project division - lemuir

37
PROJECT DIVISION

Upload: others

Post on 14-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT DIVISION - LEMUIR

PROJECT DIVISION

Page 2: PROJECT DIVISION - LEMUIR

LEMUIR GROUP COMPANIES

India’s largest Imaging Systems Co

Project Forwarding, Bulk Handling, CustomsBrokerage, International freight forwarding,Domestic Transportation, Port Handling,Stevedoring, Steamer Agency & Chartering

International Logistics – Diamonds & Jewellery

International & Domestic Logistics – BullionDomestic Logistics – Diamonds & JewelleryLogistics Services for Luxury Goods, Fine ArtVaulting & Secure Transportation

Domestic Air Cargo Logistics

CtP Solutions, Graphic Arts Consumables,Digital Print Media, Screen Printing,

(Group Affiliate)

India’s largest Imaging Systems CoIndia’s largest Imaging Systems Co

(Group Affiliate)

India’s largest Imaging Systems Co

Page 3: PROJECT DIVISION - LEMUIR

COMPANY PROFILE

• Founded in 1932, acquired by Parikh Family in 1945.

• Operations at all major ports and project locations across India

• Licensed by Indian Customs at all major ports and airports

• Specialize in handling Project Logistics including project registration & reconciliationwith customs authorities.

Page 4: PROJECT DIVISION - LEMUIR

NET WORK

NEW DELHI

MUMBAI

CHENNAI

KOLKATAHALDIA

PARADIP

VISAKAPATNAM

TUTICORIN

KUDANKULAM

KANDLA/ MUNDRAAHMEDABAD

CORPORATE OFFICE

REGIONAL OFFICE

BRANCH

Page 5: PROJECT DIVISION - LEMUIR

SERVICES & COVERAGE

• Project Cargo Forwarding• Bulk Handling & Shipping• Customs Clearance• Surface Transport - Own equipment• Project Warehousing

• Steamer Agency• Port Handling• Stevedoring• Ship Chartering• Consulting & Advisory

SERVICES

Lee & Muirhead Pvt Ltd actively serves a wide range of industry segments.

COVERAGE

Major Industry Segments

• Power• Oil & Gas• Infrastructure• Iron & Steel• Fertilizer• Chemical

Page 6: PROJECT DIVISION - LEMUIR

PROJECT LOGISTICS-OUR VISION

Our country has embarked on a major thrustfor infrastructure and industrial developmentand a large number of projects for suchdevelopment are underplanning and implementation.

The Projects Logistics Services Provider thusplays a key role in supporting the country’seconomic development.

Our vision is to see India emerge as a strong,vibrant and leading economic power and toplay our role successfully through timely, cost-effective, capable and reliable services forboth international and domestic turnkeyproject movements.

Our heritage of experience and excellence ismatched by our commitment to achievecustomer delight.

