Project PortfolioIndustrial Electrical Contractorswww.phe.net.au

14/06/13

deonbaker
2016 Edition

PHE Project Portfolio 2016 Edition 1

Yearly Contracts Lion Brewery – Milton QLD

• Preventative Maintenance • Installation Projects

Carter Holt Harvey Timber Products – Gympie

• Preventative Maintenance • Installation Projects

The Laminex Group – Gympie

• Preventative Maintenance • Installation Projects

Visy Industries Tumut Pulp & Paper Mill

• Electrical and Instrumentation maintenance management & control.

• Installation Projects

Snowy Hydro Power Stations Upgrade • Electrical and Instrumentation maintenance

management & control. • Installation Projects

Cadia Valley Operations Orange Newcrest Mining Limited

• Electrical and Instrumentation maintenance management & control.

• Installation Projects • Underground installation and maintenance

Evolution Mining - Cracow

• Shift Coverage • Installation Projects

Major Projects The following is a comprehensive list of major electrical contracts and their value carried out by PHE Pty. Ltd. from 2008 to the present time. In addition to these projects, minor installation works have been carried out in the Tumut, Wagga Wagga, Oberon, Brisbane and Gympie areas and are too numerous to mention:

PHE Project Portfolio 2016 Edition 2

Jord International - Newcrest Mining – Blayney Sealink Project Supply and Installation of Electrical & Instrumentation

• Installation of cable support systems • Small power and lighting installation • Low Voltage cabling • Instrumentation supply and installation • Commissioning support

Contract Value $ 1.1M

Lion (XXXX Brewery Milton) – Keg Line Safety Upgrade Supply and Installation of Electrical & Instrumentation

• Installation of safety gate switches and light curtains • Modifications to existing MCC and PLC cabinets • Supply and installation of remote I/O panels • Supply and installation of local control stations • Low Voltage cable installation and termination • Commissioning support

Contract Value $ 300K

Bussola – Earth Grid Installation Kemps Creek (NSW) Supply and Installation of Electrical Earth Grid

• Installation of bare earth cable • Erico CAD weld joints • Quality Assurance testing • Commissioning

Contract Value $ 250K

2016

PHE Project Portfolio 2016 Edition 3

Clarke Energy – Diamantina Blackstart Generator HV and LV Installation of Blackstart Generator Diamantina Power Station Mt. Isa

• HV Cable installation and termination • HV Tie-in to existing substation • LV power and control cable installation and terminations • Commissioning

Contract Value $ 200K

Gympie Regional Council – Showgrounds Power Upgrades Supply and Installation of Electrical Switchboards

• Supply and Installation of one (1) S/S 2000A Main switchboard • LV Cable terminations to existing 1000kVA transformer • Supply and Installation of new underground submains • Supply and Installation of 10 x S/S Consumer panels to Side Show Alley

Contract Value $ 150K

Clarke Energy – Kemps Creek (NSW) Electrical Installation of 2-Engine power station

• HV Cable installation and termination • HV Tie-in to RMU • LV power and control cable installation and terminations • Commissioning

Contract Value $ 300K

PHE Project Portfolio 2016 Edition 4

Clarke Energy – Oakey Creek (Qld) Electrical Installation of 5-Engine power station

• HV Cable installation and termination • Installation of MCC and station control room termination of auxiliary power • HV Tie-in to Overhead power lines • LV power and control cable installation and terminations • Commissioning

Contract Value $ 1M

PHE Project Portfolio 2016 Edition 5

Newcrest Mining - Cadia East Underground Panel Cave 2 East Crusher Supply and Installation of underground Electrical services for the East Crusher

• Installation of cable support systems • 33kv High Voltage switch gear • 33kv / 11kv High Voltage reticulation cabling and terminations • Low Voltage cabling • Installation and termination of general light and power • Installation of fibre optic system • MCC installations and terminations • 33kv / 11kv / 415 transformer installations and terminations • AutoCAD Design and drawings mark up

Contract Value $ 13.4M

Baralaba Coal Expansion Project E&I Contract for the supply and installation of HV & LV services for Cockatoo Coal Train Loadout facility.

• Installation, termination and commissioning of the 22kV Underground reticulation system.

