 1 2. Praktek Profesional Manajemen Konstruksi 3. Project Time Management 7. Project Risk Management 8. Project Procure- ment Management 9. Organizational & Human Resources Management 1. Philosophy & Review Proyek 5. Project Quality Management 6. Safety & Health and Environmental Management  The Contruction Management Knowledge Areas 4. Project Cost Management

Upload: yuniar-fellaa-anggraeni

Post on 13-Jul-2015

210 views

Category:

Documents


1 download

TRANSCRIPT

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 1/421

2. Praktek ProfesionalManajemen Konstruksi

3. Project TimeManagement

7. Project RiskManagement

8. Project Procure-

ment Management

9. Organizational & HumanResources Management

1. Philosophy &

Review Proyek

5. Project QualityManagement

6. Safety & Health andEnvironmental Management

 The Contruction Management Knowledge Areas

4. Project CostManagement

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 2/422

  DEFINISI PROYEK

Proyek adalah suatu kegiatan yang dilakukanuntuk mencapai tujuan dan sasaran tertentu,yang dalam prosesnya dibatasi oleh waktudan sumber daya yang diperlukan danpersyaratan2 tertentu lainnya

Proyek konstruksi, hasil fisiknya, berupa : Bangunan gedung Jembatan, Jalan Bendungan, dll

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 3/423

  TAHAPAN PROYEK KONSTRUKSI 

IDE / GAGASAN

Feasibility Study

DESIGN

PENGADAAN

PROSES

KONSTRUKSI

PEMANFAATAN

Supervisi

Cost 1

Cost 3

Cost 2

P.E

S.E

D.E

Cost 3 +

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 4/424

  JENIS C0ST 

Cost 1 : adalah biaya proyek secarakasar untuk keperluan analisis

ekonomi dlm study kelayakan( Preleminary estimate )

Cost 2 :adalah biaya proyek semi detail

untuk keperluan penyediaan

dana (budgeting bagi Owner)( Semidetail estimate )

Cost 3 : adalah biaya proyek secara detail

yang bersifat definitif (Nilai

kontrak), yaitu pertemuan angka

antara Owner estimate dan Bid

price kontraktor 

( Definitive estimate )

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 5/425

  AKURASI JENIS C0ST 

AkurasiBesar Penyimpangan

P.E S.E D.E

Rendah

TinggiRendah

Tinggi

Planning Conceptual

Design

Detail

Engineering

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 6/426

  KUALITAS COST ESTIMATE

Kriteria Cost Estimate yang jelek :

- Terjadi Cost Overrun terhadap estimasi awal- Terjadi hasil yang tidak konsisten

- Kurang detail

- Dokumentasi yang jelek / lemah

- Tidak dapat diandalkan untuk alokasi dana

- Tidak dapat diandalkan untuk cost control

Penyebab Jeleknya Cost Estimate- Estimator tidak Qualified

- Estimator yang belum terbiasa dengan obyekbangunan

- Data & method yang jelek

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 7/427

  DEFINITIVE ESTIMATE 

DEFINITIVE

ESTIMATE

VERSI

KONTRAKTORBID

PRICE

VERSI

OWNER

OWNER

ESTIMATE 

DATA NILAI

KONTRAK

Kepentingan x

Kepentingan y

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 8/428

  CONSTRUCTION COST MGT.

Pembahasan construction cost management ,meliputi :

• Construction cost accounting

• Construction cost estimating

• Construction cost budgeting

• Construction cost controlling

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 9/429

  CONSTRUCTION COST ACCOUNT 

• Biaya ( cost ) adalah merupakan konsepakuntansi .

• Dengan demikian konsep biaya harus dipa-

hami , dalam kontek pengendalian biaya .• Ada dua jenis biaya yang berbeda cara pe-

ngendaliannya , yaitu : Fix cost dan Variable

cost .

• Dalam evaluasi realisasi biaya , harus mam – 

pu membaca laporan akuntasi

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 10/4210

  CONSTRUCTION COST ACCOUNT

Variable Cost ( biaya tidak tetap ) , adalah biaya yang

selalu berubah tiap bulannya sesuai dengan intansitaskegiatan proyek . Kelompok biaya ini terdiri dari :

• Biaya Bahan / Material Konstruksi

• Biaya Upah Konstruksi

• Biaya Alat Konstruksi• Biaya Subkontraktor ( Kontraktor )

• Biaya Overhead Lapangan/ Proyek 

Fix Cost ( biaya tetap ) , adalah biaya yang relatif tidak berubah tiap bulannya atau tidak terkait dengan intansitas

kegiatan proyek . Kelompok biaya ini terdiri dari :

