    Concepts OfProjectManagementPresented by:

    Sabrina Noronha

    Mayuresh PatilLarissa MendesSudeep TateMichelle RemediousNaomi Rodricks

  • 8/2/2019 Project Mgmt Final

    2/43

    OverviewConcepts of a project

    Categories of a project

    Project life cycle phases

    Project management concepts

    Tools & techniques for project management

    The project manager

    Basic educationRoles & responsibilities

    As a profession

    Summary

  • 8/2/2019 Project Mgmt Final

    3/43

    Understanding A ProjectA physical asset variability in plantsAn objective with the on-goings during a

    project

    Project arises in a business setting fororganizations to grow for the sake ofsurvival

    Ideas which are feasible technically,

    economically, politically & sociallyacceptableA project lives between 2 cut-off points &

    the time span is called as Project LifeCycle

  • 8/2/2019 Project Mgmt Final

    4/43

    Project IsA combination of human and non-

    human resources pooled together in atemporary organization to achieve aspecific purpose

    - Project Management Institute, U.S.A.

  • 8/2/2019 Project Mgmt Final

    5/43

    Project CharacteristicsA project is characterized as one big work

    comprising of many small contribution ofpeople as well as process

    No 2 projects are identical even if their lifecycles & phases are identical

    Existence of a missionary zeal, unknownforce pushing forward people towards the

    completionFeel of importance & contribution to a big

    cause

  • 8/2/2019 Project Mgmt Final

    6/43

    Characteristic FeaturesObjective

    Life span

    Single entity

    Team work

    Life cycle

    Uniqueness

  • 8/2/2019 Project Mgmt Final

    7/43

    Characteristic FeaturesChange

    Successive principle

    Made to order

    Unity in diversity

    High level of subcontracting

    Risk & uncertainty

  • 8/2/2019 Project Mgmt Final

    8/43

    Project Family TreePlan

    National/ Corporate plan with targets for growth.

    Programme

    Health programme, educationalprogramme, Science & Technology

    Project Power Plants, schools, hospitals, Housing

    Work package Water/Power supply & distribution Package

    Task

    Award of water supply contract, construction offoundation

    Activity

    Excavation, laying of cable, preparation ofdrawings & specifications

  • 8/2/2019 Project Mgmt Final

    9/43

    Categories OF a ProjectProject

    National

    IndustrialNon

    Industrial

    International

  • 8/2/2019 Project Mgmt Final

    10/43

    Normal Projects:

    Adequate Time is allotted for implementation ofproject, requiring minimum capital, and no

    quality compromiseCrash projects:

    Additional capital costs are incurred to gaintime, minimum compromise in terms of Quality

    Disaster Projects:

    Time is money so no additional costs incurringare too big, the project needs to be done even

    at failure level Quality, work is done 24*7

  • 8/2/2019 Project Mgmt Final

    11/43

    mich

  • 8/2/2019 Project Mgmt Final

    12/43

    Project Life Cycle PhasesConception

    phase

    Definitionphase

    Planning &Organizing

    phase

    Implementation phase

    ProjectClean upphase

  • 8/2/2019 Project Mgmt Final

    13/43

    Definition PhaseCement Plant: Raw materials

    Plant size / capacity

    Location & site

    Technology / process selection

    Project layout

    Plant & Machinery

    Electrical & instrumentation works

    Civil engineering works

    Utilities fuel, power & water

    Manpower & organizational pattern

    Financial analysis

    Implementation schedule

  • 8/2/2019 Project Mgmt Final

    14/43

    Project Life Cycle PhasesConception

    phase

    Definitionphase

    Planning &Organizing

    phase

    Implementation phase

    ProjectClean upphase

  • 8/2/2019 Project Mgmt Final

    15/43

    Planning & Organizing Phase Project infrastructure & enabling services

    System design & basic engineering package

    Organization & manpower

    Schedules & budgets

    Licensing & governmental clearances

    Finance

    Systems & procedure

    Identification of project manager

    Design basis, general conditions for purchase & contracts

    Site preparation & investigations

    Construction resource & materials

    Work packaging

  • 8/2/2019 Project Mgmt Final

    16/43

    Project Life Cycle PhasesConception

    phase

    Definitionphase

    Planning &Organizing

    phase

    Implementation phase

    ProjectClean upphase

  • 8/2/2019 Project Mgmt Final

    17/43

    Implementation Phase

  • 8/2/2019 Project Mgmt Final

    18/43

    Project Life Cycle PhasesConception

    phase

    Definitionphase

    Planning &Organizing

    phase

    Implementation phase

    ProjectClean upphase

  • 8/2/2019 Project Mgmt Final

    19/43

    nai

  • 8/2/2019 Project Mgmt Final

    20/43

    Project Management ConceptsThe project management approach the

    success of a project means: It must get completed

    It must be completed within budget It must get completed within allocated time

    It must performto satisfaction

    For a project to be successful, it mustmeet these demands

    The success however, can be achievedonly through people

  • 8/2/2019 Project Mgmt Final

    21/43

    Steps In Project ManagementProject management approach consists

    of the following 5 steps:

    Grouping work in packages Entrusting the entire project to a single

    responsibility centre project manager

    Supporting & servicing the projectinternally & externally

    Building up commitment

    Ensuring adherence to goals

  • 8/2/2019 Project Mgmt Final

    22/43

    Project Management v/sFunctional ManagementThe project management approach is

    preferred to the functional managementapproach

    This can be better appreciated, if weconsider the following 2 aspects of projectwork:

