profile presentation

10
Rectified error in lifting pad for 120 ton and suggested standard and flexible lifting technique at NOV Fabtech for Greywolf

Upload: shain-sivadasan

Post on 15-Apr-2017

82 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: profile presentation

Rectified error in lifting pad for 120 ton and suggested standard and flexible lifting technique at NOV Fabtech for Greywolf

Page 2: profile presentation

Installation and commissioning of 18-15M BOP STALCK & CONTROL UNIT at NOV Fabtech for Grey wolf

Page 3: profile presentation

Complete re-certification of 18-15M BOPs at NOV Norway for Transocean and Bedford

Page 4: profile presentation

Complete re-certification of 18-15M BOP Stack at NOV Saudi for ENSCO Saudi

Page 5: profile presentation

Complete installation and commissioning of 30-1M Diverter system, 13-10M LXT Stack, 20-3M stack at MIS Sharjah port for hull 104,105,106,107,108,109 & 110 Rig

Page 6: profile presentation

Inspection of BOP control unit & Visited all NOV Sara Facility for ring gaskets, hammer union, blind flanges, spools etc., in New Delhi.

Page 7: profile presentation

Troubleshooting of offset RAM in the 13-10M LXT BOP on-site at ABRAJ, Oman

Page 8: profile presentation

Complete re-certification of 18-15M SL BOP on site at Congo SAIPEM

Page 9: profile presentation

Complete re-certification of BOP control unit at NOV Dubai Facility

Page 10: profile presentation

Complete re-certification of BOP control unit in NOV facility Dubai for ID Tech