engineering, Mumbai. The completion is by Oct 2010.

Mumbai Maharashtra

NA Pramod Purandare, GM - Projects, Dheeraj Arma, 9th Floor, Anant Kanekar Marg, Station Road, Bandra (East), Mumbai - 400051. T: 022-26583500, F: 26583535, [email protected]

Real Estate

82 Shah Group Builders and Infraprojects Ltd

Constructing ‘Shah Orchid Villas’ at Kharghar. The project comprises of total 80 villas of 2/3 bhk with landscaped ter-race gardens, parking area, etc will be provided. The completion is by December 2010. Architects: The Firm Associates.

Navi Mumbai Maharashtra

NA Neelam Shah, Director, 323 to 329, Arenja Corner, Plot No. 71, Sector-17, Vashi, Navi Mumbai - 400705. T: 022-27896490-95, F: 27811723. [email protected]

Real Estate

83 Vedant Con-structions

Constructing ‘Sumeet Enclave’ at Thane. The project comprises of a tower having G+12 fl oors of 2/3 bhk, total 46 apart-ments with basic amenities provided. The completion is by December 2010. Architect: JD Associates.

Thane Maharashtra

NA Jyothi Kadam, Offi ce Assistant, Plot 340, Sant Dnyaneshwar Marg, Near centre point, Panchpakhadi, Thane, Maharashtra. T: 022-25406391.

Real Estate

84 Star India Projects

Constructing ‘Grihashakti Phase I’ on 1.25 acre of land at Karjat. The project com-prises 18 wings of stilt+3 fl oors of 1/2 bhk with amenities like landscaped garden, health club, jogging track etc. The comple-tion is by December 2010. Architects: Goyal Associates, Vashi.

Karjat Maharashtra

NA Sagar Pardikar, Sr Manager-Market-ing, 708 Crystal paradise mall, Off.Link Road ,Veera Desai Road, Andheri West , Mumbai – 400058. T: 022-26734854, 26736534, [email protected]

Real Estate

85 Sumer Group of Compa-nies

Constructing ‘Sumer Bay View’ at Mazgaon. The project comprises tower of G+22 fl oor with 1/2 bhk. The project is to complete by April 2011.

Mazgaon Maharashtra

NA Kunal Goswami, Sr Manager, 201/220, Commerce House, 140 N M Road, Fort, Mumbai-400023. Maharashtra. T: 022-22624567, 40684068. F: 22675176.

Real Estate

Project Reporter.indd Sec1:15 08/09/2009 01:32:11 PM

Page 18: Project Reporter 15 Sept,2009

Project Reporter • 16 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

86 Omaxe Ltd The company has received approval from the Mathura-Vrindavan Development Au-thority, Uttar Pradesh, for the construction of township. The company has received approval for the construction of a township Omaxe Eternity at Vrindavan. The work has recently started and the completion period is 18 months.

Uttar Pradesh

250.00 Ruchi Goel, Sr. Executive - PR, Omaxe House, 7, Local Shopping Centre, Kalkaji, New Delhi - 110019. T: 011-41896680, 46066333, F: 41896653, M: 09711800021.

Real Estate

87 Chadha Group

Wave 1st Silver Tower’ is coming up at Sector 18 in Noida. This complex will house a G+13 storey tower providing-spaces for corporate offi ces and other commercial use. The completion is ex-pected by June 2011.

Noida Uttar Pradesh

NA Sonia, 6, Community Centre, New Friends Colony, Delhi - 110001. T: 011-46521100, 42575757.

Real Estate

88 Public Works Department (PWD). Government of NCT of Delhi

The construction of Three Level Grade Separator at Gazipur Crossing on NH-24 and Road No.56 is in progress. So far, around 48% of the work is completed by Afcons Infrastructure Ltd, the project contractor. The completion is expected by April 2010.