• 22kV / 415 RMU and transformer installations and terminations. • Installation of cable support systems. • Low Voltage cabling. • Hazardous Area (Gas & Dust) instrument supply and installation. • Installation and termination of general light and power • Installation and termination of fibre optic cabling systems. • MCC installations and terminations. • Commissioning Assistance.

Contract Value $ 4M

2015

PHE Project Portfolio 2016 Edition 6

Newcrest Mining - Cadia Low Grade Concentrator Fluorine Removal Supply and Installation of Surface Electrical services for the Fluorine Removal Project

• Installation of cable support systems • 3.3kv High Voltage switch gear • 3.3kv High Voltage reticulation cabling and terminations • High and Low Voltage cabling • Installation and termination of general light and power • MCC installations and terminations • Stage 1 and Stage 2 Commissioning

Contract Value $ 1.0M

York Civil (Subcontract) Origin Energy Spring Gully Water Transfer Station Project Supply and Installation of Electrical services for the WTP Feed dam Upgrade

• Installation of 315kVA 11KV kiosk transformer. • Earth grid. • Underground conduit/cable installation for HV, LV and Fibre Optics. • Installation of transfer pumps and local control isolators. • Manufacture and installation of marshalling and light & power panels. • Installation of Motor Control switchboard. • HV auditing and certifications. • General Dam Light & Power Installation.

Contract Value $ 600K

2014

PHE Project Portfolio 2016 Edition 7

Sedgman – Centennial Coal Springvale CPP Upgrade Electrical and Instrumentation installation of the Springvale coal preparation plant to increase throughput to 450 t/h.

• De-commissioning of redundant equipment. • Modifications to the existing MCC with the installation of new motor starting

equipment. • Installation of new PLC cabinet. • Installation of Nema 2 cable ladder and the modification of existing cable

support system. • Installation of instrumentation. • SWA control and power cable installation. • Electrical installation of new Thickener tank. • General Light & Power Installation.

Contract Value $ 700K

Halley & Mellows (Subcontract) Theiss Sedgman JV Boggabri Coal – Train Loadout Bin Electrical and Instrumentation installation of the Boggabri Coal (300t surge bin) Train Loadout Bin.

• Nema 20B cable support system. • LV cable installation and terminations. • Manufacture and installation of marshalling panels. • Trackside train weigh scale system installation. • PLC cabinet and Data cabinet installation and termination. • Indurad radar detection system installation. • General Light & Power Installation.

Contract Value $ 500K

PHE Project Portfolio 2016 Edition 8

T1 (Tumut 1) Transformer and Line Protection Upgrades Technology upgrade to the Snowy Hydro electrical control systems

• LV cable installation and terminations. • Installation and termination of control panels. • Control System commissioning.

Contract Value $ 350K

T2 (Tumut 2) Transformer and Line Protection Upgrades Technology upgrade to the Snowy Hydro electrical control systems

• LV cable installation and terminations. • Installation and termination of control panels. • Control System commissioning.

Contract Value $ 630K

UTSS (Upper Tumut Switching Station) Auto Synchroniser Upgrade

• LV cable installation and terminations. • Installation and termination of control panels. • Control System commissioning.

Contract Value $ 70K

T2 (Tumut 2) Power Station Governor Upgrades

• LV cable installation and terminations. • Installation and termination of control panels. • Commissioning.

Contract Value $ 170K

PHE Project Portfolio 2016 Edition 9

Altus Renewables Electrical Installation of a Densified Fuel Pellet Production Facility located at Tuan (via Maryborough) in Queensland.

• Principal Electrical Contractor for Altus Renewables • Installation of underground and overhead power reticulation for entire site. • HV/LV installation of 2 x 1MVA pad mount transformers. • Manufacture and installation of 1500A MSB including Bus-Tie. • Supply and installation of electrical services for Mills and associated

equipment. • Installation and termination of general light and power. • Integration with existing process at Hyne Timber – Tuan. • Hazardous Area Installation & Audit.

Contract Value $ 700K

Australian Rig Constructions Waste Water Recycle Rig.

• Electrical Design and Documentation. • Supply of Motor Control Switchboard. • Electrical LV and ELV installation on rig. • Installation and termination of emergency lighting.

