Production
Schedule:
Main Task
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
2/12
Date: Activity: Location: Equipment: Personnel: Contingency:
26th January2012
Filming-Scene 1 E20 Studio CameraTripodShoulder RigCrane
Crew: Meeraand JoyceActor: Amelie
-If permission is
not granted on
that particular
day to film then
filming will have
to be postponed
or we will have
to find another
location to film.
-If the actor is
not present then
filming should
be postponed or
the actor should
be contacted.
31st January2012
Editing E20-EditingSuite
Mac (Final CutPro, Livetype-titles)
Crew: Meeraand Joyce
-If a member of
the crew is not
available forediting it should
not dent the
schedule and
editing still must
go ahead.
1st February
2012
Editing E20-Editing
Suite
Mac (Final Cut
Pro)
Crew: Meera
and Joyce
-If a member of
the crew is notavailable for
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
3/12
Date: Activity: Location: Equipment: Personnel: Contingency:
9th February2012
Filming-Scene 3 School Grounds-Common Room
CameraTripodShoulder RigLetter
Crew; Meeraand JoyceActor: Amelie
-If permission is
not granted on
that particular
day to film then
filming will haveto be postponed
or we will have
to find another
location to film.
-If the actor is
not present thenfilming should be
postponed or the
actor should be
contacted.
22nd February
2012
Filming-Scene 2 School Grounds-
Sixth FormBlock (BrickWall)
Camera
TripodShoulder Rig
Crew: Meera
and JoyceActor: Amelie
-Weather
Conditions, ifthey prove trivialpostpone filming(wind hazard)
23rd February2012
Editing E20 Studio Mac (Final CutPro)
Crew: Meeraand Joyce
-If a member of
the crew is not
available for
editing it shouldnot dent the
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
4/12
Date: Activity: Location: Equipment: Personnel: Contingency:
3rd March 2012 Editing E20 Studio Mac (Final CutPro)
Crew; Meeraand Joyce
-If a member of
the crew is not
available for
editing it should
not dent theschedule and
editing still must
go ahead.
27th March 2012 Filming Boxers Lake-Scene 4Boxers Lake-Scene 5
CameraTripodShoulder RigLetter
Crew; Meeraand JoyceActor: Amelie
-If the
equipment can
not be used onthis particular
day postpone
filming
-Make sure any
props that are
needed are
present during
filming
-The actor
should be
present during
filming, if she is
not there then
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
5/12
Date: Activity: Location: Equipment: Personnel: Contingency:
28th March 2012 Editing E20 Studio Mac (Final CutPro)
Crew; Meeraand Joyce
-If a member of
the crew is not
available for
editing it should
not dent theschedule and
editing still must
go ahead.
30th March 2012 Editing E20 Studio Mac (Final CutPro)
Crew: Meeraand Joyce
-If a member of
the crew is not
available for
editing it should
not dent the
schedule and
editing still must
go ahead.
17th April 2012 Editing E20 Studio Mac (Final Cut
Pro)
Crew: Meera
and Joyce
-If a member of
the crew is notavailable for
editing it should
not dent the
schedule and
editing still must
go ahead.
18th April Filming The Cookie-Scene 3
CameraTripod
Crew; Meeraand Joyce
-If the actors are
not present then
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
6/12
Date: Activity: Location: Equipment: Personnel: Contingency:
18th April Filming The Cookie-Scene 3
CameraTripod
Crew; Meeraand JoyceActors: Amelie
and Jean-Jacques
-If the actors are
not present then
filming should
be postponed or
they should be
contacted.
-In the Cookie
itself make sure
that those who
do not wish to
be featured
have left first
before
commencing
with filming
-Make sure all
equipment is
charged
(camera) before
filming starts.
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
7/12
ProductionSchedule:
Ancillary Tasks
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
8/12
Date: Activity: Location: Equipment: Personnel: Contingency
plan:
15/09/11 1st Draft Designs
for CD Cover
E20 Crew: Meera and
Joyce
If the designs
produced do not
fit requirements
for the proposal
given and that isestablished
between the
crew then new
designs should
be mad if not on
the same day
another day
should be
arranged.
