I- 65
Construct weigh station on I-65 near the Kentucky state line, northbound only. Port of Entry near Kentucky state line.
Contact Agency: INDOT State ID #: 9607500
29
Project Cost: $4,000,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.2009 8
KY 1931
Widen KY 1931 (Greenwood Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 1934 (Greenbelt Highway) to US 31W (DixiHighway), a total of 2.6 miles.
Contact Agency: KYTC State ID #: 08408.00
128
Project Cost: $28,440,000Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
Provide improved access between Dixie Highway and Greenbelt Highway.
KIPDA
Project Purpose:
Greenwood Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2012 to 2016.200910
KY 393
Relocate and widen KY 393 from 2 to 3 lanes (3rd lane will be a center turn lane) from I-71 to north of KY 146 (LaGrange Road). KY 393 reconstruct from northern ramp of I-71 to north of KY 146 (stations 10+100 to 12+100. Project length is 0.9 miles.
Contact Agency: KYTC State ID #: 00234.00
147
Project Cost: $13,780,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Improve safety and reduce congestion by improving roadway geometry and adding a grade separated railroad crossing.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Changed open to public date from 2009 to 2012. Changed project description to "Relocate and widen KY 33 from2 to 3 lanes (3rd lane will be a center turn lane) from I-71 to north of KY 146 (LaGrange Road). KY 393 reconstruct from northerramp of I-71 to north of KY 146 (statins 10+100 to 12+100."
200910
I-265
Reconstruct I-265 (Gene Snyder Freeway) interchange at I-64, including: NB to WB 2 lane flyover, SB to WB 2 lane ramp, and auxiliary lane ttie into KIPDA #197; also includes WB auxiliary lane on I-64 from I-265 to Blankenbaker Pkwy.
Contact Agency: KYTC State ID #: 00021.00
179
Project Cost: $100,022,907Estimated Open to Public Year: 2015
Regional Priority:Included in AQ Analysis / Regionally Significant:
The purpose of this project is to eliminate the clover-leaf interchange, increase capacity, and reduce congestion.
KIPDA
Project Purpose:
Gene Snyder Freeway
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2012 to 2015.200910
I- 64 / KY 1747 Interchange
Reconstruct existing interchange including construct ramp 7 "flyover" from northbound KY 1747 (Hurstbourne Parkway) to westbound I-64 anre-time signals along KY 1747 (Hurstbourne Parkway).
Contact Agency: KYTC State ID #: 00052.00
181
Project Cost: $60,299,200Estimated Open to Public Year: 2021
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will reduce traffic congestion and delay by improving ramp and intersection operating conditions, improve vehicular safety by reducing potentially dangerous uncontrolled vehicle conflict points and providing safe access between local and regional highway systems, anwill enhance the existing system to provide more efficient connections between local and regional highway systems and promote better use o
KIPDA
Project Purpose:
I- 64 / Hurstbourne Parkway Interchange
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2010 to 2021.200910
Crittenden Drive/ I-65
Reconstruct Crittenden Drive intersection at Warnock Street, includes I-65 ramp modifications at Warnock Street.
Contact Agency: Lou. Metro PW State ID #: 00964.10
195
Project Cost: $640,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
The KY 1631 intersection with Warnock is proposed as a safety improvement.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2009 to 2012.200910
I-265
Reconstruct I-265 (Gene Snyder Freeway) interchange at US 60 (Shelbyville Road). Auxiliary lanes will be added to NB and SB I-265 from thUS 60 interchange south to reduce congestion and improve safety. Lanes will be added at the base of the exit ramps. Turn lanes and other improvements will be made to US 60 between English Station Road and Beckley Woods Drive in order to improve safety and increase capacProject length is 0.5 miles.
Contact Agency: KYTC State ID #: 00041.00
197
Project Cost: $5,849,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will reduce traffic congestion and improve safety.
KIPDA
Project Purpose:
Gene Snyder Freeway
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Plan cost decrease. TIP - Move FY 2007 ROW to FY 2009 and increase from $100,000 to $110,000; Move FY 2007 Utilities to FY 2009 and increase from $350,000 to $370,000; Move FY 2008 Construction to FY 2010 and increase from $3,000,000 to $4,000,000; delete FY 2009 Construction $12,480,000 and FY 2010 Construction $21,632,000; IM funds.
200910
Cooper Chapel Road Phase 1
Phase 1: Reconstruct Cooper Chapel Road from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 61 to Smyrna Parkway. Project lenis 1.8 miles.
Contact Agency: Lou. Metro PW State ID #: 00403.00
222
Project Cost: $13,125,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
The area south of I-265 (Gene Snyder Freeway) between KY 61 (Preston Highway) and US 31E (Bardstown Road) is experiencing rapid growwith the development of many new residential subdivisions. Cooper Chapel Roa is a heavily traveled collector road serving this area. The prowill add shoulders where there are none and improve existing poor geometrics to this rapidly growing residential area south of I-265. The proj
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2009 to 2012.200910
River Road
Reconstruct 1 lane bridge on River Road to 2 lanes over Harrods Creek.
Contact Agency: Lou. Metro PW State ID #: 00406.00
226
Project Cost: $1,575,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Reconstruction of the bridge will improve safety.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2008 to 2010.200910
US 42
Construct 2 way center turn lane on US 42 from Harrods Creek Bridge north to River Road. Project length is 1.0 miles.
Contact Agency: KYTC State ID #: 00972.00
230
Project Cost: $7,980,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Add center turn lane to increase safety.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2007 to 2012.200910
KY 1819
Reconstruct and widen KY 1819 (Watterson Trail) from 2 to 3 lanes (3rd lane will be a center turn lane) from Plantside Drive to KY 913 (Blankenbaker Parkway). Approximately 2.0 miles in length.
Contact Agency: KYTC State ID #: 00373.00
233
Project Cost: $13,500,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will improve roadway geometrics improving safety and will accommodate demands from local residential and industrial developm
KIPDA
Project Purpose:
Watterson Trail
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2007 to 2012.200910
KY 1819
Widen KY 1819 (Billtown Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from I-265 (Gene Snyder Freeway) to KY 1819 (WattersTrail). Project length is 3.8 miles.
Contact Agency: KYTC State ID #: 08203.00
257
Project Cost: $21,632,000Estimated Open to Public Year: 2020
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will improve road geometrics to improve safety and reduce traffic congestion.
KIPDA
Project Purpose:
Billtown Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2012 to 2020.200910
LaGrange Underpass West of LaGrange
Construct a 4 lane uninterrupted rail underpass west of LaGrange.
