For Sai Kung District Council Meeting on 5 July 2016 SKDC(M) Paper No. 116/16 Progress of the Proposed Tseung Kwan O Desalination Plant Project 1 Purpose This paper aims to provide the Sai Kung District Council (SKDC) with an update on the progress of the proposed Tseung Kwan O (TKO) desalination plant project, and seek the SKDC’s support for the proposed amendment to the TKO Outline Zoning Plan for the area earmarked for the proposed desalination plant in TKO Area 137. 2 Background of the Project 2.1 A reliable fresh water supply is of paramount importance to sustaining Hong Kong’s development and economic growth. However, our fresh water resources are facing various challenges, including increasing water demand arising from population and economic growth, fluctuating local yield, climate change, as well as keen competition for the Dongjiang (DJ) water resource due to the rapid economic development in the Pearl River Delta Area. 2.2 The total quantity of water extracted from DJ for water supply is increasing every year. The water resource available from DJ and the yield collected from the local water gathering ground may not be able to meet the water demand of Hong Kong during a severe drought with a return period of 1 in 100 years. Moreover, climate change will bring about extremely dry weather at more frequent intervals and increase the likelihood of consecutive droughts. To safeguard water security in Hong Kong, we need to develop an alternative water resource by seawater desalination which is not susceptible to climate change.

Upload: others

Post on 17-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

For Sai Kung District Council Meetingon 5 July 2016

SKDC(M) Paper No. 116/16

Progress of the Proposed Tseung Kwan O Desalination Plant Project

1 Purpose

This paper aims to provide the Sai Kung District Council (SKDC) with an update on the

progress of the proposed Tseung Kwan O (TKO) desalination plant project, and seek the

SKDC’s support for the proposed amendment to the TKO Outline Zoning Plan for the area

earmarked for the proposed desalination plant in TKO Area 137.

2 Background of the Project

2.1 A reliable fresh water supply is of paramount importance to sustaining Hong Kong’s

development and economic growth. However, our fresh water resources are facing

various challenges, including increasing water demand arising from population and

economic growth, fluctuating local yield, climate change, as well as keen competition for

the Dongjiang (DJ) water resource due to the rapid economic development in the Pearl

River Delta Area.

2.2 The total quantity of water extracted from DJ for water supply is increasing every year.

The water resource available from DJ and the yield collected from the local water

gathering ground may not be able to meet the water demand of Hong Kong during a

severe drought with a return period of 1 in 100 years. Moreover, climate change will

bring about extremely dry weather at more frequent intervals and increase the likelihood

of consecutive droughts. To safeguard water security in Hong Kong, we need to develop

an alternative water resource by seawater desalination which is not susceptible to climate

change.

Page 2: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

- 2 -

2.3 In December 2012, we engaged consultants to commence a planning and investigation

(P&I) study for the proposed desalination plant in TKO Area 137. The P&I study was

completed in 2015. It confirmed the technical feasibility of the project including its

environmental viability and provided a preliminary design of the plant.

2.4 On 6 January 2015, we briefed Members of the Sai Kung District Council about key

results of the P&I study and obtained their support for the proposed review, design and

associated site investigation works for the project.

2.5 Subsequently, the environmental impact assessment (EIA) for the project was completed

in May 2015 and the EIA report was approved under the Environmental Impact

Assessment Ordinance by the Environmental Protection Department (EPD) in November

2015. On 4 December 2015, EPD issued an Environmental Permit (EP) for the

construction and operation of the desalination plant.

2.6 In November 2015, we engaged consultants to proceed with the review, design and site

investigation works for the first stage of the proposed desalination plant at TKO. The

first stage of the plant will have a water production capacity of about 135 million litres

per day (Mld) with provision for expansion to 270 Mld to meet 5 to 10 percent of the

overall fresh water demand of Hong Kong.

