Page 1: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

Product Certification

Licensing Procedure

in BIS

Page 2: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

APPLICATION TO BIS

Apply to BIS in specified application form

Pay fees:

◦ Rs 1000.00 – APPLICATION FEES

◦ Rs 7000.00 – 1 DAY VISIT CHARGES

◦ Testing charge/Advance MF/Lic Fee- Optional

Get acknowledgement across the counter

along with application number

CM/A- XXXXXXX

Page 3: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

PROCEDURES

NORMAL PROCEDURE - 60 + Testing time

SIMPLIFIED PROCEDURE - 30 + Expected

Test time

TATKAL PROCEDURE - 30 + Reduced Test

Time

Page 4: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

NORMAL PROCEDURE

Recording Of Application

Inspection By BIS

Sampling By BIS

Testing By BIS

All Is In Order

Grant Of Licence- No Review**

Page 5: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

NORMAL PROCEDURE

“a document specifying nationally or

internationally agreed properties of

manufactured goods, principles for

procedure, etc” – Oxford Dictionary

“a document, established by consensus

and approved by a recognized body, that

provides, for common and repeated use,

rules, guidelines or characteristics for

activities or their results” – ISO Guide 2

Sl. No Activity Time Norms under Normal Scheme

I Recording of application/ Rejection On the date of receipt of application

II Scrutiny of application + informing

discrepancies/ date of preliminary

inspection

Within 7 days after recording of application, the

concerned officer shall fix the date for preliminary

inspection within 15 days from the date of recording of

the application. The concerned officer shall also examine

the application and inform the applicant about any

deficiency / missing information, if any, in the application

and / or enclosures attached therewith. Applicant shall be

advised to ensure compliance and make

information/documents available during PI. No other

documents/information shall be insisted for before PI.

III Preliminary inspection visit By IO within 15 days of recording of application . In case

of request from the applicant for postponement of the

visit for preliminary inspection, such request shall be

granted up to a maximum period of another 15 days.

IV Submission of IR by IO to BO &

preparation of draft red form in case

pending actions are not required

By IO within 7 working days of recording of application

Page 6: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

NORMAL PROCEDURE

“a document specifying nationally or

internationally agreed properties of

manufactured goods, principles for

procedure, etc” – Oxford Dictionary

“a document, established by consensus

and approved by a recognized body, that

provides, for common and repeated use,

rules, guidelines or characteristics for

activities or their results” – ISO Guide 2

Sl.

No

Activity Time Norms under Normal Scheme

V Grant of licence, in case GOL is

based on factory testing

At the earliest possible

VI Deposit of sample to Sample

Cell of BO (in case GOL is

based on independent testing)

If carried by IO (light sample less than 10 Kg) by next

working day

If despatched by Courier/ Transporters IO to ensure

it reaches the concerned lab within 7 working days.

VII Completion of testing &

submission of report by Sample

Cell

Within time limits set for normal procedure. In case

no limit has been specified it shall be taken as 45 days

from the date of receipt by T&C as per the

acknowledgement by T&C.

VIII Grant of licence if the sample is

tested for all applicable

requirements & found

passing/communicate to

applicant in case of failure

Within 3/20 working days of uploading of TR by T&C.

(Normally IO shall put up the case within 3 days of

the receipt of TR adherence to time norms circular).

20 days have been allowed for BO to

approve/seek clarification/verification visits, if any,

from the applicant for deficiencies if any in PI/TRs and

clarifications are required from applicant).

Page 7: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

TATKAL PROCEDURE

Recording of application

Inspection by BIS

Sampling by BIS

Testing by BIS

All is in order

Grant of licence- no review**

Page 8: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

TATKAL PROCEDURE

“a document specifying nationally or

internationally agreed properties of

manufactured goods, principles for

procedure, etc” – Oxford Dictionary

“a document, established by consensus

and approved by a recognized body, that

provides, for common and repeated use,

rules, guidelines or characteristics for

activities or their results” – ISO Guide 2

Sl.

No

Activity Time Norms under Tatkal Licensing shceme

I Recording of application/ Rejection On the date of receipt of application

II Scrutiny of application + informing

discrepancies/ date of preliminary

inspection

Within 3 days after recording of application, the concerned

officer shall fix the date for preliminary inspection /

verification inspection within 15 days from the date of

recording of the application. The concerned

officer shall also examine the application and inform the

applicant about any deficiency / missing information, if any, in

the application and / or enclosures attached therewith.

Applicant shall be advised to ensure compliance and make

information/documents available during PI. No other

documents/information shall be insisted for before PI.