Contact Agency: Oldham Co. State ID #: 00434.00
321
Project Cost: $5,408,000Estimated Open to Public Year: 2014
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Changed open to public date from 2012 to 2014.200910
KY 1747
Add 3rd travel lane southbound on KY 1747 (Hurstbourne Parkway) from US 60 (Shelbyville Road) to Linn Station Road 1.6 miles in length. Includes improvement to the US 60 and Hurstbourne Parkway intersection.
Contact Agency: KYTC State ID #: 00344.01
359
Project Cost: $10,060,000Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project is to improve safety and reduce congestion. Currently, intersection flow is poor; inadequate left-turn storage causes left turn trafficfrom both Hurstbourne and US 60 to back up into the thru lanes creating congestion and a safety hazard. Additionally, merging is a problem ftraffic turning onto southbound Hurstbourne Lane from US 60.
KIPDA
Project Purpose:
Hurstbourne Parkway
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2010 to 2013.200910
KY 1065
KY 1065 (Outer Loop) intersection improvement at KY 864 (Fegenbush Lane) and KY 864 (Beulah Church Road).
Contact Agency: KYTC State ID #: 00122.00
365
Project Cost: $11,810,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will improve traffic safety.
KIPDA
Project Purpose:
Outer Loop
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2008 to 2012.200910
Buechel Bank Road
Add center turn lane on Buechel Bank Road from GE Appliance Park to US 31E (Buechel Bypass). Project length is 0.9 miles.
Contact Agency: Lou. Metro PW State ID #: 08105.00
381
Project Cost: $4,325,000Estimated Open to Public Year: 2015
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will reduce traffic congestion.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2008 to 2015.200910
Hubbards Lane
Widen Hubbards Lane from 2 to 3 lanes (3rd lane will be a center turn lane) from US 60 (Shelbyville Road) to KY 1447 (Westport Road). Addbike lanes to Hubbards Lane from Kresge Way to KY 1447. Project length is 0.6 mi.
Contact Agency: Lou. Metro PW State ID #:
384
Project Cost: $2,050,000Estimated Open to Public Year: 2015
Regional Priority:Included in AQ Analysis / Regionally Significant:
Hubbards Lane is a heavily traveled collector which passes through residential development between US 60 and US 42.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Revise description to include "Add bike lanes to Hubbards Lane from Kresge Way to KY 1447" and decrease project cost $2,050,000
200910
I- 64
Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safety and congestion issuThe improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, additioauxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel.
Contact Agency: KYTC State ID #:
389
Project Cost: $68,428,453Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will help reduce traffic congestion.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed description from "I-64 corridor improvements to consider alternative transportation modes as well as the additionone travel lane in each travel direction between I-71 and I-264. If additional lane is added, intent would be to widen to insto ""Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safand congestion issues. The improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, addition of auxiliary and/or travel lanes, interchange modifications, and installation traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel."
200910
I- 64
Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safety and congestion issuThe improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, additioauxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel.
Contact Agency: KYTC State ID #:
389
Project Cost: $68,428,453Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will help reduce traffic congestion.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2012 to 2015. Increased project cost to $25,000,000.200910
KY 907
Widen KY 907 (Southside Drive) from 2 to 5 lanes (5th lane will be a center turn lane) from KY 1865 (New Cut Road) to KY 1020 (National Turnpike). The design will include the consideration of bicycle and pedestrian facilities. Project length is 0.7 miles.
Contact Agency: KYTC State ID #: 00437.01
465
Project Cost: $3,858,284Estimated Open to Public Year: 2020
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
Southside Drive
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2011 to 2020.200910
I-264
Construct new I-264 (Henry Watterson Expressway) interchange at KY 1931 (Manslick Road).
Contact Agency: KYTC State ID #:
516
Project Cost: $9,000,000Estimated Open to Public Year: 2020
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will provide interstate access to and from KY 1931 ( Manslick Road).
KIPDA
Project Purpose:
Henry Watterson Expressway
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $9,000,000.200910
15th Street East
Reconstruct 15th Street East CSX Railroad crossing, adding flashers and gates.
Contact Agency: New Albany PC State ID #: 8802635
523
Project Cost: $200,000Estimated Open to Public Year: 2020
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project will improve the safety at this railroad crossing.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Deleted from Plan.200910
Goshen Lane
Install sidewalks on Goshen Lane from Valley Drive southeast to US 42 (Brownsboro Road).
Contact Agency: NA State ID #:
908
Project Cost:Estimated Open to Public Year:
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Changed open to public date to 2013.200910
Saint John Road
Reconstruct and realign Saint John Road as a 2 lane (no additional lanes) road 0.5 miles of existing road approximately 2 miles west of IN 60(improved geometrics on section up and down hillside).
Contact Agency: Clark Co. State ID #: 0500175
964
Project Cost: $2,525,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Major horizontal alignment problems-current design speed less than 20 mph. Realignment will improve design speed to 30 mph.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Move ROW to 2011, change open date to 2012200910
IN 111
Widen IN 111 from 2 to 5 lanes (5th lane will be a center turn lane) from Klerner Lane to Chapel Road (2.26 miles). Widen from 2 to 3 lanes from Chapel Road to Fairview Knob Road (0.36 miles). Reconstruct as 2-lane road from Fairview Knob Road to IN 60 (3.08 miles). Includesbridge, signals and signs.
Contact Agency: INDOT State ID #: 9902540
998
Project Cost: $30,613,045Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
The need for improvement is based on the facilities substandard geometrics, lack of traffic capacity along the corridor and accident history. Existing LOS has fallen to substandard levels along the corridor. The purpose of the project is to improve the traffic flow/mobility and safety byadding capacity and improving geometrics along the corridor. INDOT database shows 129 accidents from 1996 to 1999 along IN 111from IUS
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark, Floyd
Move Open to Public date to 2013 TIP - Move FY 2006 ROW to FY 2010 $2,500,000; Move FY 2009 Const. to FY 2011 STP-State.
200910
IN 62
Intersection improvement at IN 62 and Salem Noble Road
Contact Agency: INDOT State ID #: 0100732
1094
Project Cost: $110,000Estimated Open to Public Year: 2009
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.2009 8
IN 60
Intersection improvement on IN 60 at Saint Joe Road (west junction).
Contact Agency: INDOT State ID #: 0100713
1098
Project Cost: $530,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.200910
I- 65
Bridge replacement on I-65 over Muddy Fork Creek. 2.38 miles north of Charlestown Road.
