Page 1: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Progress of

APIIC-GTZ Technical Cooperation

2004 - 2008

Page 2: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

A Promising Strategy

. . .to transform the Existing Industrial Parks into

Eco – Industrial Parks and to ensure industrial growth

in the state of Andhra Pradesh on sustainable models.

Vision of APIIC

Page 3: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

APIIC has entered into MOU with GTZ-ASEM in March

2003

To identify the areas for cooperation

To identify the parks for conversion to Eco Industrial Parks in AP.

To identify the infrastructure requirements in the parks

Important Milestones

Page 4: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Revised MOU was entered in April 2004 to

demonstrate Eco-Industrial Estate development of

certain identified IP’s as pilot studies.

» Existing Industrial estate at Nacharam & Mallapur

» Eco Industrial strategy for the industrial park site from planning stage

in APSEZ in Visakapatnam.

IMPARTENT MILE STONES

Page 5: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Eco Industrial Parks – Pilot Phase2004-2008

Legend

N

Centre of Excellance

EQM Division

EPTRI, Hyderabad

Fig. 3.6

IDA Layout Map, Nacharam

Eco Industrial Estate

Planning -

IDA, Mallapur, IDA, Nacharam

666

27

98

9

317

250

121

206

155

24

20

21

322

4

33

57

22

5

301

777

327308

193

310

340

242

258

7

42

262

321

293

332

43

19

8

240

15

199

62

281

2

95

202

188

12

269

313

303

119

230

1

166

18

3

89

213

334

17

186

139

326

39

109

215

324

278

74

91

207

306

221

31

13

37

41

305

120

93

219

90

203

318

87

88

16

145

47

311

336

46

84

238

55

86

154

67

96

333

241

192

295

122

99

282

115

183

297

229

268

302

312

284

194

290

34

177

275

104

23

97

92

239

252

61

44

110

289

307

80

107

270 277

103

26

112

211

237

280

45

228

217

319

38

142

244

220

134

292

101

149

106

76

201

224

314

335

190

107

226

294

271

191

64 246

79

58

151

85

247

283

236

136

287

235

267

279

210

54

32

185

70

163

225320

171

60

22749

184

223

175

100

325

304

222

248

286

182

75

316

260

125

77

328

127

147

204

555

68

315

143

6

264

178

231

128

152

144

140

168

263

170

117

131

253

150

273

Industrial Occupied Area

Vacant PlotsOpen Area

Hillock

State Highway

IDA Road Network

IDA Boundary

Eco Industrial Estate

Planning -

IDA, Mallapur, IDA, Nacharam

IDA Layout Map, Mallapur

Fig. 3.5

Centre of Excellance

EQM Division

EPTRI, Hyderabad

N

1

8

91

666

999

82

109

5

189

3

141

90

22

76

4

6

2

7

88

89

777

84

7897

85

9

26

93

77

666

79

27

143

98

16

191

124

139

40

94

107

147

104

127

137

777

134

25

110

92

188

17

108

36

105

115

103

12

123

118

117

165

114

41

2119

154

102

122

192

116

86

106

45

20

28

113

42

159

202

133

155

146

96

161

196

15

112

120

43

87

111

34

13

38

11

203

14

151

30

177

101

200

95

184

80

59

153

121

128

129

205

10

24

149

81

144

173

162

35

126

44

148

32

201

167

555

555

37

179

119

46

44

145

130

150

204

135

208

142

31

47

152

99

197

136

180

171

183

52

168

174

199

206

125

65

169

194

58

53

67

160

54

55

48

163

69

164

131

62

178

70

66

212

68

61

63

193

50

207

72

64

157

156

56

185

49

71

73

74

198

158

186

209

157

187

181

132

211

172

444

Industrial Occupied Area

Vacant PlotsOpen Area

HillockJungleOpen Well

Road Network

IDA Boundary

Legend

IP Nacharam IP Mallapur

Transformation of Existing IPs with Technical Cooperation from GTZ

Page 6: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Planned Activities

» Inventorisation of Industries in the estate

» Evaluation of the site including compatibility of

industries, infrastructure available, vacant plots etc

» Assessment of problems associated with manufacturing

process, use of resources including water and electricity

and pollution within the industries

» Identification of land uses around the estate and

assessment of impacts on the environment

Contd…

Eco Industrial Parks –Pilot Phase 2004-2008

Page 7: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Planned Activities

» Suggestion on Environmental Management Plan for improving the

estate and minimizing the conflicts with the environment and

surroundings

» Capacity building for stake holders including setting up of

Environment management cell (EMC) and training programmes.

