project health management information system (phmis) · project health management information...

29
Project Health Management Information System (PHMIS) Executive Sponsors Russell Zapalac Chief Planning and Projects Officer Lynn Isaak Director PMO Maureen Wakeland Portfolio Management & Reporting Section Director 10/25/2012 2012 Short Course M Wakeland 1

Upload: hoangdat

Post on 28-Jul-2018

224 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Project Health Management Information System (PHMIS)

Executive Sponsors

Russell Zapalac Chief Planning and Projects Officer

Lynn Isaak Director PMO

Maureen Wakeland Portfolio Management & Reporting

Section Director

10/25/2012 2012 Short Course M Wakeland 1

Page 2: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Outline

• Project Charter

• Project Development & Status

• Look Ahead Deliverables & Milestones

10/25/2012 2012 Short Course M Wakeland 2

Page 3: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Outline: Project Charter

• Approved June 2012… due date Dec 15 2012

• Goal: report on key project health information (progress, cost, schedule, resource utilization)

– Accurate

– Timely

– Relevant

10/25/2012 2012 Short Course M Wakeland 3

Page 4: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Problem Definition

• DDORs are managing multiple projects with various complexity

• Project Information resides in various legacy systems

• Each information system has a separate “owner”

• Want to see “cradle to grave” details

10/25/2012 2012 Short Course M Wakeland 4

Page 5: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Proposed Solution

• Need improved tools & Techniques

10/25/2012 2012 Short Course M Wakeland 5

PHMIS

Page 6: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Benefits of PHMIS

• Standard reports

• Ad-hoc report capability

• Share information across agency “silos”

10/25/2012 2012 Short Course M Wakeland 6

Page 7: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Outline: Project Development & Status

• Schedule remaining

• 3 Key Concepts

• New data fields needed

10/25/2012 2012 Short Course M Wakeland 7

Page 8: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Milestone/ Week

Week 1

10/05

Week 2

10/12

Week 3

10/19

Week 4

10/26

Week 5

11/02

Week 6

11/09

Week 7

11/16

Week 8

11/24

Week 9

11/30

Week 10

12/07

Week 11

12/14

Week 12

12/21

Month Jan

2013

Month Feb

2013

MonthMar 2013

Finalize Data

Requirements

Build Data Mart & P6(2)

Create Data Fields in Legacy Systems

Populate Data

Pilot &Testing (IH 35)

Five Districts Projects Data Population

Reports Testing

Training

All Districts

Project Schedule

Go - Live

Page 9: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

3 Key Concepts

• Project Maturity

• Cost Drivers

• Cost Estimate Class

10/25/2012 2012 Short Course M Wakeland 9

Page 10: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

National Best Practices Project Maturity Concepts • TTI was lead research

agency

• AASHTO evaluating for national adopting

• TTI on contract to support TxDOT in development of best Cost Estimating Practices

• Pilots are being started to evaluate “best practices” for TxDOT

10/25/2012 10 2012 Short Course M Wakeland

Page 11: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

NCHRP 574…Project Maturity Road & Bridge Development Phases

10/25/2012 2012 Short Course M Wakeland 11

Page 12: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

NCHRP 574…Project Maturity Development Phases & Activities

10/25/2012 2012 Short Course M Wakeland 12

Page 13: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

DRAFT PHMIS Project Maturity

Project Maturity

Numbering

Project Maturity Level/Phase of Overall Project

Project Maturity Timeframe (in relation to letting and typical

values by project)

7 Planning 25 to 10 years before

6 Programming 10 to 5 years before

5 Preliminary Design 0-30% 5 to 1 years before

4 Design 30- 60% 3 to 1 years before

3 Final Design 60-100% 1 to 0 years before

2 Advertise and Bid (Letting) 0 years before

1 Construction 0 to 5 years after

M Operations and Maintenance Varies after

13

Page 14: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Cost Driver Concept

• Road & Bridge

– Environmental

– Design

– ROW Acquisition

– Utility Adjustment/Relocation

– Construction

– Construction Engineering/Inspection

– Maintenance (Design-Build)

