production status

29
Production Status D. Filippov (MIT) On behalf of Data/MC Production Team February 2011

Upload: terry

Post on 14-Jan-2016

64 views

Category:

Documents


0 download

DESCRIPTION

Production Status. D. Filippov (MIT) On behalf of Data/MC Production Team February 2011. Overview. Production Scheme Job Requests Data Transfer and Jobs statistics Production statistics. Four Sites Contribute for the Production: CIEMAT MILANO NLAA SEU. Production Requests. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Production Status

Production Status

D. Filippov (MIT)On behalf of Data/MC Production Team

February 2011

Page 2: Production Status

2

Overview

• Production Scheme• Job Requests• Data Transfer and Jobs statistics• Production statistics

26 February 2010 D.Filippov Production Status

Page 3: Production Status

D.Filippov Production Status 326 February 2010

Page 4: Production Status

4

Four Sites Contribute for the Production:

• CIEMAT• MILANO• NLAA• SEU

26 February 2010 D.Filippov Production Status

Page 5: Production Status

D.Filippov Production Status 5

Production Requests

26 February 2010

Page 6: Production Status

D.Filippov Production Status 6

Production Requests

26 February 2010

Page 7: Production Status

D.Filippov Production Status 7

Data Transfer

Data transfer software:

• Developed by INFN based on DataBase, Python, Perl• Based on scripts. Used currently to transfer from NLAA and SEU via

IPv6 protocol

IPv6 is used to transfer data from NLAA and SEU as it much more faster then IPv4. Dedicated host (ams01) has been setup outside CERN firewall

26 February 2010

Page 8: Production Status

D.Filippov Production Status 826 February 2010

http://ams.cern.ch/ProdPlot/plot21.php

Page 9: Production Status

D.Filippov Production Status 926 February 2010

http://ams.cern.ch/ProdPlot/plot22.php

Page 10: Production Status

D.Filippov Production Status 1026 February 2010

http://ams.cern.ch/ProdPlot/plot31.php

Page 11: Production Status

D.Filippov Production Status 1126 February 2010

http://ams.cern.ch/ProdPlot/plot32.php

Page 12: Production Status

D.Filippov Production Status 1226 February 2010

http://ams.cern.ch/ProdPlot/plot41.php

The Reason of Having Large Pending Jobs Number at MILANO/CNAF is Under Investigation

Page 13: Production Status

D.Filippov Production Status 13

Produced Datasets

26 February 2010

Page 14: Production Status

D.Filippov Production Status 1426 February 2010

Page 15: Production Status

D.Filippov Production Status 1526 February 2010

Page 16: Production Status

D.Filippov Production Status 1626 February 2010

Page 17: Production Status

D.Filippov Production Status 1726 February 2010

Page 18: Production Status

D.Filippov Production Status 1826 February 2010

Page 19: Production Status

D.Filippov Production Status 1926 February 2010

Page 20: Production Status

D.Filippov Production Status 2026 February 2010

Page 21: Production Status

D.Filippov Production Status 2126 February 2010

Page 22: Production Status

D.Filippov Production Status 2226 February 2010

Page 23: Production Status

D.Filippov Production Status 2326 February 2010

Page 24: Production Status

D.Filippov Production Status 24

Geant4 Produced Datasets

• Thanks to J. Weng Efforts the Geant4 Engine Is now fully functional.

26 February 2010

Page 25: Production Status

D.Filippov Production Status 2526 February 2010

Page 26: Production Status

D.Filippov Production Status 2626 February 2010

Page 27: Production Status

D.Filippov Production Status 2726 February 2010

Nuclei Geant4: Just Started

Page 28: Production Status

D.Filippov Production Status 28

Special Orbit Simulation DataSets

• To Facilitate Testing of SubDetecors Calibration Procedures as well as Developing of Level3 Trigger The One Complete 24Hrs of AMS Data Taking is now being Simulated both with Geant3 and Geant4 Engines.

• The raw files data are available in/afs/ams.cern.ch/Offline/RunsDir/MC/AMS02/2009B/orbit/afs/ams.cern.ch/Offline/RunsDir/MC/AMS02/2009B/orbit.g4

26 February 2010

Page 29: Production Status

D.Filippov Production Status 29

Next To Be Generated

• Fixed Energy Points for e+-, protons, He, C, photons

• Full Geant4 Dataset corresponding to Geant3 One.

26 February 2010