project planning and control procedure 1. the project planning and control procedure (pp&c)...
TRANSCRIPT
Notes:
1. The Project Planning and Control Procedure (PP&C) provides a structure for planning and
management of projects and projects groups in controlled project Management System of
Documents and Records.
2. The PP&C for other types of controlled documents such as drawings, specifications, other
design data and documents of external origin is not included here.
3. The same PP&C structure is to be established for other Electronic and Paper project control
documents.
4. The PP&C for controlled project Management System documents is to be maintained.
5. The procedure provides a sample structure for projects
6. Items shown in BLUE require insertion of data or deletion when not applicable.
7. Items shown in RED are for instruction only and should be deleted
Rev Date Details By Approved
A Nov 2014 Draft Format VK/VT VK
This document remains the property of Javelin Associates Pty Ltd. Its contents are confidential and shall not be reproduced,
destroyed or given away without the express, written permission of Javelin Management. The electronic version of this
document is the Master Copy and is a controlled document. Unless specifically noted thereon, hard copies of this document
are uncontrolled.
DOCUMENT CONTROLLED
Javelin Associates Pty Ltd
Management System Document
PROJECT PLANNING AND
CONTROL PROCEDURE
Document number JV038
PP&C Procedure
Document No. XXX
Revision [X]
Date [Sep 2013]
Javelin Management
PAGE 1 OF 20
Javelin Associates Pty Ltd
ABN No. 90 106 633 845
CORPORATE / CLIENT: XXX
PROJECT: XXX
LOCATION: XXX
PROJECT NO.: XXX
[CLIENT LOGO]
PROJECT PLANNING AND CONTROL PROCEDURE
DOCUMENT NUMBER: XXX
Revision History
Rev Date Details By Approved
A Nov 2014 Draft Format – Not Issued VK/VT VK
© Copyright. This document is property of Javelin Associates Pty Ltd and all rights are reserved in respect of it. This
document shall not be reproduced or disclosed in any manner whatsoever, in whole or in part, without the prior written
consent of Javelin Management expressly disclaim any third party. The electronic version of this document is the Master
Copy and is a controlled document. Unless specifically noted thereon, hard copies of this document are uncontrolled
TABLE OF CONTENTS1.0 REFERENCES
1.1
1.2
2.0 DEFINITIONS
3.0 PROCESS OVERVIEW
4.0 SCHEDULE DEVELOPMENT
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
5.0 PROCESS FLOW
6.0 METHODOLOGY
7.0 RESPONSIBILITIES
TABLE OF CONTENTSEFERENCES
1.1 INTERFACING PROCESSE
1.2 REFERENCE DOCUMENTS
DEFINITIONS
PROCESS OVERVIEW
SCHEDULE DEVELOPMENT
4.1 ACTIVITY CODING
4.2 CALENDAR MANAGEMENT
4.3 RESOURCE MANAGEMENT
4.4 SCHEDULE INTEGRATION
4.5 BASELINE MANAGEMENT
4.6 SCHEDULE CHANGE MANA
4.7 SCHEDULE UPDATE PROC
4.8 CRITICAL PATH ANALYS
4.9 SCHEDULE CONTINGENCY
4.10 SCHEDULE REPORTS
PROCESS FLOW
METHODOLOGY
RESPONSIBILITIES
PROJECT
TABLE OF CONTENTSEFERENCES................................
INTERFACING PROCESSE
REFERENCE DOCUMENTS
DEFINITIONS ................................
PROCESS OVERVIEW
SCHEDULE DEVELOPMENT
ACTIVITY CODING
CALENDAR MANAGEMENT
RESOURCE MANAGEMENT
SCHEDULE INTEGRATION
BASELINE MANAGEMENT
SCHEDULE CHANGE MANA
SCHEDULE UPDATE PROC
CRITICAL PATH ANALYS
SCHEDULE CONTINGENCY
SCHEDULE REPORTS
PROCESS FLOW ................................