Contract Value $ 60K

Snowy Hydro Limited Murray 1 Transformer Protection Panels Upgrade. (Switchboard Division)

• Construction of 4 x XI Panels. • Construction of 4 x XP Panels.

Contract Value $ 121K

2013

PHE Project Portfolio 2016 Edition 10

Clarke Energy Decommissioning of Power Station (Gas Generator sets) from Blackwater site.

• Disconnection of HV and LV terminations. • Reclaim all usable HV and LV cables. • Reclaim all Cable Support Structure. • Prepare Gensets, switchrooms, switchgear, and cable support structure for

transportation and assembly in new location. Contract Value $ 355K

Alpha Concrete / Clarke Energy Installation of Earth Grid at Origin Energy Reedy Creek Site

• Early works for the relocation of Blackwater Power Station. • Trenching and Laying of Earth Grid cabling. • Cad-welds as per Origin specifications on all cable joints and reinforcing bars. • QA Documentation on all joints via PHE “live” document portal allowing Alpha

Concrete and Clarke Energy to monitor performance and quality in real time. Contract Value $ 250K

Clarke Energy Installation of Cable Ladder for temporary power station at Origin Energy Reedy Creek Site

• Using a combination of reclaimed and new Cable Ladder. Contract Value $ 250K

Clarke Energy Installation of Cable Clamp system to existing sites.

• Cable Clamp system installed for HV cable fault protection. Contract Value $ 75K

PHE Project Portfolio 2016 Edition 11

Evolution Mining – Cracow Gold Mine Design and Manufacture of Motor Control Centre (MCC) for Extraction Fan (Switchboard Division)

• 315kW VFD Controlled Motor Starter. • MicroLogix 1100 PLC Control System. • Installed into Modular Air-Conditioned Switchroom. • Site electrical installation and cabling system.

Contract Value $ 170K

Carter Holt Harvey (CHH) – Gympie Operation Installation of a Wet Electrostatic Precipitator (WESP) – System used for the reduction of emissions into the atmosphere from the Drying process.

• Disconnect existing field cabling from the decommissioned MCC. • Install new MCC and reconnect cabling. • Installation of cabling and instrumentation for WESP and ancillary equipment. • Fibre Optic cable installation.

Contract Value $ 280K

Laminex Supply Chain - Murrarie Warehouse installation of POE, IP cameras at the Laminex Distribution Centre

• Installation of Structured Data Cabling System. • Cat-6 Shielded cabling and termination. • Installation network switching hardware. • Installation and Commissioning of Recording software and hardware.

Contract Value $ 54K

PHE Project Portfolio 2016 Edition 12

Newcrest Mining – Cadia East Manufacture of 1000V Vent Door Control System (Switchboard Division)

• 4 units supplied in total. • Sizing and installation of Circuit Breakers, Contactors. • Control wiring as per Newcrest supplied documentation.

Contract Value $ 22K

St. Hilliers – Australian Dept. of Defence (Wide Bay Training) Installation of Sewage Treatment Plant at Wide Bay Defence Training Centre

• Installation of cable reticulation system. • Installation of Motor and Instrumentation Cabling.

Contract Value $ 95K

Lion – Brewery Milton Keg line PLC/VFD upgrade to the Palletiser, De-palletiser and Filler Areas

• Remove Siemens S5 PLC and install Siemens S7 Controller. • Modify DOL motor starters to Danfoss VLT (Variable Frequency Drives) • Upgrade associated cabling to EMC compliance. • Manufacture and Installation of extension tier to existing MCC.

Contract Value $ 169K

Lion – Brewery Milton Glass Line filler safety upgrade

• Incorporates Siemens S5 PLC removal and replacement with Siemens S7 Controller.

• Cable and install safety access locks to gates and hatches. • Installation of fixed Emergency Stop stations.

