I- 65 Construct weigh station on I-65 near the Kentucky state line, northbound only. Port of Entry near Kentucky state line. Contact Agency: INDOT State ID #: 9607500 29 Project Cost: $4,000,000 Estimated Open to Public Year: 2010 Regional Priority: Included in AQ Analysis / Regionally Significant: KIPDA Project Purpose: A M E N D M E N T Description of Amendments County/Counties: Clark Deleted from Plan. 2009 8

Upload: trantuyen

Post on 09-Apr-2018

214 views

Category:

Documents


2 download

TRANSCRIPT

I- 65

Construct weigh station on I-65 near the Kentucky state line, northbound only. Port of Entry near Kentucky state line.

Contact Agency: INDOT State ID #: 9607500

29

Project Cost: $4,000,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.2009 8

KY 1931

Widen KY 1931 (Greenwood Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 1934 (Greenbelt Highway) to US 31W (DixiHighway), a total of 2.6 miles.

Contact Agency: KYTC State ID #: 08408.00

128

Project Cost: $28,440,000Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

Provide improved access between Dixie Highway and Greenbelt Highway.

KIPDA

Project Purpose:

Greenwood Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2012 to 2016.200910

KY 393

Relocate and widen KY 393 from 2 to 3 lanes (3rd lane will be a center turn lane) from I-71 to north of KY 146 (LaGrange Road). KY 393 reconstruct from northern ramp of I-71 to north of KY 146 (stations 10+100 to 12+100. Project length is 0.9 miles.

Contact Agency: KYTC State ID #: 00234.00

147

Project Cost: $13,780,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Improve safety and reduce congestion by improving roadway geometry and adding a grade separated railroad crossing.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Changed open to public date from 2009 to 2012. Changed project description to "Relocate and widen KY 33 from2 to 3 lanes (3rd lane will be a center turn lane) from I-71 to north of KY 146 (LaGrange Road). KY 393 reconstruct from northerramp of I-71 to north of KY 146 (statins 10+100 to 12+100."

200910

I-265

Reconstruct I-265 (Gene Snyder Freeway) interchange at I-64, including: NB to WB 2 lane flyover, SB to WB 2 lane ramp, and auxiliary lane ttie into KIPDA #197; also includes WB auxiliary lane on I-64 from I-265 to Blankenbaker Pkwy.

Contact Agency: KYTC State ID #: 00021.00

179

Project Cost: $100,022,907Estimated Open to Public Year: 2015

Regional Priority:Included in AQ Analysis / Regionally Significant:

The purpose of this project is to eliminate the clover-leaf interchange, increase capacity, and reduce congestion.

KIPDA

Project Purpose:

Gene Snyder Freeway

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2012 to 2015.200910

I- 64 / KY 1747 Interchange

Reconstruct existing interchange including construct ramp 7 "flyover" from northbound KY 1747 (Hurstbourne Parkway) to westbound I-64 anre-time signals along KY 1747 (Hurstbourne Parkway).

Contact Agency: KYTC State ID #: 00052.00

181

Project Cost: $60,299,200Estimated Open to Public Year: 2021

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will reduce traffic congestion and delay by improving ramp and intersection operating conditions, improve vehicular safety by reducing potentially dangerous uncontrolled vehicle conflict points and providing safe access between local and regional highway systems, anwill enhance the existing system to provide more efficient connections between local and regional highway systems and promote better use o

KIPDA

Project Purpose:

I- 64 / Hurstbourne Parkway Interchange

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2010 to 2021.200910

Crittenden Drive/ I-65

Reconstruct Crittenden Drive intersection at Warnock Street, includes I-65 ramp modifications at Warnock Street.

Contact Agency: Lou. Metro PW State ID #: 00964.10

195

Project Cost: $640,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

The KY 1631 intersection with Warnock is proposed as a safety improvement.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2009 to 2012.200910

I-265

Reconstruct I-265 (Gene Snyder Freeway) interchange at US 60 (Shelbyville Road). Auxiliary lanes will be added to NB and SB I-265 from thUS 60 interchange south to reduce congestion and improve safety. Lanes will be added at the base of the exit ramps. Turn lanes and other improvements will be made to US 60 between English Station Road and Beckley Woods Drive in order to improve safety and increase capacProject length is 0.5 miles.

Contact Agency: KYTC State ID #: 00041.00

197

Project Cost: $5,849,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will reduce traffic congestion and improve safety.

KIPDA

Project Purpose:

Gene Snyder Freeway

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Plan cost decrease. TIP - Move FY 2007 ROW to FY 2009 and increase from $100,000 to $110,000; Move FY 2007 Utilities to FY 2009 and increase from $350,000 to $370,000; Move FY 2008 Construction to FY 2010 and increase from $3,000,000 to $4,000,000; delete FY 2009 Construction $12,480,000 and FY 2010 Construction $21,632,000; IM funds.

200910

Cooper Chapel Road Phase 1

Phase 1: Reconstruct Cooper Chapel Road from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 61 to Smyrna Parkway. Project lenis 1.8 miles.

Contact Agency: Lou. Metro PW State ID #: 00403.00

222

Project Cost: $13,125,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

The area south of I-265 (Gene Snyder Freeway) between KY 61 (Preston Highway) and US 31E (Bardstown Road) is experiencing rapid growwith the development of many new residential subdivisions. Cooper Chapel Roa is a heavily traveled collector road serving this area. The prowill add shoulders where there are none and improve existing poor geometrics to this rapidly growing residential area south of I-265. The proj

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2009 to 2012.200910

River Road

Reconstruct 1 lane bridge on River Road to 2 lanes over Harrods Creek.

Contact Agency: Lou. Metro PW State ID #: 00406.00

226

Project Cost: $1,575,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Reconstruction of the bridge will improve safety.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2008 to 2010.200910

US 42

Construct 2 way center turn lane on US 42 from Harrods Creek Bridge north to River Road. Project length is 1.0 miles.

Contact Agency: KYTC State ID #: 00972.00

230

Project Cost: $7,980,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Add center turn lane to increase safety.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2007 to 2012.200910

KY 1819

Reconstruct and widen KY 1819 (Watterson Trail) from 2 to 3 lanes (3rd lane will be a center turn lane) from Plantside Drive to KY 913 (Blankenbaker Parkway). Approximately 2.0 miles in length.

Contact Agency: KYTC State ID #: 00373.00

233

Project Cost: $13,500,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will improve roadway geometrics improving safety and will accommodate demands from local residential and industrial developm

KIPDA

Project Purpose:

Watterson Trail

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2007 to 2012.200910

KY 1819

Widen KY 1819 (Billtown Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from I-265 (Gene Snyder Freeway) to KY 1819 (WattersTrail). Project length is 3.8 miles.