Contact Agency: INDOT State ID #: 0100346
1101
Project Cost: $1,030,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.2009 8
IN 60
Intersection improvement on IN 60 at Saint Joe Road (east junction).
Contact Agency: INDOT State ID #: 0100712
1104
Project Cost: $330,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.200911
KY 61
Widen KY 61 from 2 to 4 lanes from existing 4 lane section to Shepherdsville. Section 3 - from south of Brooks Run to existing four lane (Construction Sequence 1). Project length is 1.7 mi.
Contact Agency: KYTC State ID #: 00117.35
1125
Project Cost:Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Improve safety and reduce congestion
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Bullitt
TIP - Change OTP from 2009 to 2012; Move FY 2009 Construction to FY 2010 and increase from $10,175,000 to $10,930,000.
200910
Broadway & 18th Street
Align intersection of Broadway and 18th Street by moving the south leg of 18th Street to the east.
Contact Agency: Lou. Metro PW State ID #: 00413.00
1192
Project Cost: $500,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Improve operation of signal by eliminating offset intersection.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2008 to 2010.200910
I- 64
Interchange modification on I-64 at IN 62 and IN 64, adding turn lanes.
Contact Agency: INDOT State ID #: 0101102
1244
Project Cost: $7,534,000Estimated Open to Public Year: 2009
Regional Priority:Included in AQ Analysis / Regionally Significant:
The essential purpose for this project is to modify the existing interchange to accommodate the IN 64 movements and to coordinate or clusterclosely spaced signals (West Knable Rd. North (westbound) ramp terminus and South (eastbound ramp terminus) to optimize the flow of traffThe primary need for this improvement is based on congestion and geometric deficiencies at the interchange and the closely spaced
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Moved open to public date from 2013 to 2009. Changed project cost from $16,480,000 to $7,534,000.200910
Olmsted Parkways Multi-Use Path System
Construct a multi-use path system connecting Algonquin, Southwestern, Southern and Eastern Parkways with existing trails to create a continuous 30 miles of connected paths for pedestrians and bicyclists. Change from 4 lanes to 3 lanes (3rd lane will be a center turn lane) onSouthwestern Parkway from Shawnee Park to I-264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from New Cut Road to Sou3rd Street, and Eastern Parkway from I-65 to Cherokee Park.
Contact Agency: Lou. Metro Parks State ID #: 00506.00
1273
Project Cost: $8,189,010Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed project description to include, "Change from 4 lanes to 3 lanes (3rd lane will be a center turn lane) on Southwestern Parkway from Shawnee Park to I-264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from NCut Road to South 3rd Street, and Eastern Parkway from I-65 to Cherokee Park". Changed open to public date to 2012.
200910
Downtown Two-Way Street Conversion
Convert the following north/south streets to two-way from the river to Broadway: Preston, Jackson, 3rd, 5th, 6th, 7th and 8th streets. In additiconvert the following east/west streets to two-way: Liberty and Jefferson streets.
Contact Agency: Metro. Dev. Auth. State ID #:
1337
Project Cost:Estimated Open to Public Year: 2007
Regional Priority:Included in AQ Analysis / Regionally Significant:
Retailers usually experience a positive impact from the conversion to two-way streets that allow for more visibility and the possibility of a growsales.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Deleted from Plan, $2,550,000. Replace with new projects - One-Way Street Conversion to Two-Way Phase 1 #1809 anPhase 2 #1810.
200910
I-265
I-265 (Lee Hamilton Highway) interchange modification at State Street. Add lanes on ramps.
Contact Agency: INDOT State ID #: 0401133
1344
Project Cost: $880,000Estimated Open to Public Year: 2017
Regional Priority:Included in AQ Analysis / Regionally Significant:
To alleviate congestion (back ups) on State Street. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alonhas not addressed this issue.
KIPDA
Project Purpose:
Lee Hamilton Highway
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date from 2012 to 2017. Increased project cost to $880,000.200910
I-265
I-265 interchange modification at IN 111. Add lanes on ramps.
Contact Agency: INDOT State ID #: 0401134
1345
Project Cost: $880,000Estimated Open to Public Year: 2017
Regional Priority:Included in AQ Analysis / Regionally Significant:
To alleviate congestion (back ups) on ramps to IN 111. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alone has not addressed this issue.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date from 2012 to 2017. Increased project cost to $880,000.200910
I-265
I-265 interchange modification at Charlestown Road. Add lanes on ramps.
Contact Agency: INDOT State ID #: 0401135
1346
Project Cost: $880,000Estimated Open to Public Year: 2017
Regional Priority:Included in AQ Analysis / Regionally Significant:
To alleviate congestion (back ups) on ramps to IN 311. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alone has not addressed this issue.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date from 2012 to 2017. Increased project cost to $880,000.200910
Blackiston Mill Road
Intersection improvements at Blackiston Mill Road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB BlackistMill Road, and left and right turn lanes at WB Potters Lane, including sidewalks, curb, gutters and landscaping.
Contact Agency: Clarksville PW State ID #:
1394
Project Cost: $900,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Change description from "Intersection improvements at Blackiston Mill Road and Potters Lane including the installation oftraffic signal and add left turn lanes on SB approach of Blackiston Mill Road and right turn lane on Potters Lane." to "Intersection improvements at Blackiston Mill road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB Blackiston Mill Rd., and left and right turn lanes at WB Potters ln., including sidewalks, curb, gutters and landscaping."
2009 8
Blackiston Mill Road
Intersection improvements at Blackiston Mill Road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB BlackistMill Road, and left and right turn lanes at WB Potters Lane, including sidewalks, curb, gutters and landscaping.
Contact Agency: Clarksville PW State ID #:
1394
Project Cost: $900,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Increased cost to $900,000. Changed open to public date to 2012.200910
KY 2053
Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes (3rd lane is center turn lane): Phase 1 - from KY 61 (Preston Highway) to Penn RunCreek (Open to public date is 2012); Phase 2 - from Penn Run Creek to KY 864 (Cedar Creek Road) (Open to public date is 2020). Project length: Phase 1 - 1.6 mi; Phase 2 - 1.2 mi.; total - 2.8 mi.
Contact Agency: KYTC State ID #: 08205.00
1396
Project Cost: $4,000,000Estimated Open to Public Year: 2020
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
Mt. Washington Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed project description from "Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes from KY 61 (Preston Highwayto KY 864 (Cedar Creek Road)" to "Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes (3rd lane is center turn lane)Phase 1 - from KY 61 (Preston Highway) to Penn Run Creek (Open to public date is 2012); Phase 2 - from Penn Run Creto KY 864 (Cedar Creek Road) (Open to public date is 2020)." Changed open to public date from 2009 to dates indicateddescription.
