project management concepts (from pmbok 5th ed)
TRANSCRIPT
![Page 1: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/1.jpg)
PROJECT MANAGEMENTConcepts and Cases
Certified Six Sigma Black Belt Certified Project Management Professional (PMP) BPM Practitioner
Jeremy Jay V. Lim
![Page 2: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/2.jpg)
What is a Project?
What is Project Life Cycle?
What are Project Management Processes?
Project Management Pillars
![Page 3: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/3.jpg)
WHAT IS A PROJECT?
![Page 4: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/4.jpg)
A Project is...
![Page 5: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/5.jpg)
We do projects because..Projects make it "possible"
BUT Operational processes give us the results and benefits of the projects on an ongoing basis.
![Page 6: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/6.jpg)
A Project is a means to create ...
![Page 7: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/7.jpg)
A Project is...
![Page 8: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/8.jpg)
A Project is...
![Page 9: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/9.jpg)
A Project is...A Project is A TEMPORARY ENDEAVOR
undertaken to create A UNIQUE PRODUCT, SERVICE or RESULT!
![Page 10: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/10.jpg)
A Project is of ...
![Page 11: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/11.jpg)
Keep in mind...
![Page 12: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/12.jpg)
Keep in mind...
![Page 13: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/13.jpg)
Keep in mind...There's always a challenge in a project
Pushing too much in one direction causes problems on the other.
It's called the "Project Constraints"
![Page 14: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/14.jpg)
That's why Project Management is so important..
![Page 15: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/15.jpg)
And the role and responsibilities of a project manager are ..
![Page 16: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/16.jpg)
And the cross-cutting skills and traits of an effective project manager are ..
![Page 17: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/17.jpg)
And the cross-cutting skills and traits of an effective project manager are ..
![Page 18: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/18.jpg)
Now, Your Idea
How many projects can a
project manager handle at one
time?
![Page 19: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/19.jpg)
WHAT IS A PROJECT LIFE CYCLE?
![Page 20: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/20.jpg)
Project Life Cycle
![Page 21: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/21.jpg)
Project Life Cycle
Initiating Process Group.Those processes performed to define a new project or a new phase of an existing project by obtaining to start the project or phase.
![Page 22: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/22.jpg)
Project Life Cycle
Planning Process Group.Those processes required to establish the scope of the project, refine the objectives, and define the course of action required to attain the objectives that the project was undertaken to achieve.
![Page 23: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/23.jpg)
Project Life Cycle
Executing Process Group.Those processes performed to complete the work defined in the project management plan to satisfy the project specifications.
![Page 24: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/24.jpg)
Project Life Cycle
Monitoring & Controlling Process Group.Those processes required to track, review, and regulate the progress and performance of the project; identify any ares in which changes to the plan are required; and initiate the corresponding changes.
![Page 25: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/25.jpg)
Project Life Cycle
Closing Process Group.Those processes performed to finalize all activities across all Process Groups to formally close the project or phase.
![Page 26: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/26.jpg)
![Page 27: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/27.jpg)
Effort Spent in the Process Groups
![Page 28: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/28.jpg)
Now, Your Idea
How do you save a problematic or
troubled project that no one wants
to take?
![Page 29: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/29.jpg)
WHAT ARE THE PROJECT MANAGEMENT
PROCESSES?
![Page 30: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/30.jpg)
PROJECT MANAGEMENT CORE PROCESSESOr Knowledge Areas
Quality
Cost
Human Resources
Communication
Project Risk
ProcurementIntegration
Scope
Schedule
![Page 31: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/31.jpg)
![Page 32: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/32.jpg)
Stakeholder Management
Making sure that people concerned with the project are continuously engaged and their expectations met.