• Biaya Overhead Perusahaan

• Biaya Pemasaran Perusahaan• Biaya Penyusutan aktiva tetap Perusahaan

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 11/4211

VERSI BIAYA PROYEK

OWNER

KONTRAKTOR

Nilai Kontrak 

Proyek 

Nilai Sub Kontrak  Sub Kontraktor

Bahan, upah,alat ,

Overhead, dll

Biaya ( cost )

Biaya

Biaya

Harga ( price )

Harga

Bahan / alat ,

dari Owner

Biaya

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 12/4212

 FAKTOR KUNCI & ASUMSI 

Cost Engineer yang profesional dalam membuat

Cost Estimate mengenal dua hal penting, yaitu :Asumsi dan Faktor kunci yang pasti

Faktor kunci yang pasti adalah :

- CONSTRUCTION SCHEDULE

- CONSTRUCTION METHOD

- METHOD ESTIMASI

- DASAR PRODUKTIVITAS TENAGA & ALAT , yg

digunakan

Asumsi : Inflasi , Kenaikan harga , resiko lain

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 13/4213

 SIKLUS COST ESTIMATE 

Proses cost estimate, merupakan suatu siklus yang

dapat digambarkan sbb :

• Kontrak 

• Spesifikasi

• Gambar , dll

• Data lokasi

proyek 

Work breakdown structures (WBS)

• Time Schedule

• Cons.Method

• Prod. & H.S

• Policy keu.

B.Q

Biaya Proyek D.C

M.UU.P

x

A

BC

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 14/4214

  WORK BREAKDOWN STRUCTURE

Tahap pertama sebelum menghitung biaya adalah

menetapkan susunan rincian pekerjaan, berdasardokumen yang ada.

Susunan rincian pekerjaan dirumuskan melalui hirarki

dari jenis proyek ybs.

Tiap hirarki dari proyek, diuraikan menjadi level terakhirberupa item-item pekerjaan secara detail

Seorang Cost Engineer terkadang menganut spesiali-sasi ( Struktur , M/E , Finishing , dll )

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 15/42

15

  WORK BREAKDOWN STRUCTURES 

WBS disusun berdasarkan hirarki proyek , sbb :

Gedung Bertingkat

Preliminaries

Fondasi Basement Struktur M / E Finishing

Bore Pile

Raft

Galian

Dinding Bsmt .

Kolom

Balok& Slab

Corewall

M

E

Dinding

Lantai

Plafond

Dst.

Landscaping

Kolom

Balok& Slab Shearwall

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 16/42

16

  WORK BREAKDOWN STRUCTURE

Hal-hal yang diperlukan untuk menyusun work 

breakdown structure , adalah :

• Dokumen tender ( Gambar , Spesifikasi , per  –syaratan ,Surat perjanjian , addenda )

• Informasi 2 yang diperoleh dari survey lokasiproyek

• Rencana metode pelaksanaan ( Mis. Bottom Up

atau Top Down)

• Pengalaman & pengetahuan cost engineer ,untuk proyek sejenis

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 17/42

17

  PRELIMINARIES

Yang dimaksud Prelim adalah berbagai pekerjaanpersiapan yang perlu dilakukan.

Kegiatan - kegiatan ini umumnya dirumuskan melalui

construction method

Biaya prelim, masuk dalam kelompok Variable cost / Direct cost

Untuk proyek besar, biaya prelim besarnya cukupsignificant.

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 18/42

18

  TAHAPAN PENYUSUNAN BIAYA PRELIM.

Dirinci/didaftar semua item pokok yang merupakanprelim.

Dihitung quantity masing-masing item prelim.

Dihitung unit price masing-masing item prelim.

Biasanya prelim ini disusun oleh tenaga khusus yangberpengalaman.

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 19/42

19

  CONTOH PRELIM UNTUK PROYEK GEDUNG

Soil investigation Pembebasan tanah

Temporary site office

Peresmian

Contract document

Shop & AS Built Drawing

Site overhead

Pembersihan sampah konstruksi Mobilisai & demobilisasi

Tower Crane

K-3, dan lain-lain.

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 20/42

20

WAKTU VS COST

Hubungan antara waktu pelaksanaan proyek dengan

biaya dapat digambarkan sebagai berikut :

Biaya

Waktu

B1

B2

Bi 

W1 Wi

W2

Biaya dg waktu singkat

Biaya dg waktu longgar

Biaya dg waktu ideal

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 21/42

21

METHOD VS COST

Hubungan antara metode pelaksanaan proyek dengan

biaya dapat digambarkan sebagai berikut :

Biaya

Method

B1

B2

Bi 

W1 Wi

W2

Method yg kurang layak 

Over method

Method yg ideal

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 22/42

22

CONTOH FORMULIR ESTIMASI ( gedung )

No. Item Pekerjaan Quantity Hargasatuan

Jumlah harga

1.