20/09/11 Feedback E20 Crew: Meera and
Joyce
If there are not
enough
participants to
ahead with afeedback session
then this has to
be rearranged for
a later date.
20/09/11 Flat Plans for
Article
E20 Crew: Meera and
Joyce
If the flat plans
produced do not
fit requirements
for the proposal
D A i i L i E i P l C i
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
9/12
Date: Activity: Location: Equipment: Personnel: Contingency
plan:
22/09/11 2nd Draft For CD
Cover
E20 Crew: Meera and
Joyce
27/09/11 Continuation of
Flat Plans
E20 Crew: Meera and
Joyce
10/10/11 Photo shoot Camera Crew: Meera and
Joyce
+Artist
If the artist in
question does
not turn up then
another day
should be
arranged for thephoto shoot to be
carried out.
Another factor to
consider is the
weather/location
11/10/11 Photoshop/Editin
g
Editing Suite Crew: Meera and
Joyce
If there is no
space in the
editing suite
editing should be
carried out on
another day.
18/10/11 Article
Production
Editing Suite Crew: Meera and
Joyce
If there is no
space in theediting suite
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
10/12
Date: Activity: Location: Equipment: Personnel: Contingency
plan:
18/10/11 Editing Editing Suite Crew: Meera and
Joyce
If there is no
space in the
editing suite
editing should be
carried out on
another day.
26/10/11 ArticleProduction
Editing Suite Crew: Meera andJoyce
If there is nospace in the
editing suite
Article production
elements could
be done
elsewhere or
carried out onanother day.
26/10/11 Editing Editing Suite Crew: Meera and
Joyce
If there is no
space in the
editing suite
editing should be
carried out on
another day.
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
11/12
Allocation of RolesScene: Allocation of Role:
1-E20 Studio Scene Directors: Meera Tailor and Joyce NkelaProducers: Meera Tailor and Joyce NkelaEditors: Meera Tailor
Joyce NkelaCamera Operator: Meera Tailor and Joyce NkelaScript Writer: Joyce NkelaStoryboard/Set Design Artist: Meera TailorActors: Amelie
Music song: Pour Que Tu M'aimes Encore by CelineDion
2-Letter Scene Directors: Meera Tailor and Joyce NkelaProducers: Meera Tailor and Joyce NkelaEditors: Meera Tailor
Joyce Nkela
Camera Operator: Meera Tailor and Joyce NkelaScript Writer: Joyce NkelaStoryboard/Set Design Artist: Meera TailorActors: Amelie
3-The Cookie Directors: Meera Tailor and Joyce NkelaProducers: Meera Tailor and Joyce Nkela
Editors: Meera TailorJoyce Nkela
-
8/2/2019 Production Schedules and Allocation of Roles Power Point
12/12
Scene: Allocation of Role:
4-Boxers Lake (Walking Scene) Directors: Meera Tailor and Joyce NkelaProducers: Meera Tailor and Joyce NkelaEditors: Meera Tailor
Joyce NkelaCamera Operator: Meera Tailor and Joyce Nkela
Script Writer: Joyce NkelaStoryboard/Set Design Artist: Meera TailorActors: Amelie
5-Boxers Lake (Scenic Scene) Directors: Meera Tailor and Joyce NkelaProducers: Meera Tailor and Joyce Nkela
Editors: Meera TailorJoyce NkelaCamera Operator: Meera Tailor and Joyce NkelaScript Writer: Joyce NkelaStoryboard/Set Design Artist: Meera TailorActors: Amelie
Whole Production overall Directors: Meera Tailor and Joyce NkelaProducers: Meera Tailor and Joyce NkelaEditors: Meera Tailor
Joyce NkelaCamera Operator: Meera Tailor and Joyce NkelaScript Writer: Joyce NkelaStoryboard/Set Design Artist: Meera Tailor
Actors: AmelieMusic song: Pour Que Tu M'aimes Encore by Celine