Contact Agency: KYTC State ID #: 08203.00

257

Project Cost: $21,632,000Estimated Open to Public Year: 2020

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will improve road geometrics to improve safety and reduce traffic congestion.

KIPDA

Project Purpose:

Billtown Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2012 to 2020.200910

LaGrange Underpass West of LaGrange

Construct a 4 lane uninterrupted rail underpass west of LaGrange.

Contact Agency: Oldham Co. State ID #: 00434.00

321

Project Cost: $5,408,000Estimated Open to Public Year: 2014

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Changed open to public date from 2012 to 2014.200910

KY 1747

Add 3rd travel lane southbound on KY 1747 (Hurstbourne Parkway) from US 60 (Shelbyville Road) to Linn Station Road 1.6 miles in length. Includes improvement to the US 60 and Hurstbourne Parkway intersection.

Contact Agency: KYTC State ID #: 00344.01

359

Project Cost: $10,060,000Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project is to improve safety and reduce congestion. Currently, intersection flow is poor; inadequate left-turn storage causes left turn trafficfrom both Hurstbourne and US 60 to back up into the thru lanes creating congestion and a safety hazard. Additionally, merging is a problem ftraffic turning onto southbound Hurstbourne Lane from US 60.

KIPDA

Project Purpose:

Hurstbourne Parkway

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2010 to 2013.200910

KY 1065

KY 1065 (Outer Loop) intersection improvement at KY 864 (Fegenbush Lane) and KY 864 (Beulah Church Road).

Contact Agency: KYTC State ID #: 00122.00

365

Project Cost: $11,810,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will improve traffic safety.

KIPDA

Project Purpose:

Outer Loop

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2008 to 2012.200910

Buechel Bank Road

Add center turn lane on Buechel Bank Road from GE Appliance Park to US 31E (Buechel Bypass). Project length is 0.9 miles.

Contact Agency: Lou. Metro PW State ID #: 08105.00

381

Project Cost: $4,325,000Estimated Open to Public Year: 2015

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will reduce traffic congestion.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2008 to 2015.200910

Hubbards Lane

Widen Hubbards Lane from 2 to 3 lanes (3rd lane will be a center turn lane) from US 60 (Shelbyville Road) to KY 1447 (Westport Road). Addbike lanes to Hubbards Lane from Kresge Way to KY 1447. Project length is 0.6 mi.

Contact Agency: Lou. Metro PW State ID #:

384

Project Cost: $2,050,000Estimated Open to Public Year: 2015

Regional Priority:Included in AQ Analysis / Regionally Significant:

Hubbards Lane is a heavily traveled collector which passes through residential development between US 60 and US 42.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Revise description to include "Add bike lanes to Hubbards Lane from Kresge Way to KY 1447" and decrease project cost $2,050,000

200910

I- 64

Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safety and congestion issuThe improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, additioauxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel.

Contact Agency: KYTC State ID #:

389

Project Cost: $68,428,453Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will help reduce traffic congestion.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed description from "I-64 corridor improvements to consider alternative transportation modes as well as the additionone travel lane in each travel direction between I-71 and I-264. If additional lane is added, intent would be to widen to insto ""Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safand congestion issues. The improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, addition of auxiliary and/or travel lanes, interchange modifications, and installation traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel."

200910

I- 64

Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safety and congestion issuThe improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, additioauxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel.

Contact Agency: KYTC State ID #:

389

Project Cost: $68,428,453Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will help reduce traffic congestion.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2012 to 2015. Increased project cost to $25,000,000.200910

KY 907

Widen KY 907 (Southside Drive) from 2 to 5 lanes (5th lane will be a center turn lane) from KY 1865 (New Cut Road) to KY 1020 (National Turnpike). The design will include the consideration of bicycle and pedestrian facilities. Project length is 0.7 miles.

Contact Agency: KYTC State ID #: 00437.01

465

Project Cost: $3,858,284Estimated Open to Public Year: 2020

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

Southside Drive

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2011 to 2020.200910

I-264

Construct new I-264 (Henry Watterson Expressway) interchange at KY 1931 (Manslick Road).

Contact Agency: KYTC State ID #:

516

Project Cost: $9,000,000Estimated Open to Public Year: 2020

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will provide interstate access to and from KY 1931 ( Manslick Road).

KIPDA

Project Purpose:

Henry Watterson Expressway

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $9,000,000.200910

15th Street East

Reconstruct 15th Street East CSX Railroad crossing, adding flashers and gates.

Contact Agency: New Albany PC State ID #: 8802635

523

Project Cost: $200,000Estimated Open to Public Year: 2020

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project will improve the safety at this railroad crossing.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Deleted from Plan.200910

Goshen Lane

Install sidewalks on Goshen Lane from Valley Drive southeast to US 42 (Brownsboro Road).

Contact Agency: NA State ID #:

908

Project Cost:Estimated Open to Public Year:

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Changed open to public date to 2013.200910

Saint John Road

Reconstruct and realign Saint John Road as a 2 lane (no additional lanes) road 0.5 miles of existing road approximately 2 miles west of IN 60(improved geometrics on section up and down hillside).

Contact Agency: Clark Co. State ID #: 0500175

964

Project Cost: $2,525,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Major horizontal alignment problems-current design speed less than 20 mph. Realignment will improve design speed to 30 mph.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Move ROW to 2011, change open date to 2012200910

IN 111

Widen IN 111 from 2 to 5 lanes (5th lane will be a center turn lane) from Klerner Lane to Chapel Road (2.26 miles). Widen from 2 to 3 lanes from Chapel Road to Fairview Knob Road (0.36 miles). Reconstruct as 2-lane road from Fairview Knob Road to IN 60 (3.08 miles). Includesbridge, signals and signs.

Contact Agency: INDOT State ID #: 9902540

998

Project Cost: $30,613,045Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

The need for improvement is based on the facilities substandard geometrics, lack of traffic capacity along the corridor and accident history. Existing LOS has fallen to substandard levels along the corridor. The purpose of the project is to improve the traffic flow/mobility and safety byadding capacity and improving geometrics along the corridor. INDOT database shows 129 accidents from 1996 to 1999 along IN 111from IUS

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark, Floyd

Move Open to Public date to 2013 TIP - Move FY 2006 ROW to FY 2010 $2,500,000; Move FY 2009 Const. to FY 2011 STP-State.

200910

IN 62

Intersection improvement at IN 62 and Salem Noble Road

Contact Agency: INDOT State ID #: 0100732

1094

Project Cost: $110,000Estimated Open to Public Year: 2009

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.2009 8

IN 60

Intersection improvement on IN 60 at Saint Joe Road (west junction).