2.

3.

4.

5.

6.

Preliminaries

……………… 

Pek. Substruktur

………………. 

Pek. Struktur

……………. 

Pek.M / E

……………. 

Pek. Finishing

…………. 

Pek. Landscaping

Jumlah

Ppn 10%

Jumlah akhir

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 23/42

23

INSERT MARK UP

Dalam Nilai Kontrak, nilai Mark Up tidakdimunculkan , ini berarti harus diinsertkedalam unit price dari direct cost 

Ada tiga strategi insert Mark Up , yaitu : Dibagi secara merata

Disebar pada beberapa item tertentu saja

Disebar hanya pada pekerjaan awal saja(front loading )

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 24/42

24

CURVA “ S “ 

Bentuk curva “ S “ , berbeda tiap strategi insert mark 

up

Strategi merata

Strategi Front

Loading

Rp.

Bln

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 25/42

25

COST BUDGET sbg ALAT KENDALI

PelaksanaanProyek

Penyimpanganbiaya

Pembelanjaan

COSTBUDGET

SesuaiBudget

Realisasibiaya

Start

SelesaiFeed back 

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 26/42

26

  MAKSUD & TUJUAN C . B

(1)  Untuk memberikan batasan uang yang ha-rus disediakan untuk biaya pelaksanaanproyek

(2) Untuk memberikan patokan terhadap biayapelaksanaan proyek

Oleh karena itu , Cost Budget harus realis-tikterhadap kenyataan yang diharapkan .

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 27/42

27

HUBUNGAN C . B & C . E

CostEstimate

CostBudget

B. L

CostBudgetB.T. L

Cadangan

+

+

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 28/42

28

Contoh Formulir Cost Budget Kontraktor

Kel. Sub.Kel PEMBEBANAN Rp. Keterangan

I BIAYA LANGSUNG PROYEK

1. BAHAN / MATERIAL

2. UPAH

3. ALAT

4. SUBKONTRAKTOR

5. PERSIAPAN / PENYELESAIAN

6. OVERHEAD LAPANGAN

SUB TOTAL

II KEWAJIBAN PAJAK

1. PPN ( 10% )

2. UANG MUKA PPH / PPH final

SUB TOTAL

III BIAYA TIDAK LANGSUNG1. OVERHEAD PUSAT / CABANG/ PERW.

2. PENYUSUTAN AKTIVA TETAP

SUB TOTAL

CADANGAN

TOTAL

( NILAI KONTRAK )

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 29/42

29

  Contoh Formulir Cost Budget Owner

Kel. Sub.Kel URAIAN Rp. Keterangan

I BIAYA LANGSUNG PROYEK

1. BAHAN / MATERIAL Bila ada

2. UPAH Bila ada

3. ALAT Bila ada

4. KONTRAKTOR / KONSULTAN 

5. PERSIAPAN / PENYELESAIAN

6. OVERHEAD LAPANGAN

SUB TOTAL

II KEWAJIBAN PAJAK

1. PPN ( 10% )

2. PPH perorangan

SUB TOTAL

III BIAYA TIDAK LANGSUNG1. OVERHEAD PROYEK INDUK

2. CADANGAN

SUB TOTAL

TOTAL

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 30/42

30

  COST CONTROL

Yang mendorong peran cost control jadi penting dikonstruksi , adalah :

Harga jual/Budget bersifat konservatif ( relatiftetap)

Biaya produksi bersifat fluktuatif ( sangat mudahberubah bila tidak dikendalikan )

Untuk mengatasi kondisi yang delematis tsb diatas ,maka diperlukan :

Kemampuan tentang construction cost

Kemampuan dalam cost control

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 31/42

31

  ASPEK - ASPEK KONTROL

Untuk dapat berhasil mengendalikan biaya proyekdengan baik , maka perlu dilakukan pengendalianterhadap aspek-aspek yang mempengaruhinya :

Time Control

Quality Control

Safety Control

Cost Control

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 32/42

32

  ASPEK TIME CONTROL

• Kegiatan pekerjaan harus dikendalikan

sesuai jadwal yang ada .

• Bila pekerjaan terlambat , dapat timbul resi-

ko tambahan biaya akibat terkena pinaltimaupun kenaikan harga

• Bila kegiatan harus dipercepat , karena

berbagai alasan , cenderung akan menam-bah biaya .

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 33/42

33

  ASPEK QUALITY CONTROL

• Mutu pekerjaan harus dikendalikan agarselalu masuk dalam toleransi keberterimaan

• Mutu yang lebih rendah dari persyaratan ,

akan menambah cost untuk perbaikan .