10/25/2012 2012 Short Course M Wakeland 14

Page 15: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

NCHRP 658: Estimate Class Concept Refinement of Estimate over Time

10/25/2012 15

Page 16: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project
Page 17: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Estimate Class Rating

(Legacy System)

Definition & Maturity

(% Complete of Cost Driver Progress)

Conceptual Step of Cost Driver Task

Definition

End Usage (Typical purpose of Estimate)

Methodology Typical TxDOT Methodology

Preparation Effort

E 0% to 2% Determine Scope Screening or

Feasibility

Stochastic or Judgment

Based on % of Construction estimate

Very Low (.005% of Cost)

D 1% to 5% Identify Tasks Concept Study or

Feasibility

Primarily Stochastic

Based on % of Construction estimate

Low (.01% to .02% of Cost)

C 10% to 40%

Identifying Tasks not Previously and

Identified Completing Tasks

Budget, Authorization or

Control

Mixed but primarily stochastic

Unit Prices applied to Estimated Major

Tasks/Items/Hours

Medium (.015% to .05% of Cost)

B 30% to 70% Completing and

Few Tasks Control or Bid

Tender Primarily

Deterministic

Unit Prices applied to all Estimated

Tasks/Items/Hours

High (.025% to .1% of Cost)

A 50%-100% Finalizing all Tasks Check Estimate or

Bid/Tender Deterministic

Unit Price applied to Tasks/Items/Hours of

Work

Very High (.05% to .5% of Cost)

DRAFT PHMIS Cost Driver Estimate Class Guidance

Page 18: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

New Data Fields Needed By Cost Driver

• Planned Start

• Actual Start

• Planned Finish

• Actual Finish

• Planned Budget (w/ date)

• Cost Estimate Class

• Others specific to Cost Driver

10/25/2012 2012 Short Course M Wakeland 18

Page 19: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Outline: Look Ahead

• Reports

• Data fields needed

• Timeline

10/25/2012 2012 Short Course M Wakeland 19

Page 20: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Report Stakeholders

• 3 Tiers of reports

– ADM

– DDOR & Sr Management

– Project Managers

10/25/2012 2012 Short Course M Wakeland 20

Page 21: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Draft Top 10 Report Needs

10/25/2012 21 2012 Short Course M Wakeland

Page 22: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Current Status

• Final Design Completed by Consultant

• New fields are being created

• Kick Off meeting – IH 35 project teams last

week

– 5 Metro Districts next week

• Short turn around for populating fields (please)

10/25/2012 2012 Short Course M Wakeland 22

Page 23: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Reports…What is Next?

• Business Intelligent tool

• HCL Consultant

• Top 10 list of reports

– List developed & prioritized based on feedback

10/25/2012 2012 Short Course M Wakeland 23

Page 24: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

PHMIS Team

10/25/2012 2012 Short Course M Wakeland 24

Page 25: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Summary & Conclusions

• PMO/IT are working hard on delivering a valuable product

• With your help we can meet Dec 15 deadline

• HNTB is present

• Please call if you have questions/concerns

Maureen Wakeland, PE PMP

512 416 2262

[email protected]

10/25/2012

2012 Short Course M Wakeland 25

Page 26: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Discussion & Questions

10/25/2012 2012 Short Course M Wakeland 26

Page 27: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

End

10/25/2012 2012 Short Course M Wakeland 27

Page 28: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Location of saved file:

• T:\PMO_DD\Short Course 2012/PHMIS Short Course 2012 V_Final V_1.pptx

10/25/2012 2012 Short Course M Wakeland 28

Page 29: Project Health Management Information System (PHMIS) · Project Health Management Information System (PHMIS) ... Problem Definition ... DRAFT PHMIS Project Maturity Project

Cost

Variance ($)

A

Time

Cu

mu

lati

ve

Co

st

($)

Today (Data Date)

Planned Budget ($)

Information Needed

10/25/2012 2012 Short Course M Wakeland 29

Schedule Slip

(units of time)

At

Completion

Cost

Variance

($) Project

Budget

Budget at Completion ($)

Estimate at Completion ($)

By Project Maturity

Actual Start Planned Start

Original Planned Finish

Current Estimated Finish