200910
Wilson Switch Road
Railroad grade crossing improvements at Ebenezer Church Road and CSX Railroad near Borden.
Contact Agency: INDOT State ID #: 0500232
1431
Project Cost: $225,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Maintenance and safety improvements at railroad crossing.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Changed open to public date from 2008 to 2010. Increased plan project cost from $210,000 to $225,000.200910
Ebenezer Church Road
Railroad grade crossing improvement at Ebenezer Church Road and CSX Railroad near Borden.
Contact Agency: INDOT State ID #: 0500233
1433
Project Cost: $225,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Changed open to public date from 2008 to 2010.200910
KY 22
Reconstruct intersection of KY 22 at Goose Creek Road.
Contact Agency: KYTC State ID #: 00371.13
1446
Project Cost: $2,710,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Project will improve the safety, operation, and congestion of the roadway as sited in the KY 22 Scoping Study in Jefferson and Oldham Countprepared by HNTB Corporation, October, 2005.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2009 to 2012.200910
KY 2055
Widen existing lanes (no new travel lanes), improve, and realign west KY 2055 (Manslick Road and Mt. Holly Road) at the intersections of Fairdale Road and Mitchell Road.
Contact Agency: KYTC State ID #: 08501.00
1451
Project Cost: $3,000,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
To improve traffic conditions.
KIPDA
Project Purpose:
Manslick Road/Mt. Holly Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2008 to 2010.200910
River Ridge Commerce Center
Intersection improvements to IN 62 and Salem Noble Road, including widening EB and WB approaches of Salem Noble Road, additions and modifications of turn lanes, and installation of traffic signal. Addition of turn lanes on IN 62 and connection to Patrol Road at 3 intersections nof Salem Noble Road ending at Avenue D. Also includes the closing of 3 median openings on IN 62 between River Ridge Circle and Salem Noble Road, and the addition of right turn deceleration lanes on the east side of IN 62 at these intersections.
Contact Agency: River Ridge Dev. Auth. State ID #: 0600756
1455
Project Cost:Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
IN 62
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Move FY 2009 Const to Fy 2010 and Change desctiption from "Reconstruct existing 2 lane road (no additional lanes) in thRiver Ridge Commerce Center (Phase 2)." to " "Intersection improvements to IN 62 and Salem Noble Road, including widening EB approach of Salem Noble Road, addition and modification of turn lanes, and installation of traffic signal. Alsoincludes the closing of 3 median openings on IN 62 between River Ridge Circle and Salem Noble Road, and the addition right turn deceleration lanes on the east side of IN 62 at these intersections."
2009 8
I- 64
Bridge inspection of I-64 over the Ohio River.
Contact Agency: INDOT State ID #: 0600404
1458
Project Cost: $50,000Estimated Open to Public Year: 2007
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Deleted from Plan.2009 8
I- 64/I-264
Reconstruct the I-264 (Shawnee Expressway) northbound ramp to westbound I-64.
Contact Agency: KYTC State ID #: 00389.00
1477
Project Cost: $3,700,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Replace inferior and deteriorating bridge.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2008 to 2012.200910
I- 71
Reconstruct I-71/I-264 interchange including the addition of north and southbound auxiliary lanes on I-71 and I-264. Project length is 2.2 miles
Contact Agency: KYTC State ID #: 00048.20
1479
Project Cost: $26,577,134Estimated Open to Public Year: 2014
Regional Priority:Included in AQ Analysis / Regionally Significant:
Reduce congestion and improve safety at I-71/I-264 and I-264/US 42 interchanges.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2020 to 2014. Changed description to "Reconstruct I-71/I-264 interchange including thaddition of north and southbound auxiliary lanes on I-71 and I-264."
200910
I-265
Improve the I-265 / KY 146 (LaGrange Road) interchange by: (1) extending 1 NB travel lane on KY 146 from Kroger to Springs Station Road (2) extending 1 SB KY 146 left-turn lane for access to SB I-265. Project length is 0.2 miles.
Contact Agency: KYTC State ID #: 00271.00
1485
Project Cost: $3,620,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
Safety concerns and traffic flow improvements
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2009 to 2011.200910
KY 22
Reconstruct KY 22 widening it from 2 to 3 lanes (3rd lane will be a center-turn lane) from KY 329 to KY 329B and from 2 to 5 lanes (5th lane wbe a center-turn lane) from KY 329B to Abbott Lane.
Contact Agency: KYTC State ID #: 00304.10
1488
Project Cost: $15,910,076Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
Project will update the facility to meet existing and future capacity needs and transportation demands, and address safety issues along KY 14and KY 22 between Pryor Ave. and Abbott Ln. The realignment of KY 22 in the vicinity of Currys fork will address some safety concerns.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Changed open to public date from 2012 to 2013.200910
KY 22
Reconstruct 22 widening it from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 329 to KY 329B; and from 2 to 5 lanes (5th lane will a center turn lane) from KY 329B to Abbott Lane. Total project length is 2.4 mi.
Contact Agency: KYTC State ID #: 00304.20
1489
Project Cost: $15,910,076Estimated Open to Public Year: 2015
Regional Priority:Included in AQ Analysis / Regionally Significant:
Project will update the facility to meet existing and future capacity needs and transportgation demands, and address safety issues along KY 1and KY 22 between Abbott Lane and (existing) KY 393.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Changed open to public date from 2012 to 2015.200910
KY 1494
Widen travel lanes (no additional travel lanes) on KY 1494 in Bullitt County, and relocate road from 2000 feet west of KY 61 to KY 61.
Contact Agency: KYTC State ID #: 00293.00
1493
Project Cost: $2,000,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Minor widening project to improve traffic flow.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Bullitt
Changed open to public date from 2008 to 2012.200910
I- 64
Inspection of I-64 bridge over the Ohio River.
Contact Agency: INDOT State ID #: 0300421
1495
Project Cost: $560,000Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
Bridge maintenance.
KIPDA
Project Purpose:
Sherman Minton Bridge
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date from 2008 to 2013. Increased total project cost from $50,000 to $560,000.200910
I-265
Pavement of I-265 from I-64 to I-65.
Contact Agency: INDOT State ID #: 0501179
1497
Project Cost: $6,000,000Estimated Open to Public Year: 2014
Regional Priority:Included in AQ Analysis / Regionally Significant:
Roadway maintenance.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark, Floyd
Changed open to public date to 2014.2009 8
Bicycle Priority Corridor
Improvements for bicycling on River Road between Zorn Avenue and Blankenbaker Lane
Contact Agency: Lou. Metro PW State ID #:
1513
Project Cost: $845,520Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Description changed to "Improvements for bicycling on River Road between Zorn Avenue and Blankenbaker Lane." Changed open to public date to 2011.