Eco Industrial Parks –Pilot Phase 2004-2008

Page 8: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Interventions Implemented in Nacharam & Mallapur

» Environment Management cell(EMC)

» Awareness/Cautionary Signage boards at illegal

Hazardous waste sites

» Plantations

» Storm water drainage system

» Sewerage system

» CETP

» Eco-clubs

Eco Industrial Parks –Pilot Phase 2004-2008

Page 9: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Structure of Estate Management

Eco Industrial Parks – Pilot Phase2004-2008

Page 10: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

13

Eco Industrial Parks –Pilot Phase 2004-2008

Environment management cell role : To Assist/support

industries in addressing the environmental related issue.

Support

Services to

industries

Environment

Monitoring

Coordinate

Disaster

Management

Coordinate

Training

Programmes

Industrial Park

Information

System

Environment

Management

Cells

Coordinate

Environmental

Infrastructure

Development

Page 11: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Environment Management Cell

» EMC is Established commonly for the industrial parks Nacharam and Mallapur.

» Initial for a period of one year cost borne by APIICRs.18.00 lacs.

» IALAS /Service society will be sharing the maintenance cost proportionately

» Execution agency M/s Indwa Technologies

Impacts: »Data bank on industries developed on activity & pollution

» Regularly monitored the pollution levels, identified the non-complying/polluting industries and informed IALAs

» Coordinated infrastructure implementation – 3,000 tree plantations, 21 km roads, 30% of sewer & storm water drains.

Eco Industrial Parks –Pilot Phase 2004-2008

Page 12: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Signboards are placed at waste dump sites.

Presently, reduced dumping is noticed.

Eco Industrial Parks –Pilot Phase 2004-2008

Page 13: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Plantation:

»7.5 Km Avenue plantation & Block Plantations

»Species: Paltraform & karanj

»Number of Trees- 3000

»Spacing between trees 5m

»Cost Rs. 1.6 million (including Tree guards)

»Execution agency – M/s HUDA

Eco Industrial Parks –Pilot Phase 2004-2008

Page 14: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Storm - Water Drainage

» Length of storm-water drains is approx 21.00 Km

» Estimated cost of storm-water drainage system is Rs 80 millions

» Zone based on topography for cost optimisation

» Water harvesting Pits - prior treatment - Recharge the Groundwater Table

Status: Work in progress

Eco Industrial Parks –Pilot Phase 2004-2008

Page 15: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Waste Water Management : Sewerage system

» Designed to cater the wastewater – 8.00 MLD

» Overall length of sewerage system – 22.60 km

» Estimated cost for sewerage system- Rs. 50 mi

» Execution Agency – M/s Jain Irrigation

Status : Civil Work is in progress

Eco Industrial Parks –Pilot Phase 2004-2008

Page 16: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Eco Industrial Parks –Pilot Phase 2004-2008

CETP at Nacharam & Mallapur :

» Modular Approach

» Ultimate Capacity – 8.00 MLD

» Initial Capacity – 2.00 MLD

» PPP mode - BOO Basis through CETP operator

» Polluter Pays – Principle contd..

Page 17: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

»Treatment – Primary/Secondary/Tertiary including recycle of treated water

» Land allotted -3.25 Acres» Foundation stone was laid on 11th Feb 2008» Developers/Operating Agency – M/s Indwa Technologies.

» Obtained – CFE

Status: Civil works are in progress

Eco Industrial Parks –Pilot Phase 2004-2008

Page 18: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Training for Industries

Group Training

» Green productivity

» Process optimization

» Managerial skills

Consultancy Type of Training

» Analysis of Process, Material Balance

» Identification and assessment of potential resource

saving measures

» Team building, motivation and communication skillsM/s Ahlaada Pharmaceuticals -MallapurM/s Salicylates & Chem. Pvt.Ltd - Nacharam.