Gazipur Delhi

2456.00 S.C.Chauhan, Executive Engineer, 12th Floor MSO Building Delhi Police Head-quarter New Delhi -110001. T: 011-23490323, M: [email protected], [email protected]

Roads/Highways

89 Public Works Department (PWD). Government of NCT of Delhi

The construction of a Flyover at Apsara Border on GT Road is on and around 30% of the work is completed so far. The project includes 3 lane Flyover, 9m eachway, dual carriageway partly in UP on GT Road. Underpasses on either side of the existing ROB on Road No.56 to Seemapuri and vise versa. Rotary proposed below Flyover for Right turning movements. Pedestrian facilites to be provided. The work started in September 2008 and is expected to complete by June 2010.

Delhi 226.47 R P S Chauhan, Executive Engineer, 12th Floor MSO Building Delhi Police Headquarter New Delhi -110001. T: 011-23490323. M: 9312948797, [email protected], [email protected]

Roads/Highways

90 Public Works Department (PWD). Government of NCT of Delhi

The construction of Flyover on G.T.Road near Shyam Lal College is on. The status as on 4th Aug '09: Test pile (2 no.) cast and testing done. Diversion Road along GT Road completed and traffi c diverted. All 96 Pile available, out of 120 done. All 20 pile caps available out of 24 done. 18 piers out of 20 pier available done. All 750 RE Wall panels casted and erection of RE Wall panels Opposite Welcome Station completed & erection towards Shahdara side is in progress. 1232/1760 MT Steel Girder fabricated and 290 MT (77 Nos. segments) transported at site. All 308 bearings received. Expan-sion joints (about 300m) also received. Around 31% of the work is completed. The contractors are: 1) Navayuga Engg. for C/O Flyover,Underpass and FOBs. 2) Khukhrain Builders for Shifting of 3 Nos. 1200m water supply lines.

Delhi 93.82 Bhupender Kumar, M: 9910378462, 12th Floor MSO Building Delhi Police Headquarter New Delhi -110001. T: 011-23490323. [email protected], [email protected]

Roads/Highways

91 Infotech Enterprises Ltd

The company is building an IT SEZ spread over 25 acre in Vizag. The construction has already started and will complete by March 2010.

Visakhapat-nam Andhra Pradesh

NA Krishna Rao, DGM, Plot no.11, A-Wing, Software Units Layouts, 4th Flr, Plot No. 11, Infocity, Madhapur, Hyderabad - 500081. T: 040-23110357-9, F: 66624368.

SEZ

92 Andhra Pradesh Industrial Infrastructure Corp (APIIC)

The Central Government has accorded formal approval for establishing an Aero-space SEZ on 250 acre. The infrastruc-ture works have started and the project will complete in 3 years.

Ranga Reddy District Andhra Pradesh

NA Prabhakar, GM - SEZ, 5-9-58/B, Parish-ram Bhavan, P.B.No.1409, Basheerb-agh, Andhra Pradesh, T: 040- 23237622 / 191, 23237623, F: 23240205, M: 09948220507.

SEZ

Project Reporter.indd Sec1:16 08/09/2009 01:32:11 PM

Page 19: Project Reporter 15 Sept,2009

Project Reporter • 17 • September 15, 2009

*Figures are approximate (Rs. Crore)

Sno Organisation Project Title / Details Location Budget* Contacts Sector

Project Under Implementation Stage

93 PSL Ltd. Setting up single-product SEZ near Pipavav spread over 250 acre.The work has started and is expected to complete in 12 months. The SEZ will have spaces for storage and offtake facilities and multiple bio-diesel units.

Pipavav Gujarat

150.00 Krishna, Manager Marketing, PSL Towers, 615, Makwana Road, Marol Naka, Andheri East, Mumbai - 400059. T: 022-66447777, F: 66447700 / 7711, [email protected]

SEZ

94 Best & Crompton Engineering Ltd

The company is setting up a commercial complex with spaces for industrial galas and factories. The construction has just started and will complete in 18 months.