ARVIND PARIKHChairman

Page 7: PROJECT DIVISION - LEMUIR

Kandla

Haldia

Paradip

VisakhapatnamHyderabad

Bangalore

Mangalore

TuticorinKudam kulam

NEW DELHI

CHENNAI

CALCUTTA

MUMBAI

DVC -Raghunathpur

2 x 600 MW

DVC -Raghunathpur

2 x 600 MW

Lanco - Anpara2 x 600 MW

Lanco - Anpara2 x 600 MW

NTPC Meja2 x 660 MWNTPC Meja2 x 660 MW

ElectrosteelCasting

2.2 MTPA ISP

ElectrosteelCasting

2.2 MTPA ISP

MitsubishiChemicalPTA Plant

MitsubishiChemicalPTA Plant

Lanco Amarkantak2 x 300 MW

Lanco Amarkantak2 x 300 MW

Lanco Amarkantak2 x 660 MW

Lanco Amarkantak2 x 660 MW

NTPC Sipat2 x 600 MWNTPC Sipat2 x 600 MW

Vardha Power6 x 600 MW

Vardha Power6 x 600 MW

NTPC Sipat2 x 600 MWNTPC Sipat2 x 600 MW

TNEB TPP1 x 600 MWTNEB TPP1 x 600 MW

BHELVarious Projects

BHELVarious Projects

NPCIL2 x 1000 MW

NPCIL2 x 1000 MW

Udipi TPP2 x 600 MWUdipi TPP

2 x 600 MW

JSW TPP4 x 300 MWJSW TPP

4 x 300 MW

Dhariwal TPP2 x 300 MW

Dhariwal TPP2 x 300 MW

Lanco Kondapalli2 x 671 MW

Lanco Kondapalli2 x 671 MW

GMR Chatt. TPP2 x 685 MW

GMR Chatt. TPP2 x 685 MW

Muthiara TPP2 x 600 MW

Muthiara TPP2 x 600 MW

PROJECT MAP

NTPC Darlipalli2 x 800 MW

NTPC Darlipalli2 x 800 MW

Page 8: PROJECT DIVISION - LEMUIR

SOME OF OUR CURRENT PROJECTSCUSTOMER PROJECT DETAILS QUANTITY

2 x 1000 MW. Nuclear Power Corporation of India Ltd. Nuclear Power Plant at Kudankulam at Tuticorinport

450,000 FRT

2 x 800 MW Toshiba JSW Power Systems Pvt Ltd Darlipali Super Thermal Power Project. PortsChennai & Paradip

35000 FRT

2 x 660 MW Toshiba JSW Power Systems Pvt.Ltd - MejaUrja Nigam Pvt Ltd., UP

Thermal Power Project . Ports : Kolkata, Haldia &Chennai, domestic movements

28000 FRT

2 x 660 MW BGR Energy Systems Ltd - Meja Urja NigamPvt.Ltd., UP

Thermal Power Project . Ports : Kolkata, Haldia &Mumbai

43,000 FRT

2 x 660 MW BGR Energy Systems Ltd - NTPC SholapurThermal Power Project

Thermal Power Project . Ports : Mumbai & Navasheva

43,000 FRT

2 x 800 MW BGR Energy Systems Ltd - LARA SuperThermal Power Project , Chattisgarh

Thermal Power Project . Ports : Paradip, Haldia,Kolkata & Vizag

18,000 FRT

2 x 300 MW Dhariwal Infrastructure LtdPower Plant at Chandrapur, Maharstra – PowerPlant Equipment. Port: Mumbai 45,000 MT

4 x 300 MW JSW Thermal Power Project Thermal Power Project at Jaigad, Maharastra –Power Plant Equipment. Port: Mumbai

84,000 MT

Page 9: PROJECT DIVISION - LEMUIR

SOME OF OUR CURRENT PROJECTSCUSTOMER PROJECT DETAILS QUANTITY

2 x 685 MW Doosan Projects India Pvt. Ltd. – GMRChattisgarh Energy Pvt Ltd

Thermal Power Project – Power PlantEquipment at Raipur, Chattisgarh. Ports:Gangavaram and Vizag

375,000 FRT

6 x 600 MW SEPCO Electric Power ConstructionCorporation – Wardha Power Co Ltd

Thermal Power Project at Akaltara, Chattisgarh –Power Plant Equipment. Port: Gangavaram & Vizag 700,000 FRT

2 x 600 MW Reliance Infrastructure Ltd. – DVCRaghunathpur Power Project

Thermal Power Project of Damodar ValleyCorporation – Power Plant Equipment. Ports:Kolkata, Haldia.

225,000 FRT

2 x 300 MW LANCO Amarkantak Thermal Power Station Thermal Power Plant (1 & 2) at Pathadi, Chattisgarh– Power Plant Equipment. Port : Vizag

141,000 FRT

2 x 660 MW Lanco Amarkantak Thermal Power Plant Amarkantak thermal power plant (3&4) at Pathadi,Chattisgarh . Ports:Vizag & Gangavaram

70,000 MT

3 x 660 MW NTPC Sipat Thermal Power PlantThermal Power Plant at Sipat, Chattisgarh – Power

Plant Equipment. Port: Visakhapatnam. 300,000 FRT

2 x 600 MW Lanco Infratech Ltd, Udipi -NagarjunaPower Corporation Ltd.

