project overview - bart
TRANSCRIPT
BART LAKE MERRITT PLAZA year month day
2017 05 10PROJECT OVERVIEW
TRANSIT OPERATIONS FACILITY CONCEPT MASSING
8TH STREET
9TH STREET
MADISON AVE8TH STREET
8TH STREET
MADISON AVE
9TH STREET
RETAIL AT CORNER(e.g., cafe, coffee shop)
POTENTIAL RETAIL KIOSKTRANSIT OPERATIONS FACILITY
LEASABLE COMMUNITY SPACE
RETAIL AT CORNER (e.g., cafe, coffee shop)
LEASABLE COMMUNITY SPACETRANSIT OPERATION
FACILITY
POTENTIAL RETAIL KIOSK
9TH ST8TH ST PLAZA
+57 FT
SECTION A-A
+73 FT
+17 FT
BART LAKE MERRITT PLAZA & TRANSIT OPERATIONS FACILITY
BART is starting work on a new Transit Operations Facility (TOF) and
redesign of the Lake Merritt Plaza to support improved & expanded BART
operations and create an enhanced multimodal transportation hub and
transit plaza that better serves the neighborhood.
The TOF will be a 3-story secure facility, with opportunities for retail and/or
community uses at the ground floor. A study was undertaken to select the
site for the TOF, and the Lake Merritt Plaza was identified as the preferred
alternative location due to its central location, the availability of space,
and colocation with related systems. The TOF will be constructed where
the BART Administration building was previously located. Construction is
projected to begin in 2019/2020.
This project presents an exciting opportunity to modernize the plaza to
serve as an enhanced transportation hub and to support the vision of the
Lake Merritt Station Area Plan, adopted by the City of Oakland in 2014. The
Plan envisions the BART blocks as catalytic sites that establish an active
neighborhood hub, provide pedestrian-oriented spines along 8th and 9th,
and connect neighborhood assets – including BART, Chinatown, Laney
College, the Oakland Museum of California, and the Jack London District,
among others. The Plan also envisions high-rise development for the BART
parking lot block and the MetroCenter block, which will be designed and
developed through a separate process in the future.
The concepts presented here are initial concepts that will be further refined
following community input. Additional design details will be added and
further feasibility analyses will be needed for some elements.
OUR GOALS
Make Transit Work
Create Place
Connect to Community
COMMUNITY ENGAGEMENT
The BART Lake Merritt Plaza redesign project will have several opportunities
for community input, through a community Working Group, two large
community open houses, and stakeholder meetings. In February, at our first
Working Group meeting, the group provided feedback summarized into the
following design objectives:
• Catalyze & Activate
• Connect & Integrate
• Safe & Welcoming
In March, the Working Group provided feedback on three design concepts
for the plaza. Two preferred options have been refined for your review and
feedback today! SECTION A-A
BART STATION
BART OFFICES
LEGEND:
COMMUNITY / RETAIL
SECT
ION
A-A
GROU
±275 SQ FT
±1,100 SQ FT
±2,000 SQ FT
GROUND FLOOR PLAN
BART OFFICES
COMMUNITY/RETAIL
BART STATIONN
N
N
N
N
BART LAKE MERRITT PLAZA year month day
2017 05 10SITE CONTEXT
County Court
yawdaor
B
tS nil knarF
t S r et sbeW
t S nosirr aH
t S ecilA
t S noskcaJ
t S nosi daM
t S kaO
2nd
Ave
3rd
Ave
E 10th St
6th St
7th St
9th St
10th St
11th St
12th St
13th St
14th St
8th St
E 11th St
E 12th St
E 13th St
E 14th St
tS nollaF
California Supreme Court
Public Library
Post Office
Oakland Asian Cultural Center
Chinese Garden Park
Madison Sq Park
Lincoln Sq Park
I-880
Frank Ogawa Plaza LAKE MERRITT
Laney College
Henry J. KaiserAuditorium
Oakland Museum of California
Lakeside Park
Peralta Park
Buddhist Church ofOakland
Laney CollegeParking
PeraltaCommunity College District
Oakland Unified School District
Lincoln Elementary
BARTLake MerrittPlaza
調整式重複利用計劃正在規劃中
經認定需翻修處
Oakland Chinatown Commercial Core
To Jack London Square
BARTParking
MetroCenter
郵局
公共圖書館
加州最高法院
縣法院
加州博物館屋崙 (奧克蘭) 分館
湖濱公園
Henry J. Kaiser演藝廳 Peralta 公園
Laney 學院BART停車場
Metro Center
Laney 學院停車場
Peralta 社區大學區
屋崙 (奧克蘭) 市聯合學區
美麗湖
Lincoln廣場公園
屋崙 (奧克蘭) 市亞裔文化中心
屋崙 (奧克蘭) 市佛寺
中式花園公園
Lincoln 小學
往傑克倫敦廣場
Madison廣場公園 BART 美麗湖廣場
屋崙 (奧克蘭) 市中國城商圈
FrankOgawa廣場
12 街
13 街
14 街
11 街
10 街
8 街
9 街
7 街
6 街
E 14 街
E 13 街
E 12 街
E 11 街
E 10 街
Fran
klin
街
Web
ster
街
Har
riso
n 街
Alic
e 街
Jack
son 街
Mad
ison
街
Oak
街
Fallo
n 街
xxxxx
xxxx
x
xxxx
x
Bro
adw
ay街
Identified NeededFor Renovation
預計興建高樓 TOD
FutureEnvisioned
Highrise TOD
Adaptive ReusePlans Underway
Planned Development Project
LEGEND1665 residential units 90 affordable housing units95 hotel rooms38,000 SF commercial96,600 SF retail100,000 SF maker/storage space1700 seat theater
City of Oakland, 2016
N
0 150 300 600
scale 1”=300’-0”
BART LAKE MERRITT PLAZA year month day
2017 05 10EXISTING SITE
Tunnel
9TH STREET
8TH STREET
OA
K S
TREE
T
MA
DIS
ON
STR
EET
MA
DIS
ON
9
OA
K
8
Metro Center / Future Envisioned Highrise
BART Parking /d Future Envisioned
Highrise
Commercial
Residential
MADISON PARK
Sunken Court
Vent Shaft
Head House
Proposed TransitOperations Facility
BARTEntrance
BARTEntranceEntrance
BARTEntrance
BARTEntrance
MADISON
Residential Residential Residential
BART PlazaBART
BART
Head House Utility Plant
BART
BART
BART
Residential
BART /
Metro Center / N