BART LAKE MERRITT PLAZA year month day 2017 05 10 CBSU ভ PROJECT OVERVIEW TRANSIT OPERATIONS FACILITY CONCEPT MASSING Ռඏᗜᄎൻजဗޚསᣯ 8TH STREET 9TH STREET MADISON AVE 8TH STREET 8TH STREET MADISON AVE 9TH STREET RETAIL AT CORNER (e.g., cafe, coffee shop) POTENTIAL RETAIL KIOSK TRANSIT OPERATIONS FACILITY LEASABLE COMMUNITY SPACE RETAIL AT CORNER (e.g., cafe, coffee shop) LEASABLE COMMUNITY SPACE TRANSIT OPERATION FACILITY POTENTIAL RETAIL KIOSK Ռඏᗜᄎൻज Ⴕᄿఇ௸ ދ)ӱ୨ൻᐄᒲ ӱ჻࠼௴࠷ ӱ୨ൻᐄᒲ Ռඏᗜᄎൻज ӱ჻࠼௴࠷ Ⴕᄿఇ௸ ދ)9TH ST 8TH ST PLAZA +57 FT +73 FT +17 FT BART LAKE MERRITT PLAZA & TRANSIT OPERATIONS FACILITY BART is starting work on a new Transit Operations Facility (TOF) and redesign of the Lake Merritt Plaza to support improved & expanded BART operations and create an enhanced multimodal transportation hub and transit plaza that better serves the neighborhood. The TOF will be a 3-story secure facility, with opportunities for retail and/or community uses at the ground floor. A study was undertaken to select the site for the TOF, and the Lake Merritt Plaza was identified as the preferred alternative location due to its central location, the availability of space, and colocation with related systems. The TOF will be constructed where the BART Administration building was previously located. Construction is projected to begin in 2019/2020. This project presents an exciting opportunity to modernize the plaza to serve as an enhanced transportation hub and to support the vision of the Lake Merritt Station Area Plan, adopted by the City of Oakland in 2014. The Plan envisions the BART blocks as catalytic sites that establish an active neighborhood hub, provide pedestrian-oriented spines along 8th and 9th, and connect neighborhood assets – including BART, Chinatown, Laney College, the Oakland Museum of California, and the Jack London District, among others. The Plan also envisions high-rise development for the BART parking lot block and the MetroCenter block, which will be designed and developed through a separate process in the future. The concepts presented here are initial concepts that will be further refined following community input. Additional design details will be added and further feasibility analyses will be needed for some elements. OUR GOALS Make Transit Work Create Place Connect to Community COMMUNITY ENGAGEMENT The BART Lake Merritt Plaza redesign project will have several opportunities for community input, through a community Working Group, two large community open houses, and stakeholder meetings. In February, at our first Working Group meeting, the group provided feedback summarized into the following design objectives: Catalyze & Activate Connect & Integrate Safe & Welcoming In March, the Working Group provided feedback on three design concepts for the plaza. Two preferred options have been refined for your review and feedback today! ྈԾဗB.B ௴ SECTION A-A LEGEND: SECTION A-A ±275 SQ FT ±1,100 SQ FT ±2,000 SQ FT GROUND FLOOR PLAN ֆጋৠᅤ CBSU ভቖՌඏᗜᄎൻज ᛱўᤜ௴౸ᄎ )CBSU* ԥݨ൵ᅤЫྈစՌඏᗜᄎൻज )Usbotju PqfsbujpotGbdjmjuz-UPG*৹စൻৠভ)MblfNfssjuuQmb{b*ʔӐ๚ ୨ҭโ CBSU ևᗜᄎтڏ࠱ཞᚩ੶ʔ܀ӊԚЫਡ୨ॡᐣۺړ ߚӣ֍ፓᘤᄎፐୋՌඏᄎᕁʖ ඍઆՌඏᗜᄎൻजలढ 4 ጋፔൻजʔӊలևֆጋᄿఇ0 ௴࠷ԴᒲဎʖٺਚѢॡრՌඏᗜᄎൻजཞשؿᏳषʔߠւܡѭҨֆׯႜʕӱԴᓨቖঌែۓѵඏޤʔढਈ ෂԴֆᚚʖრՌඏᗜᄎൻजѠֆׯႜׯ ߍCBSU שङѕፔᛱؿʖ ѠҲ๚ᅃৠॡ 312:03131 ʖ ԡྈԾбЫਡӗгડᑿᒲဎʔᤃӖҏߚ௭ӣՌ ඏፐୋʔ܀ӊ୨ҭโ )࿋،ᡞ* ԑङ מތ3125 ಆשѰˈভ௴ ৠᅤˉ൵ᅤኛ๓ʖრৠᅤᅃৠల CBSU և༩௴ᣢՅᡬᐣ ۺፐୋҏᚚʔ༑ 9 ༩ : ༩ӐשгॡӌՌඏ࿘ʔ܀ӊඑ ࠱ۺᜆคჷം ʩ ӥऔ CBSUʕѭఏʕMbofz ᒂʕӣෑᕴ )࿋،ᡞ* ҉ᕴʔӐҗස،௴ʖრৠᅤшᅃৠև CBSU ༩௴ NfuspDfoufs ༩௴ཞשፔጋʔܡൻৠలӐӼԆ໓٧ שʖ ൠӠޚڡࡣޚʔԢܐల௶௴࠷ושലਥʖٺਚల ӣе֍ړൻৠലႏʔшలᆙඝ҉ҁୈཞړשೡеӱޤש҉ʖ ٺԾፑ ᤃՌඏᄎᕁเѕӤ୨ ඏඑ ௴࠷௶௴࠷CBSU ভ৹စൻৠྈԾలᄘЫਡ௴࠷Ѡћഴ )Xpsljoh Hspvq*ʕ ܟ௴࠷ѕဎʕӐҗ֍੭ঌែဎቦ௴࠷ʖևвҴ՝ ണЫѠћഴဎѭʔቖဎփᖨѢᘔևрըൻৠԾ ፑѭʚ ʘ ҏቖҏ ʘ ඏඑቖᒞս ʘ դቖҖ ևпҴʔѠћഴாᆙпਡൻৠဗޚбփᖨʖܟਡᗧᕇ ޚ႖ᄘലਥʔѾҚᗀ༮ʜ BART OFFICES CBSU ᕄ COMMUNITY/RETAIL ௴࠷0ᄿఇ BART STATION CBSU ୀ N N N N N