• Mutu yang lebih tinggi dari persyaratan ,

 juga akan menambah biaya ( material / 

proses ) .

• Inti dari manajemen mutu , adalah mengu-

rangi terjadinya kegagalan mutu ( perbaik-

an / penolakan pekerjaan )

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 34/42

34

  ASPEK SAFETY CONTROL

• Safety harus dikendalikan untuk menekan

accident cost sekecil mungkin , denganmenyediakan biaya safety yang layak .

• Biaya safety yang terlalu rendah , dapat me-

nyebabkan accident yang tidak diinginkan

• Biaya safety yang terlalu tinggi (oversafety),

selain menambah biaya secara lngsung juga

dapat menambah biaya secara tidak lang-sung ( turunnya produktivitas )

• Inti dari manajemen safety ( K3 ) adalah

mengurangi terjadinya kecelakaan proyek .

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 35/42

35

  ASPEK COST 

ASPEK

COST

Work Breakdown

Structures

Quantity of Works

Unit Price of Works

Pek. Prelim.

Pek. Pokok 

Method

Akurasi.

Produktifitas

Waste

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 36/42

36

  UNSUR & FAKTOR BIAYA

Unsur-unsur biaya langsung proyek dibagi menjadidua kelompok :

Kelompok Dominan : Bahan , upah , alat , atausubkon.

Kelompok Minoritas : Persiapan/penyelesaian ,overhead / administrasi proyek .

Faktor terjadinya biaya ada dua , yaitu :

Quantity pekerjaan Harga satuan pekerjaan

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 37/42

37

  PENGENDALIAN BIAYA

Tindakan nyata ( riil ) dalam pengendalian

biaya adalah :

“ Mengendalikan Quantity dan Harga Satuan

untuk bahan , upah , alat , subkon , persiapan

/penyelesaian dan adm./ overhead proyek “ 

Mengendalikan penyebab penyimpangan2 yg

mungkin terjadi

CONTOH FORMULIR COST CONTROL

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 38/42

38

CONTOH FORMULIR COST CONTROL

No.

URAIAN

Total

budget

Realisasi s/d tgl. Sisabudget

Perkira-an sisabiaya

Penyim-pangan

( + / - )Budgetrealisasi

Realisasibiaya

a b c d = a - c e f = d - e

1. Material

2. Upah

3. Alat

4. Subkon

5. Pekerjaanpersiapan

6. Overheadlapangan

TOTAL

BCWP ACWP

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 39/42

39

BCWS , BCWP , & ACWP 

BCWS : adalah besarnya anggaran biaya sesuai

schedule 

ACWP : adalah besarnya realisasi biaya untuk peker-

 jaan yang telah diselesaikan 

BCWP : adalah besarnya anggaran biaya untuk peker- jaan yang telah diselesaikan 

BCWP > BCWS : Proyek Ahead Schedule 

ACWP > BCWP : Proyek Over Budget ( cost overrun ) 

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 40/42

40

  Contoh Evaluasi Akhir (Kontraktor)Kel. Sub.Kel PEMBEBANAN BUDGET REALISASI

I. BIAYA LANGSUNG PROYEK

1. BAHAN / MATERIAL

2. UPAH

3. ALAT

4. SUBKONTRAKTOR

5. PERSIAPAN / PENYELESAIAN

6. OVERHEAD LAPANGAN

SUB TOTAL

II KEWAJIBAN PAJAK

1. PPN ( 10% )

2. UANG MUKA PPH / PPH final

SUB TOTAL

III BIAYA TIDAK LANGSUNG1. OVERHEAD PUSAT / CABANG/ PERW.

2. PENYUSUTAN AKTIVA TETAP

SUB TOTAL

CADANGAN / LABA

TOTAL

( NILAI KONTRAK )

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 41/42

41

  Contoh Evaluasi Akhir (Owner)

Kel. Sub.Kel URAIAN BUDGET REALISASI

I. BIAYA LANGSUNG PROYEK

1. BAHAN / MATERIAL

2. UPAH

3. ALAT

4. KONTRAKTOR/ KONSULTAN

5. PERSIAPAN / PENYELESAIAN

6. OVERHEAD LAPANGAN

SUB TOTAL

II KEWAJIBAN PAJAK

1. PPN ( 10% )

2. PPH

SUB TOTAL

III BIAYA TIDAK LANGSUNG1. OVERHEAD PROYEK INDUK

2. CADANGAN

SUB TOTAL

TOTAL

5/11/2018 Project Cost Mgt-pert1 - slidepdf.com

http://slidepdf.com/reader/full/project-cost-mgt-pert1 42/42

Questions