Contact Agency: INDOT State ID #: 0100713

1098

Project Cost: $530,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.200910

I- 65

Bridge replacement on I-65 over Muddy Fork Creek. 2.38 miles north of Charlestown Road.

Contact Agency: INDOT State ID #: 0100346

1101

Project Cost: $1,030,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.2009 8

IN 60

Intersection improvement on IN 60 at Saint Joe Road (east junction).

Contact Agency: INDOT State ID #: 0100712

1104

Project Cost: $330,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.200911

KY 61

Widen KY 61 from 2 to 4 lanes from existing 4 lane section to Shepherdsville. Section 3 - from south of Brooks Run to existing four lane (Construction Sequence 1). Project length is 1.7 mi.

Contact Agency: KYTC State ID #: 00117.35

1125

Project Cost:Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Improve safety and reduce congestion

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Bullitt

TIP - Change OTP from 2009 to 2012; Move FY 2009 Construction to FY 2010 and increase from $10,175,000 to $10,930,000.

200910

Broadway & 18th Street

Align intersection of Broadway and 18th Street by moving the south leg of 18th Street to the east.

Contact Agency: Lou. Metro PW State ID #: 00413.00

1192

Project Cost: $500,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Improve operation of signal by eliminating offset intersection.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2008 to 2010.200910

I- 64

Interchange modification on I-64 at IN 62 and IN 64, adding turn lanes.

Contact Agency: INDOT State ID #: 0101102

1244

Project Cost: $7,534,000Estimated Open to Public Year: 2009

Regional Priority:Included in AQ Analysis / Regionally Significant:

The essential purpose for this project is to modify the existing interchange to accommodate the IN 64 movements and to coordinate or clusterclosely spaced signals (West Knable Rd. North (westbound) ramp terminus and South (eastbound ramp terminus) to optimize the flow of traffThe primary need for this improvement is based on congestion and geometric deficiencies at the interchange and the closely spaced

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Moved open to public date from 2013 to 2009. Changed project cost from $16,480,000 to $7,534,000.200910

Olmsted Parkways Multi-Use Path System

Construct a multi-use path system connecting Algonquin, Southwestern, Southern and Eastern Parkways with existing trails to create a continuous 30 miles of connected paths for pedestrians and bicyclists. Change from 4 lanes to 3 lanes (3rd lane will be a center turn lane) onSouthwestern Parkway from Shawnee Park to I-264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from New Cut Road to Sou3rd Street, and Eastern Parkway from I-65 to Cherokee Park.

Contact Agency: Lou. Metro Parks State ID #: 00506.00

1273

Project Cost: $8,189,010Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed project description to include, "Change from 4 lanes to 3 lanes (3rd lane will be a center turn lane) on Southwestern Parkway from Shawnee Park to I-264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from NCut Road to South 3rd Street, and Eastern Parkway from I-65 to Cherokee Park". Changed open to public date to 2012.

200910

Downtown Two-Way Street Conversion

Convert the following north/south streets to two-way from the river to Broadway: Preston, Jackson, 3rd, 5th, 6th, 7th and 8th streets. In additiconvert the following east/west streets to two-way: Liberty and Jefferson streets.

Contact Agency: Metro. Dev. Auth. State ID #:

1337

Project Cost:Estimated Open to Public Year: 2007

Regional Priority:Included in AQ Analysis / Regionally Significant:

Retailers usually experience a positive impact from the conversion to two-way streets that allow for more visibility and the possibility of a growsales.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Deleted from Plan, $2,550,000. Replace with new projects - One-Way Street Conversion to Two-Way Phase 1 #1809 anPhase 2 #1810.

200910

I-265

I-265 (Lee Hamilton Highway) interchange modification at State Street. Add lanes on ramps.

Contact Agency: INDOT State ID #: 0401133

1344

Project Cost: $880,000Estimated Open to Public Year: 2017

Regional Priority:Included in AQ Analysis / Regionally Significant:

To alleviate congestion (back ups) on State Street. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alonhas not addressed this issue.

KIPDA

Project Purpose:

Lee Hamilton Highway

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date from 2012 to 2017. Increased project cost to $880,000.200910

I-265

I-265 interchange modification at IN 111. Add lanes on ramps.

Contact Agency: INDOT State ID #: 0401134

1345

Project Cost: $880,000Estimated Open to Public Year: 2017

Regional Priority:Included in AQ Analysis / Regionally Significant:

To alleviate congestion (back ups) on ramps to IN 111. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alone has not addressed this issue.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date from 2012 to 2017. Increased project cost to $880,000.200910

I-265

I-265 interchange modification at Charlestown Road. Add lanes on ramps.

Contact Agency: INDOT State ID #: 0401135

1346

Project Cost: $880,000Estimated Open to Public Year: 2017

Regional Priority:Included in AQ Analysis / Regionally Significant:

To alleviate congestion (back ups) on ramps to IN 311. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alone has not addressed this issue.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date from 2012 to 2017. Increased project cost to $880,000.200910

Blackiston Mill Road

Intersection improvements at Blackiston Mill Road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB BlackistMill Road, and left and right turn lanes at WB Potters Lane, including sidewalks, curb, gutters and landscaping.

Contact Agency: Clarksville PW State ID #:

1394

Project Cost: $900,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Change description from "Intersection improvements at Blackiston Mill Road and Potters Lane including the installation oftraffic signal and add left turn lanes on SB approach of Blackiston Mill Road and right turn lane on Potters Lane." to "Intersection improvements at Blackiston Mill road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB Blackiston Mill Rd., and left and right turn lanes at WB Potters ln., including sidewalks, curb, gutters and landscaping."

2009 8

Blackiston Mill Road

Intersection improvements at Blackiston Mill Road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB BlackistMill Road, and left and right turn lanes at WB Potters Lane, including sidewalks, curb, gutters and landscaping.

Contact Agency: Clarksville PW State ID #:

1394

Project Cost: $900,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Increased cost to $900,000. Changed open to public date to 2012.200910

KY 2053

Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes (3rd lane is center turn lane): Phase 1 - from KY 61 (Preston Highway) to Penn RunCreek (Open to public date is 2012); Phase 2 - from Penn Run Creek to KY 864 (Cedar Creek Road) (Open to public date is 2020). Project length: Phase 1 - 1.6 mi; Phase 2 - 1.2 mi.; total - 2.8 mi.

