Page 1: Project Planning and Scheduling by Derek Hendrikz

Project Planning & Scheduling

derek hendrikz

Page 2: Project Planning and Scheduling by Derek Hendrikz

Copyright © 2014

Derek Hendrikz Consulting

www.derekhendrikz.com

Page 3: Project Planning and Scheduling by Derek Hendrikz

The Logical Flow of Project

Scheduling…

1. Work Break Down Structure (WBS)

2.Resources, Roles & Performance Measures

3.Dependency Diagram

4. Programme Evaluation Review Technique

(PERT)

5.Gantt Analysis

6. Project Budget

www.derekhendrikz.com

Page 4: Project Planning and Scheduling by Derek Hendrikz

Process Flow of Project Scheduling…

www.derekhendrikz.

Page 5: Project Planning and Scheduling by Derek Hendrikz

Work Breakdown Structure

www.derekhendrikz.com

WBS

Page 6: Project Planning and Scheduling by Derek Hendrikz

the WBS subdivides the project

tasks into smaller work elements

www.derekhendrikz.com

Page 7: Project Planning and Scheduling by Derek Hendrikz

www.derekhendrikz.com

the WBS aims to outline the project

activities in detail

Page 8: Project Planning and Scheduling by Derek Hendrikz

the WBS takes the form of an organogram,

where objectives are translated to

action programmes, which translates to

performance measures, etc…

www.derekhendrikz.com

Page 9: Project Planning and Scheduling by Derek Hendrikz

WBS Organogram…

4

3

2

1 Project X

Objective 1

Action Programm

e 1

Performance Indicator

1

Performance Indicator

2

Action programm

e 2

Objective 2

www.derekhendrikz.com

Page 10: Project Planning and Scheduling by Derek Hendrikz

Practical Exercise…

Use your workplace project as practical exercise to plan

and schedule your actions.

Also use the objectives designed during the project brief

as base-line for the development of your WBS.

The first part of this exercise will be to relate your primary

objectives to tasks, and then to relate your tasks to

performance measures and resources needed.

Tasks do not have to be progressive in nature and the

numbers must follow through irrelevant of which objective

you are busy with.

www.derekhendrikz.com

Page 11: Project Planning and Scheduling by Derek Hendrikz

Linking Tasks to Objectives…

Task:

That which must be done to realise a project objective.

Predecessors:

The tasks that precede the current task.

Performance measures:

How will we know that the task is done?

Resources Needed:

What resources do we need to successfully complete the

task?

www.derekhendrikz.com

Page 12: Project Planning and Scheduling by Derek Hendrikz

Rules of a Logic (dependency) Diagram…

Time flows from ‘start’ to ‘finish’.

Each key stage must be described

separately.

Show the dependency links with

arrows, e.g. ‘C’ can only take place

once ‘B’ and ‘A’ has been done.

www.derekhendrikz.com

Page 13: Project Planning and Scheduling by Derek Hendrikz

Sample of a Logic (dependency) Diagram…

www.derekhendrikz.com

Page 14: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 2(a)…

www.derekhendrikz.com

Page 15: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 2(b)…

www.derekhendrikz.com

Page 16: Project Planning and Scheduling by Derek Hendrikz

Critical Path Method

www.derekhendrikz.com

Page 17: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 3(a)…

www.derekhendrikz.com

Page 18: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 3(b)…

www.derekhendrikz.com

Page 19: Project Planning and Scheduling by Derek Hendrikz

PERT (Programme Evaluation Review Technique)

www.derekhendrikz.com

Page 20: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(a)…

www.derekhendrikz.com

Page 21: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(b)…

www.derekhendrikz.com

Page 22: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(c)…

www.derekhendrikz.com

Page 23: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(d)…

www.derekhendrikz.com

Page 24: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(e)…

www.derekhendrikz.com

Page 25: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(f)…

www.derekhendrikz.com

Page 26: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(g)…

www.derekhendrikz.com

Page 27: Project Planning and Scheduling by Derek Hendrikz

Answer to exercise 4(h)…