project is founded by european union through rsedp 2 project project is implemented by institut...
TRANSCRIPT
![Page 1: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/1.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institute Gosa
www.w-tech.rs
„W-Tech“
Technology Transfer and Innovation Centre
for Advanced Welding Technologies, Material Science
and Application of Engineering softwareSerbian Chamber of Commerce
April 23rd 2013
Belgrade
![Page 2: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/2.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
• Programme: Regional Socio-Economic Development Programme II (RSEDP2)
• Total eligible cost of the action: 755.575,91 €• Funded by EU Delegation to Serbia: 680.018,319 €• Total duration of the action: 27 months
• Locations of the action: Serbia Braničevo and Podunavlje, Central Serbia, South Banat,
Smederevska Palanka, Smederevo, Kragujevac, Pančevo
![Page 3: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/3.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
PARTNERSPartner 1: Regional Development Agency “Branicevo-Podunavlje”,
RS-2009-BUJ-3011499305Serbia
Partner 2: Faculty of Technology Sør-Trøndelag, University College (HiST) Trondheim, NO-2010-BZY-3108404975
Norway
Partner 3: University of Belgrade (with the following faculties and institutes Faculty of Technology and Metallurgy, Vinča Institute, Faculty of Mining and Geology, Faculty of Mechanical Engineering), RS-2010-BUO-2004537322
Serbia
Partner 4: Serbian Chamber of Commerce, RS-2009-FNC-0312514938
Serbia
Associated partner 1:
National Institute of Research and Development in Welding and Material Testing Isim Timişoara
Romania
Associated partner 2:
Institut Jozef Stefan Slovenia
![Page 4: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/4.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
OBJECTIVESOverall objective of the action is to contribute to better preconditions for
sustainable economic growth and human resource development in the regions with the highest concentration of manufacturing and engineering industry of Serbia, in particular Braničevo and Podunavski, Central Serbia and Banat (South)
Specific Objectives: • To improve competitiveness of enterprises operating in manufacturing and
engineering industry in targeted regions by implementing state of the art technology solutions and enhancing their human resource capacities through research, innovation, quality control services and training services.
• To promote inter-institutional partnerships between knowledge centres and targeted industry
• To position Smederevska Palanka as a Centre of innovation and technology transfer for new welding technologies, material science and engineering in Serbia and in the Western Balkans by improving research and vocational training infrastructure, upgrading of existing and developing new accredited lab and training services
![Page 5: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/5.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
Significantly improved and modernized research, laboratory and training facilities in Smederevska Palanka
![Page 6: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/6.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
2 laboratory
• mechanical laboratory
• metallographic laboratory
3 training facilities
• conference room
• computer classrooms
• practical training workshop space for new trainings in advanced welding technologies
About 1000 m2 of Institute Goša in Smederevska Palanka modernized and energy
efficiency of old premises significantly improved:
![Page 7: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/7.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Mechanical laboratory
• 140 m2 of mechanical laboratory improved
• more secure and comfortable working conditions for testing
![Page 8: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/8.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Metallographic laboratory
• 95 m2 in metallographic laboratory improved
• quicker reporting of sample testing as a request by industry and R&D
![Page 9: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/9.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
The existing training space modernized and rearranged into 1 conference room (tele-conferences, trainings, meetings..), 1 computer classroom for application of engineering software and tool design and e-learning courses and offices for researchers in the field of engineering software and e-learning
![Page 10: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/10.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Conference room, computer classroom and offices
• better conditions and higher standard for provision of training programme, in particular computer supported trainings
![Page 11: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/11.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Rearranged existing facility in the total size 145 m2
Workshops space for practical training of welders
![Page 12: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/12.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
•Better working conditions for practical training of welders
• Health and safety conditions enhanced
• Dangerous gas emissions channelized and filtrated
![Page 13: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/13.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Improved training facility
of 280 m2
Practical training workshop space for new trainings in advanced welding technologies
Training centre for
new welding techniques
according to EU standards
and norms
![Page 14: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/14.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
• data acquisition system on existing Sharpy's pendulum• measurement and data acquisition system for the determination of the tensile force of the sample
Mechanical lab equipment improved
Mechanical testing of metal materials in MML upgradedfor:productlife assessment analysisfurther risk assessment analysisfracture testing
RESULTS
![Page 15: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/15.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Mechanical testing of metal materials in MML is upgraded :
Separating the total impact energy, the energy of creation and the energy spread of crack, which is judged to plasticity of materials.
Introduction of methods for monitoring the behaviour of metallic and semi-finished products in the presence of defects
Universal testing of tightening and pressure
Digital reading based on force-time, force –elongation.