Contract Value $ 40K

PHE Project Portfolio 2016 Edition 13

Australian Department of Defence Wide Bay Training Facility

• Principal Electrical Contractor for St Hillier’s Construction. • Installation of underground and overhead power reticulation for entire site. • 11kv / 415 pad mount transformer and terminations. • Supply and installation of 2000A MSB and 4 x 1250A Sub • Distribution Boards. • Supply and installation of electrical services for accommodation blocks,

ablutions blocks and supporting infrastructure. • Installation and termination of general light and power • Installation of fibre optic system • Installation of hazardous area fuel dispensing system • AutoCAD Design and drawings mark up

Contract Value $ 3.8M

Clarke Energy Laing O’Rourke Australia. Wilcannia Water Treatment Plant Power Station

• Installation and commissioning of 7 coal gas powered 3MW generators • Project involved all LV and 11kv terminations, termination of HV control

system • Installation of MCC and station control room termination of auxiliary power • Step up transformer

Contract Value $ 2M

2012

PHE Project Portfolio 2016 Edition 14

Newcrest Cadia East Project / Cadia Valley Orange Electrical & Instrumentation installation of Cadia East Mine Underground crushing and conveying systems.

• Installation of cable support systems • 33kv High Voltage switch gear • 33kv / 11kv High Voltage reticulation cabling and terminations • Low Voltage cabling • Installation and termination of general light and power • Installation of fibre optic system • MCC installations and terminations • 33kv / 11kv / 415 transformer installations and terminations • AutoCAD Design and drawings mark up

Contract Value $ 90M+

Devro Upgrade to Plant Lines / Devro Bathurst Electrical Installation and upgrade to Newcrest Blayney Filtration Plant

• Installation of cable support systems • Low Voltage cabling • Installation and termination of general light and power

Contract Value $ 800K

2011

PHE Project Portfolio 2016 Edition 15

Newcrest Cadia East Project / Cadia Valley Orange VR 70 Ventilation system installation

• Installation of cable support systems • Low Voltage cabling • Installation and termination of general light and power • Installation of fibre optic system • MCC installations and terminations • 33kv / 11kv High Voltage reticulation cabling and terminations

Contract Value $ 800K

Newcrest Cadia East Project / Cadia Valley Orange VR 30 Ventilation system installation

• Installation of cable support systems • Low Voltage cabling • Installation and termination of general light and power • Installation of fibre optic system • MCC installations and terminations • 33kv / 11kv High Voltage reticulation cabling and terminations

Contract Value $ 1.6M

Newcrest Cadia Blayney Filtration Plant / Cadia Valley Orange Electrical Installation and upgrade to Newcrest Blayney Filtration Plant

• Installation of cable support systems • Low Voltage cabling • Installation and termination of general light and power

Contract Value $ 300K

2010

PHE Project Portfolio 2016 Edition 16

Devro Upgrade to Plant Lines / Devro Bathurst Electrical Installation and upgrade to Newcrest Blayney Filtration Plant

• Installation of cable support systems • Low Voltage cabling • Installation and termination of general light and power

Contract Value $ 500K

ABB Australia The project involved sub contract works to ABB Australia and supplier contract works to Snowy Hydro Limited.

• Replacement of SHL generator main circuit breakers • Removal and 21 off 11k main air circuit breakers and replacement with CF6

gas circuit breakers ranging from 90 megawatts to 300 megawatts per unit Contract Value to date for 21 units is $630K with 13 units still to be completed.

ABB Australia Upgrades of SHL generator excitation control systems T3 Power Station Units 1 to 4

• Replacement of dynamic breaking transformer and associated control wiring • Interface with new controls upgrade

Project is ongoing with two units to be completed at T3 power Station in 2010.

Contract Value $ 65K

2009

PHE Project Portfolio 2016 Edition 17

Visy Pulp & Paper Plant ABB Oy Power Distribution, Process Electrification of Visy Pulp & Paper Plant at Tumut.

• Installation of cable reticulation support systems • High voltage switchgear • High voltage reticulation cabling • High voltage motor cabling up to 5.2 MW drives • Low voltage cabling to 800 drives ranging up to 800 KW • Motor control centers • 11kV to 690 VAC transformers • Plant earthing and lightning protection

Contract value $ 3,2M

Visy VPP10

• ABB Oy Visy VPP10 minor works materials and labour supply Contract value $ 738K

