Professional Engineering Services For Restoration Project
Professional Engineering Services For Restoration Project
John Mitnik, P.E.Engineering & Construction Bureau ChiefOperations, Maintenance & Construction
John Mitnik, P.E.Engineering & Construction Bureau ChiefOperations, Maintenance & Construction
Pre-Proposal MeetingNovember 21, 2013
The PROJECT
Part 3 Section 4 describes the PROJECT as:
The PROJECT contains restoration activities for refurbishing, enhancing and/or adding components . . . while also accomplishing the additional needs of the environment . . . Restoration activities under the PROJECT may include, but not be limited to: stormwater treatment areas, flow equalization basins, reservoirs . . . as contained within the District’s Restoration Strategies Regional Water Quality Plan, Comprehensive Everglades Restoration Plan and Northern Everglades and Estuaries Protection Plan.
Which consists of:. . . design and construction management of various restoration activities further described as being similar in nature but not limited to high and low hazard embankments and levees, associated canal excavation/bank stabilization, stormwater pump stations, control structures, spillways, bridges, monitoring systems, communication . . . and control systems . . . the associated features of grading, paving & drainage systems and electrical facility improvements . . . including architectural, structural, mechanical, electrical and landscaping components, . . . Refurbishment/retrofitting of existing facilities, rather than design of new facilities, may be applicable to any of the restoration activities listed above
The PROJECT
Water Control Structure - Spillway
Reinforced Concrete Gated Spillway
Vertical lift roller gates
Type Hoist: Electric Motor drum and Cable hoist; or portable power-drive for manual operations
Control by remote telemetry through SFWMD SCADA system
Normal Power Source: Commercial Electricity
Emergency Power Source: Portable Backup generator
Water Control Structure – Culvert
Reinforced Concrete Box Culvert
CMP pipe
Non-gated as well as Gated culvert structure
5
Architectural Design - Control Building
TYPICAL CONTROL BUILDING PLAN
TYPICAL CONTROL BUILDING ELEVATION
Levee, Embankments, and Dams
Seepage Analysis
Wind and Wave Analysis
Freeboard Analysis
Seepage Management
Canals
Bank Stabilization / Slope Stability
Erosion Protection
Hydraulic conveyance
Operating Plans
Pump Stations
Vary in Size from 100 cfs to 3000 cfs
Diesel, Electric, Natural Gas, or Dual Fuel
Flood Control and Non-flood control
Additional Services
Construction Management Inspections
Engineering During Construction
Things To Touch On
Methodology and approach to the PROJECT
Quality Assurance / Quality Control
Schedule
Cost Control
Anticipated volume of work $150M
Questions?