Page 1: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Planning

Page 2: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans - Objective

The participant will be able to understand

the purpose of a Project Plan and how the

Project Plan is integrated into

Management of Soil Survey by MLRA

Page 3: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans (NSSH 610)

Priority Items from Long Range Work Plan

Developed by the Technical Team in the context of the entire MLRA Soil Survey Area

Address needs of the majority of users

Focus on specific groups of soils and associated interpretations

Page 4: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans

• Agreed upon by the Soil Survey Area Management Team – State Soil Scientists with an interest in the MLRA Soil Survey Office

Page 5: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan VisionMicheal Golden, Director, Soils Division

• Should Project plans should be based on the map units affected? Yes

• Should multi-year projects should be broken down to annual projects for reporting purposes?   Yes, In fact many projects may be just months in length and the office will have multiple projects within a year.   

Page 6: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan VisionMicheal Golden, Director, Soils Division

• Are two year projects okay?   YES - these could be separated by reportable milestones. 

• Is the emphasis on the completion of a project?   YES - in most cases projects will not be to redraw lines but will have database population, correlation, and documentation as the main objectives. 

• Are project acres reported when delivered to the Soil Data Mart? YES 

Page 7: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan VisionMicheal Golden, Director, Soils Division

• Not enough time to redraw all the lines on a 15 million acre MLRA Soil Survey Area

• Join and correlate and populate the database the best we can so we have a seamless product.

• Review map units to determine if the soils are adequately described & documented & that the database is complete and accurate.

Page 8: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan VisionMicheal Golden, Director, Soils Division

• Up to the Management Team to decide how much or how little time should be devoted to updating the soil map units.

• A methodical approach in looking at each geology and catena of geographic extent of soils is a wise approach. 

• Utilize NCSS cooperators to do outside research• NSSC Lab liaisons to contribute and help with research

and sampling  

Page 9: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan VisionMicheal Golden, Director, Soils Division

• We will hopefully be surprised that we have enough data and knowledge to support the map units. 

• The Soil Survey success will be measured by our ability launch this effort to update the soil survey by catena and sets of map units. 

Page 10: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Planning

• All projects gleaned from the LRP are entered into NASIS

• The project table is populated for all projects

• The project child tables are populated for Approved projects

• The detailed evaluation is the first project milestone for an approved project

Page 11: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Creating the “Project”Open the

Tables Explorer panel, then Project table and insert a new row

Page 12: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

PROJECT PLANEvaluation of MLRA 55

Barnes-Buse Map Unit

(one of the Soil-Landscape issues from the Long Range Plan)

Page 13: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – Objective

Evaluate map unit composition of eroded fine-loamy glacial till found on 3-6 percent slopes in cropland.

From composition percentages a map unit name will be developed and an MLRA Symbol assigned.

A new map unit will potentially be correlated across MLRA 55.

Page 14: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan - Justification and Significance

Map units may not correctly represent the terrain

Map units exist in thirteen of sixteen counties in MLRA 55

Includes Benchmark soils such as the Barnes Series

Soils are among the most productive in the MLRA& extremely important to conservation planning

Impact of erosion on the North Dakota Soil Productivity Index

Page 15: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated
Page 16: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated
Page 17: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Name and Description

At a minimum, all project plans will include this information.• Project names begin with the MLRA space dash space

then project name• Description is used as an “Executive Summary”• Identify the MLRA SS office and the state

Page 18: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans in NASIS

• From concept to project (broken down into manageable projects)

• Project Name includes the “MLRA 55 – “

Page 19: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

The description column should provide the justification, significance, background, benefits

Project Plan - Project Plan - Justification and and SignificanceSignificance

Page 20: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Approved Projects

• NASIS 6.1 will include an “Approve” flag

• Approved projects will have a detailed evaluation completed on all map units as the first step of the Project

Page 21: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – General Procedure

Locate the eroded fine-loamy till landscapes found on 3 to 6 percent slopes

Identify map units used

Choose representative map units to investigate from the geographical distribution

Page 22: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – Map Units

Page 23: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – Milestones Transects of the eroded landscape,

focusing on eroded areas and depositional areas

Determine composition percentages and develop map unit name

Correlate the map unit across MLRA 55

Review spatial data

Page 24: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan - Milestones

Milestones are used to capture important activities within the project

Page 25: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Milestone Progress

• Report milestone progress

Page 26: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – Other Items

• Equipment

• Duration & Timeframe (fits into APO)

• Personnel (who & when)

Page 27: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – Other Items• Project Staff

Include all members associated with the Project including MLRA Regional Office staff and NSSL liaison, if assistance is needed

Page 28: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan – Other Items

• Review existing correlation documents

• Correlation documented in NASIS

• NASIS Data Updated

• Export to Soil Data Mart – WEB Soil Survey

Page 29: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Correlation• Correlation documentation is entered into

the Project Correlation table

Project child tables are used to document Project child tables are used to document and manage project needsand manage project needs

Page 30: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Mapping Goals• Acres are goaled by staff member

Page 31: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Reporting

Page 32: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Reporting Products

• Project child tables provide the SSL a field to identify the various products

Page 33: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Text

• Used to record old project or investigation plans (assuming you need more than 240 characters) or notes on the specific project

Page 34: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Quality Control, Quality Assurance, and

Soil Correlation (NSSH 609)

• Ensure objectives of Project Plan are met

• State Conservationist concurs in Project selected

• Determine if documents Long Range, Project Plan, & Annual Plan of Operations are current

• Does level of detail on mapping conform to the objectives of the project plan

• Are interpretations consistent with the purposes of the survey as described in the project plan

Page 35: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans – new concept

• Multiple projects worked on at the same time

• Each project will have different timeframes

• Each project will require a different approach & staff skills

• Each project may have a different group interested in the outcome

Page 36: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans – new concept

• Soils staff at all levels of the NCSS need to develop and utilize effective planning tools and approaches

• Over the next few years we will collectively test and refine the best approaches

• The best ideas will come from the MLRA Soil Survey Leaders since they will be managing the plans

Page 37: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated
Page 38: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Ideas on project planning

• Written definition of the problem

• Written specifications (to avoid changing goals in mid-project)

• Work Breakdown – activities to complete

• Task allocation – know your team

• Realistic time estimates

Page 39: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Ideas on project planning

• Involve staff & Technical Team members

• Explicit plans to test for quality (avoid futile quests for perfection)

• Avoid “scope creep”

• Plan for errors (something is going to go wrong)

• Unambiguous targets

Page 40: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Ideas on project planning

• The MLRA Soil Survey Office staff & Technical Team develops one or more project plans

• Priorities are set by the Management Team• Coordinate spatial and tabular information

across existing soil survey area boundaries following natural landforms.

• Projects, in most cases, will concentrate on database population, correlation, and documentation.

Page 41: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plan Definition (NSSH 610)

• Based on the prioritized inventory of needs in the long range plan, identify specific priorities within the MLRA soil survey area that can be accomplished within a set timeframe 

Page 42: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Project Plans in NASIS

• Required to enter all management team approved project plans in NASIS

• Optional but encouraged to enter all project plans with at least a brief description of it objectives– How else will anyone coming in behind you

know what these plans are meant to accomplish

Page 43: Project Planning. Project Plans - Objective The participant will be able to understand the purpose of a Project Plan and how the Project Plan is integrated

Additional information

• Read Chapter 14 of the NASIS Users Guide