PROJECT HIGHLIGHTSEnergy efficiency is a key feature of the design of Reagan Education Center. The heating, cooling, and electrical lighting systems exceed energy code requirements, thereby reducing annual power consumption and utility costs.
WATER EFFICIENCY■ Installation of high efficiency plumbing fixtures.■ 50% reduction in plant irrigation water usage.
ENERGY & ATMOSPHERE■ 20% reduction in energy costs. ■ Use of occupancy sensors.■ Reduced lighting power density
MATERIALS & RESOURCES■ Interior materials are low-maintenance and high-quality to reduce operational costs. ■ Exterior materials are durable and low maintenance. ■ Corrugated metal will be used for most of the second floor of the school.■ Extruded aluminum canopies for the bus and auto drop-off locations.
INDOOR ENVIRONMENTAL QUALITY■ Classrooms provide a healthy environment with lower life-cycle costs, lessening environmental
impact.■ Enhanced commissioning performed on the building, pressure testing of mechanical system, duct
protection during construction and building envelope commissioning.
INNOVATION AND DESIGN■ Masonry face brick, as well as aluminum/glass windows, store fronts and doors will be used to
reduce the amount of exterior painting required. ■ 20% of building materials designed to be of recycled content.■ Construction waste management performed by the contractor.
Renderings courtesy of PBK Architects, Inc.
Houston Independent School District
Billy R. Reagan PK-8 Education Center
PROJECT PROFILE
Owner: Houston Independent School District (HISD)Architect: PBK Architects, Inc. Civil Engineer: T.E.A.M.MEP Engineer: Infrastructure AssociatesLEED Commissioning Agent: Rice and GardnerContractor: Anslow Bryant ConstructionProject Size: 164,545 SFTotal Project Cost: $20,831,993Cost PSF: $126.61Opening: Fall 2012
ABOUT LEED®The LEED® Green Building Rating System is the national benchmark for the design, construction, and operations of high-performance green buildings. Visit the U.S.Green Building Council’s Web site at www.usgbc.org to learn more about how you can make LEED® work for you.
ABOUT HOUSTON INDEPENDENT SCHOOL DISTRICT
The Houston Independent School District is the largest public school system in Texas and the seventh-largest in the United States. Its schools are dedicated to giving every student the best possible education through an intensive core curriculum and challenging specialized instructional and career programs. HISD is working hard to be Houstonians' K–12 school system of choice, by constantly improving instruction and management for these to be effective, productive, and economical.
The district desires to provide a healthy school environment that can be utilized by students, parents, faculty, and staff. HISD has mandated adherence to the LEED® for Schools “certified” rating level for all new school construction.
LEED® Facts
LEED® for Schools 2007(Certification Pending)
Seeking Silver 41*
Sustainable Sites 8Water Efficiency 5Energy & Atmosphere 7Materials & Resources 6Indoor Environmental 12QualityInnovation and Design 3
*Out of a possible 79 points
LEED® for Schools (Submittal)
36% Reduction in Energy Consumption
37% Reduction in Water Use
25.5% Recycled Content of Materials
32.3% Use of Local/Regional Materials
92% Construction Waste Diverted from Landfill