Improving the registration – recording, readings of force in the growth function of time and force to function elongation
Analysis of the behaviour of the system in operation and life assessment- practical application in industry
![Page 16: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/16.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
• device for equipment and software for data acquisition the existing microscope NEOPHOT 30
• device for electrochemical polishing of samples• device for preparation of metallic samples
Metallographic lab equipment improvedRESULTS
![Page 17: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/17.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Metallographic testing of metal materials in MML is upgraded:
very precisely analyse of micro-and macro structures
variety of analyses of very thin metallic samples
higher quality testing and registration – recording and higher quality of images
higher quality of preparation of metallic samples for testing -higher magnification of x 600
practical application in industry
![Page 18: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/18.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
multitask machines 250 A for MIG/MAG/TIG/E
MIG/MAG machines 400 A with water cooling
auxiliary equipment for safety, preparation of samples and theoretical education
Welding equipment for new training programmes in 3 new advanced welding techniques purchased:
![Page 19: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/19.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
device for welding plastic-multiprocess
![Page 20: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/20.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
device for ultrasonic welding
![Page 21: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/21.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Better conditions and higher standard for provision of training programme for practical training of welders, improved safety and health conditions and energy efficiency and computer supported trainings
• Training centre for new welding techniques according to EU standards and norms.
• Health and safety conditions are enhanced.
• Maximal safety during practical welding trainings is assured.
• Process for detection of mistakes is speed up.
• Conditions for certification and later on implementation of training programmes for 3 advanced welding technologies and for implementation of 3 different specialised engineering software have been met.
• Quality of trainings and in particular quality of the preparation of samples are improved.
• Computer classroom equipped and ready for trainings of engineering software.
![Page 22: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/22.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
Special engineering software and hardware installed:
Software for engineering calculations Math Cad
Softwares for tool design Catia V5
Softwares for tool design ProEngineer
![Page 23: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/23.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS Established 4 new tailor made training programmes and tools for facilitation of technology transfer and innovation:
training programme for welding of polymers 5 instructors trained and licensed for delivering training
training programme for metal welding: - E/TIG/MIG/MAG/G and 136 process: flux cored wire welding5 instructors trained and licensed for delivering training
![Page 24: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/24.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
training programmes for ultrasonic welding
5 instructors trained and licensed
e-learning
programmes for welding technologies iQSim
5 toutors trained
![Page 25: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/25.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
Team of 6 engineers and tool designers trained in engineering software: 2 engineer trained in Math Cad2 engineer trained in Catia V5 2 engineer trained in ProEngineer
![Page 26: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/26.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS10 researchers trained in new lab methods-electron microscopy and optical microscopy
![Page 27: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/27.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
• Provision of a certified training program for welding of polymers, metal welding and ultrasonic welding in Serbia enable faster transfer of this technology and reduce costs for companies.
• e-learning programmes for welding technologies here is completely new offer for training and for developing industrial sector.
• "iQSim" is an e-learning tool – simulation programme which shows with ease how our choices and variations in welding techniques and procedures have consequences for the outcome, with respect to both quality and costs. It was funded by the EU Commission Leonardo Program under the partnership led by Sør-Trøndelag University College and in cooperation with research and development partners in Sweden, Lithuania, Hungary and Greece. Throught W-tech project this useful and applicable e-learning tool is transferred to Serbian industry.
• Advanced software engineering provide optimisation of products, simulation of related processes, assistance in tool design and facilitated tailor made engineering courses (cases).
Throught ehese activities the human and institutional capacities to facilitate technology transfer to the target regions are enhanced and advanced technical training programmes, laboratory and R&D services need today are developed:
![Page 28: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/28.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
1. Know how transfer workshop for mechanical fracture and life assessment2. Know how transfer workshop for preparation of samples 3. Know how transfer workshop for optical microscopy 4. Know how transfer workshop for ultra sonic welding5. Know how transfer workshop for welding of polymers
13 know- how transfer workshops: transfer of knowledge, international, national and business networking, exchange of experience and transfer of knowledge
Above 260 participants
13 research and
technological topics demonstrated
![Page 29: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/29.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
6. Know how transfer workshop for flux cored wire welding
7. Know how transfer workshop - Possibilities of applications of industrial software: design and numerical simulations
8. Know how transfer workshop – implementation for e-learning course of welding
9. Know how transfer workshop on technology transfer best practices
December 2012December 2012
Transfer of knowledge, international, national and business networking, exchange of experience and increase possibility of transfer of knowledge
Identifications possibilities of innovations and R&D
![Page 30: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/30.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTSHuman resources and competences of min 20 companies in adopting advanced technologies improved
20 most perspective companies selected according defined criteria. They were understand better their current situation as regards their level of technology and competences and speeded up their adoption of new technologies and skills:
11. ATB FOD BOR d.o.o., Bor12. GOŠA Fabrika šinskih vozila d.o.o.,
Smederevska Palanka13. IMK “14.oktobar” AD u restrukturiranju, Kruševac14. “JAN” PR, Beograd15. Korporacija F AP a.d. , Priboj 16. SZR Flex Line, Čačak17. MOSTOGRADNJA a.d., Beograd18. TERMOELEKTRO d.o.o., Beograd19. Železara Smederevo d.o.o., Smederevo20. MIM-MIM d.o.o., Mihailovac