![Page 33: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/33.jpg)
66
7
4343644
47PM Processes
![Page 34: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/34.jpg)
Initiating Planning Executing Monitoring & Controlling Closing
Project Integration
Project Scope
Scheduling
Project Cost
Quality
Human Resource
Communications
Project Risk
Procurement
Stakeholder Mgt
![Page 35: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/35.jpg)
Project Integration: "Getting the job done"
4.1. Getting the project charter approved to be authorized to control the budget and assign resources 4.2. Planning all of the work that's going to happen throughout the project 4.3. Directing the work once it gets started 4.4. Monitoring the way the work progresses and looking for potential problems 4.5. Looking out for changes, understanding their impacts, and making sure they don't derail the project 4.6. Closing out the project and making sure that there are no loose ends when it's over
![Page 36: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/36.jpg)
Project Integration: "Getting the job done"
![Page 37: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/37.jpg)
Steps when making a Project CharterStates the need,
expected project benefit and the compelling
reason to do the project
![Page 38: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/38.jpg)
Steps after making a Project Charter
Identify Stakeholders is part of Stakeholders Management
![Page 39: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/39.jpg)
Project Scope: "Doing the right stuff"
![Page 40: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/40.jpg)
Steps when defining Project Scope
![Page 41: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/41.jpg)
When Project Scope is poorly defined
![Page 42: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/42.jpg)
Project Schedule: "Getting it done on time"
![Page 43: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/43.jpg)
Project Schedule: "Getting it done on time"
![Page 44: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/44.jpg)
Steps when defining Project Schedule
![Page 45: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/45.jpg)
Steps when defining Project Schedule
![Page 46: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/46.jpg)
Different techniques of Determining Activity Duration
![Page 47: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/47.jpg)
Computing Activity Duration with 3-Point Estimate
![Page 48: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/48.jpg)
Let's try identifying the technique used
![Page 49: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/49.jpg)
Project Cost: "Watching the Bottom Line"
![Page 50: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/50.jpg)
Inputs Needed when Creating the Project Budget
![Page 51: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/51.jpg)
Accuracy of Budget Forecast throughout the Life CycleVariance
100% - (-50%) = 150%
50% - (-30%) = 80%
-20% - (+30%) = 50%
20% - (-15%) = 80%
15% - (-10%) = 25*%
![Page 52: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/52.jpg)
Steps when Creating Project Budget
![Page 53: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/53.jpg)
Steps when Computing Project Costs
![Page 54: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/54.jpg)
Behavior of Project Cost
![Page 55: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/55.jpg)
Behavior of Project Cost (2)
![Page 56: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/56.jpg)
Behavior of Project Cost (3)
![Page 57: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/57.jpg)
Let's Compute Project Cost Performance
![Page 58: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/58.jpg)
How to Interpret Project Cost Performance
![Page 59: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/59.jpg)
Project Quality: "Getting it Right"
![Page 60: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/60.jpg)
Steps when defining Project Quality
![Page 61: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/61.jpg)
Human Resources: "Getting the team together"
![Page 62: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/62.jpg)
Steps when Forming the Project Team
![Page 63: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/63.jpg)
Tips when Forming the Project Team
![Page 64: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/64.jpg)
Tips when Assigning Roles and Responsibilities
![Page 65: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/65.jpg)
Steps when Forming the Project Team
![Page 66: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/66.jpg)
Project Comm'ns: "Getting the words out"
![Page 67: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/67.jpg)
90% of the Project Manager's job is Communications
![Page 68: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/68.jpg)
![Page 69: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/69.jpg)
Communication Techniques
![Page 70: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/70.jpg)
Ways of Communicating Out the Project Status
![Page 71: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/71.jpg)
More People, More Connections
![Page 72: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/72.jpg)
Let's try ...
![Page 73: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/73.jpg)
Project Risk: "Planning for the Unknown"
![Page 74: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/74.jpg)
Steps when Managing Project Risks
![Page 75: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/75.jpg)
![Page 76: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/76.jpg)
![Page 77: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/77.jpg)
![Page 78: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/78.jpg)
![Page 79: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/79.jpg)
![Page 80: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/80.jpg)
![Page 81: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/81.jpg)
![Page 82: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/82.jpg)
![Page 83: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/83.jpg)
![Page 84: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/84.jpg)
Let's Try...
![Page 85: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/85.jpg)
Let's Try...
![Page 86: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/86.jpg)
Project Procurement: "Getting some Help"
![Page 87: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/87.jpg)
![Page 88: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/88.jpg)
And remember, in each failed contracted service there is a frustrated project manager
![Page 89: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/89.jpg)
Procurement is an Intuitive Process
Plan what to contract
Plan how to contract
Contact Sellers re. Requirements
Sellers bid for a contract
Select best Seller
Sign contract with Seller
Monitor adherence to agreed contract
Close out Contract
![Page 90: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/90.jpg)
Let's Try...
![Page 91: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/91.jpg)
Let's Try...
![Page 92: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/92.jpg)
Steps when Managing Project Procurements
![Page 93: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/93.jpg)
Steps when Managing Project Procurements
![Page 94: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/94.jpg)
Stakeholders Mgt: "Managing Expectations"
![Page 95: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/95.jpg)
![Page 96: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/96.jpg)
![Page 97: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/97.jpg)
Now, Your Idea
Knowing the PM processes now, is
there anything you would have done
differently? Why?
![Page 98: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/98.jpg)
Now, Your Idea
How do you work with people not
familiar with Project Management
practices?
![Page 99: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/99.jpg)
Updates on PMBOK from 4th Ed to 5th Ed
![Page 100: Project Management Concepts (from PMBOK 5th Ed)](https://reader034.vdocuments.mx/reader034/viewer/2022051404/5428a4a68d7f72714e8b4a43/html5/thumbnails/100.jpg)
References
2013