Page 1: Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall

Progress Report 12/13/11

Page 2: Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall

Progress ScheduleDecember 2011

Work Completed December:

• Installed Concrete topping on roof

• Rough In M&E • East side screen wall

foundations poured• Building Insulation• Tower Foundation Completed• Rough in of Fire Protection

System• Interior Plumbing, Roof Drains

Work Scheduled January:

• Complete Roofing• Frame Interior Walls• Rough in M & E• Erect Tower• Run Electrical Service• Run Natural Gas Service• Start Masonry Screen Walls• Complete Exterior Brick•Window Installation

Page 3: Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall

Progress 12/13/11

West Mechanical Screen Wall Roof Blocking

Page 4: Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall

Progress 12/13/11

Tower Foundation Call Center

Page 5: Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall

Office Corridor Rough InOffice Corridor Rough In

Progress 12/13/11

Page 6: Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall

Progress 12/13/11

Staff Support Rough In Call Center