3 Design of the First Stage of TKO Desalination Plant

3.1 The first stage of the TKO desalination plant project comprises the following key

components:

Page 3: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

- 3 -

a) construction of the first stage of the proposed desalination plant with a water

production capacity at 135 Mld with provision for future expansion to the ultimate

water production capacity up to 270 Mld and associated facilities;

b) formation of a 10-hectare site earmarked at TKO Area 137 for the desalination

plant and associated facilities with the ultimate water production capacity at 270

Mld;

c) construction of the intake and outfall facilities of the proposed desalination plant

with capacities catering for the ultimate water production capacity of the proposed

desalination plant at 270 Mld;

d) associated works including environmental impact mitigation, slope stabilisation and

landscaping works; and

e) associated mainlaying works for conveying the fresh water produced at the

proposed desalination plant to existing fresh water service reservoirs.

The project layout plan is shown in Annex 1.

3.2 The proposed plant will adopt the latest seawater reverse osmosis (SWRO) treatment

technology. The desalinated water will comply with the World Health Organization’s

“Guidelines for Drinking-water Quality” (WHO 2011). A diagram on the proposed

seawater desalination process is enclosed in Annex 2. The consultants are looking into

various options of optimizing the energy consumption of desalination with innovative

design features, in terms of pre-treatment process of lower energy consumption, optimal

sizing of plant and equipment, and advanced energy recovery system for greater energy

efficiency. In addition, the plant will adopt suitable architectural and landscaping design

to harmonize with the surrounding environment. A preliminary layout of the desalination

plant is shown in Annex 3.

Page 4: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

- 4 -

3.3 We are carrying out detailed design for the water mains by in-house resources. The

works will involve laying of about 9.5 kilometres of water mains with a diameter of 1 200

millimetres (mm) along Wan Po Road, Po Hong Road and Tsui Lam Road, for

transferring water produced from the proposed desalination plant to the existing Tseung

Kwan O Primary Service Reservoir and other existing service reservoirs. The proposed

alignment of the water mains is shown in Annex 1. The alignment has been designed to

minimse impact to the road traffic and trenchless construction method will be adopted for

laying of water mains along busy road junctions and some critical road sections where

necessary.

4 Impact Assessments and Arrangement for the Construction Stage

4.1 The approved EIA concluded that with the implementation of appropriate mitigation

measures, no unacceptable environmental impacts are envisaged. Prior to commencing

construction works for the proposed desalination plant, we will require the contractor to

prepare and submit an Environmental Monitoring and Assessment Plan as per the EP

requirements to EPD for approval. During the construction stage of the proposed

desalination plant, we will implement relevant environmental mitigation measures and

monitoring for ensuring compliance with the EP requirements as well as relevant

environmental protection regulations.

4.2 We have carried out a traffic impact assessment (TIA) for the proposed water mainlaying

works. The TIA results reveal that the mainlaying works through implementation of

appropriate temporary traffic management schemes would not cause any significant

impact on the traffic. We will closely liaise with the Transport Department, Hong Kong

Police Force and Highways Department for taking into account their comments and

requirements for the TIA. During the construction stage, we will also keep close contact

Page 5: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

- 5 -

with relevant government departments and require the contractor to implement the

temporary traffic management measures in order to minimise the traffic impact arising

from the mainlaying works.

5 Way Forward

We plan to submit funding application to the Legislative Council Finance Committee in due

course according to the established procedure for public works projects. If all the work

proceeds smoothly, it is expected that the mainlaying works and the plant construction can

commence in 2017 and 2018 respectively for commissioning of the first stage of the proposed

desalination plant by 2020-2021 the earliest.

6 Advice Sought

Members are invited to offer comments, and lend support to the project and the proposed

amendment to the TKO Outline Zoning Plan for the area earmarked for the proposed TKO

desalination plant in TKO Area 137.

