project development workflow task manual ... · project development workflow task manual version...

1
PROJECT DEVELOPMENT WORKFLOW TASK MANUAL VERSION 2.0 PS & E 1-Phase EA Project Initiation K-Phase EA 150.05 Environmental Studies Award Contract 410 Right of Way Certification 030 Notice of Preparation CEQA requirement (EIR- ONLY) Hold Public Hearing 265.20 Circulate, Review and Prepare Final District PS&E Package Develop the Alternatives 200 PA & ED 285 300 225 Regular Right of Way Draft Sturctures PS&E 265.05 205.05 Respond to Public Comments 240 225.55 180.15 165.25 290 Prepare Project for Advertising 150.20 XXX.xx Prepare Staking Notes 175.05 250 100.25 Project Management R/W Component 600 Contract Acceptance (CCA) 175.15 Prepare PID 165.05 185.20 XXX.xx 255 XXX.xx 255.35 Draft Environmental Document Perform Design Surveys 185.10 Prpare Draft PS&E Quantities and Esitmates 100.20 Project Management-Constructction 265.30 150.25 230.05 Obtain Permits, Agreements, & Route Adoptions 010 Approve PID Prepare and Administer Contract Change Orders 380 Project PS&E 190 Prepare Draft Specifications Prepare Engineering Reports Prepare Draft Drainage Plans 165.15 175.20 270 Right of Way Activities Preliminary sturctures Design 265.25 100.05 Project Management- PID Preliminary Environmental Evaluation 220.05 Project Control Surveys, Mapping and Initial Land Net Mapping Construction Engineering and General Contract Administration District Engineering Services (Lab, RW Eng, etc.) LEGEND LEAD FOR DELIVERABLES 160.20 Draft Project Report Resolve Contract Claims Prepare Draft Roadway Plans XXX.xx Analyze Alternatives 230.15 Perform Preliminary Design PM Activities 185.25 160.10 230.20 Design Activities Prepare Resident Engineer’s File Sturctures PS&E 245.55 Close Right of Way Interests 150.15 120 Circulate Draft Env. Doc. Circulate DED Environmental Close-out 180.10 165.20 Execute and Approve Contract Parcel and Project Documentation Otain Right of Way Interests 260.15 230.35 Develop and Issue Addenda Select Preferred Alternative 160.15 Project Report Accept Contract, Prepare Final Consturciton Estimate and Final Report. Engineering Studies Office of Structures & Other ES offices Milestones 700 Final Report Environmental Activities Distribute Bid Documents XXX.xx 460 Ready to List (RTL) Construction Determine R/W Requirements 195 R/W Property Management 215 500 Approve Contract 100.10 Project Management- PA&ED 265.10 100.15 Project Management PS&E Prepare Draft Contract Documents Environmental Scoping 210 180.05 175.10 265.35 230.25 Xxx.xx 255.40 150.10 225.50 165.10 Prepare Draft Utilty Plan Prepare Structures Site Plans Respond to Inquireies & Open Bids 295 300.05 Cultural Resource Studies Prepare Traffic Management Plan Define the Problem Prepare Draft Traffic Plans Sturctures General Plan Advertise Project 035 Notice of Intent FHWA-NEPA requirement (EIS ONLY) XXX.xx Final Environmental Document (FED) 200 Coordinate Utilities 265.15 185.15 235 Mitigate Environmental Impacts and Clean-up Hazardous Waste 230.40 Perpetuate Exiting Land Net for R/W Acuisition 230.30 Biological Studies 1/13/2005

Upload: hoangnguyet

Post on 21-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT DEVELOPMENT WORKFLOW TASK MANUAL ... ·  PROJECT DEVELOPMENT WORKFLOW TASK MANUAL VERSION 2.0 PS & E 1-Phase EA Project Initiation

<Process Name> PROJECT DEVELOPMENT WORKFLOW TASK MANUALVERSION 2.0

PS & E1-Phase EA

Project InitiationK-Phase EA

150.05

Environmental Studies

Award Contract

410 Right of WayCertification

030 Notice of PreparationCEQA requirement (EIR-

ONLY)

Hold Public Hearing

265.20

Circulate, Review and PrepareFinal District PS&E Package

Develop the Alternatives

200 PA & ED

285

300

225 RegularRight of Way

Draft Sturctures PS&E

265.05

205.05

Respond to Public Comments 240

225.55

180.15

165.25

290

Prepare Project for Advertising

150.20

XXX.xx

Prepare Staking Notes

175.05

250

100.25 Project Management R/W Component

600 ContractAcceptance

(CCA)

175.15

Prepare PID

165.05 185.20

XXX.xx

255XXX.xx

255.35

Draft Environmental Document

Perform Design Surveys185.10

Prpare Draft PS&E Quantities andEsitmates

100.20 Project Management-Constructction

265.30

150.25

230.05

Obtain Permits, Agreements, & Route Adoptions

010 ApprovePID

Prepare and Administer ContractChange Orders

380 Project PS&E

190

Prepare Draft Specifications

Prepare Engineering Reports

Prepare Draft Drainage Plans165.15

175.20

270

Right of Way Activities

Preliminary sturctures Design

265.25

100.05 Project Management- PID

Preliminary EnvironmentalEvaluation

220.05

Project Control Surveys, Mapping andInitial Land Net Mapping

Construction Engineering andGeneral Contract Administration

District EngineeringServices (Lab, RW Eng,

etc.)

LEGENDLEAD FOR

DELIVERABLES

160.20

Draft Project Report

Resolve Contract Claims

Prepare Draft Roadway Plans

XXX.xx

Analyze Alternatives

230.15

Perform Preliminary Design

PM Activities

185.25

160.10

230.20

Design Activities

Prepare ResidentEngineer’s File

Sturctures PS&E

245.55 Close Right of Way Interests

150.15

120 CirculateDraft Env. Doc.

Circulate DED

EnvironmentalClose-out

180.10

165.20

Execute andApprove Contract

Parcel and Project Documentation

Otain Right of Way Interests

260.15

230.35

Develop and Issue Addenda

Select Preferred Alternative

160.15

Project Report

Accept Contract,Prepare FinalConsturciton Estimateand Final Report.

Engineering Studies

Office of Structures &Other ES offices

Milestones

700 FinalReport

EnvironmentalActivities

Distribute Bid Documents

XXX.xx

460 Ready to List

(RTL)

Construction

Determine R/W Requirements

195 R/W Property Management

215

500 ApproveContract

100.10 Project Management- PA&ED

265.10

100.15 Project Management PS&E

Prepare Draft ContractDocuments

Environmental Scoping

210

180.05

175.10

265.35

230.25

Xxx.xx

255.40

150.10

225.50

165.10 Prepare Draft Utilty Plan

Prepare Structures Site Plans

Respond to Inquireies& Open Bids

295

300.05

Cultural Resource Studies

Prepare Traffic Management Plan

Define the Problem

Prepare Draft Traffic Plans

Sturctures General Plan

Advertise Project

035 Notice of IntentFHWA-NEPA requirement

(EIS ONLY)

XXX.xx

Final Environmental Document(FED)

200 Coordinate Utilities

265.15

185.15

235 Mitigate Environmental Impacts and Clean-up Hazardous Waste

230.40

Perpetuate Exiting Land Net for R/WAcuisition

230.30Biological Studies

1/13/2005