Thermal Power Plant at Yellur , Karnataka. PowerPlant Equipment. Port: Mangalore. 80,000 MT

2 x 600 MW Lanco Anpara Thermal Power Pvt.Ltd.Thermal Power Plant at Anpara, UP Power Plant

Equipment. Ports: Kolkata, Haldia, Vishakapatnam. 70,000 MT

Page 10: PROJECT DIVISION - LEMUIR

SOME OF OUR CURRENT PROJECTS

CUSTOMER PROJECT DETAILS QUANTITY

2 x 371 Stage III Lanco Infratech Ltd Lanco Power Plant at Kondapalli . Ports : Vizag &Gangavaram

5,500 MT

1 x 600 MW BGR Energy Ltd. – TNEB Thermal PowerProject

Thermal Power Project at Mettur, TN. PowerPlant Equipment. Port: Chennai. 110,000 FRT

Mitsubishi Chemical Corporation PTA Plant at Haldia 36,000 FRT

2 x 600 MW Mudiara Thermal Power Project - CoastalEnergen Ltd

Thermal Power Plant at Tuticorin. Port :Tuticorin 100,000 FRT

Page 11: PROJECT DIVISION - LEMUIR

OUR MAJOR CUSTOMERS

Page 12: PROJECT DIVISION - LEMUIR

OUR MAJOR CUSTOMERS

Page 13: PROJECT DIVISION - LEMUIR

OUR FLEET

Trailers 24 Nos.

Mobile / Pick & Move Cranes 12 MT 2 Nos.

15 MT 1 No.

40MT 1 No.

Moduler Hyd.Axles-Indian 24 Nos.

Moduler Hyd.Axles - Goldhofer 38 Nos.

Primemover Volvo Prime Mover - 520 HP 5 Nos.

Goldhofer side by side eqpt 750 MT capacity

Goldhofer 1 + 1/2 combination 16 x 1/2 combination

Goldhofer Long Load Boalster 200 MT capacity

Load Spreaders 500 Tons & 300 Tons capacity

Load Distribution Beam 6 M Long

Ancillary Equipment Stools - 50MT each 78 Nos.

Beams - 100 MT each 39 Nos.

Beams - 200 MT each 4 Nos.

Jacks/Winches/Chain Pulley/

Ro Ro Ramp etc

Page 14: PROJECT DIVISION - LEMUIR

OUR NEW ACQUISITION

Girder Bridge from Goldhofer, Germany

Page 15: PROJECT DIVISION - LEMUIR

OUR NEW ACQUISITION

Combinations

Page 16: PROJECT DIVISION - LEMUIR

OUR NEW ACQUISITION

Transport Concept - 500 Ton PayloadLoading Specifications

Payload Dead WeightHGB

Dead WeightOthers

Dead Weight2xTHP/SL 16

Total GrossWt.

Axle Loadfront 16x

Axle LoadRear 16x

500.00 t 95.60 t 31.2 t 115.60 t 742.40 t 23.20 t 23.20 t

Page 17: PROJECT DIVISION - LEMUIR

OUR NEW ACQUISITION

Transport Concept - 440 Ton PayloadLoading Specifications

Payload Dead WeightHGB

Dead WeightOthers

Dead Weight2xTHP/SL 18

Total GrossWt.

Axle Loadfront 18x

Axle LoadRear 18x

440.00 t 102.20 t 31.20 t 129.20 t 702.60 t 19.50 t 19.50 t

Page 18: PROJECT DIVISION - LEMUIR

OUR NEW ACQUISITION

Comparison with Indian make Girder Bridge

Faktor 5 Indian make girder bridge

Payload up to 500 t Payload up to 375 tDeadweight of 102 t Deadweight of 140 tVariable axle combination up to 2 x 18 Variable axle combination up to 2 x 14Loading length up to 17m Loading length up to 12mLoading width up to 6.75m Loading width up to 5.00mVertical lifting hydraulic stroke of 1.80m No vertical lifting hydraulic stroke

Simple operation – remote control Rigid operationFaster assembly time Longer assembly timeEasy mobilization Complex mobilization

Page 19: PROJECT DIVISION - LEMUIR

STORAGE YARD

Page 20: PROJECT DIVISION - LEMUIR

PROJECT HANDLING CAPABILITIES

ILLUSTRATIONS

Page 21: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 01

o Customer : Lanco Infratech Ltd

o Project : Udupi power corporation Ltd

o Activity : Ocean Import

o Origin : China

o Destination : New Mangalore port

o Quantity : 80000 MT

Movement of steam drum from New Mangaloreport to project site at Padubidri .Cargo weight : 211.398MTCargo dimensions : 27M x 2.9M x 3.2M