METHODOLOGY ................................
RESPONSIBILITIES ................................
JAVELIN ASSOCIATESGENERAL PROCEDURE
PROJECT SERVICESPROJECT PLANNING AND CONTROL
TABLE OF CONTENTS ................................
INTERFACING PROCESSES
REFERENCE DOCUMENTS ................................
................................
PROCESS OVERVIEW ................................
SCHEDULE DEVELOPMENT ................................
ACTIVITY CODING ................................
CALENDAR MANAGEMENT
RESOURCE MANAGEMENT
SCHEDULE INTEGRATION................................
BASELINE MANAGEMENT ................................
SCHEDULE CHANGE MANA
SCHEDULE UPDATE PROC
CRITICAL PATH ANALYSIS
SCHEDULE CONTINGENCY
SCHEDULE REPORTS ................................
................................
................................
................................
ASSOCIATES GENERAL PROCEDURE
PROJECT SERVICESPLANNING AND CONTROL
JAVELIN ASSOCIATES P
................................................................
S ................................
................................
................................................................
................................
................................
................................
CALENDAR MANAGEMENT ................................
RESOURCE MANAGEMENT ................................
................................
................................
SCHEDULE CHANGE MANAGEMENT
SCHEDULE UPDATE PROCESS ................................
IS ................................
SCHEDULE CONTINGENCY MANAGEMENT
................................
................................................................
................................................................
................................................................
PROJECT GENERAL PROCEDURE
PROJECT SERVICES PLANNING AND CONTROL
JAVELIN ASSOCIATES P
................................
................................
................................
................................
................................................................
................................................................
................................................................
................................
................................
................................................................
................................................................
GEMENT ................................
................................
................................
MANAGEMENT ................................
................................................................
................................
................................
................................
Dir. Ref:
JAVELIN ASSOCIATES PP&C PROCEDURE
................................................................
................................................................
................................
................................................................
................................
................................
................................
................................................................
................................................................
................................
................................
................................
................................................................
................................................................
................................
................................
................................................................
................................................................
...............................................................
Dir. Ref:
Date:
Page:
P&C PROCEDURE - PREVIEW.DOCX
................................
................................
................................
................................
............................................................
..................................................
..........................................................
................................
................................
.............................................
.............................................
...........................................................
................................
................................
................................................
..................................................
................................
................................
...............................
JM-009
23/11/14
2 of 20
PREVIEW.DOCX
.......................................... 5
............................................ 5
.............................................. 5
........................................... 6
............................ 7
.................. 9
.......................... 11
........................................... 11
........................................... 11
............. 11
............. 12
........................... 13
.................................... 13
........................................... 13
................ 13
.................. 14
................................... 15
.................................... 16
............................... 18
PREVIEW.DOCX
5
5
5
6
7
9
11
11
11
11
12
13
13
13
13
14
15
16
18
Project:Country:
Industry
Business:
Project: JAVELIN
Country:
Industry:
Business:
JAVELIN ASSOCIATES
• Qatar
• Housing
• Real Estate
JAVELIN GENERAL
PROJECT SERVICESPROJECT
ASSOCIATES
Qatar
Housing
Real Estate
JAVELIN ASSOCIATESGENERAL PROCEDURE
PROJECT SERVICESPROJECT PLANNING AND CONTROL
JAVELIN ASSOCIATES P
ASSOCIATES DEVELOPMENT PLAN
ASSOCIATES PROJECTPROCEDURE
PROJECT SERVICES PLANNING AND CONTROL
JAVELIN ASSOCIATES P
DEVELOPMENT PLAN
PROJECT
PLANNING AND CONTROL
JAVELIN ASSOCIATES PP&C PROCEDURE
DEVELOPMENT PLAN
Dir. Ref:
Date:
Page:
P&C PROCEDURE - PREVIEW.DOCX
JM-00923/11/14
3 of 20
PREVIEW.DOCX
009
4
20
PREVIEW.DOCX
PURPOSEThe purpose of this for planning and scheduling in an integrated manner.