Eco Industrial Parks –Pilot Phase 2004-2008

Page 19: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

“ECO- CLUB” is a forum where representatives of individual industries can discuss the problem related to their industrial productivity, environmental aspects etc and explore possible solutions.

Experts from NPC – Hyderabad played the role of technical resource personnel, providing appropriate inputs form time to time besides acting as facilitators of the discussions.

Impact: The Unit holders have appreciated the need for productivity

improvement tools and 15 units have submitted LOI for participation in ECO-Profit programme.

Eco Industrial Parks –Pilot Phase 2004-2008

Page 20: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Topic Discussed by Eco Clubs

» Material flow

» Energy systems

» Resource conservation

» Common utilities

» Waste management

» Pollution control

Eco Industrial Parks –Pilot Phase 2004-2008

Page 21: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Eco Industrial Parks –Pilot Phase 2004-2008

Certificate Program – EIP for APIIC Officials

» Eco – Industrial Park Approach

» Management and Operation

» Planning and Development

» Presentation – Group work – Field visit

Page 22: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Replication of EIP initiatives Phase one – 32 industrial parks

EMC Zone Industrial ParksShamshabad Hardware Park/ IP Mankhal/FAB City

Patencheruvu IP Patencheru/IP Pashymylaram

Vishakhapatnam Autonagar Vishakapatnam Blocks A,B,C,D, ext.,E,F,G / Aparel Park

Kakinada IP Kakinada IP Vakalapudi IDA Peddapuram

Nellore IE Krishnapatnam IP & SEZIE MambattuMenakur

Tirupathi Tirupathi APIE (O) and (SEIE)IP Tirupathi (UD)(APIE), (CC), (AN)IE Tirupathi (ADJM)IDA TirupathiIHC TirupathiIP Gajulamandyam (UDL/Housing)

Eco Industrial Parks –2004-2008

Page 23: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Eco Industrial Parks 2004-2008

» Establishment of EMC in Six Zones

» Pattancheru, Shamshabad, Nellore, Tirupati, Vizag & Kakinada

» Catering to the needs to 32 industrial parks

» Execution Agency : M/s Bhagavati Ana Labs (4), & M/s IGIAT (2)

»Date commencement of operation : 1st week of August

Page 24: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Amount spent on Infrastructure Up-gradation in industrial parks by APIIC

S.No Period Expenditure (Rs. in Cr)

Yearly Average (Rs. in Cr)

1 1974-1999 113.6 4.54

2 1999-2004 40.4 8.08

3 2004-2008 322 80.50

Eco Industrial Parks –2004-2008

Page 25: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Eco Industrial Parks –2004-2008

EMCs set up in zones catering to 32

Industrial Parks

Page 26: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Common Effluent Treatment Plant At FAB CITY:

» To facilitate the treatment & Disposal of industrial effluents generated in Fab city, APIIC has allotted land on soft lease to the operator( IL& FS).

» IL& FS to take up the project on BOO Model and complete the first module in 6 months.

Initial Capacity 1.1 MLD

Ultimate Capacity 10 MLD

Build Own Operator – PPP Model

Operator – M/s ILFS Eco smart

Eco Industrial Parks2004-2008

Page 27: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Release of Eco Industrial Park Strategy of APIIC by the Hon’ble Minister for Industries, Govt. of Andhra Pradesh

Page 28: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

» APIIC- GTZ Environment Award - in recognition of outstanding efforts of APIIC officials in environment protection efforts.

» For the year 2007-08, the Zonal Manager of Moula ali has received the “APIIC – GTZ Environment Award”.

Page 29: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

» APIIC- GTZ sign MoU on Sept. 26, 2008 for Extended Phase of 2009 to 2012

Page 30: Progress of APIIC-GTZ Technical Cooperation · Eco Industrial Parks –Pilot Phase 2004-2008 Legend N Centre of E xcellance E Q M Division E P TR I, Hyderabad Fig. 3.6 IDA Layout

Thank You