Contact Agency: KYTC State ID #: 08205.00

1396

Project Cost: $4,000,000Estimated Open to Public Year: 2020

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

Mt. Washington Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed project description from "Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes from KY 61 (Preston Highwayto KY 864 (Cedar Creek Road)" to "Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes (3rd lane is center turn lane)Phase 1 - from KY 61 (Preston Highway) to Penn Run Creek (Open to public date is 2012); Phase 2 - from Penn Run Creto KY 864 (Cedar Creek Road) (Open to public date is 2020)." Changed open to public date from 2009 to dates indicateddescription.

200910

Wilson Switch Road

Railroad grade crossing improvements at Ebenezer Church Road and CSX Railroad near Borden.

Contact Agency: INDOT State ID #: 0500232

1431

Project Cost: $225,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Maintenance and safety improvements at railroad crossing.

KIPDA

Project Purpose:

A M E N D M E N T

 

Description of Amendments

County/Counties: Clark

Changed open to public date from 2008 to 2010. Increased plan project cost from $210,000 to $225,000.200910

Ebenezer Church Road

Railroad grade crossing improvement at Ebenezer Church Road and CSX Railroad near Borden.

Contact Agency: INDOT State ID #: 0500233

1433

Project Cost: $225,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

 

Description of Amendments

County/Counties: Clark

Changed open to public date from 2008 to 2010.200910

KY 22

Reconstruct intersection of KY 22 at Goose Creek Road.

Contact Agency: KYTC State ID #: 00371.13

1446

Project Cost: $2,710,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Project will improve the safety, operation, and congestion of the roadway as sited in the KY 22 Scoping Study in Jefferson and Oldham Countprepared by HNTB Corporation, October, 2005.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2009 to 2012.200910

KY 2055

Widen existing lanes (no new travel lanes), improve, and realign west KY 2055 (Manslick Road and Mt. Holly Road) at the intersections of Fairdale Road and Mitchell Road.

Contact Agency: KYTC State ID #: 08501.00

1451

Project Cost: $3,000,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

To improve traffic conditions.

KIPDA

Project Purpose:

Manslick Road/Mt. Holly Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2008 to 2010.200910

River Ridge Commerce Center

Intersection improvements to IN 62 and Salem Noble Road, including widening EB and WB approaches of Salem Noble Road, additions and modifications of turn lanes, and installation of traffic signal. Addition of turn lanes on IN 62 and connection to Patrol Road at 3 intersections nof Salem Noble Road ending at Avenue D. Also includes the closing of 3 median openings on IN 62 between River Ridge Circle and Salem Noble Road, and the addition of right turn deceleration lanes on the east side of IN 62 at these intersections.

Contact Agency: River Ridge Dev. Auth. State ID #: 0600756

1455

Project Cost:Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

IN 62

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Move FY 2009 Const to Fy 2010 and Change desctiption from "Reconstruct existing 2 lane road (no additional lanes) in thRiver Ridge Commerce Center (Phase 2)." to " "Intersection improvements to IN 62 and Salem Noble Road, including widening EB approach of Salem Noble Road, addition and modification of turn lanes, and installation of traffic signal. Alsoincludes the closing of 3 median openings on IN 62 between River Ridge Circle and Salem Noble Road, and the addition right turn deceleration lanes on the east side of IN 62 at these intersections."

2009 8

I- 64

Bridge inspection of I-64 over the Ohio River.

Contact Agency: INDOT State ID #: 0600404

1458

Project Cost: $50,000Estimated Open to Public Year: 2007

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Deleted from Plan.2009 8

I- 64/I-264

Reconstruct the I-264 (Shawnee Expressway) northbound ramp to westbound I-64.

Contact Agency: KYTC State ID #: 00389.00

1477

Project Cost: $3,700,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Replace inferior and deteriorating bridge.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2008 to 2012.200910

I- 71

Reconstruct I-71/I-264 interchange including the addition of north and southbound auxiliary lanes on I-71 and I-264. Project length is 2.2 miles

Contact Agency: KYTC State ID #: 00048.20

1479

Project Cost: $26,577,134Estimated Open to Public Year: 2014

Regional Priority:Included in AQ Analysis / Regionally Significant:

Reduce congestion and improve safety at I-71/I-264 and I-264/US 42 interchanges.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2020 to 2014. Changed description to "Reconstruct I-71/I-264 interchange including thaddition of north and southbound auxiliary lanes on I-71 and I-264."

200910

I-265

Improve the I-265 / KY 146 (LaGrange Road) interchange by: (1) extending 1 NB travel lane on KY 146 from Kroger to Springs Station Road (2) extending 1 SB KY 146 left-turn lane for access to SB I-265. Project length is 0.2 miles.

Contact Agency: KYTC State ID #: 00271.00

1485

Project Cost: $3,620,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

Safety concerns and traffic flow improvements

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2009 to 2011.200910

KY 22

Reconstruct KY 22 widening it from 2 to 3 lanes (3rd lane will be a center-turn lane) from KY 329 to KY 329B and from 2 to 5 lanes (5th lane wbe a center-turn lane) from KY 329B to Abbott Lane.

Contact Agency: KYTC State ID #: 00304.10

1488

Project Cost: $15,910,076Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

Project will update the facility to meet existing and future capacity needs and transportation demands, and address safety issues along KY 14and KY 22 between Pryor Ave. and Abbott Ln. The realignment of KY 22 in the vicinity of Currys fork will address some safety concerns.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Changed open to public date from 2012 to 2013.200910

KY 22

Reconstruct 22 widening it from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 329 to KY 329B; and from 2 to 5 lanes (5th lane will a center turn lane) from KY 329B to Abbott Lane. Total project length is 2.4 mi.

Contact Agency: KYTC State ID #: 00304.20

1489

Project Cost: $15,910,076Estimated Open to Public Year: 2015

Regional Priority:Included in AQ Analysis / Regionally Significant:

Project will update the facility to meet existing and future capacity needs and transportgation demands, and address safety issues along KY 1and KY 22 between Abbott Lane and (existing) KY 393.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Changed open to public date from 2012 to 2015.200910

KY 1494

Widen travel lanes (no additional travel lanes) on KY 1494 in Bullitt County, and relocate road from 2000 feet west of KY 61 to KY 61.

Contact Agency: KYTC State ID #: 00293.00

1493

Project Cost: $2,000,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Minor widening project to improve traffic flow.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Bullitt

Changed open to public date from 2008 to 2012.200910

I- 64

Inspection of I-64 bridge over the Ohio River.

Contact Agency: INDOT State ID #: 0300421

1495

Project Cost: $560,000Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

Bridge maintenance.

KIPDA

Project Purpose:

Sherman Minton Bridge

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date from 2008 to 2013. Increased total project cost from $50,000 to $560,000.200910

I-265

Pavement of I-265 from I-64 to I-65.