Sriperum-budur Tamil Nadu

NA #15, Kasturi Rangan Road, Alwarpet, Chennai - 600 018, Tamil Nadu. T: 044 4506 6410 / 4504 0450, F: 45066436, M: 9940067218 / 9810616285.

SEZ

95 L&T Shipbuilding Ltd

The company plans to setup Heavy Engi-neering SEZ in Tamil Nadu. The prelimi-nary work has started at Kattupalli village near Tiruvallur. The project is expected to complete in 2 years.

Tiruvallur Tamil Nadu

NA Debjyoti Chatterjee, Media Manager, L&T House, Ballard Estate Mumbai - 400001. T: 022-66585104, 67665851, F: 66525858, M: 9833368337, [email protected]

SEZ

96 New Chennai Township Pvt Ltd

Setting up multi services SEZ covering 300 acre and a light engineering SEZ on 312 acre. The work has started and will complete by 2015. They have already set up a school and 2 residential complexes in the multi services SEZ.

Chennai Tamil Nadu

NA Subramaniam, Head- CC, New Chennai Township Pvt Ltd. C/o Marg Construc-tions, 4/318, Old Mahabalipuram Road, Kottivakkam, Chennai - 600041. T: 044-24541111, F: 24541123, M: 09600076532, www.marggroup.com

SEZ

97 Mahadev Gruha Nirman Company

The company is developing a new town-ship ‘Mohan Tulsi Vihar’ at Hendrepada, Badlapur - West. It will be a residential township with 38 buildings each of G+7 storey having 1 - 3 bhk apartments. The project completion is expected by Dec '11.

Thane Maharashtra

NA Prafful Patel, 311, Devavrata, Sector 17, Vashi, Navi Mumbai, Maharashtra. T: 022-27658764, F: 27658765, www.mahadevgn.com

Township

98 Delhi Metro Rail Corporation Ltd (DMRC)

The Delhi Metro project is a rapid transit system being built by DMRC in phases. The project has a combination of el-evated, at-grade and underground lines. The Phase I of the network comprises 65.11 km of route length with 13.01 km underground corridor and 52.10 km sur-face/elevated corridor. The Phase II of the network comprises 128 km of route length and 79 stations, and is presently under construction, with the fi rst section opened in June 2008 and a target completion date of 2010. Overall progress of Phase-II has been 37% as of July, 2009. Phase III (112 km) and IV (108.5 km) are planned to be completed by 2015 and 2020 respectively.

Delhi NA Anuj Dayal, Chief Public Relations Of-fi cer, Metro Bhawan, Fire Brigade Lane, Barakhamba Road, New Delhi - 110001. T: 011-23417910 / 12, F: 23417921, [email protected]

Transport

99 Aparna BPO Services Ltd

The company has set up its warehouse in Chimbli village near Pune with a capacity for 9,000 tonnes of goods. The company plans to expand its warehousing division over the next fi ve years. The company will look at expanding the capacity of its new warehouse and may set up a new facility at some other location.

Pune Maharashtra

3.50 Rakesh Singhania, CEO, Survey No 140/3,Village Thathawade, Taluka Mulshi , District Pune - 411033. T : 020-27424141, 4148

Warehousing

100 National Collateral Management Services Ltd

The company plans to expand its ware-housing capacity in the agri-commodities space to 1 million tonne by October-end from the current six lakh tonne.

Nationwide NA K Shankar Narayana, Risk Compliance Manager, Gayatri Towers, 954, Appasa-heb Marathe Marg, Prabhadevi, Mumbai 400025. T: 022 30419191, F: 40419193.

Warehousing

101 LMJ International Ltd

The company plans to build 46 new warehouses across 12 States in 2 years for storing agro commodity. The company has started the fi rst phase of construc-tion and has built several warehouses in Karnataka, Rajasthan West Bengal and Gujarat, besides eight other States.

