progress presentation by: amani alkayyali dalal abed jacob doan yousef karyouti
TRANSCRIPT
Progress Presentation
BY: Amani Alkayyali
Dalal AbedJacob Doan
Yousef Karyouti
Objectives
Our project is about community service in Detroit.
• Increase volunteerism and awareness in Detroit.
Audiences For The Project
• Primary– Elizabeth Gordon Sachs, the founder and
president of Greening of Detroit.
• Secondary– Maria C. Esperanza, the director of public relations
for Greening of Detroit.
Members and Roles
• Team leader: Yousef
• Note keeper: Dalal
• Schedule keepers : Amani & Jacob
TOPIC
Team Members Qualifications
Community Service in Detroit
• Amani -Community Service Coordinator at TAU BETA Pi-Volunteered for Blight Busters to Clean Detroit
• Dalal -Community Service in High School
• Jacob -Community Service in High school
• Yousef: -Volunteered for Services ( Setting up ADT Security Alarm System)-Community Service in High School
Forecast
• Topic Introduction by AMANI
• Past Work by Dalal
• Team Work by YOUSEF
• Conclusion by Jacob
Possible Solutions
• Creating social networking accounts• Creating online volunteer registration forms• Creating incentives for volunteers– Food, Shirts, extra
• Creating a safer volunteering environment– Set up something with local police to send a squad
car to watch over the event.
Central Problem
• Community Service in Detroit– To Clean Up Detroit
• Lack of Volunteers for Various Reasons– Increase Volunteers to Decrease Blight
• Greening of Detroit– Clean Vacant Lots– Plant Trees
Completed Research
• Primary Sourceso Survey – 16 completedo Interviewso John George – Blight Busters President
o “People are busy with other things”o Greening of Detroit Volunteer Coordinator
o “The 3 most important things to an organization are: Money, Volunteers, and Time”
Completed Research
• Secondary Sourceso British Journal of Social Work – “Who
Volunteers?”o Studies show more volunteer opportunities
motivate people to volunteer moreo Law Technology – “Utilizing Social Networking
as a Business Marketing Tool for NGOs” o Benefits to using social network sites
Research to Complete
• Primary Sources• Analysis of Surveys• Hope to find results similar to those from the
articles and direct quotes• Secondary Sources• Another Article• Cost of incentives
Issues Immerged• One secondary Audience to be changed to Primary Audience.
Tasks Remaining
1. Research • More research to be done on the solutions
part• Finish Research about incentives to attract
volunteers to come to events• Research about ways to make the
volunteering experience safer
Tasks Remaining
2. Survey• Survey is to be finished by at least 30 people• Survey results should be analyzed• Use the survey results to help improve the
solutions of the project
Tasks Remaining
3. Interviews • Two interviews• Analyze the interviews • Use the interviews to construct some
solutions for the project and find supporting points for the formal proposal discussion.
Tasks Remaining
4. Formal proposal• Collect all the information to be added to the
final report• Edit the results of research• Divide the report into different sections• Start writing each section and adding the
gathered information to it.
Tasks Remaining
5. Assignment 5 a,b,c• Finish assignment 5 which is mostly working
on the final report and the presentation of the formal proposal.
• Also includes the Evite Brochure
Future Work Project timeline/completion date:
Tasks Students March April
1 7 14 21 28 4 11 18 24
Survey Amani
Research Dalal , Jacob , Yousef
Progress Report Yousef
Compile information
Amani , Jacob
Editing Dalal
Final Report All team members
Team Members Duties
Specific Part Student
• Introduction and Conclusion Jacob
• Discussion (Past Work) Dalal
• Discussion (Team Work) Amani
• Discussion (Future work) Yousef
Specific duties: •Assignment #4 :Progress Report
Team Duties: Entire Project Plan:
• Team Duties for this project is going to remain the same thing.
• As a team decision, we decided to divide the work load fairly for each assignment.
• I am the team leader for this assignment.• All team members is to be a team leader for
each project.
Team Collaboration
• We haven’t had any issues with team collaboration. We have all been getting along great.
• We always divide the assignments into four parts and assign work fairly as a team decision.
• All team members get together a week prior to the assignment due date for editing.
Summary of Main Points