7 Attachments

Annex 1 Project layout plan

Annex 2 Seawater desalination process diagram

Annex 3 Preliminary layout of the first stage of the proposed desalination plant

Water Supplies Department July 2016

Page 6: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

刃S掛N 0

澆水灣CLEAR W盯ER BAY

本廟品嘗 :. JO司會脫;��,E BAY ﹛TAI MIU WAN

i,';館鏽答洲

INDICATIVE LOCATION OF S日WATERINTAKE刊P且INE

海水進水管道指示位置

INDICATIVE LOCAT ON OF SUBMARINE

O凹FALL PIPELINE 禪底排水管道揭示位置

PROPOSED FRESH WATER M/IJN 撰鹽宜,Jc永管

臥RMARK印S TE FOR DESAU仙TIONPL/IJNT 海水化改廠預留她點

PROJECT LAYOUT P凶N工程項目佈局圖

Page 7: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

海水化淡處理流程圖Seawater Desai ination Process Diagram

海水進水管道Seawater Intake

Pipe Ii ne

Y'\DalYWrll1C\2回國。因fil\19D'I苟且•6-0C-OO 1DD且由旬,

L.ayOUl:1,6/1刀2[]165:41:J7P阿祖祖PDF

Post-treatment 後處理

Pretreatment 前處理

Reverse Osmosis (即)逆滲透

消毒Disinfection

清水菜房Treated Water

PUTping Station

濃鹽水經排水管道排出大海Brine wi 11 be discharged to the sea vi a outf a I I pi pe I i ne

食水經管道輸送至現有的食水配水庫Water wi 11出transferred to existing fresh water service reservoirs via pipe I ine

附件二 ANNEX 2 。“啊恤"' ""'.岫h 岫岫 linitad

R喃m I Dot, I DHoriptio, I l耐l

D咱"'' I , .. ,... I ,間.. I Ch帥d

In耐,1

Dat1

師proved

Ag,..m,nl N。CE 8/2015 (WS)

FIRST STAGE OF DESALINATION PLANT AT

TSEUNG KWAN O INVESTIGATION, DESIGN AND CONSTRUCTION

將軍澳海水化淡廠第一階段-

勘查研究,設計及建造

Drawlno Tttl ﹒

SEAWATER DESALINATION

PROCESS DIAGRAM

海水化淡處理流程圖

Drowlng No. I Rev!’,。n

190495/B/DC/00-10002

Soole N.T.S

可晨,先請s

BLACK & VEATCH HONG KONG LIMITED 博盧工程顧問有限量b司

Page 8: Progress of the Proposed Tseung Kwan O Desalination Plant ... · sizing of plant and equipment, and advanced energy recovery system for greater energy efficiency. In addition, the

附件三 ANNEX 3 。,... ψtO,llod<l叫糊糊Llm>•d山

口。,

也守國

FAT TONG 0

口。例

也寸固

'"'"' ""''''"'" Choekod

'"爾開

lolHol

、、、

、、\後處理及清水輸送設施

POST-TREATMEt:H AND 、、TREATED W盯ER DELIVERY F�t:JLITIES

海水(七淡廠預留地點EARMARKED SITE FOR DESALINATION P凶NT

,一 ’,’‘ ’、’..’,’ -

, ’, ’ 、

、、 ’ 、、、” 、’

、、

-、--

---

』司

、、

、、

、、

、、

、、

、、

l、

心-

hr

814盼0 N

Dot,

App.,,ed

Ag,,.meol No

CE 8/2015 (WS)

FIRST STAGE OF DESALINATION PLANT AT

TSEUNG KWAN O -INVESTIGATION, DESIGN AND CONSTRUCTION

將軍澳海水化淡廠第一階段

勘查研究,設計及建造

PRELIMINARY凶.YOUT OF THE FIRST STAGE OF THE

PROPOS印DESALINATION P凶NT擬議將軍澳海水化淡廠第一階段初步總平面圖

海水進水管道

SEAWATER INTAKE PIPELINE

SAi KUNG

前處理及海水進水設施PRET.RE盯MENT AND SEAWAT凹,」INTJ,\f\E FAO札ITIES ,’,﹔’,

<:J.:>')

固-BLACK & VEATCH HONG KONG LIMITED

博戚工程顧問有限公司

'"''"曰”

可�fw�:J':;;甚s

190495/B/DC/00-10003

Al 1 1500 AJ 1 3000

'"'

Q 10 2.0 30 49 59 m

1 1 5日C SC此E BAR

海底排水管道SUBMARINE OUTFALL PIPELINE

814 000 N

y \Daly W四1c\ZD160616L l'lD何手B-DC-00-10田l.<t.vg,Layt耳Jll,6J10/2Dl65:l0'1SPM,M。be PDF