Nationwide 500.00 Hitesh Arora, Business Development Manager (Logistics),15B, Hemant Basu Sarani Kolkata- 700001. T: 033- 39839999, F: 033-39839900, [email protected]

Warehousing

Project Reporter.indd Sec1:17 08/09/2009 01:32:11 PM

Page 20: Project Reporter 15 Sept,2009

Project Reporter • 18 • September 15, 2009

Tenders/Bids

102 | Roads And Buildings DepartmentDetails: 1/EPC/ROB/Balacheruvu/E-in-C(R&B)R/EE®/Dee3/AEE/09: E-tender for investigation, design and construction of four lane road over bridge @ km3/4 of Balacheruvu-Visakhpatnam steel plant crossing Gangavaram port road to NH5 and also to cross railway lead link from port to east coast railways link in Visakhapatnam Dist. Period of completion: 24 months.Submission Date: 29/09/2009Location: Gangavaram Andhra PradeshContact: Superintending Engr (R&B), Seethammadhara, Viskhapatnam:13, Andhra Pradesh. T: 91-891-2553265. M: 09440818023, www.eprocurement.gov.inCategory: Architects/Interior Work/Consultancy

103 | Cauvery Neeravari Nigama LtdDetails: 03/2009-10: E-tender for providing & fi xing chain link fencing in front of Hemavathy Dam from circuit house to right bank of Hemavathy Dam (0 point) along HPC road. Period of completion: 10 months. Registered class of contractor in KPWD/CNNL: Class 1-A.Submission Date: 30/09/2009Location: Gorur KarnatakaTender value (Rs): 136,50,000.00Contact: Executive Engineer, Hemavathy Dam Division, Gorur, Karnataka. T: 080-23284311, www.knnlindia.comCategory: EPC/Civil Works/Fencing/Wall Works

104 | Neyveli Lignite Corporation LtdDetails: CO/CONTS/0022N/TS-II EXPN/C02-GR-III/2009: E-tender for entire civil engineering work for the construction of fi re station building, chemical storage building, canteen building, sewage lines, manholes and sewage treatment plant, all electrical works and communication networks, etc. Tenders are invited for general civil works - phase II - group II fi re station building, chemical stoarge building, canteen building and sewage line & treatment plant (c 02-GR-III) for Second thermal power station expansiion (2x250 MW).Submission Date: 28/09/2009Location: Chennai Tamil NaduContact: Neyveli House, No. 135, Periyar EVR High Road, Chennai: 600010, Tamil Nadu. T: 044–28255163–166, F: 28255499, www.nlcindia.comCategory: EPC/Civil Works/Fencing/Wall Works

105 | Karnataka Neeravari Nigam LtdDetails: KNNL/HBP/R&R Dn/TND/09-10/-3: E-tender for Raising and improvement to Bhiradi-Malwad road including C.D. works 0.00 to 3.00 km. Tenders are invited from contractors (Class I and category III and above).Submission Date: 05/10/2009Location: Bhiradi KarnatakaTender value (Rs): 244,00,000.00Contact: Executive Engineer, HP, R & R Division, Athani. Dist. Belgaum, Karnataka. T: 91-8289-285031, www.nlcindia.comCategory: Roads/Road over Bridge/Bridges/Flyovers/Highways

106 | Karnataka Neeravari Nigam LtdDetails: KNNL/HBP/R&R Dn/TND/09-10/-3: E-tender for Raising and improvement to Chinchali-Dharana road including C.D. works 0.00 to 3.00 km. Tenders are invited from contractors (Class I and category III and above). Submission Date: 05/10/2009Location: Chinchali KarnatakaTender value (Rs): 243,00,000.00Contact: Executive Engineer, HP, R & R Division, Athani. Dist.