200910
I- 65
Landscaping the interchange of I-65 and IN 311.
Contact Agency: INDOT State ID #: 0500936
1518
Project Cost: $420,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.2009 8
I- 64
Paint I-64 bridge over the Ohio River (Main Bridge).
Contact Agency: INDOT State ID #: 0501153
1519
Project Cost: $15,000,000Estimated Open to Public Year: 2018
Regional Priority:Included in AQ Analysis / Regionally Significant:
Maintenance of bridge over the Ohio River.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2018.2009 8
I- 64
Paint I-64 WBL Bridge (Indiana WBL approach bridge - upper level).
Contact Agency: INDOT State ID #: 0501154
1520
Project Cost:Estimated Open to Public Year: 2017
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2017.2009 8
I- 64
Paint I-64 east bound bridge (Indiana longer east bound approach bridge - lower level).
Contact Agency: INDOT State ID #: 0501155
1521
Project Cost:Estimated Open to Public Year: 2017
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2017.2009 8
I- 64
Paint I-64 east bound bridge (Indiana shorter east bound approach bridge - lower level).
Contact Agency: INDOT State ID #: 0501156
1522
Project Cost:Estimated Open to Public Year: 2017
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2017.2009 8
I- 65
I-65 bridge maintenance and rehabilitation (Indiana approach bridge) over the Ohio River.
Contact Agency: INDOT State ID #: 0501158
1524
Project Cost: $500,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Changed open to public date to 2012.2009 8
IN 62
Pavement rehabilitation on IN 62 from I-65 to E junction of IN 62/IN 265.
Contact Agency: INDOT State ID #: 0600814
1526
Project Cost:Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.2009 8
I- 65
Pavement resurfacing on I-65 from IN 62 to 0.26 mi south of IN 311. Project length is 2.9 miles.
Contact Agency: INDOT State ID #: 0501211
1529
Project Cost: $1,272,279Estimated Open to Public Year: 2015
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Added to the Plan.200910
IN 62
Roadside maintenance on IN 62 at Fourteen Mile Creek.
Contact Agency: INDOT State ID #: 0300437
1533
Project Cost: $100,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties:
Deleted from Plan.2009 8
I- 64 Guardrails
Install guardrails on I-64 at various locations.
Contact Agency: INDOT State ID #: 0710151
1535
Project Cost: $560,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Floyd
Changed open to public date from 2009 to 2010. Changed total project cost from $346,500 to $560,000.200910
I-265 Guardrails
Add guardrails at various location on I-265 (Lee Hamilton Highway).
Contact Agency: INDOT State ID #: 0710152
1536
Project Cost: $931,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
Lee Hamilton Highway
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark, Floyd
Changed open to public date from 2009 to 2010. Increased total project cost from $651,000 to $931,000.200910
I- 64
Bridge maintenance and repair of I-64 bridge over the Ohio River.
Contact Agency: INDOT State ID #: 0710264
1538
Project Cost: $2,575,000Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2013, total cost $2,575,000.2009 8
I- 64
Bridge maintenance and repair of I-64 approach bridges to the Ohio River Bridge and over IN 111.
Contact Agency: INDOT State ID #: 0710265
1539
Project Cost: $1,350,000Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2013, total cost $1,350,000.2009 8
IN 60
Replace bridge over Persimmon Run, 4.93 miles west of IN 111.
Contact Agency: INDOT State ID #: 0800080
1541
Project Cost: $575,000Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Move FY 2009 ROW and FY 2011 Construction to future, Bridge funds.2009 8
IN 60
Replace bridge over Persimmon Run, 4.93 miles west of IN 111.
Contact Agency: INDOT State ID #: 0800080
1541
Project Cost: $575,000Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Changed open to public date to 2016.2009 8
IN 60
Replace bridge over Persimmon Run, 4.93 miles west of IN 111.
Contact Agency: INDOT State ID #: 0800080
1541
Project Cost: $575,000Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Increased plan project cost from $195,000 to $575,000, changed open to public date from 2011 to 2016.200910
Incident Management (Hoosier Helper Program)
Purchase TMC vehicles for Falls City (Hoosier Helpers).
Contact Agency: INDOT State ID #: 0710299
1546
Project Cost:Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark, Floyd
Project deleted from Plan and TIP200910
Market Street/Spring Street
Upgrade and designate Market Street and Spring Street as two-way streets from IN 111 to State Street; also includes the two-way conversionElm Street, Pearl Street, and Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvemenwell as traffic calming devices and sidewalks.
Contact Agency: New Albany PC State ID #: 0901275
1556
Project Cost:Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
This project would upgrade portions of Market Street and Spring Street between State Street and Vincennes Street to modify the street as twway. The change would enhance traffic flow and alleviate traffic congestion associated with New Albany's current one way street system in thDowntown district.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Revised project description to "Upgrade and designate Spring Street as two-way streets from IN 111 to State Street; also includes the two-way conversion of Elm Street, Pearl Street, and Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvement as well as traffic calming devices and sidewalks."
200910
IN 60
Reconstruct and widen the bridge deck on IN 60, 1.97 miles west of IN 311. Lane will be added to the bridge deck to connect with the addedlanes at intersections on each end of the bridge, Saint Joe Road East and Saintt Joe Road West. Saintt Joe Road East and Saint Joe Road West intersections are located approx. 1,580 ft apart.
Contact Agency: INDOT State ID #: 0710592
1571
Project Cost: $256,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Deleted from Plan.200910
IN 60
Small structure maintenance (pipe lining) at various locations on IN 60
Contact Agency: INDOT State ID #: 0800197
1591
Project Cost: $507,865Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark
Added to Plan.200910
West Street
Railroad protection improvement at CSX railroad at West Street in Borden, Indiana.
Contact Agency: INDOT State ID #: 0810455
1597
Project Cost: $265,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Decreased plan project cost from $1,875,000 to $265,000.200910
Georgetown-Lanesville Road
Pavement Resurfacing on Georgetown-Lanesville Road for approximately 2.0 miles.
Contact Agency: Floyd Co. State ID #:
1601
Project Cost: $257,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Maintenance
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Deleted from Plan.2009 8
Jeffersontown ADA Ramp/Sidewalk Replacements
Replace or upgrade approximately 1443 handicap ramps and 1570 linear feet of sidewalks within the City of Jeffersontown, Kentucky
Contact Agency: Jeffersontown State ID #:
1605
Project Cost: $742,500Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
The City of Jeffersontown needs to reconstruct and replace various sidewalks throughout the City as well as reconstruct older ADA-accessiblramps in order to meet current ADA standards.