Contact Agency: INDOT State ID #: 0501179

1497

Project Cost: $6,000,000Estimated Open to Public Year: 2014

Regional Priority:Included in AQ Analysis / Regionally Significant:

Roadway maintenance.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark, Floyd

Changed open to public date to 2014.2009 8

Bicycle Priority Corridor

Improvements for bicycling on River Road between Zorn Avenue and Blankenbaker Lane

Contact Agency: Lou. Metro PW State ID #:

1513

Project Cost: $845,520Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Description changed to "Improvements for bicycling on River Road between Zorn Avenue and Blankenbaker Lane." Changed open to public date to 2011.

200910

I- 65

Landscaping the interchange of I-65 and IN 311.

Contact Agency: INDOT State ID #: 0500936

1518

Project Cost: $420,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.2009 8

I- 64

Paint I-64 bridge over the Ohio River (Main Bridge).

Contact Agency: INDOT State ID #: 0501153

1519

Project Cost: $15,000,000Estimated Open to Public Year: 2018

Regional Priority:Included in AQ Analysis / Regionally Significant:

Maintenance of bridge over the Ohio River.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2018.2009 8

I- 64

Paint I-64 WBL Bridge (Indiana WBL approach bridge - upper level).

Contact Agency: INDOT State ID #: 0501154

1520

Project Cost:Estimated Open to Public Year: 2017

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2017.2009 8

I- 64

Paint I-64 east bound bridge (Indiana longer east bound approach bridge - lower level).

Contact Agency: INDOT State ID #: 0501155

1521

Project Cost:Estimated Open to Public Year: 2017

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2017.2009 8

I- 64

Paint I-64 east bound bridge (Indiana shorter east bound approach bridge - lower level).

Contact Agency: INDOT State ID #: 0501156

1522

Project Cost:Estimated Open to Public Year: 2017

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2017.2009 8

I- 65

I-65 bridge maintenance and rehabilitation (Indiana approach bridge) over the Ohio River.

Contact Agency: INDOT State ID #: 0501158

1524

Project Cost: $500,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Changed open to public date to 2012.2009 8

IN 62

Pavement rehabilitation on IN 62 from I-65 to E junction of IN 62/IN 265.

Contact Agency: INDOT State ID #: 0600814

1526

Project Cost:Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.2009 8

I- 65

Pavement resurfacing on I-65 from IN 62 to 0.26 mi south of IN 311. Project length is 2.9 miles.

Contact Agency: INDOT State ID #: 0501211

1529

Project Cost: $1,272,279Estimated Open to Public Year: 2015

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

 

Description of Amendments

County/Counties: Clark

Added to the Plan.200910

IN 62

Roadside maintenance on IN 62 at Fourteen Mile Creek.

Contact Agency: INDOT State ID #: 0300437

1533

Project Cost: $100,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties:

Deleted from Plan.2009 8

I- 64 Guardrails

Install guardrails on I-64 at various locations.

Contact Agency: INDOT State ID #: 0710151

1535

Project Cost: $560,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Floyd

Changed open to public date from 2009 to 2010. Changed total project cost from $346,500 to $560,000.200910

I-265 Guardrails

Add guardrails at various location on I-265 (Lee Hamilton Highway).

Contact Agency: INDOT State ID #: 0710152

1536

Project Cost: $931,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

Lee Hamilton Highway

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark, Floyd

Changed open to public date from 2009 to 2010. Increased total project cost from $651,000 to $931,000.200910

I- 64

Bridge maintenance and repair of I-64 bridge over the Ohio River.

Contact Agency: INDOT State ID #: 0710264

1538

Project Cost: $2,575,000Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2013, total cost $2,575,000.2009 8

I- 64

Bridge maintenance and repair of I-64 approach bridges to the Ohio River Bridge and over IN 111.

Contact Agency: INDOT State ID #: 0710265

1539

Project Cost: $1,350,000Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2013, total cost $1,350,000.2009 8

IN 60

Replace bridge over Persimmon Run, 4.93 miles west of IN 111.

Contact Agency: INDOT State ID #: 0800080

1541

Project Cost: $575,000Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Move FY 2009 ROW and FY 2011 Construction to future, Bridge funds.2009 8

IN 60

Replace bridge over Persimmon Run, 4.93 miles west of IN 111.

Contact Agency: INDOT State ID #: 0800080

1541

Project Cost: $575,000Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Changed open to public date to 2016.2009 8

IN 60

Replace bridge over Persimmon Run, 4.93 miles west of IN 111.

Contact Agency: INDOT State ID #: 0800080

1541

Project Cost: $575,000Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Increased plan project cost from $195,000 to $575,000, changed open to public date from 2011 to 2016.200910

Incident Management (Hoosier Helper Program)

Purchase TMC vehicles for Falls City (Hoosier Helpers).

Contact Agency: INDOT State ID #: 0710299

1546

Project Cost:Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark, Floyd

Project deleted from Plan and TIP200910

Market Street/Spring Street

Upgrade and designate Market Street and Spring Street as two-way streets from IN 111 to State Street; also includes the two-way conversionElm Street, Pearl Street, and Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvemenwell as traffic calming devices and sidewalks.

Contact Agency: New Albany PC State ID #: 0901275

1556

Project Cost:Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

This project would upgrade portions of Market Street and Spring Street between State Street and Vincennes Street to modify the street as twway. The change would enhance traffic flow and alleviate traffic congestion associated with New Albany's current one way street system in thDowntown district.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Revised project description to "Upgrade and designate Spring Street as two-way streets from IN 111 to State Street; also includes the two-way conversion of Elm Street, Pearl Street, and Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvement as well as traffic calming devices and sidewalks."

200910

IN 60

Reconstruct and widen the bridge deck on IN 60, 1.97 miles west of IN 311. Lane will be added to the bridge deck to connect with the addedlanes at intersections on each end of the bridge, Saint Joe Road East and Saintt Joe Road West. Saintt Joe Road East and Saint Joe Road West intersections are located approx. 1,580 ft apart.

Contact Agency: INDOT State ID #: 0710592

1571

Project Cost: $256,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Deleted from Plan.200910

IN 60

Small structure maintenance (pipe lining) at various locations on IN 60

Contact Agency: INDOT State ID #: 0800197

1591

Project Cost: $507,865Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark

Added to Plan.200910

West Street

Railroad protection improvement at CSX railroad at West Street in Borden, Indiana.

Contact Agency: INDOT State ID #: 0810455

1597

Project Cost: $265,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Decreased plan project cost from $1,875,000 to $265,000.200910

Georgetown-Lanesville Road

Pavement Resurfacing on Georgetown-Lanesville Road for approximately 2.0 miles.