Belgaum, Karnataka. T: 91-8289-285031, www.nlcindia.comCategory: Roads/Road over Bridge/Bridges/Flyovers/Highways

107 | Himachal Pradesh Sarkar, Public Works DepartmentDetails: 1039/09-10: Prequalifi cation are invited for construction of high level bridge over river beas at Tanda Pattan in Tehsil Indore Distt. Kangra (HP) under NABARD-RIDF-13 (sh: construction of PSC Box Girder Bridge. Total span 250 mtrs, two spans of 41 mtr and four spans of 42 mts each i/c construction of approaches and guide bunds.Submission Date: 05/10/2009Location: Fatehpur Himachal PradeshTender value (Rs): 9,29,00,000.00Contact: The Executive Engineer, Fatehpur Division, Fatehpur, Himachal Pradesh. T: 01893-256602Category: Roads/Road over Bridge/Bridges/Flyovers/Highways

108 | Government of Rajasthan, Public Works DepartmentDetails: 1/2009-10: Request for proposal for appointment of technical consultant for preparation of feasibility report for national highways development works in the state.. Name of road: Nagaur-Jodhpur section of NH-65. The Government of Rajasthan has decided to underake two laning with paved shoulder of the highway stretches in Rajasthan through public-private partnership on design, build, fi nance, operate and tranfer (DBFO) basis.Submission Date: 25/09/2009Location: Nagaur RajasthanContact: Chief Engineer (NH), Public Works Dept. N H Circle, Jaipur, Room no. C-101, 1, Jacob Road, Jaipur: 30200, Rajasthan. T: 91-141-5110538. F: 91-141-5110538.Category: Architects/Interior Work/Consultancy

109 | Government of Rajasthan, Public Works DepartmentDetails: 1/2009-10: Request for proposal for appointment of technical consultant for preparation of feasibility report for national highways development works in the state of Rajasthan. Name of road: Sikar-Bikaner section of NH-11. Submission Date: 01/10/2009Location: Sikar RajasthanContact: Chief Engineer (NH), Public Works Dept. N H Circle, Jaipur, Room no. C-101, 1, Jacob Road, Jaipur: 30200, Rajasthan. T: 91-141-5110538. F: 91-141-5110538.Category: Architects/Interior Work/Consultancy

110 | Government of Rajasthan, Public Works DepartmentDetails: 1/2009-10: Request for proposal for appointment of technical consultant for preparation of feasibility report for national highways development works in the state of Rajasthan. Name of road: Fatehpur-Nagaur section of NH-65. Submission Date: 16/10/2009Location: Fatehpur RajasthanContact: Chief Engineer (NH), Public Works Dept. N H Circle, Jaipur, Room no. C-101, 1, Jacob Road, Jaipur: 30200, Rajasthan. T: 91-141-5110538. F: 91-141-5110538.Category: Architects/Interior Work/Consultancy

111 | Government of Rajasthan, Public Works DepartmentDetails: 1/2009-10: Request for proposal for appointment of technical consultant for preparation of feasibility report for national highways development works in the state of Rajasthan. Name of road: Ajmer-Nagaur section of NH-89. Submission Date: 23/10/2009Location: Ahmer RajasthanContact: Chief Engineer (NH), Public Works Dept. N H Circle, Jaipur, Room no. C-101, 1, Jacob Road, Jaipur: 30200, Rajasthan. T: 91-141-5110538. F: 91-141-5110538.Category: Architects/Interior Work/Consultancy

112 | Government of Goa

Tender.indd 18 08/09/2009 01:32:22 PM

Page 21: Project Reporter 15 Sept,2009

Project Reporter • 19 • September 15, 2009

Tenders/Bids

Details: Request for proposal for development of Super Speciality Hospital, Goa. The selected bidder will be responsible for designing, building, fi nancing, construction, operation and management of the Super Speciality Hospital.Submission Date: 25/09/2009Location: Panjim GoaContact: Joint Secretary (Health), Secretariat, Porvorim, Goa 403 521. T: 91-832-2419455. [email protected]: Healthcare

