progard® pack - serv-a-pure the progard pack? the progard pack should be replaced when one of the...
TRANSCRIPT
PROGARD® PACKCat. # PROGOTOS2 - PR0G0TNP2
Replacement
Where used • Milli-Q® Integral systems• Elix® and Elix Advantage systems• All Essential range
Shipping boxc o n t e n t
1 Progard Pack
W h e n t o F o r I n t e g r a l r a n g e :
replace theProgard Pack? The Progard pack should be replaced when one of the following Alert messages
is displayed:• REPLACE PROGARD AND TANK VENT FILTER IN XX DAYS, or
• REPLACE PROGARD AND TANK VENT FILTER.
For Essential range:
• When the system displays the yellow alert:
H o w t o
proceedFor the Integral range, the procedure is described below.For the Essential range, the User Manual describes this procedure.
The information in this document is meant to be used by a Qualified Service RepresentativeP F 0 9 7 6 1 - R e v . 3 , 1 2 / 2 0 1 3 P R O G A R D ® P A C K 1 / 5
Procedure
Removal Follow the steps below to remove the Progard pack.
Step A c t i o n Diagram1 Place the Milli-Q System into
STANDBY Mode.
S T A N D B Y
10 Sep 2007 14:12
Readij •*
2 Depressurize the system:• Push the Q-POD plunger all the way down and release it.• Walt until water stops flowing.• Push the Q-POD plunger all the way down and release it.
3 • Open the Milli-Q System leftd o o r .
• Lift up the pack lockingh a n d l e .
4 Remove the used Progard pack. 1
J ."yn^T'
i ' ,
5 The system indicates that theProgard pack is removed.
S T fl l
P R O G A R D PA C K
O U T
= R E S S +
1 U
Continued on next page
THE [NFORMATION IN THIS DOCUMENT IS MEANT TO BE USED BY A QUALIFIED SERVICE REPRESENTATIVEP F 0 9 7 6 1 - R e v . 3 , 1 2 / 2 0 1 3 p r o g a r d ® P A C K 2 / 5
Procedure, Continued
Installation Follow the steps below to install the Progard pack.• Remove the covers on the 2 ports of the Progard pack.• Make sure the rubber 0-rings are firmly in place inside these ports.• Wet the 0-rings with water.
Step A c t i o n
Lift the pack locking handleup.Push the top of the Progardpack into the ports on the
li-Q system.
Diagram
Push on the bottom of the
Progard pack.
Continued on next page
T h e i n f o r m a t i o n i n t h i s d o c u m e n t i s m e a n t t o b e u s e d b y a Q u a l i fi e d S e r v i c e R e p r e s e n t a t i v eP F 0 9 7 6 1 - R e v . 3 , 1 2 / 2 0 1 3 P R 0 G A R D ® P A C K 3 / 5
Procedure, Continued
I n s t a l l a t i o n
(continued] Step A c t i o n Diagram
3 • Push the pack locking handled o w n .
• Close the left door.
A i
4 The system indicates that a newProgard is installed.
I N S TA L L P R O G A R D
A fieu PT093rd has beeni n s t a l l e d .
Catalogue N": PR0G0T002Lot N': FSDN27324.Press •> to start Progard
Flushing.
5 Press C) to start the Progardfl u s h .
I N S TA L L P R O G A R D
Progard Flush procedure inprogress .Renaining Tine • 15 nin.P r e s s ■» t o c a n c e l .
6 When the Progard Pack flushhas finished, the Milli-Q Systemgoes to READY Mode.
R E A D Y
10 Sep 2007 14:22
s m c s cstandby ->
E l l x R : 1 2 . 5 M a c m T C
El ix T : 25.1 "C
Ta n k : 8 0 . 0 %
Continued on next page
The INFORMATION IN THIS DOCUMENT IS MEANT TO BE USED BY A QUALIFIED SERVICE REPRESENTATIVEP F 0 9 7 6 1 - R e v . 3 , 1 2 / 2 0 1 3 p r o g a r d ® p a c k 4 / 5
Procedure, Continued
I n s t a l l a t i o n
(continued) Step A c t i o n Diagram
7 Unscrew and replace the ventfi l t e r .
T h e i n f o r m a t i o n i n t h i s d o c u m e n t i s m e a n t t o b e u s e d b y a Q u a l i fi e d S e r v i c e R e p r e s e n t a t i v eP F 0 9 7 6 1 - R e v . 3 , 1 2 / 2 0 1 3 p r o g a r d ® p a c k 5 / 5