Contact Agency: Floyd Co. State ID #:

1601

Project Cost: $257,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Maintenance

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Deleted from Plan.2009 8

Jeffersontown ADA Ramp/Sidewalk Replacements

Replace or upgrade approximately 1443 handicap ramps and 1570 linear feet of sidewalks within the City of Jeffersontown, Kentucky

Contact Agency: Jeffersontown State ID #:

1605

Project Cost: $742,500Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

The City of Jeffersontown needs to reconstruct and replace various sidewalks throughout the City as well as reconstruct older ADA-accessiblramps in order to meet current ADA standards.

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Jefferson

Changed open to public date from 2009 to 2010.200910

8th Street Rehabilitation

Mill, grind, and rehabilitate pavement on 8th Street from Main Street to Perrin Lane.

Contact Agency: Jeffersonville PW State ID #: 0900627

1619

Project Cost:Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Bullitt, Clark

Deleted from Plan.2009 8

Bullitt County Signage

Add or replace signs on functionally classified roads in Bullitt County.

Contact Agency: Bullitt Co. State ID #:

1624

Project Cost:Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Bullitt

Deleted from Plan.2009 8

A.B. Sawyer Shared Use Path

Construct a 2,800' long, 10' wide multiuse path through A.B. Sawyer Park and connecting to surrounding neighborhoods includes an underpabridge, and site amenities.

Contact Agency: Lou. Metro Parks State ID #: 0

1662

Project Cost: $616,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.2009 4

TARC Jeffersonville Riverfront Transit

New express bus service from downtown Louisville to Jeffersonville for employees who work along Jeffersonville's riverfront.

Contact Agency: TARC State ID #: 0

1664

Project Cost: $395,314Estimated Open to Public Year: 2009

Regional Priority:Included in AQ Analysis / Regionally Significant:

Project provides transit service to people who work along Jeffersonville's riverfront.

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark

Added to Plan.2009 4

Brown Station Way

Pavement resurfacing of Brown Station Way from Randolph Avenue to Lewis & Clark Parkway.

Contact Agency: Clarksville PW State ID #: 0901547

1666

Project Cost: $1,000,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Maintenance of roadway to preserve infrastructure.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Added to Plan, $1,000,000.2009 8

Ohio River Scenic Byways

2004 National Scenic Byway Grant for Implementation of the Corridor Management Plan of the Ohio River Scenic Byway in Indiana

Contact Agency: INDOT State ID #: 0400719

1757

Project Cost: $31,840Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Preservation of Ohio River Scenic Byway.

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark, Floyd

Added to Plan, $31,840.2009 8

Ohio River Scenic Byways

Ohio River Scenic Byways interpretive panels

Contact Agency: INDOT State ID #: 0300114

1758

Project Cost: $179,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark, Floyd

Added to Plan, $179,000.2009 8

I- 64

Perform in-depth inspection of I-64 bridge (Sherman Minton) over Ohio River at Louisville

Contact Agency: KYTC State ID #: 0063.00

1759

Project Cost: $160,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Bridge maintenance

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $160,000.2009 8

I- 71

Spot improvements and pavement rehabilitation on I-71

Contact Agency: KYTC State ID #: 8510.00

1760

Project Cost: $6,000,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

Roadway maintenance

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Jefferson

Added to Plan.2009 8

I-264

Design and construct a sound barrier between Bardstown Road and Newburg Road

Contact Agency: KYTC State ID #: 8413.00

1761

Project Cost: $1,000,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.2009 8

I-264

Landscaping I-264 (Shawnee Expressway) at Dixie Highway

Contact Agency: KYTC State ID #: 2000.76

1762

Project Cost: $1,020,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Landscaping

KIPDA

Project Purpose:

Shawnee Expressway

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $1,020,000.2009 8

I- 65

Install new guardrail on I-65 at various locations on I-65

Contact Agency: INDOT State ID #: 0900105

1764

Project Cost: $4,658,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark

Added to Plan.200910

IN 111

Install signs, signals, and markings on IN 111 from Beechwood Avenue to Mt. Tabor Road. Project length is 1.7 miles.

Contact Agency: INDOT State ID #: 0710335

1765

Project Cost: $500,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Added to Plan.200910

I- 64

Install lighting at the I-64/US 150 Interchange

Contact Agency: INDOT State ID #: 0800320

1768

Project Cost: $500,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Added to Plan.200910

I- 64

Replace pipe lining at various locations on I-64

Contact Agency: INDOT State ID #: 0800420

1769

Project Cost: $1,077,750Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Floyd

Added to Plan.200910

I- 64

Install signs, lighting, and markings on I-64 from I-265 to IN 111. Project length is 1.8 mi.

Contact Agency: INDOT State ID #: 0810264

1770

Project Cost: $350,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Added to Plan.200910

I- 65

Purchase Hoosier Helper Vehicles for the Jeffersonville/New Albany Area

Contact Agency: INDOT State ID #: 0200602

1771

Project Cost: $115,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark, Floyd

Added to Plan.200910

IN 62

Replace traffic signal at IN 62 and Salem Noble Road

Contact Agency: INDOT State ID #: 0900143

1773

Project Cost: $250,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Clark

Added to Plan.200910

IN 160

Replace pipe lining at various locations on IN 160.

Contact Agency: INDOT State ID #: 0800204

1774

Project Cost: $527,480Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark

Added to Plan.200910

Spring Street

Railroad crossing improvement on Spring Street at CSX Railroad crossing

Contact Agency: INDOT State ID #: 9383760

1775

Project Cost: $100,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Added to Plan.200910

New Albany Ohio River Greenway

Construct a pedestrian/bicycle path along Water Street and the floodwall from East 8th Street to the Silver Creek Bridge. Project length is 1.7miles.

Contact Agency: New Albany PC State ID #: 0902325

1779

Project Cost: $1,062,500Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

Project will provide for alternate form of transportation and provide a safe way for bicyclists and pedestrians to travel to and from Clarksville aJeffersonville.

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Floyd

Added to Plan, $1,062,500.200911

Second Street Streetscape Project

Improvements to traffic intersections, sidewalks, accessibility/mobility, landscaping, lighting, architectural enhancements, utilities and the creating of a public gathering space along Second Street between Main Street and River Road as well as a portion of Washington Street in thblock east of Second Street in downtown Louisville.

Contact Agency: Lou. Metro PW State ID #: 0

1783

Project Cost: $2,400,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Bicycle Facility Improvements - Striping, Signage & Signalization 2010

Provide signage for the expanding bicycle facility network and enhance the safety of existing roadways by installing shared-lane markings andother bike/ped signage and markings. The project will also retrofit existing roadways without changing the curb to curb width.

