project 1
TRANSCRIPT
UNDER THE GUIDANCE OF UNDER THE GUIDANCE OF BY BY
DR.P.T.RAVICHANDRAN,PH.D A.PAULMAKESH A.PAULMAKESH PROFESSOR M.TECH - CEMPROFESSOR M.TECH - CEMDEPT. OF CIVIL ENGINEERING REG NO. 1520910010 DEPT. OF CIVIL ENGINEERING REG NO. 1520910010 SRM UNIVERSITY DEPT. OF CIVIL ENGINEERING SRM UNIVERSITY DEPT. OF CIVIL ENGINEERING KATTHANKULATHUR SRM UNIVERSITY KATTHANKULATHUR SRM UNIVERSITY
PRESENTATION OF PROJECT WORK PHASE 1
First Review
MATERIAL UNCERTAINTY AND COST EFFECTIVENESS OF THE COMMERICAL BUILDING
• One of the most common sets of activities in the management is planning.
• Creating the project plan is the first thing you should do when undertaking any kind of project.
• However , many people fail to realize the value of a plan in saving time, money, and many problems
* The project management techniques of planning and scheduling are tools and devices, which are used to compute the project.
INTRODUCTION
SCHEDULE FOR PROJECT WORK
PHASE 1
* Literature Review , Floor Plan…
•Estimate of the work.
•To visit the site and to find deviation or uncertainty in the project.
•Planning and scheduling using primavera .
PHASE 2
•Planning and
scheduling
using primavera .
•To find duration by
using PERT method.
•Resource planning,
resource allocation and
resource leveling.
•Report preparation.
LITERATURE REVIEW:
Knowledge- Based System for Construction Planning
of High- Rise Buildings, Ory Shaked and Abraham
Warszawsi (2001),J.Constr. Engg. Mgmt., the knowledge-
based expert system for construction planning is part of
an automated building realization a process. This paper
presents the principles of the system, explains the
structure of its knowledge and discusses various
implementations.
LITERATURE REVIEW:
Estimating Resource Requirements at conceptual Design Stage
Using Neutral Networks ,Asharaf.M Elazouni, Ibrahim A. Nosair,
and Yousif A. Mohieldin (2001), construction conceptual
estimating models provide frame works for evaluating different
alternatives at the conceptual design stage.. The results indicated
can be used satisfactorily to estimate the construction resources
requirements at the conceptual design stage
LITERATURE REVIEW:
Optimal Allocation of construction Planning Resources,
J.Constr. Engfg and Mgmt., Tarek Hegazy (2002), Resource
allocation and leveling are among the top challenges in
project management. In this paper, improvements are
proposed to resource allocation
LITERATURE REVIEW:
• Schedule Analysis under the effect of Resources
Allocation , William IBBS and Long D. Nguyan (2007), the
construction industry has employed various schedule
analysis techniques to supply delay claims. The research
presented here shows that delay analysis without
resources allocation practice substantially affects results of
schedule analysis.
LITERATURE REVIEW:
• Managing Port folios of Projects Under Uncertainty, Annals of
Operations Research, Linda K.Nozick Mark A. Turnquist and
Ningxiong Xu (2004), Managers of projects and multi- project
programs often face considerable uncertainty in the duration and
outcomes of specific tasks as well as in the overall of resources
required by tasks. This paper presents optimizing the resources
allocations to individual tasks to minimize the completion times of a
collection of projects.
LITERATURE REVIEW:
Simulation – based optimization for dynamic resource
allocation, automation in construction, Olusegun O. Faniran,
Peter E.D.Love, and Heng Li (2001), Efficient allocation of
resources foe construction planning activities requires
construction planning resource requirements to be determined
on a cost- effective and value- adding basis. This study explored
the concept of optimal planning of construction projects.
* To understand the uncertainty.
* To select an ongoing projects, and find out the deviation
in scheduled.
* Allocate the limited available resources using primavera
software.
* To complete the project on scheduled date or to minimize
the delay.
OBJECTIVES OF THE PROJECT
• Task durations are subject to considerable uncertainty,
and that uncertainty can be influenced by resources
assigned.
• Due to the complexity of projects, resource allocation
and leveling are among the top challenges in project
management.
* The purpose of this study is to optimally allocate the
resources among individual tasks
NEED OF THE STUDY
* This thesis work covers the entire main civil
works of the commercial complex building.
* To plan and evaluate the resources for the
commercial complex building project
SCOPE OF THE WORK
FOCUS AREA
• Planning and scheduling for micro level activities.
• Resource calculation, which includes the different
categories of labors, material and machinery
• Resource leveling of labour resources.
WORK SCHEME
• Macro level are defined and also defined uncertainty.
• Based on macro level, the project completion dates
are to be calculated.• Macro level activities are divided into micro level.• Quantum of work in micro level activities.• Micro level activities using primavera software.
• Resource planning is done with the duration and
quantum of work found.• The resources are loaded for activities and leveled
that assigned resources
FLOW CHART OF THE METHODOLOGY
Detail of the project
• Name of the project : Commercial Complex• Location : Avadi, Chennai.• Floor : Basement + G+ 9 • Client : FSO foundations. Pvt.ltd• Contractor : R.K Enterprises • Plot area : 55,200 sqft• Type of structure : RCC Framed structure
BASEMENT FLOOR PLAN
FLOOR PLAN
Planned Schedule
Planned Schedule
• Knowledge – based system for construction planning of high rise building. J.Constr. Engg. Management.
• Chitkara. K.K. Construction Project Management: Planning Scheduling and Control Tata McGraw Hill Publishing Company, New Delhi, 1998.
• Construction Management – S.Chand & Company Pvt Ltd.• Project scheduling under uncertainty, Survey and Research
potentials• Websites• www.cm.pg.edu• www.seiencedirect.com• www.primavera.com
References
THANKING YOU