prof awad s. hanna work breakdown structure wbs work breakdown structure wbs
TRANSCRIPT
Prof Awad S. Hanna
Prof Awad S. Hanna
A hierarchical system which sub-
divides larger elements of the
project into smaller elements.
The smallest unit of the WBS is the
work package.
Prof Awad S. Hanna
Level
Level Description
1
Total Project2
Subproject3
Category of Work
4Work
Package
5
Resources
Work Breakdown Structure
MasonryWall
FloorSlab
FootingSiteworkInteriorFinishes
RoofSystem
SteelColumns& Joints
PlaceFootings
Form &ReinforceFootings
ExcavateFootings
EquipmentMaterialLabor
MasonryWall
Mobilization/DemobilizationAdministration
RoofSystem
SteelColumns& Joints
Warehouse
Prof Awad S. Hanna
The scope of work in each work package
should be defined to avoid overlaps and
omissions between work packages.
Work packages should be defined in terms of
design, construction methods, and completion
requirements, with associated performance
dates
Prof Awad S. Hanna
Each work packages should be:
1. ManageableSpecific authority and responsibility can be
assigned.
2. IndependentWith minimum interfacing or dependence
on other elements.
3. MeasurableIn terms of progress.
Prof Awad S. Hanna
Objectives of Establishing Project Cost
System.
1. Keep the construction costs of the
project within the established budget.
2. Develop labor and equipment
productivity information for estimating
the cost of future work.
Prof Awad S. Hanna
9708B 05 03157.20 3
ProjectNumber
AreaCode
Work Type Code
DistributionCode
Cost Code for stripping concrete formwork for bridge deck (Labor).
Prof Awad S. Hanna
Eighth project in 1997 (Bridge)
9708B 05 03157.20 3
Prof Awad S. Hanna
Geographic location
OR
Associate Field Cost to Specific supervisor or Management
9708B 05 03157.20 3
Prof Awad S. Hanna
03 Concrete
0315 Concrete Formwork
03157 Wood Concrete Formwork
03157.20 Wood Concrete Formwork for
Deck
03157.30 Wood Concrete Formwork for
Abutment
9708B 05 03157.20 3
Prof Awad S. Hanna
9708B 05 03157.20 3 1. Total
2. Material
3. Labor
4. Equipment
5. Sub-Contract
Prof Awad S. Hanna
All items of expense are charged to the
project where they are incurred.
"General" or "miscellaneous" cost
accounts should not be used, is poor
practice, and should be avoided.
The cost code is to serve its basic
purpose, it must be understood and used
consistently by all company personnel.
Prof Awad S. Hanna
Cost report intervals are a function of
the project size, nature of the work, and
the type of contract involved.
There must be a balance between the
cost of generating the reports and the
value of the management information
received
Prof Awad S. Hanna
The most widely used cost codes are
Masterformat, CSI (Construction Specifications
Institute)
Uniformat, UCI (Uniform Construction Index).
Masterformat is widely used software
companies and government agencies.
Prof Awad S. Hanna
Most contractors match their cost
control system to their payroll
periods and to their time-
monitoring system.
Prof Awad S. Hanna
MasterformatHas 16 divisionsDivisions were developed according to
trades
UniformatHas 12 divisionsTends to follow the progress of
construction
Prof Awad S. Hanna
Leve
l 2
01 G
ener
al R
equi
rem
ents
02
Sub
stru
ctur
e
03
Sup
erst
ruct
ure
04
Ext.
Clo
sure
05
Roofi
ng
06
Int.
Clo
sure
07
Conv
eyin
g S
ys.
08
Mec
hani
cal
09
Elec
tric
al
10 G
en. C
ond.
OH
& P
11 Eq
uipm
ent
12 S
ite W
ork
Leve
l 3
011
Sta
ndar
d Fo
unda
tions
012
Spe
c. F
ound
atio
n Co
nd.
021
Sla
b on
Gra
de
022
Bas
emen
t Ex
cava
tion
023
Bas
emen
t W
all
031
Flo
or C
onst
ruct
ion
032
Roo
f Con
stru
ctio
n
033
Sta
ir Co
nstr
uctio
n
041
Ext
erio
r Wal
ls
042
Ext
. Doo
rs &
Win
dows
06
1 Par
titio
ns
06
2 In
terio
r Fin
ishe
s
06
3 S
peci
altie
s
08
1 Plu
mbi
ng
08
2 H
.V.A
.C.
08
3 Fi
re P
rote
ctio
n
08
4 S
pec.
Mec
hani
cal S
yst.
091
Ser
vices
& D
istr
ibut
ion
092
Lig
htin
g &
Powe
r
093
Spe
c. E
lect
rical
Sys
t.
111 fi
xed
& M
ovab
le E
quip
.
112 F
urni
shin
gs
113 S
peci
al c
onst
ruct
ion
121 S
ite P
repa
ratio
n
122
Site
Impr
ovem
ents
123
Site
Util
ities
124
Off-S
ite W
ork
01 General Requirments
02 Site work
03 Concrete
04 Masonry
05 Metals
06 Wood & Plastic
07 Therm. & Moisture Protect.
08 Doors & Windows
09 Finishes
10 Specialities
11 Equipment
12 Furnishings
13 Special Construction
14 Conveying Systems
15 Mechanical16 Electrical
Des
ign
Uni
form
at
Prof Awad S. Hanna
Total Building Costs0100 Foundation (level A) 0620 Interior Finishes 0920 Lighting-Power0110 Standard (level B) 0630 Specilties 0930 Special Electrical Systems0120 Special (level B) 0700 Conveying Systems 0940 Communications Systems0200 Substructure 0710 Elevators 0950 Electrical Heating System0210 Slab on Grade 0720 Moving Stairs/Walks 1000 General Conditions0230 Basement Walls 0730 Dumwaiters 1100 Equipment0300 Superstructure 0740 Pneumatic Yubes 1110 Special Equipment0310 Floor Construction 0750 Other Conveying Systems 1120 Furnishings0320 Roof Construction 0800 Mechanical 1130 Special Construction0330 Stair Construction 0810 Plumbing0400 Exterior Closure 0820 HVAC0410 Exterior Walls 0830 Fire Protection0420 Exterior Doors and Windows 0840 Medical Gases 1200 Site Work0500 Roofing 0850 Sewage Treatment 1210 Site Preparation0600 Interior Construction 0900 Electrical Systems 1220 Site Improvement0610 Partitions 0910 Basic Materials 1230 Site Utilities
Total Base Construction Cost