    All work has inter-dependence & inter-relationshipwith others

    The work & the inter-relationship are liable tochange

  • 8/2/2019 Project Mgmt Final

    23/43

    Structuring of responsibilities based onspecialization would not meet the basicrequirements of a project

    The first need for fast work is grouping &

    generalization of work & not extremespecialization & too much division of work

    Then follows, the need for trade off-acceptinglesser than the best, in one or more areas, foran overall benefit

    In the name of functional specialization, thetotality of work is often lost sight of

    A work is done better if it is taken up as awhole & assigned to one responsibility centre

  • 8/2/2019 Project Mgmt Final

    24/43

    Project management, like functionalmanagement, will require getting thingsdone through people but, with a little

    difference In project management, the work gets

    done mostly through lateral & diagonalcontacts

    The hierarchical protocol is almost non-existentMany may also not like to projectize their

    outlook. i.e. look all the time at the future

  • 8/2/2019 Project Mgmt Final

    25/43

    lasa

  • 8/2/2019 Project Mgmt Final

    26/43

    Techniques in Project Management Project selection technique

    Cost benefit analysis

    Risk and sensitivity analysis

    Project execution planning techniqueWork breakdown structure (WBS)Project responsibility matrix

    Project management manual

    Project scheduling and coordinating techniquesBar charts

    Life cycle curves

    Line of Balance (LOB)

    Networking techniques (PERT/CPM)

  • 8/2/2019 Project Mgmt Final

    27/43

    Techniques in Project Management Project monitoring and progressing techniquesProgress measurement technique (PROMPT)Performance monitoring technique (PERMIT)Updating, reviewing and reporting technique

    (URT) Project cost and productivity control techniquesProductivity budgeting techniqueValue engineering (VE)

    COST/WBS Project communication and clean-uptechniquesControl roomComputerized information systems

  • 8/2/2019 Project Mgmt Final

    28/43

    Project Management TaskPerformance

    Productivity

    Time

    Cost

    Start of work Completion of work

    Externalinfluenceson work

    Externalinfluenceson work

  • 8/2/2019 Project Mgmt Final

    29/43

    Importance of ComputerisedProject ManagementProjects include a high degree of

    volume, variety and complexity of

    informationInformation flow is the key to success

    Computers help in simplifying data

    without compromising on accuracy

  • 8/2/2019 Project Mgmt Final

    30/43

    Important Aspects ofProject ManagementAll work is interdependent and inter-

    related, therefore everyone must workhand-in-hand towards a group goal

    Must be team spirit, resources need to bediverted to whoever needs it most

    Flexibility in relationship and adaptability

    to change is essential for survival

    Computers can provide aid but ultimatelythings will depend on human wisdom

  • 8/2/2019 Project Mgmt Final

    31/43

    sab

  • 8/2/2019 Project Mgmt Final

    32/43

    Management System LoopInformation Network

    Reports

    Reports

    Directions

    Directions

    Computer

  • 8/2/2019 Project Mgmt Final

    33/43

    Myths or Facts?! ?Success or failure of a project depends

    on the project manager

    Project managers are a special breed ofmanagers

    In a project everything is unknown anduncertain

    Those who are successful have adegree in project management

  • 8/2/2019 Project Mgmt Final

    34/43

    Roles and Responsibilities of aProject ManagerDefining and maintaining the integrity of

    a project

    Development of project execution plan

    Organization for execution of the plan

    Setting targets and development ofsystems and procedures

    Negotiation for commitments

    Direction, co-ordination and control of

    project activities

  • 8/2/2019 Project Mgmt Final

    35/43

    Roles and Responsibilities of aProject ManagerContract management

    Non-human resource managementincluding fiscal matters

    Projecting and problem solving

    Man management

    Satisfaction of customer, Govt. and thepublic

    Achievement of project objectives, cash

    surplus and higher productivity

  • 8/2/2019 Project Mgmt Final

    36/43

    Owner

    PM

    TurnkeyContractor-1

    PM

    TurnkeyContractor-2

    PM

    TurnkeyContractor-3

    PM

    WP Contract1

    PM

    WP Contract2

    PM

    WP Contract3

    PM

    Roles and Responsibilities of aProject Manager

  • 8/2/2019 Project Mgmt Final

    37/43

    mayu

  • 8/2/2019 Project Mgmt Final

    38/43

    Basic Education for ProjectManagerBasic degree in Engineering

    But engineers usually do notconsider the cost & time factor

    Hence a special educationrelated to project management

  • 8/2/2019 Project Mgmt Final

    39/43

    Owner

    PM

    TurnkyContractor

    1

    PM

    TurnkyContractor

    3

    PM

    TurnkyContractor

    2

    PM

    W.P.Contract 3

    PM

    W.P.Contract 2

    PM

    W.P.Contract 1

    PM

    Responsibility of a Project Manager

  • 8/2/2019 Project Mgmt Final

    40/43

    Roles & Responsibilities of ProjectManagerDefining & maintaining theintegrity of the project

    Developing of projectexecution plan

    Organization for execution ofthe plan

    Setting of targets

  • 8/2/2019 Project Mgmt Final

    41/43

    Roles & Responsibilities of ProjectManagerNegotiation for commitments

    Direction, coordination & control ofproject activities

    Contract management

    Non-human resource managementincluding fiscal matters

  • 8/2/2019 Project Mgmt Final

    42/43

    Roles & Responsibilities of ProjectManagerProjectising & problem-solving

    Man management

    Satisfaction of customer,

    Government and the public

    Achievement of project objectives,cash surplus & higher productivity

  • 8/2/2019 Project Mgmt Final

    43/43

    Projects aresuccessful due to thesynergy of allinvolved, not becauseof the energy of aSuperman