113 | Haryana State Electronics Dvelopment Corporation LtdDetails: HARTRON/Proj/ITTC/2009-10: Request for proposal for Setting up of information technology & telecommunication (ITT) complexes at Gurgaon. Request for proposal of setting up three multi-storeyed information technology & telecommunication (ITT) complex-es for IT & ITES companies on two plots measuring 3.5 acres & 2.0 acres in electronics city, Gurgaon and one plot measuring 3.5 acres in Udyog Vihar.Submission Date: 25/09/2009Location: Gurgaon HaryanaContact: Managing Director, SCO-111-113, Sector 17-B, Chandigarh-160017, Haryana. T: 91-172-2722961-62/2710743/2706105. F:91-712-2720113Category: IT/Ites

114 | Reserve Bank of IndiaDetails: Empanelment of structural consultants for designing/re-designing of RBI’s existing/old structures. Applications are invited from participating consultants with adequate qualifi ed supporting staff and who have successfully completed at least 3 works of designing/redesiging of offi ce/residential/commercial buildings individual project costing not less than Rs.50 (fi fty) lakh for government/semi goverm-netgovernement of India undertaking/private reputed organisations during the last 5 years.Submission Date: 25/09/2009Location: New Delhi DelhiContact: Sandip Ghose, Regional Director, Project Management Cell (NZ), 6, Sansad Marg, New Delhi : 110001, Delhi. T: 011- 23710538 to 42, F: 23711250Category: Architects/Interior Work/Consultancy

115 | Mormugao Port TrustDetails: CME/PROJ/COAL TERMINAL/INDEPENDENT ENGI-NEER/1/2009: Appointment of independent engineer (IE) for the project “Development of a coal handling terminal at Port of Mor-mugao, Goa on DBFOT basis.Submission Date: 06/10/2009Location: Mormugao GoaContact: K C Kuncheria, Executive Mechanical Engineer/The Offi ce of Chief Mechanical Engineer, 2nd fl oor, B Wing New A.O Building, Mormugao Port Trust, Headland Sada-403804, Goa. T: 91-832-2521160. F: 91-832- 2521165.Category: Architects/Interior Work/Consultancy

116 | Mehsana District Co-operative Milk Producers’ Union LtdDetails: Design, supply, labour job for installation, testing and commissioning of 500 MTPD (expandable to 1000 MTPD) cattle feed plant equipment, structure, related utility equipment for cattle feed plant at Jagudan. Work completion period: 12 months.Submission Date: 22/09/2009Location: Mehsana GujaratTender value (Rs): 20,00,00,000.00Contact: Managing Director, Highway, Mehsana-384002, Gujarat. T:91-2762-253201. F: 91-2762-253422. [email protected]: Architects/Interior Work/Consultancy

117 | Kerala State Bamboo Corporation Ltd

Details: Design, supply, installation, testing and commissioning of plants with technology transfer for (1) A green fi eld unit for bamboo fl ooring tiles 1,44,000 sq.m p.a. capacity in Cheruvannur Grama Panchayath, Kozhikode district and (2) Three green fi eld units for seasoned bamboo strips, blinds etc. on each at (i) Nadapuram in Kozhikode District; (ii) Karuvarakundu in Malappuram district and (iii) Marakkara in Malappuram District, Kerala, State, India. Submission Date: 03/10/2009Location: Malappuram KeralaContact: Managing Director, P.B No. 20, Angamaly South, Kerala. T: 91-484-2452248, 2456595, 2452796,2456575. F: 91-484-2453006 [email protected]: Architects/Interior Work/Consultancy

118 | North Central RailwayDetails: 2009/13/A/1.: Consultancy contract for preparation and submission of structural design and drawing as per the site constrain-ing and suitability for replacement of steel girder bridges of 9.14 m span with PSC slab/ inverted T- Type PSC slab/ steel girder between AGC- PWL section. Completion period: 20 months.Submission Date: 09/10/2009Location: Allahabad Uttar PradeshTender value (Rs): 4,50,000.00Contact: DRM (Engineering), Allahabad, Uttar Pradesh. T: 91-532- 2601265. F: 91-532-2601265Category: Architects/Interior Work/Consultancy