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Jefferson
Changed open to public date from 2009 to 2010.200910
8th Street Rehabilitation
Mill, grind, and rehabilitate pavement on 8th Street from Main Street to Perrin Lane.
Contact Agency: Jeffersonville PW State ID #: 0900627
1619
Project Cost:Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Bullitt, Clark
Deleted from Plan.2009 8
Bullitt County Signage
Add or replace signs on functionally classified roads in Bullitt County.
Contact Agency: Bullitt Co. State ID #:
1624
Project Cost:Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Bullitt
Deleted from Plan.2009 8
A.B. Sawyer Shared Use Path
Construct a 2,800' long, 10' wide multiuse path through A.B. Sawyer Park and connecting to surrounding neighborhoods includes an underpabridge, and site amenities.
Contact Agency: Lou. Metro Parks State ID #: 0
1662
Project Cost: $616,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.2009 4
TARC Jeffersonville Riverfront Transit
New express bus service from downtown Louisville to Jeffersonville for employees who work along Jeffersonville's riverfront.
Contact Agency: TARC State ID #: 0
1664
Project Cost: $395,314Estimated Open to Public Year: 2009
Regional Priority:Included in AQ Analysis / Regionally Significant:
Project provides transit service to people who work along Jeffersonville's riverfront.
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark
Added to Plan.2009 4
Brown Station Way
Pavement resurfacing of Brown Station Way from Randolph Avenue to Lewis & Clark Parkway.
Contact Agency: Clarksville PW State ID #: 0901547
1666
Project Cost: $1,000,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Maintenance of roadway to preserve infrastructure.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Added to Plan, $1,000,000.2009 8
Ohio River Scenic Byways
2004 National Scenic Byway Grant for Implementation of the Corridor Management Plan of the Ohio River Scenic Byway in Indiana
Contact Agency: INDOT State ID #: 0400719
1757
Project Cost: $31,840Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Preservation of Ohio River Scenic Byway.
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark, Floyd
Added to Plan, $31,840.2009 8
Ohio River Scenic Byways
Ohio River Scenic Byways interpretive panels
Contact Agency: INDOT State ID #: 0300114
1758
Project Cost: $179,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark, Floyd
Added to Plan, $179,000.2009 8
I- 64
Perform in-depth inspection of I-64 bridge (Sherman Minton) over Ohio River at Louisville
Contact Agency: KYTC State ID #: 0063.00
1759
Project Cost: $160,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Bridge maintenance
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $160,000.2009 8
I- 71
Spot improvements and pavement rehabilitation on I-71
Contact Agency: KYTC State ID #: 8510.00
1760
Project Cost: $6,000,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
Roadway maintenance
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Jefferson
Added to Plan.2009 8
I-264
Design and construct a sound barrier between Bardstown Road and Newburg Road
Contact Agency: KYTC State ID #: 8413.00
1761
Project Cost: $1,000,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.2009 8
I-264
Landscaping I-264 (Shawnee Expressway) at Dixie Highway
Contact Agency: KYTC State ID #: 2000.76
1762
Project Cost: $1,020,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Landscaping
KIPDA
Project Purpose:
Shawnee Expressway
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $1,020,000.2009 8
I- 65
Install new guardrail on I-65 at various locations on I-65
Contact Agency: INDOT State ID #: 0900105
1764
Project Cost: $4,658,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark
Added to Plan.200910
IN 111
Install signs, signals, and markings on IN 111 from Beechwood Avenue to Mt. Tabor Road. Project length is 1.7 miles.
Contact Agency: INDOT State ID #: 0710335
1765
Project Cost: $500,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Added to Plan.200910
I- 64
Install lighting at the I-64/US 150 Interchange
Contact Agency: INDOT State ID #: 0800320
1768
Project Cost: $500,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Added to Plan.200910
I- 64
Replace pipe lining at various locations on I-64
Contact Agency: INDOT State ID #: 0800420
1769
Project Cost: $1,077,750Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Floyd
Added to Plan.200910
I- 64
Install signs, lighting, and markings on I-64 from I-265 to IN 111. Project length is 1.8 mi.
Contact Agency: INDOT State ID #: 0810264
1770
Project Cost: $350,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Added to Plan.200910
I- 65
Purchase Hoosier Helper Vehicles for the Jeffersonville/New Albany Area
Contact Agency: INDOT State ID #: 0200602
1771
Project Cost: $115,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark, Floyd
Added to Plan.200910
IN 62
Replace traffic signal at IN 62 and Salem Noble Road
Contact Agency: INDOT State ID #: 0900143
1773
Project Cost: $250,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Clark
Added to Plan.200910
IN 160
Replace pipe lining at various locations on IN 160.
Contact Agency: INDOT State ID #: 0800204
1774
Project Cost: $527,480Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark
Added to Plan.200910
Spring Street
Railroad crossing improvement on Spring Street at CSX Railroad crossing
Contact Agency: INDOT State ID #: 9383760
1775
Project Cost: $100,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Added to Plan.200910
New Albany Ohio River Greenway
Construct a pedestrian/bicycle path along Water Street and the floodwall from East 8th Street to the Silver Creek Bridge. Project length is 1.7miles.
Contact Agency: New Albany PC State ID #: 0902325
1779
Project Cost: $1,062,500Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
Project will provide for alternate form of transportation and provide a safe way for bicyclists and pedestrians to travel to and from Clarksville aJeffersonville.
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Floyd
Added to Plan, $1,062,500.200911
Second Street Streetscape Project
Improvements to traffic intersections, sidewalks, accessibility/mobility, landscaping, lighting, architectural enhancements, utilities and the creating of a public gathering space along Second Street between Main Street and River Road as well as a portion of Washington Street in thblock east of Second Street in downtown Louisville.
Contact Agency: Lou. Metro PW State ID #: 0
1783
Project Cost: $2,400,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Bicycle Facility Improvements - Striping, Signage & Signalization 2010
Provide signage for the expanding bicycle facility network and enhance the safety of existing roadways by installing shared-lane markings andother bike/ped signage and markings. The project will also retrofit existing roadways without changing the curb to curb width.