Visy VPP10

• Visy construction power for VPP10 Contract value $ 127K

Southcorp Wines

• Southcorp Wines pump station upgrades Contract value $ 21K

Snowy Hydro Scheme

• Excide Technologies Snowy Hydro Scheme wide replacement of UPS Units

Contract value $ 60K

PHE Project Portfolio 2016 Edition 18

Snowy Hydro Scheme

• Snowy Hydro upgrading of T3 lighting & power Contract value $ 192K

Snowy Hydro Scheme

• SHL T1 cable tunnel lighting

Contract value $ 177K

Snowy Hydro Scheme

• SHL T1 Workshop light and power switchboard replacement

Contract Value $ 62K

Snowy Hydro Scheme

• SHL T1 main transformer auxiliary drives power & control cabling upgrades including device-net and PLC cabling Contract value $ 143K

Alstom, Jounama Hydro Power • Installation of cable support systems • High voltage power cables to generator • Control wiring systems and power station earthing

Contract value $ 145K

Visy VPP10

• Lear Seigler Visy VPP10 emissions monitoring system instrument and control wiring including fiber optic interface cabling

Contract value $ 55K

PHE Project Portfolio 2016 Edition 19

Carter Holt Harvey

• T2 Radco boiler design, installation and commissioning

Contract Value $ 147K

Newcrest Ridgeway Deeps Project / Cadia Valley Orange Complete electrical installation of Ridgeway Deeps Mine Underground crushing and conveying system

• Installation of cable support systems • High Voltage switch gear • High Voltage reticulation cabling • Low Voltage cabling • Installation and termination of general light and power • Installation of fibre optic system • MCC installations and terminations • 11kv / 415 transformer installations and terminations • CAD Design and drawings mark up

Contract Value $ 9M

Cement Australia

• Safety upgrades on conveyors • New precipitators installation

Contract Value $ 1.5M

PHE Project Portfolio 2016 Edition 20

Visy Pulp & Paper Plant ABB Oy power distribution, process electrification of Visy Pulp & Paper Plant at Tumut.

• Installation of cable reticulation support systems • High voltage switchgear • High voltage reticulation cabling • High voltage motor cabling up to 5.2 MW drives • Low voltage cabling to 800 drives ranging up to 800 KW • Motor control centers • 11kV to 690 VAC transformers • Plant earthing and lightning protection

Contract value $ 3.2M

Visy VPP10

• ABB Oy Visy VPP10 minor works materials and labour supply

Contract value $ 738K

Visy Tumut

• ABB Oy Visy Tumut reel store lighting and power Contract value $ 180K

Visy Pulp & Paper

• Upgrades of Wood yard conveyor system

Contract value $ 81K

2008

PHE Project Portfolio 2016 Edition 21

Southern Cross Engineering • Southern Cross Engineering Visy Tumut upgrade of Wood yard crane and

conveyor system

Contract value $130K

Newcrest Ridgeway Deeps Project / Cadia Valley Orange Underground crushing and conveying system Complete electrical installation of Ridgeway Deeps Mine

• Installation of cable support systems • High Voltage switch gear • High Voltage reticulation cabling • Low Voltage cabling • Installation and termination of general light and power • Installation of fibre optic system • MCC installations and terminations • 11kv / 415 transformer installations and terminations • CAD Design and drawings mark up

Contract Value $ 9M

EDI rail Maryborough

• Installation of new rail car test shed • Project involved 2 x load centres, 22kv HV Qrail over line • Installation of light and power

Contract Value $ 417K

Clarke Energy Dyno Nobel Moranbah

• Installation and commissioning of 7 black start gas powered 3MW generators • Project involved all LV and 11kv terminations, termination of HV control

system • Installation of MCC and station control room termination of auxiliary power • Step up transformer

Contract Value $ 447K

PHE Project Portfolio 2016 Edition 22

Clarke Energy EDL Moranbah

• Installation and commissioning of 15 gas powered 3MW generators • Project Involved all LV and 11kv terminations, termination of HV control

System • Installation of MCC and Station control room termination of auxiliary power • Step up transformer

Contract Value $ 1.07M

Carter Holt Harvey Gympie

• Supply and installation of sanding line safety system • Installation of new drier and feed system

Contract Value $ 142K

8 Hall Rd Gympie

Copyright © PHE Pty Ltd 2016. All rights reserved. Photographs may be subject to copyright of their respective owners