119 | Aeronautical Development EstablishmentDetails: 09-195/NP: Design, development & installation of 9 mtr dia FRP dome - Qty 1 no.Submission Date: 08/10/2009Location: Bangalore KarnatakaContact: Veeraraju SSO-II For Director, New Thippasandra Post, Bangalore : 560 075, Karnataka. T: 080-25057888.Category: Aviation

120 | Central RailwayDetails: Tender No : Dy.CE(C)AMI/04-of-2009: Amravati - Construc-tion of new terminal station building with circulating area.Submission Date: 22/09/2009Location: Mumbai MaharashtraTender value (Rs): 5,38,89,000.00Contact: 6th Floor, NAB Building CST, Mumbai-40000, Maharashtra. T: 91-22-22612416. F: 91-22-22621608. [email protected]: Aviation

121 | Government of Madhya Pradesh, Water Resources DepartmentDetails: 09/08/2010: Collection of quarried stone for construction of boulder toe and toe drain of pilliakhal dam project Tehsil Nalkheda District Shajapur. Completion period: four month excluding rainy season.Submission Date: 25/09/2009Location: Shajapur Madhya PradeshTender value (Rs): 13,82,000.00Contact: Executive Engineer, Agar Distt. Shajapur, Madhya Pradesh T: 07362-258029, 258231Category: Building Material/Cement/Equipment

122 | Bhakra Beas Management BoardDetails: 2348 dt 20.07.09: Replacement of roofi ng of E-4 & SL-4 type quarters (26 no.) at BBMB Colony, slapper. Completion period: one year. Submission Date: 09/10/2009Location: Mandi Himachal PradeshTender value (Rs): 43,12,656.00Contact: Er. S. K. Singla, Superintending Engineer, Dehar

Tender.indd 19 08/09/2009 01:32:22 PM

Page 22: Project Reporter 15 Sept,2009

Project Reporter • 20 • September 15, 2009

Tenders/Bids

Power House Circle, Slapper, Distt. Mandi, Himachal Pradesh T: 01907-262233Category: Ceiling/Flooring/Plaster/Painting

123 | Bhakra Beas Management BoardDetails: 2349 dt 20.07.09: Replacement of roofi ng of SL-2 type quarters (80 no.) at BBMB Colony, slapper. Completion period: one year. Tenders are invited from eligible contractors of appropriate class (enlisted) with state public works department/ govt. departments.Submission Date: 09/10/2009Location: Mandi Himachal PradeshTender value (Rs): 43,55,564.00Contact: Er. S. K. Singla, Superintending Engineer, Dehar Power House Circle, Slapper, Distt. Mandi, Himachal Pradesh T: 01907-262233Category: Ceiling/Flooring/Plaster/Painting

124 | Bhakra Beas Management BoardDetails: 2350 dt 20.07.09: Replacement of roofi ng of E-1 type quarters (16 nos.) and SL-1 type (62 nos.) at BBMB Colony, slapper. Completion period: one year. Submission Date: 09/10/2009Location: Mandi Himachal PradeshTender value (Rs): 24,62,170.00Contact: Er. S. K. Singla, Superintending Engineer, Dehar Power House Circle, Slapper, Distt. Mandi, Himachal Pradesh T: 01907-262233Category: Ceiling/Flooring/Plaster/Painting

125 | Kerala State Electricity BoardDetails: CECCN/3/2009-10: Construction of IVth & Vth fl oor of Vydyuthi Bhavanam, Kozhikode. Tenders are invited from experienced contractors.Submission Date: 23/09/2009Location: Kozhikode KeralaTender value (Rs): 201,00,000.00Contact: Chief Engineer (Civil Construction), North, Vydyudhi Bhavanan, Gandhiroad, Kozhikode, Kerala. T: 91-895-2765902. [email protected]: Construction

126 | Arambagh Girls CollegeDetails: AGC/Tender/124-09: Construction of proposed three storied women’s hostel at Arambagh, Hooghly (W.B). Completion period: 12 months. Tenders are invited from bonafi de, reputed and resourceful contractors or construction companies as per revised UGC Guideline.Submission Date: 22/09/2009Location: Hooghly West BengalTender value (Rs): 98,00,000.00Contact: The Principal, Arambagh, Hooghly, West Bengal. T: 91-3211-255960Category: Construction