This document addresses planning and scheduling for Managementfor the Javelin Management Development Plan
This procedure defines the requirements, responsibilities, and activities for There are references throughout this document to the standard tools and forms to be used by the Management
PLEASE CALL JAVELIN ASSOCIATES FOR
PURPOSE and SThe purpose of this documentfor planning and scheduling in an integrated manner.
This document addresses planning and scheduling for Management standards. The document
Javelin Management Development Plan
This procedure defines the requirements, responsibilities, and activities for There are references throughout this document to the standard tools and forms to be used by the Management Planning and Scheduling team.
PLEASE CALL JAVELIN ASSOCIATES FOR
and SCOPEdocument is to provide general guidelines and define the process and procedures used
for planning and scheduling in an integrated manner.
This document addresses planning and scheduling for standards. The document
Javelin Management Development Plan
This procedure defines the requirements, responsibilities, and activities for There are references throughout this document to the standard tools and forms to be used by the
Planning and Scheduling team.
PLEASE CALL JAVELIN ASSOCIATES FOR
JAVELIN GENERAL
PROJECT SERVICESPROJECT
COPE is to provide general guidelines and define the process and procedures used
for planning and scheduling in an integrated manner.
This document addresses planning and scheduling for standards. The document gives an overview of the planning and scheduling procedure
Javelin Management Development Plan (
This procedure defines the requirements, responsibilities, and activities for There are references throughout this document to the standard tools and forms to be used by the
Planning and Scheduling team.
PLEASE CALL JAVELIN ASSOCIATES FOR PROCEDURE
JAVELIN ASSOCIATESGENERAL PROCEDURE
PROJECT SERVICESPROJECT PLANNING AND CONTROL
JAVELIN ASSOCIATES P
is to provide general guidelines and define the process and procedures used for planning and scheduling in an integrated manner.
This document addresses planning and scheduling for Javelin Managementgives an overview of the planning and scheduling procedure
(JMDP).
This procedure defines the requirements, responsibilities, and activities for There are references throughout this document to the standard tools and forms to be used by the
PLEASE CALL JAVELIN ASSOCIATES FOR PROCEDURE
ASSOCIATES PROJECTPROCEDURE
PROJECT SERVICES PLANNING AND CONTROL
JAVELIN ASSOCIATES P
is to provide general guidelines and define the process and procedures used
Javelin Managementgives an overview of the planning and scheduling procedure
This procedure defines the requirements, responsibilities, and activities for There are references throughout this document to the standard tools and forms to be used by the
PLEASE CALL JAVELIN ASSOCIATES FOR FURTHER PROCEDURE…
PROJECT
PLANNING AND CONTROL
JAVELIN ASSOCIATES PP&C PROCEDURE
is to provide general guidelines and define the process and procedures used
Javelin Management projects and is based on gives an overview of the planning and scheduling procedure
This procedure defines the requirements, responsibilities, and activities for creating the integrated schedules. There are references throughout this document to the standard tools and forms to be used by the
FURTHER DETAILS OF TH
Dir. Ref:
Date:
Page:
P&C PROCEDURE - PREVIEW.DOCX
is to provide general guidelines and define the process and procedures used
s and is based on gives an overview of the planning and scheduling procedure
creating the integrated schedules. There are references throughout this document to the standard tools and forms to be used by the
DETAILS OF TH
JM-00923/11/14
4 of 20
PREVIEW.DOCX
is to provide general guidelines and define the process and procedures used
s and is based on Javelin gives an overview of the planning and scheduling procedure used
creating the integrated schedules. There are references throughout this document to the standard tools and forms to be used by the Javelin
DETAILS OF THIS
009
4
20
PREVIEW.DOCX
Javelin
creating the integrated schedules.