Upload: others

Post on 23-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

BART LAKE MERRITT PLAZA year month day

2017 05 10PROJECT OVERVIEW

TRANSIT OPERATIONS FACILITY CONCEPT MASSING

8TH STREET

9TH STREET

MADISON AVE8TH STREET

8TH STREET

MADISON AVE

9TH STREET

RETAIL AT CORNER(e.g., cafe, coffee shop)

POTENTIAL RETAIL KIOSKTRANSIT OPERATIONS FACILITY

LEASABLE COMMUNITY SPACE

RETAIL AT CORNER (e.g., cafe, coffee shop)

LEASABLE COMMUNITY SPACETRANSIT OPERATION

FACILITY

POTENTIAL RETAIL KIOSK

9TH ST8TH ST PLAZA

+57 FT

SECTION A-A

+73 FT

+17 FT

BART LAKE MERRITT PLAZA & TRANSIT OPERATIONS FACILITY

BART is starting work on a new Transit Operations Facility (TOF) and

redesign of the Lake Merritt Plaza to support improved & expanded BART

operations and create an enhanced multimodal transportation hub and

transit plaza that better serves the neighborhood.

The TOF will be a 3-story secure facility, with opportunities for retail and/or

community uses at the ground floor. A study was undertaken to select the

site for the TOF, and the Lake Merritt Plaza was identified as the preferred

alternative location due to its central location, the availability of space,

and colocation with related systems. The TOF will be constructed where

the BART Administration building was previously located. Construction is

projected to begin in 2019/2020.

This project presents an exciting opportunity to modernize the plaza to

serve as an enhanced transportation hub and to support the vision of the

Lake Merritt Station Area Plan, adopted by the City of Oakland in 2014. The

Plan envisions the BART blocks as catalytic sites that establish an active

neighborhood hub, provide pedestrian-oriented spines along 8th and 9th,

and connect neighborhood assets – including BART, Chinatown, Laney

College, the Oakland Museum of California, and the Jack London District,

among others. The Plan also envisions high-rise development for the BART

parking lot block and the MetroCenter block, which will be designed and

developed through a separate process in the future.

The concepts presented here are initial concepts that will be further refined

following community input. Additional design details will be added and

further feasibility analyses will be needed for some elements.