127 | Oil and Natural Gas Corporation LtdDetails: W26YC09009 (OT-32): Hiring of shot hole drilling & seismic job services to acquire 2D and 3D data in Purnea & Bengal Basin under NELP-VII for the fi eld season 2009-10 & 2010-11. The bidder should have experience of drilling minimum of 1,00,000 meters or more in seismic exploratory work, water well drilling, mining drilling etc., during any one year in the preceding fi ve years (as on date of opening on the tender). Duration of contract: 02 (two) fi eld seasons.Submission Date: 23/09/2009Location: Purnea West BengalContact: General Manager (MM), Materials Management Cell, 50 J L

Nehru Road, Kolkata : 700071, West Bengal T: 91-33-22821002/23012573, F: 91-33-22822144Category: Drilling Works/Equipment

128 | Gujarat State Electricity Corporation LtdDetails: Selection of EPC contractor for design, engineering, procurement, construction, supply, installation, testing & commission-ing of the power plant. GSECL proposes to set up a natural gas based combined cycle power plant at Dhuvaran, Gujarat, with an estimated gross output of 350 mw or more at site conditions. The capacity is only indicative based on the gas allocation of 1.7 million cm/day natural gas/R-LNG. The plant would operate as base load station. The power from the project would be sold to GUVNL under a PPA.Submission Date: 03/11/2009Location: Dhuvaran GujaratContact: Chief Engineer (P&P), Vidyut Bhavan, Race Course, Vadodara 390007, Gujarat. T: 91-265-6612131/6612154/6612343. F: 91-265-6612155/57. [email protected]/[email protected]/[email protected]: EPC/Civil Works/Fencing/Wall Works

129 | Punjab State Electricity BoardDetails: CW/JC/T-05/2009-10: Construction of all tech civil works at 220 kv sub station Algaon (U/G from 66 kv ( under Border zone )Submission Date: 29/09/2009Location: Jalandhar PunjabContact: Dy.Chief Engineer, Civil works Circle, Shakti Sadan, Jalandhar, Punjab. T: 0175 - 2213162, F: 2215897.Category: EPC/Civil Works/Fencing/Wall Works

130 | Eastern RailwayDetails: 222-S/1/W-II: Renovation and face lifting of A P Roy Institute with other ancillary works at Gholsapur railway colony. Completion period for the work: 4 months. Submission Date: 01/10/2009Location: Gholsapur West BengalTender value (Rs): 53,22,000.00Contact: G Bhattacharyya, Divl. Engineer (SPL), Sealdah, Kolkata, West Bengal. T: 033-23506655.Category: EPC/Civil Works/Fencing/Wall Works

131 | Military Engineer ServicesDetails: T9016: Construction of hospital building and ancillaries at Bengdubi. Completion period: 3 months. Tenders are invited from eligible enlisted contractors of MES and enlisted / unenlisted contractors working with other govt. departments meeting eligibility criteria for selection of contractorsSubmission Date: 30/09/2009Location: Siliguri West BengalTender value (Rs): 77,00,00,000.00Contact: Chief Engineer, Siliguri zone, Sevoke Road, PO: Salugara, Siliguri 08, West Bengal. T: 0353-2590225Category: Healthcare

All rights reserved. While all efforts are made to ensure that the information published is correct, Project Reporter hold no responsibility for any unlikely errors that might occur. Printed and Published by Pratap Padode on behalf of ASAPP Media Pvt Ltd, A - 303, Navbharat Estate, Zakaria Bunder Road, Sewri (West), Mumbai - 400 015, and printed at Jayant Printery, 352/54, Girgaum Road, Murlidhar Temple Compound, Mumbai 400 002. Editor- Pratap Padode. Subject to Mumbai Jurisdiction only.