project: power station poŘÍČÍ ii

8
PROJECT: POWER STATION POŘÍČÍ II

Upload: urania

Post on 13-Feb-2016

26 views

Category:

Documents


2 download

DESCRIPTION

PROJECT: POWER STATION POŘÍČÍ II. TRANSPORT OF BIOMASS EPO. Belt width 1600 mm Belt speed1 ms -1 Drive 1 2 x 22kW Drive 2 1 x 22kW. Thank you for attention…. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PROJECT: POWER STATION POŘÍČÍ II

PROJECT:• POWER STATION POŘÍČÍ II

Page 2: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012

Strana 2

TRANSPORT OF BIOMASS EPO Belt width 1600

mm Belt speed 1 ms-1

Drive1 2 x 22kW

Drive2 1 x 22kW

Page 3: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012Strana 3

Page 4: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012

Strana 4

Page 5: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012

Strana 5

Page 6: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012Strana 6

Page 7: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012Strana 7

Page 8: PROJECT: POWER STATION POŘÍČÍ II

Prezentace společnosti SE-MI Technology, a.s. / 2012

Ing. Aleš Kosňovský

Chairman of the Board  of Directors and General Director

Ing. Jiří Valenta

Vice-Chairman of the Board of Directors

and Financial Director

Ing. Radek

Pecina

Member of the

Board of Directors

Strana 8

Thank you for attention…