OUR GOALS

Make Transit Work

Create Place

Connect to Community

COMMUNITY ENGAGEMENT

The BART Lake Merritt Plaza redesign project will have several opportunities

for community input, through a community Working Group, two large

community open houses, and stakeholder meetings. In February, at our first

Working Group meeting, the group provided feedback summarized into the

following design objectives:

• Catalyze & Activate

• Connect & Integrate

• Safe & Welcoming

In March, the Working Group provided feedback on three design concepts

for the plaza. Two preferred options have been refined for your review and

feedback today! SECTION A-A

BART STATION

BART OFFICES

LEGEND:

COMMUNITY / RETAIL

SECT

ION

A-A

GROU

±275 SQ FT

±1,100 SQ FT

±2,000 SQ FT

GROUND FLOOR PLAN

BART OFFICES

COMMUNITY/RETAIL

BART STATIONN

N

N

N

N

BART LAKE MERRITT PLAZA year month day

2017 05 10SITE CONTEXT

County Court

yawdaor

B

tS nil knarF

t S r et sbeW

t S nosirr aH

t S ecilA

t S noskcaJ

t S nosi daM

t S kaO

2nd

Ave

3rd

Ave

E 10th St

6th St

7th St

9th St

10th St

11th St

12th St

13th St

14th St

8th St

E 11th St

E 12th St

E 13th St

E 14th St

tS nollaF

California Supreme Court

Public Library

Post Office

Oakland Asian Cultural Center

Chinese Garden Park

Madison Sq Park

Lincoln Sq Park

I-880

Frank Ogawa Plaza LAKE MERRITT

Laney College

Henry J. KaiserAuditorium

Oakland Museum of California

Lakeside Park

Peralta Park

Buddhist Church ofOakland

Laney CollegeParking

PeraltaCommunity College District

Oakland Unified School District

Lincoln Elementary

BARTLake MerrittPlaza

調整式重複利用計劃正在規劃中

經認定需翻修處

Oakland Chinatown Commercial Core

To Jack London Square

BARTParking

MetroCenter

郵局

公共圖書館

加州最高法院

縣法院

加州博物館屋崙 (奧克蘭) 分館

湖濱公園

Henry J. Kaiser演藝廳 Peralta 公園

Laney 學院BART停車場

Metro Center

Laney 學院停車場

Peralta 社區大學區

屋崙 (奧克蘭) 市聯合學區

美麗湖

Lincoln廣場公園

屋崙 (奧克蘭) 市亞裔文化中心

屋崙 (奧克蘭) 市佛寺

中式花園公園

Lincoln 小學

往傑克倫敦廣場

Madison廣場公園 BART 美麗湖廣場

屋崙 (奧克蘭) 市中國城商圈

FrankOgawa廣場

12 街

13 街

14 街

11 街

10 街

8 街

9 街

7 街

6 街

E 14 街

E 13 街

E 12 街

E 11 街

E 10 街

Fran

klin

Web

ster

Har

riso

n 街

Alic

e 街

Jack

son 街

Mad

ison

Oak

Fallo

n 街

xxxxx

xxxx

x

xxxx

x

Bro

adw

ay街

Identified NeededFor Renovation

預計興建高樓 TOD

FutureEnvisioned

Highrise TOD

Adaptive ReusePlans Underway

Planned Development Project

LEGEND1665 residential units 90 affordable housing units95 hotel rooms38,000 SF commercial96,600 SF retail100,000 SF maker/storage space1700 seat theater

City of Oakland, 2016

N

0 150 300 600

scale 1”=300’-0”

BART LAKE MERRITT PLAZA year month day

2017 05 10EXISTING SITE

Tunnel

9TH STREET

8TH STREET

OA

K S

TREE

T

MA

DIS

ON

STR

EET

MA

DIS

ON

9

OA

K

8

Metro Center / Future Envisioned Highrise

BART Parking /d Future Envisioned

Highrise

Commercial

Residential

MADISON PARK

Sunken Court

Vent Shaft

Head House

Proposed TransitOperations Facility

BARTEntrance

BARTEntranceEntrance

BARTEntrance

BARTEntrance

MADISON

Residential Residential Residential

BART PlazaBART

BART

Head House Utility Plant

BART

BART

BART

Residential

BART /

Metro Center / N

BART LAKE MERRITT PLAZA year month day

2017 05 10PRECEDENT IMAGES