Page 22: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 02

o Customer : Mitsubishi Chemical Corporation

o Project : PTA Plant

o Activity : Ocean Inbound

o Destination : Haldia

o Quantity : 36000 FT

Transportation of the heaviest package

Transportation of the heaviest package with adimension of 16.2M x 10.45M x 10.66M and weightof 375 MT

Page 23: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 03

o Customer : Air Liquide Engineering India Pvt Ltd

o Consignee : Hwan young Steel Industry Co Ltd

o Activity : Ocean Export (Break-bulk)

o Origin : Chennai

o Destination : Korea

o Volume : 2900 FT

Stevedoring & Port handling of a package with a length of 31 M & weight of 125 MT

Page 24: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 04

o Customer : Coastal Energen Pvt Ltd

o Activity : Customs clearance, handling &

transportation

o Origin : China

o Destination : Tuticorin

o Volume : 110000 FT

Page 25: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 5

o Customer : Lanco Infratech Ltd

o Project : Amarkantak Thermal Power Project

o Activity : Ocean Import

o Origin : China

o Destination : Vishakapatnam

o Quantity : 68000 MT

Movement of stator from Vishakapatnam port toproject site at Korba .

Page 26: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 6

o Customer : Dhariwal Infrastructure Limited

o Project : 2x300 MW Chandrapur Power

o Activity : Ocean Inbound

o Destination : Mumbai

o Quantity : 45,000 MT

Page 27: PROJECT DIVISION - LEMUIR

ILLUSTRATION # 7

o Customer : Toshiba JSW Turbine Generator Pvt Ltd

o Project : Meja Thermal Power Project

o Activity : Ocean Import

o Origin : Japan

o Destination : Haldia

Movement of stator wighing 343Mt(9.65Mx6.28Mx5.30M) from Haldia port toproject site at Meja.

Page 28: PROJECT DIVISION - LEMUIR

NPCIL’S KUDANKULAM ATOMIC POWERPROJECT

ILLUSTRATION # 8

Name / Location of Project Kudankulam Atomic Power StationName of the client Nuclear Power Corporation of India Ltd, Tamil Nadu

Description of Work Inbound Movement of Power Project cargo Ex-Russia toIndia on turnkey basis

Duration 2002 – 2015

Volume 450,000 FRT (Approx) including 60 Charters

• Vendor Liaison• Ocean Freight• Air Freight• Handling at Port• Construction of Jetty

• Handling at Jetty• Land & Sea Route movement of ODC

/ heavy lift cargo• Site warehouse management• Delivery at erection point

SCOPE OF WORK

Page 29: PROJECT DIVISION - LEMUIR

Ship to bargeTransfer

Barging of heavy lift & ODC from Tuticorin port to project site .Including packages with a height of 14 M

Page 30: PROJECT DIVISION - LEMUIR

APPRECIATION LETTERS

Page 31: PROJECT DIVISION - LEMUIR

APPRECIATION LETTERS

Page 32: PROJECT DIVISION - LEMUIR

APPRECIATION LETTERS

Page 33: PROJECT DIVISION - LEMUIR

APPRECIATION LETTERS

Page 34: PROJECT DIVISION - LEMUIR

REWARD & RECOGNITION

EXIM INDIA SHIPPING TIMES – SOUTH EAST INDIA

PROJECT CARGO MOVER

Page 35: PROJECT DIVISION - LEMUIR

AFFILIATIONS, ACCREDITATIONS &MEMBERSHIP

Page 36: PROJECT DIVISION - LEMUIR

WHY LEMUIR ?

• Perfect understanding of localconditions

• Well developed infrastructureincluding owning hydraulic axles,cranes, trailers, etc.

• Global presence through agents

• Presence at strategic locations

• Operate under Own Customsbrokerage license in all locations

• Highly trained and skilledpersonnel

• Experienced in every type ofcargo movement

• Multimodal capacity

• Personnel holding Seniorpositions in National Bodiesgoverning Logistics Trade andIndustry

• Planning & Safety

Page 37: PROJECT DIVISION - LEMUIR

THANK YOU !