1. KRYOOPREMA d.o.o., Pančevo2. ENIKON a.d., Loznica3. VATROSPREM proizvodnja d.o.o., S.
Palanka4. TERMORAD GROUP d.o.o., Požega5. GP „PLANUM“ AD, Beograd6. Koncern FABRIKA VAGONA KRALJEVO
a.d. u restruktuiranju, Kraljevo7. „Utva Silosi“ a.d., Kovin8. Fabrika železničkih vozila ŽELVOZ a.d.-u
restruktuiranju, Smederevo9. METALAC a.d., Gornji Milanoviac10. Holding ˝Kablovi˝a.d., Jagodina
![Page 31: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/31.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS70 employees increased their technical skills in applying advanced welding technologies
Training welding of polymers: 10 persons
Training ultrasonic welding : 10 persons
Training flux cored wire welding: 20 persons
Training e-learning program "iQSim": 30 persons
![Page 32: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/32.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
21 employees from 20 companies increased their competences in using engineering software
training in engineering software for tool design-Catia V5Catia V5
7 persons
training in engineering software for engineering calculations-ProEngineerProEngineer
7 persons
training in engineering software for engineering calculations-Math Cad Math Cad
7 persons
RESULTS
![Page 33: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/33.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
RESULTS
2 international conference in Serbian Chamber of Commerce:
Planned 60 participants
2 international conference in Serbian Chamber of Commerce:
Planned 60 participants
Increased awareness for continues innovation and technology development and life-long learning
Attended above 150 participants
![Page 34: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/34.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
5 open days with workshops-demonstration of new technologies:
1. Welding: new technologies and
new materials workshop
2. Material testing, new services
workshop
3. Numerical simulations workshop
Established closer cooperation and links with businesses, research and enterprisesDemonstrated opportunities of technological development, new technical courses
and industrial services in Institute Goša in Smederevska Palanka
![Page 35: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/35.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
4. Training of welding personal – workshop 5. E-learning workshop
Established links between research and enterprisesExchanging experience and know-howDesign of new possibilities of R&D and transfer of knowledgeDesign of new possibilities for developing of new services
Planned 50 participants
Attended above 70 participants
![Page 36: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/36.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
8 presentations in the region :8 presentations in the region :
SmederevskaSmederevska PalankaPalanka
PančevoPančevo
KragujevacKragujevac
ŠabacŠabac
PožarevacPožarevac
SmederevoSmederevo
BeogradBeograd
about 190 participantsabout 190 participants
![Page 37: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/37.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
2 Strategic workshops with international, national and associated partners and other stakeholders – transfer of experience & brain storming workshop in Serbia
II Strategic workshop Mart 2013
Above 30 participants
I Strategic workshop September 2011
Above 20 participants
![Page 38: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/38.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
• Participants from Hungary, Norway, Slovenia, Bosnia and Herzegovina, Romania and Serbia
• Duration 2 days per workshop
• Implementation of the project has been extended for 3 months
• transfer of experience & brain storming workshop in Serbia
• Established and certified training programmes and harmonized standards and procedures provide long term vision of Institut Goša as a leading industry research and innovation centre in region
• Transfers of knowledge through workshops provided international, national and business networking and exchange of experience. Possibilities of transfer of knowledge and possibilities of innovations and R&D are increased.
![Page 39: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/39.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Media campaign:
project site www.w-tech.rs
partner’s web sites,
about 70 newspaper
articles
15 TV reports
20 radio reports
14 articles on business
portal "e-kapija "
![Page 40: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/40.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Intervention business environment for the enterprises in Braničevo and Podunavlje, Central Serbia and South Banat is improved: it is enabled with easier access to advanced technological knowhow and lab infrastructure
it is endowed with new and better services, trainings and information provision
other R&D institutions and technological centres might enter the partnership
new more intensive and demanding concrete local or international R&D projects might be initiated
extensions of the project into “technological and educational park” for the same area for technology and same target area is sensed
![Page 41: Project is founded by European Union through RSEDP 2 project Project is implemented by Institut Goša W-Tech Project is founded](https://reader037.vdocuments.mx/reader037/viewer/2022110101/56649e6c5503460f94b6abb9/html5/thumbnails/41.jpg)
Project is founded byEuropean Union throughRSEDP 2 project
Project is implemented by Institut Goša
www.w-tech.rs
W-Tech
www.w-tech.rs
Thank you for attention!