![Page 1: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/1.jpg)
uMWP: SSC 11 Sep 2012 1
The uMkhomazi Water Project Phase 1Strategy Steering Committee meeting of the
Maintenance of the Water Reconciliation Strategy Study for the KwaZulu‐Natal Coastal Metropolitan
Areas Study
11 September 2012
The uMkhomazi Water Project Phase 1
Purpose of presentation
• Share available information
E l i th th f• Explain the progress thus far
• Obtain and discuss relevant impacts on the project
2
Spring Grove Dam
Midmar Dam Albert Falls
Dam Nagle Dam
Project area
Proposed Impendle Dam
Inanda Dam
1
Proposed Smithfield Dam
Baynesfield Dam
ProjectcomponentsPhase 2:
Proposed Impendle Dam
Module 1: Raw water• Raw Water
component• DWA contract• BKS appointed: 1
Proposed conveyance infrastructure
Umlaas Road / Cato Ridge
Impendle Dam
Phase 1: d Baynesfield
Module 2: EIAModule 2: EIA•• Raw and potable waterRaw and potable water
•• DWA contractDWA contract
Dec 2011 to 30 Nov 2014
WTPCato Ridge reservoirProposed
Smithfield Dam
Baynesfield Dam
4
Module 3: Potable water• Potable water component
• Umgeni Water contract
• Knight Piésold appointed
![Page 2: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/2.jpg)
uMWP: SSC 11 Sep 2012 2
Objective of the study
• Undertake a feasibility study to finalise planning of proposed uMWP at a very detailed level so that schemeproposed uMWP at a very detailed level so that scheme may be:
accurately compared with other possible alternatives
ready for implementation (detail design & construction) on completion of study
Project Description:
• Develop Smithfield and Impendle dams with conveyanceDevelop Smithfield and Impendle dams with conveyance infrastructure transfer water to a balancing dam in the Baynesfield area. This will supply water to a Water Treatment Plant, from where it is conveyed to a tie‐in point with the eThekwini distribution system
5
Governance of the project
The uMkhomazi River Water Project Phase 1
6
Environmental Screening
• Critical considerations for EIA:Damming one of the few “undammed” riversDamming one of the few undammed rivers
Biodiversity: presence of terrestrial fauna and flora• Loss of Southern KwaZula‐Natal Moist Grassland veld type
• Vulnerable species: Bald Ibis, Fire lilies, Millipedes
Biodiversity: impact on riverine and aquatic ecosystems• Potential sensitive fish species
l l f f• Potential loss of water features
Changes to water quality due to dam
Socio‐economic issues
7
Water resourcesWater resources(Hydrology, water requirements)
![Page 3: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/3.jpg)
uMWP: SSC 11 Sep 2012 3
Water Resource Focus Area
Proposed Impendle Dam
Proposed Smithfield
Dam
Baynesfield Dam
19
53%33%
I dl
Water resources(Hydrology)
14%
Impendle
Smithfield
Remainder
16%
1 078 million m1 078 million m33/a/a
6%ForestrynMAR
35%
31%
27%
6%Industrial (SAPPI)
Irrigation
Other170 million170 million
mm33/a/a*
*Include Domestic of 1%
Spring Grove DamSpring Grove Dam Additional Yield
(Pumpstation)
Re‐use of Treated Effluent
Mkomazi River Development(Smithfield Dam)
1370
1507
1644
1781
500
550
600
650
Mgeni System water balance
Existing Total Mgeni (including Growth in Darvill Return Flows)
548
685
822
959
1096
1233
200
250
300
350
400
450
Volum
e (M
ℓ/d)
Volume (106
m³/a)
emen
tation
plem
entation
Deficit
137
274
411
50
100
150
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
Actual historic water use (Source: KZN Reconciliation Strategy)
Water requirement scenario ‐ September 2011 (Source: KZN Reconciliation Strategy)
Total AADD required at Umlaas Road (Source: BKS,GIBB, Umgeni Water)
Total AADD required at Umlaas Road (Source: Umgeni water, KNIGHT PIESOLD)
Total SDD required at Umlaas Road (Source: BKS,GIBB, Umgeni Water)
Earliestre‐use im
ple
EarliestMkomazi imp
11
Phase 1: Smithfield, Average 4.6 m³/s; If 1.25 peak, 5.8 m³/sPhase 2: Impendle added with 1.25 peak = 14.9 m³/s
12
![Page 4: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/4.jpg)
uMWP: SSC 11 Sep 2012 4
uMWP PROPOSED SUPPLY AREA
13
Engineering investigation
1
Proposed Smithfield Dam• 58 m high composite dam• Dam wall length 1.1km• Storage capacity = 140 million m³/a (0.19 MAR)• Historic firm yield = 119 million m³/a
(Information from Pre-feasibility Study)
Investigated Dam Positions
Site A
Site B
16
Site C
![Page 5: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/5.jpg)
uMWP: SSC 11 Sep 2012 5
Site B, Option 3
Preferred option:Main wall : ECRF 67m highSaddle wall: ECRF 13 m highSpillway at Saddle embankment
17
Proposed Impendle Dam
• Proposed clay core rockfill dam
1
• Proposed clay core rockfill dam• Maximum size = 830 million (1.5 MAR)• 92 m high• Historic firm yield with Smithfield Dam
= 388 million m³/a(Information from Pre-feasibility Study)
Tunnel from Smithfield Dam to Baynesfield
• Tunnel length = 32,5 km• 2 x 3,5 m diameter
19
Long section through conveyance system
Preferred:
Twin phased pressure tunnel from Smithfield position B to Baynesfield
20
To be confirmed:1. Firm yields and storage provided;2. Transfer capacity factor;3. Storage state exceedance relationship;4. Power generation at the outlet of the tunnel;5. Necessity to line tunnels – geotechnical investigation;
![Page 6: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/6.jpg)
uMWP: SSC 11 Sep 2012 6
Proposed Balancing Dam –Latest option : New Mbangweni Dam
21
Cato Ridge reservoir
Western Aquaduct
Umlaas Road reservoir
1
Date
Feasibility studies
h i l ‘ ‘
Project programme
Technical – Raw water Dec ‘11 to Nov ‘14
Environmental Impact Assessment (EIA) Jan ‘13 to Dec ’15
Technical – Potable water Aug ‘12 to Oct ‘13
Implementation
Decision Support Phase 2015 to 2017
Design/Documentation Phase 2017 to 2019Design/Documentation Phase 2017 to 2019
Construction/Implementation Phase
Smithfield Dam and tunnel 4 years
Estimated water delivery 2023Impendle Dam (incl. decision support phase, design & construction) 9 years
23
Key current tasks• Geotechnical investigation
Tender document completed, ready to advertise
• Yield modelSetup completed, ready to run different scenarios
Obtain new Reserve figures, including reserve for estuary
Establish dam size
• Coordination and collaboration with Module 3: Potable Water PSP
Finalise water requirements
Determine balancing dam size and position
• Appointment of EIA PSP24
![Page 7: Project area Project - DWAF Recon/documents/SSC 5 presentations/6... · uMWP: SSC 11 Sep 2012 1 TheuMkhomaziWater ProjectPhase 1 Strategy Steering Committee meeting of the Maintenance](https://reader031.vdocuments.mx/reader031/viewer/2022022805/5cac6a4b88c993d4278c3611/html5/thumbnails/7.jpg)
uMWP: SSC 11 Sep 2012 7
Thank you www.dwa.gov.za/Projects/uMkhomazi
25