Contact Agency: Lou. Metro PW State ID #: 0

1785

Project Cost: $187,500Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Bicycle Sharing System

Pilot system for the installation of four bike kiosks to be located at: (1) SW corner of W. Jefferson St and S. 8th St. (2) SE corner of W. LibertySt. and S. 6th. St. (3) NW corner of W. Muhammad Ali Blvd and S. 5th St. and (4) SE corner of E. Gray St. and S. Preston St.

Contact Agency: Lou. Metro PW State ID #: 0

1787

Project Cost: $225,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

I-264 Fairgrounds & Airport Exits Landscaping Project

Install landscaping at the following areas along I-264 near the KY State Fairground and the Louisville International Airport:(1) Area bounded by the ramp from Freedom Way (CS-1508G) to I-264 West(2) Area bounded by the ramp from I-264 East to Freedom Way (CS-1508G)(3) Area bounded by Lower Terminal Drive (CS-1212G), Standiford Field NC (CS-2120-10), and I-264 West(4) Area bounded by I-264 West, the ramp from I-65 South to Terminal Drive (CS-1073G)/Louisville International Airport Entrance

Contact Agency: Lou. Metro PW State ID #: 0

1788

Project Cost: $870,793Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

ITS Activities on Various NHS Routes

Provide message signs (DMS)/ cameras on I-265 on either side of I-64 and I-65 interchanges, and I-71 NB in Oldham County, as part of the TRIMARC system. This will be part of a larger ITS project in Highway District's 4, 5, and 6.

Contact Agency: KYTC State ID #: 0

1789

Project Cost: $850,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Jefferson, Oldham

Added to Plan.200910

KY 245

Minor widening of KY 245 (no additional travel lanes) from Bernheim Forest to the Community College. Project length is 1.2 mi.

Contact Agency: KYTC State ID #: 08509.00

1790

Project Cost: $4,310,000Estimated Open to Public Year: 2015

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Bullitt

Added to Plan.200910

LaGrange Road Pedestrian Facilities Project

(1) Construction of sidewalks along Lagrange Road from Lyndon Lane to Bowen Elementary School. (2) Narrow the travel lanes from 12 ft. to 11 ft. and remove the rumbles from the shoulders to provide two 4-foot on-street bicycle lanes along New Lagrange Road (KY-146) from Lyndon Lane to Whipps Mill Road.

Contact Agency: Lou. Metro PW State ID #: 0

1791

Project Cost: $1,695,500Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Louisville Metro Hybrid Fleet Vehicles 2010

Purchase of 25 Ford Escape Hybrids

Contact Agency: Lou. Metro PW State ID #: 0

1792

Project Cost: $204,611Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Northeast Louisville Loop Multi-Use Path

Construct a shared-use path along US 60 (Shelbyville Road) from Old Shelbyville Road to North English Station Road and from English StatioWay to North Beckley Station Road.

Contact Agency: Lou. Metro Parks State ID #: 0

1794

Project Cost: $937,500Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Portland Elementary Safe Routes to School

Pedestrian and bicycle improvements around the Portland Elementary School campus including the following locations: (1) Northwestern Pkwthe intersection of 33rd, 34th, and 35th Streets. (2) 35th Street between Northwestern Pkwy and Pflanz Ave. (3) Intersection of Northwestern Pkwy and Portland Ave

Contact Agency: Lou. Metro PW State ID #: 0

1795

Project Cost: $56,811Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Rangeland Elementary Safe Routes to School

Pedestrian and bicycle improvements in and around the Rangeland Elementary School campus including the following locations: (1) intersectat Ridgecrest Road and Rangeland Road. (2) from the school grounds through Rosalind Court to Runic Way. (3) various areas along Runic Way. (4) from the school grounds to Ridgecrest Road

Contact Agency: JCPS State ID #: 0

1796

Project Cost: $39,473Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Middletown Streetscape Project Phase IV

Streetscape improvements to Main Street from Watterson Trail to Blankenbaker Parkway in Middletown (final phase of the project). Various improvements include: ADA accessibility, improved parking, improved sidewalks, street lights, drainage, curbs and gutters, and landscaping

Contact Agency: Middletown State ID #: 0

1797

Project Cost: $262,875Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Third Street and Eastern Parkway Bikeway and Safety Improvement Project

(1) Construction of new University of Louisville entrance and more direct access to classroom buildings at the intersection of Third Street andEastern Parkway. (2) Construction of bicycle/pedestrian safety improvements along Third Street from Eastern Parkway to Grawemeyer Hall aalong Eastern Parkway from Third Street to Ernst Hall. (3) Reconstruction of the bus pull-off area at the intersection of Third Street and EasteParkway.

Contact Agency: Univ. of Louisville State ID #: 0

1798

Project Cost: $2,500,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

University Corridor Fourth Street Intersection Improvements

Reconstruct intersections on Fourth Street at Industry Rd. and Central Ave. (no additional travel lanes); includes restriping Fourth St. from noof Norfolk-Southern viaduct to Central Ave.

Contact Agency: Univ. of Louisville State ID #: 0

1799

Project Cost: $1,600,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $1,600,000.200910

University of Louisville - Campus Bikeway & Safety Improvement

Completion of the U of L Master Plan for campus biking/walking improvements along: (1) Lee Street from the CSX railroad line to Third StreetThird Street from Lee Street to Cardinal Blvd. (3) Cardinal Blvd. from CSX railroad line to Floyd Street (4) Floyd Street from Cardinal Blvd. to Cardinal Stadium (5) Eastern Pkwy from Floyd Street to Second Street

Contact Agency: Univ. of Louisville State ID #: 0

1800

Project Cost: $2,110,500Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

Crittenden Drive

Relocate Crittenden Drive at the Louisville Regional Airport Authority to allow for construction of a taxiway to accommodate Group 6 Aircraft.

Contact Agency: KYTC State ID #: 08414.00

1801

Project Cost: $2,000,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $2,000,000. Open to public date is 2012.200910

Greenwood Road/Terry Road

Construct a right turn lane on Terry Road at Greenwood Road.

Contact Agency: KYTC State ID #: 08500.00

1802

Project Cost: $300,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $300,000.200910

I- 64

Construction of I-64 WB auxiliary lane from Hurstbourne Pkwy. To I-264, restripe gore area on I-264 WB at I-64 and extend left turn storage lanes on KY 1932 (Breckenridge Ln.). Initial phase of ultimate project 159.00. Project length is 1.7 mi.