Contact Agency: Lou. Metro PW State ID #: 0
1785
Project Cost: $187,500Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Bicycle Sharing System
Pilot system for the installation of four bike kiosks to be located at: (1) SW corner of W. Jefferson St and S. 8th St. (2) SE corner of W. LibertySt. and S. 6th. St. (3) NW corner of W. Muhammad Ali Blvd and S. 5th St. and (4) SE corner of E. Gray St. and S. Preston St.
Contact Agency: Lou. Metro PW State ID #: 0
1787
Project Cost: $225,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
I-264 Fairgrounds & Airport Exits Landscaping Project
Install landscaping at the following areas along I-264 near the KY State Fairground and the Louisville International Airport:(1) Area bounded by the ramp from Freedom Way (CS-1508G) to I-264 West(2) Area bounded by the ramp from I-264 East to Freedom Way (CS-1508G)(3) Area bounded by Lower Terminal Drive (CS-1212G), Standiford Field NC (CS-2120-10), and I-264 West(4) Area bounded by I-264 West, the ramp from I-65 South to Terminal Drive (CS-1073G)/Louisville International Airport Entrance
Contact Agency: Lou. Metro PW State ID #: 0
1788
Project Cost: $870,793Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
ITS Activities on Various NHS Routes
Provide message signs (DMS)/ cameras on I-265 on either side of I-64 and I-65 interchanges, and I-71 NB in Oldham County, as part of the TRIMARC system. This will be part of a larger ITS project in Highway District's 4, 5, and 6.
Contact Agency: KYTC State ID #: 0
1789
Project Cost: $850,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Jefferson, Oldham
Added to Plan.200910
KY 245
Minor widening of KY 245 (no additional travel lanes) from Bernheim Forest to the Community College. Project length is 1.2 mi.
Contact Agency: KYTC State ID #: 08509.00
1790
Project Cost: $4,310,000Estimated Open to Public Year: 2015
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Bullitt
Added to Plan.200910
LaGrange Road Pedestrian Facilities Project
(1) Construction of sidewalks along Lagrange Road from Lyndon Lane to Bowen Elementary School. (2) Narrow the travel lanes from 12 ft. to 11 ft. and remove the rumbles from the shoulders to provide two 4-foot on-street bicycle lanes along New Lagrange Road (KY-146) from Lyndon Lane to Whipps Mill Road.
Contact Agency: Lou. Metro PW State ID #: 0
1791
Project Cost: $1,695,500Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Louisville Metro Hybrid Fleet Vehicles 2010
Purchase of 25 Ford Escape Hybrids
Contact Agency: Lou. Metro PW State ID #: 0
1792
Project Cost: $204,611Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Northeast Louisville Loop Multi-Use Path
Construct a shared-use path along US 60 (Shelbyville Road) from Old Shelbyville Road to North English Station Road and from English StatioWay to North Beckley Station Road.
Contact Agency: Lou. Metro Parks State ID #: 0
1794
Project Cost: $937,500Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Portland Elementary Safe Routes to School
Pedestrian and bicycle improvements around the Portland Elementary School campus including the following locations: (1) Northwestern Pkwthe intersection of 33rd, 34th, and 35th Streets. (2) 35th Street between Northwestern Pkwy and Pflanz Ave. (3) Intersection of Northwestern Pkwy and Portland Ave
Contact Agency: Lou. Metro PW State ID #: 0
1795
Project Cost: $56,811Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Rangeland Elementary Safe Routes to School
Pedestrian and bicycle improvements in and around the Rangeland Elementary School campus including the following locations: (1) intersectat Ridgecrest Road and Rangeland Road. (2) from the school grounds through Rosalind Court to Runic Way. (3) various areas along Runic Way. (4) from the school grounds to Ridgecrest Road
Contact Agency: JCPS State ID #: 0
1796
Project Cost: $39,473Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Middletown Streetscape Project Phase IV
Streetscape improvements to Main Street from Watterson Trail to Blankenbaker Parkway in Middletown (final phase of the project). Various improvements include: ADA accessibility, improved parking, improved sidewalks, street lights, drainage, curbs and gutters, and landscaping
Contact Agency: Middletown State ID #: 0
1797
Project Cost: $262,875Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Third Street and Eastern Parkway Bikeway and Safety Improvement Project
(1) Construction of new University of Louisville entrance and more direct access to classroom buildings at the intersection of Third Street andEastern Parkway. (2) Construction of bicycle/pedestrian safety improvements along Third Street from Eastern Parkway to Grawemeyer Hall aalong Eastern Parkway from Third Street to Ernst Hall. (3) Reconstruction of the bus pull-off area at the intersection of Third Street and EasteParkway.
Contact Agency: Univ. of Louisville State ID #: 0
1798
Project Cost: $2,500,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
University Corridor Fourth Street Intersection Improvements
Reconstruct intersections on Fourth Street at Industry Rd. and Central Ave. (no additional travel lanes); includes restriping Fourth St. from noof Norfolk-Southern viaduct to Central Ave.
Contact Agency: Univ. of Louisville State ID #: 0
1799
Project Cost: $1,600,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $1,600,000.200910
University of Louisville - Campus Bikeway & Safety Improvement
Completion of the U of L Master Plan for campus biking/walking improvements along: (1) Lee Street from the CSX railroad line to Third StreetThird Street from Lee Street to Cardinal Blvd. (3) Cardinal Blvd. from CSX railroad line to Floyd Street (4) Floyd Street from Cardinal Blvd. to Cardinal Stadium (5) Eastern Pkwy from Floyd Street to Second Street
Contact Agency: Univ. of Louisville State ID #: 0
1800
Project Cost: $2,110,500Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
Crittenden Drive
Relocate Crittenden Drive at the Louisville Regional Airport Authority to allow for construction of a taxiway to accommodate Group 6 Aircraft.
Contact Agency: KYTC State ID #: 08414.00
1801
Project Cost: $2,000,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $2,000,000. Open to public date is 2012.200910
Greenwood Road/Terry Road
Construct a right turn lane on Terry Road at Greenwood Road.
Contact Agency: KYTC State ID #: 08500.00
1802
Project Cost: $300,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $300,000.200910
I- 64
Construction of I-64 WB auxiliary lane from Hurstbourne Pkwy. To I-264, restripe gore area on I-264 WB at I-64 and extend left turn storage lanes on KY 1932 (Breckenridge Ln.). Initial phase of ultimate project 159.00. Project length is 1.7 mi.
