SERVICE
Provide solidification and disposal services for approximately 54,300 gallons of non-recyclable liquids in support of bulk storage tank cleaning and routine maintenance. Clearfield MMG, Inc. received the material as an on-going wastestream over the course of two months. The non-recyclable liquid was solidified at our Chesapeake Plant and subsequently disposed at a Subtitle D landfill.
LIQUID SOLIDIFICATION
PROJECT SCOPE
PROJECT DURATION 2 Months
PROJECT LOCATION Yorktown, VA
INDUSTRY SECTOR Private / Petroleum Terminal Operator
1
SERVICE
Vegetation reduction within defined areas including 230,000 linear feet of transects and 13 acres of grids as part of a remedial investigation at five Munitions Response sites. Trees and brush were cut and mulched on site in order to prepare for digital geophysical mapping in an effort to identify potential UXO anomalies. Clearfield MMG, Inc. completed the project in five phases, over the course of eight months, working on-site for a total of 38 days.
FIELD SERVICES - VEGETATION CLEARANCE
PROJECT SCOPE
PROJECT DURATION 8 Months
PROJECT LOCATION Quantico, VA
INDUSTRY SECTOR Federal Government / Department of Defense
SERVICE
Solidify, excavate, transport and dispose of 20,400 tons of coal combustion residuals. Sludge was stabilized within the existing lagoon using a combination of bulk reagents which successfully removed all free liquids. Clearfield MMG, Inc. completed the project in two phases over the course of six months.
SLUDGE SOLIDIFICATION
PROJECT SCOPE
PROJECT DURATION 6 Months
PROJECT LOCATION Yorktown, VA
INDUSTRY SECTOR Private / Utility
SERVICE
Characterize, profile, load, transport and dispose of 5,600 tons of petroleum contaminated soil. Clearfield MMG, Inc. completed removing the material from the site in 6 days. The contaminated soil was treated using bioremediation at our Suffolk Plant and subsequently used as alternate daily cover at a local Subtitle D landfill.
CONTAMINATED SOIL REMEDIATION
PROJECT SCOPE
PROJECT DURATION One Week
PROJECT LOCATION Hampton, VA
INDUSTRY SECTOR Federal Government / Department of Defense
PROJECT PROFILES 2
SERVICE
Excavate, transport and disposal of 2,500 tons petroleum saturated soils on a site planned for multi-unit residential redevelopment. Soils left in place on site were treated in-situ prior to the placement and compaction of select fill. The site was restored to original grade and a temporary seed mix was applied to stabilize the area of disturbance between construction activities.
PETROLEUM SATURATED SOIL CORRECTIVE ACTION IMPLEMENTATION
PROJECT SCOPE
PROJECT DURATION 2 Weeks
PROJECT LOCATION Portsmouth, VA
INDUSTRY SECTOR Local Government
SERVICE
Provide waste profile preparation, transportation and disposal services for both hazardous and non-hazardous wastes generated during a CERCLA remedial action. Over the course of 12 months, the following waste materials were transported and disposed: 2,100 tons of non-hazardous sediment and debris; 30 drums of non-hazardous investigation derived waste; 7 tons of characteristic hazardous waste soil: and 85 drums of characteristic hazardous waste groundwater. In addition to the above waste disposal activities, Clearfield MMG, Inc. recycled 550 cubic yards of land clearing debris and supplied crushed aggregates and select fill materials in support of the project.
CERCLA REMEDIAL ACTION WASTE TRANSPORTATION AND DISPOSAL
PROJECT SCOPE
PROJECT DURATION 1 Year
PROJECT LOCATION Chesapeake, VA
INDUSTRY SECTOR Federal Government
SERVICE
Segregate, inventory, profile and package waste paint related materials (PRM) in preparation for proper disposal. Consolidate compatible material types into UN/DOT shipping containers including the overpacking of 14 drums in un-shippable condition. Clearfield MMG, Inc. packed, transported and shipped 6 cubic yard boxes of high solids characteristic hazardous waste PRM, 1 drum of characteristic hazardous waste PRM, 3 cubic yard boxes of non-hazardous waste PRM, and 28 drums of non-hazardous waste PRM. The project was completed in 4 days and included two separate mobilizations at the request of the customer.
HAZARDOUS AND NON-HAZARDOUS WASTE PAINT RELATED MATERIAL MANAGEMENT
PROJECT SCOPE
PROJECT DURATION 4 Days
PROJECT LOCATION Hampton, VA
INDUSTRY SECTOR Private / Industrial Manufacturing
PROJECT PROFILES 3
SERVICE
Management of 608 compressed gas cylinders including identification services, controlled relief of pressure and de-valving. 459 low pressure and 149 high pressure cylinders were processed over the course of 8 work days.
CYLINDER MANAGEMENT
PROJECT SCOPE
PROJECT DURATION 2 Weeks
PROJECT LOCATION Chesapeake, VA
INDUSTRY SECTOR Private / Industrial
SERVICE
Excavate, transport and dispose of petroleum saturated soils. 5 USTs and associated piping were removed, cleaned and recycled in association with the corrective action. The site was restored to original grade using select fill materials and 21A aggregate.
UST CORRECTIVE ACTION
PROJECT SCOPE
PROJECT DURATION 3 Days
PROJECT LOCATION Suffolk, VA
INDUSTRY SECTOR Private
SERVICE
Provide recycling and disposal services in support of remedial actions at a former US Navy fuel farm. The following waste materials were managed over the 4 month project duration: 6,700 tons of non-hazardous petroleum contaminated soil; 1,025 gallons of non-hazardous oily water; 11 tons of recyclable steel pipe and other misc. scrap; and 465 tons of recyclable concrete. In addition to the above waste disposal and recycling activities, Clearfield MMG, Inc. supplied 4,400 cubic yards of select fill materials and topsoil in support of the project.
CERCLA REMEDIAL ACTION WASTE TRANSPORTATION AND DISPOSAL
PROJECT SCOPE
PROJECT DURATION 4 Months
PROJECT LOCATION Norfolk, VA
INDUSTRY SECTOR Federal Government