Contact Agency: KYTC State ID #: 00159.10

1803

Project Cost: $5,600,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $5,600,000.200910

I- 64 / KY 1747 Interchange

Reconstruct existing interchange including construct a triple left turn movement from WB Linn Station Rd. to SB Hurstbourne Pkwy.; additionaSB lane for Hurstbourne Pkwy from Linn Station Rd. to Ramp 1 (I-64 EB off ramp); provide right turn lane for NB Hurstbourne to EB Linn StatRd.; provide dual left turn lanes from Ramp 5 (I-64 WB off ramp) to SB Hurstbourne. Widen Ramp 5 to 3 lanes approaching the terminal; WidRamp 6 (I-64 WB on ramp) for dual right turn lanes from SB Hurstbourne Pkwy.; provide dual left turn lanes from SB Hurstbourne Pkwy to Ramp 4 (I-64 EB on ramp). Widen Ramp 4 for dual lanes turning to ramp; Align Ramp 2 (I-64 EB off ramp for local traffic) to the new lane to S

Contact Agency: KYTC State ID #: 0052.00

1804

Project Cost: $32,620,000Estimated Open to Public Year: 2013

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan. Open to public date is 2013.200910

I- 64

Various roadside maintenance (mowing) on I-64

Contact Agency: INDOT State ID #: 0800566

1805

Project Cost: $250,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Floyd

Added to Plan, $250,000.200911

I- 65

Various roadside maintenance (mowing) for 14.67 miles on I-65

Contact Agency: INDOT State ID #: 0800564

1806

Project Cost: $90,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Clark

Added to Plan, $90,000.200911

Buckner Connector

Construct new connection from Old LaGrange Road to KY 393 Project length is 0.8 miles.

Contact Agency: Oldham Co. State ID #: 0

1808

Project Cost: $1,300,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Added to Plan.200910

One-Way Street Conversion to Two-Way Phase 1

Conversion of one-way streets in downtown Louisville to two-way traffic (Main, Jefferson, Liberty, Muhammad Ali, Chestnut, 3rd Streets).

Contact Agency: Lou. Metro PW State ID #: 0

1809

Project Cost: $2,606,500Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $2,606,500. Open to public date is 2010.200910

One-Way Street Conversion to Two-Way Phase 2

Conversion of one-way streets in downtown Louisville to two-way traffic (8th, 7th, Shelby, Campbell Streets).

Contact Agency: Lou. Metro PW State ID #: 0

1810

Project Cost: $935,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $935,000. Open to public date is 2011.200910

Metro-wide Traffic Signal Synchronization - Phase 1

Upgrade and expand the Metro-wide traffic signal program to reduce vehicle emissions, reduce overall vehicle delays and travel times, reducfuel consumption, reduce vehicle operating costs and increase traffic safety. The proposed project would provide upgrades and communications to approximately 106 traffic signals along critical suburban corridors.

Contact Agency: Lou. Metro PW State ID #: 0

1811

Project Cost: $1,000,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Cannot be  mapped. 

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

KY 480

Widen from 2 to 3 lanes (3rd lane is center turn lane) from Cedar Grove Elementary to Valley View Drive. Project length is 0.6 mi.

Contact Agency: KYTC State ID #: 00391.20

1816

Project Cost: $2,500,000Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Bullitt

Breakout this section from Plan Parent Project KIPDA #1490. Added this section to Plan. Open to public date changed from 2009 to 2010.

200910

KY 1020

Widen KY 1020 (National Turnpike) from 2 to 3 lanes (3rd lanes will be a center turn lane) from Fairdale Road (MP 0.615) to South Park Road(MP 2.669).

Contact Agency: KYTC State ID #: 08502.00

1817

Project Cost: $1,350,000Estimated Open to Public Year: 2018

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

National Turnpike

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $1,350,000.200910

KY 1849

Construct a new access road beginning where Moorman Road crosses KY 1230 (Lower River Road) and traveling NW into Farnsley-MoormaLanding.

Contact Agency: KYTC State ID #: 0

1820

Project Cost: $680,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $680,000.200910

KY 1931

Construct a left turn lane at KY 1931 (St. Andrews Church Road) and St. Anthony Road.

Contact Agency: KYTC State ID #: 08506.00

1821

Project Cost: $150,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

Project will provide intersection congestion relief and safety improvements.

KIPDA

Project Purpose:

St. Andrews Church Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $150,000.200910

KY 1934

Construct a new access road at the entrance to Farnsley-Kaufman House from KY 1934 (Cane Run Road).

Contact Agency: KYTC State ID #: 08505.00

1822

Project Cost: $80,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

Cane Run Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $80,000.200910

KY 2053/KY 864

Design and construct (phase 1) of a new North/South Park Road west of McNeely Lake from Cooper Chapel Rd. to Mt. Washington Rd. Projlength is 2.0 mi.

Contact Agency: KYTC State ID #: 08400.00

1823

Project Cost: $6,200,000Estimated Open to Public Year: 2012

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

McNeely Lake Park Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $6,200,000. Open to public date is 2012.200910

KY 2055

Widen KY 2055 (Mt. Holly Rd.) from 2 to 3 lanes from KY 1020 (National Turnpike) to Fairdale Road. Project length is 1.4 mi.

Contact Agency: KYTC State ID #: 08503.00

1824

Project Cost: $2,000,000Estimated Open to Public Year: 2016

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

Mt. Holly Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan. Open to public date is 2016.200910

TARC High Capacity Corridors

Add TARC service along two high capacity corridors: Broadway - Bardstown Road - Taylorsville Road Corridor and the Preston Highway-DixHighway Corridor.

Contact Agency: TARC State ID #: 0

1825

Project Cost: $1,274,000Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan.200910

The Park and Ride at Apple Patch

Construction of a park and ride facility including a parking lot, shelter, playground, bike lockers, walkways, and a 1000' access road located oApple Patch Way off of KY-329 near I-71 Exit 14 in Crestwood.

Contact Agency: Oldham Co. State ID #: 0

1826

Project Cost: $1,241,939Estimated Open to Public Year: 2011

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

A M E N D M E N T

Description of Amendments

County/Counties: Oldham

Added to Plan.200910

US 42

Modification of US 42 (Brownsboro Rd.) between Ewing Ave. and Lindsay Ave., includes reduce the existing 4 lane road to 3 lanes and providsidewalk on the north side of road between Lindsay and Dresher Bridge Ave. Project length is 0.4 mi.

Contact Agency: Lou. Metro PW State ID #: 0

1827

Project Cost: $357,610Estimated Open to Public Year: 2010

Regional Priority:Included in AQ Analysis / Regionally Significant:

KIPDA

Project Purpose:

Brownsboro Road

A M E N D M E N T

Description of Amendments

County/Counties: Jefferson

Added to Plan, $357,610. Open to public date is 2010.200910