Contact Agency: KYTC State ID #: 00159.10
1803
Project Cost: $5,600,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $5,600,000.200910
I- 64 / KY 1747 Interchange
Reconstruct existing interchange including construct a triple left turn movement from WB Linn Station Rd. to SB Hurstbourne Pkwy.; additionaSB lane for Hurstbourne Pkwy from Linn Station Rd. to Ramp 1 (I-64 EB off ramp); provide right turn lane for NB Hurstbourne to EB Linn StatRd.; provide dual left turn lanes from Ramp 5 (I-64 WB off ramp) to SB Hurstbourne. Widen Ramp 5 to 3 lanes approaching the terminal; WidRamp 6 (I-64 WB on ramp) for dual right turn lanes from SB Hurstbourne Pkwy.; provide dual left turn lanes from SB Hurstbourne Pkwy to Ramp 4 (I-64 EB on ramp). Widen Ramp 4 for dual lanes turning to ramp; Align Ramp 2 (I-64 EB off ramp for local traffic) to the new lane to S
Contact Agency: KYTC State ID #: 0052.00
1804
Project Cost: $32,620,000Estimated Open to Public Year: 2013
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan. Open to public date is 2013.200910
I- 64
Various roadside maintenance (mowing) on I-64
Contact Agency: INDOT State ID #: 0800566
1805
Project Cost: $250,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Floyd
Added to Plan, $250,000.200911
I- 65
Various roadside maintenance (mowing) for 14.67 miles on I-65
Contact Agency: INDOT State ID #: 0800564
1806
Project Cost: $90,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Clark
Added to Plan, $90,000.200911
Buckner Connector
Construct new connection from Old LaGrange Road to KY 393 Project length is 0.8 miles.
Contact Agency: Oldham Co. State ID #: 0
1808
Project Cost: $1,300,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Added to Plan.200910
One-Way Street Conversion to Two-Way Phase 1
Conversion of one-way streets in downtown Louisville to two-way traffic (Main, Jefferson, Liberty, Muhammad Ali, Chestnut, 3rd Streets).
Contact Agency: Lou. Metro PW State ID #: 0
1809
Project Cost: $2,606,500Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $2,606,500. Open to public date is 2010.200910
One-Way Street Conversion to Two-Way Phase 2
Conversion of one-way streets in downtown Louisville to two-way traffic (8th, 7th, Shelby, Campbell Streets).
Contact Agency: Lou. Metro PW State ID #: 0
1810
Project Cost: $935,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $935,000. Open to public date is 2011.200910
Metro-wide Traffic Signal Synchronization - Phase 1
Upgrade and expand the Metro-wide traffic signal program to reduce vehicle emissions, reduce overall vehicle delays and travel times, reducfuel consumption, reduce vehicle operating costs and increase traffic safety. The proposed project would provide upgrades and communications to approximately 106 traffic signals along critical suburban corridors.
Contact Agency: Lou. Metro PW State ID #: 0
1811
Project Cost: $1,000,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Cannot be mapped.
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
KY 480
Widen from 2 to 3 lanes (3rd lane is center turn lane) from Cedar Grove Elementary to Valley View Drive. Project length is 0.6 mi.
Contact Agency: KYTC State ID #: 00391.20
1816
Project Cost: $2,500,000Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Bullitt
Breakout this section from Plan Parent Project KIPDA #1490. Added this section to Plan. Open to public date changed from 2009 to 2010.
200910
KY 1020
Widen KY 1020 (National Turnpike) from 2 to 3 lanes (3rd lanes will be a center turn lane) from Fairdale Road (MP 0.615) to South Park Road(MP 2.669).
Contact Agency: KYTC State ID #: 08502.00
1817
Project Cost: $1,350,000Estimated Open to Public Year: 2018
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
National Turnpike
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $1,350,000.200910
KY 1849
Construct a new access road beginning where Moorman Road crosses KY 1230 (Lower River Road) and traveling NW into Farnsley-MoormaLanding.
Contact Agency: KYTC State ID #: 0
1820
Project Cost: $680,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $680,000.200910
KY 1931
Construct a left turn lane at KY 1931 (St. Andrews Church Road) and St. Anthony Road.
Contact Agency: KYTC State ID #: 08506.00
1821
Project Cost: $150,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
Project will provide intersection congestion relief and safety improvements.
KIPDA
Project Purpose:
St. Andrews Church Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $150,000.200910
KY 1934
Construct a new access road at the entrance to Farnsley-Kaufman House from KY 1934 (Cane Run Road).
Contact Agency: KYTC State ID #: 08505.00
1822
Project Cost: $80,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
Cane Run Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $80,000.200910
KY 2053/KY 864
Design and construct (phase 1) of a new North/South Park Road west of McNeely Lake from Cooper Chapel Rd. to Mt. Washington Rd. Projlength is 2.0 mi.
Contact Agency: KYTC State ID #: 08400.00
1823
Project Cost: $6,200,000Estimated Open to Public Year: 2012
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
McNeely Lake Park Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $6,200,000. Open to public date is 2012.200910
KY 2055
Widen KY 2055 (Mt. Holly Rd.) from 2 to 3 lanes from KY 1020 (National Turnpike) to Fairdale Road. Project length is 1.4 mi.
Contact Agency: KYTC State ID #: 08503.00
1824
Project Cost: $2,000,000Estimated Open to Public Year: 2016
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
Mt. Holly Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan. Open to public date is 2016.200910
TARC High Capacity Corridors
Add TARC service along two high capacity corridors: Broadway - Bardstown Road - Taylorsville Road Corridor and the Preston Highway-DixHighway Corridor.
Contact Agency: TARC State ID #: 0
1825
Project Cost: $1,274,000Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan.200910
The Park and Ride at Apple Patch
Construction of a park and ride facility including a parking lot, shelter, playground, bike lockers, walkways, and a 1000' access road located oApple Patch Way off of KY-329 near I-71 Exit 14 in Crestwood.
Contact Agency: Oldham Co. State ID #: 0
1826
Project Cost: $1,241,939Estimated Open to Public Year: 2011
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
A M E N D M E N T
Description of Amendments
County/Counties: Oldham
Added to Plan.200910
US 42
Modification of US 42 (Brownsboro Rd.) between Ewing Ave. and Lindsay Ave., includes reduce the existing 4 lane road to 3 lanes and providsidewalk on the north side of road between Lindsay and Dresher Bridge Ave. Project length is 0.4 mi.
Contact Agency: Lou. Metro PW State ID #: 0
1827
Project Cost: $357,610Estimated Open to Public Year: 2010
Regional Priority:Included in AQ Analysis / Regionally Significant:
KIPDA
Project Purpose:
Brownsboro Road
A M E N D M E N T
Description of Amendments
County/Counties: Jefferson
Added to Plan, $357,610. Open to public date is 2010.200910