III Preliminary inspection visit By IO within 15 working days of recording of application. In

case of request from the applicant for postponement of the

visit for preliminary inspection / verification, such request

shall be granted up to a maximum period of another 7

days

IV Submission of IR by IO to BO By IO within 5 working days.

Page 9: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

TATKAL PROCEDURE

“a document specifying nationally or

internationally agreed properties of

manufactured goods, principles for

procedure, etc” – Oxford Dictionary

“a document, established by consensus

and approved by a recognized body, that

provides, for common and repeated use,

rules, guidelines or characteristics for

activities or their results” – ISO Guide 2

Sl.

No

Activity Time Norms under Tatkal Licensing shceme

V Grant of licence , in case GOL is

based on factory testing

At the earliest possible

VI Deposit of sample to Sample Cell of

BO (in case GOL is based on

independent testing)

If carried by IO (light sample less than 10 Kg) by next working

day

If despatched by Courier/ Transporters IO to ensure it

reaches the concerned lab within 5 working days.

VII Completion of testing & submission

of report by Sample Cell

Within time limits set for priority samples. In case no limit has

been specified it shall be taken as 45 days from the date of

receipt by T&C as per the acknowledgement by T&C.

VIII Grant of licence if the sample is

tested for all applicable requirements

& found passing/communicate to

applicant in case of failure

Within 10 working days of receipt of test report from in-

charge sample Cell.

(Normally IO shall put up the case within 3 days of the

receipt of TR (adherence to time norms circular). Additional

5 days have been allowed for BO to approve/seek clarification,

if any, from the applicant for deficiencies if any in TRs and

clarifications are required from applicant).

Page 10: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

TATKAL PROCEDURE

“a document specifying nationally or

internationally agreed properties of

manufactured goods, principles for

procedure, etc” – Oxford Dictionary

“a document, established by consensus

and approved by a recognized body, that

provides, for common and repeated use,

rules, guidelines or characteristics for

activities or their results” – ISO Guide 2

Sl.

No

Activity Time Norms under Tatkal Licensing shceme

V Grant of licence , in case GOL is

based on factory testing

At the earliest possible

VI Deposit of sample to Sample Cell of

BO (in case GOL is based on

independent testing)

If carried by IO (light sample less than 10 Kg) by next working

day

If despatched by Courier/ Transporters IO to ensure it

reaches the concerned lab within 5 working days.

VII Completion of testing & submission

of report by Sample Cell

Within time limits set for priority samples. In case no limit has

been specified it shall be taken as 45 days from the date of

receipt by T&C as per the acknowledgement by T&C.

VIII Grant of licence if the sample is

tested for all applicable requirements

& found passing/communicate to

applicant in case of failure

Within 10 working days of receipt of test report from in-

charge sample Cell.

(Normally IO shall put up the case within 3 days of the

receipt of TR (adherence to time norms circular). Additional

5 days have been allowed for BO to approve/seek clarification,

if any, from the applicant for deficiencies if any in TRs and

clarifications are required from applicant).

Page 11: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SIMPLIFIED PROCEDURE

Sampling By Applicant

Testing By Applicant

Recording Of Application

Inspection By BIS

sampling by BIS*

Grant Of Licence-

Testing By BIS*

Review of sample drawn*

All is in order- licence to continue

Page 12: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SIMPLIFIED PROCEDURE

Sl.

No

Activity Time Norms under Simplified Procedure

I Recording of application/

Rejection

On the date of receipt of application

II Scrutiny of application +

informing discrepancies/ date of

preliminary inspection

Within 15 days of recording of application, the concerned

officer shall fix the date and undertake the verification visit.

The concerned

officer shall complete also examine the application and inform

the applicant about any deficiency / missing information, if any,

in the application and / or enclosures attached therewith.

Applicant shall be advised to ensure compliance and make

information/documents available during verification visit. No

other documents/information shall be insisted for before

verification visit.

III Preliminary inspection visit By IO within 15 working days of recording of application. In

case of request from the applicant for postponement of the

visit for preliminary inspection / verification, such request shall

be granted up to a maximum period of another 7 days

IV Submission of IR by IO to BO By IO within 5 working days.

V Grant of licence Within 7 working days of receipt of IR

Page 13: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

BIS GUIDELINES

GUIDELINES FOR CERTIFICATION

OF DISTRIBUTION

TRANSFORMERS

Page 14: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SALIENT FEATURES

IS 1180 (P-1):2014

DTs have been categorized into

three groups based on their ratings:

◦ 3 Ф ( Sealed & Non-Sealed), up to & including

200kVA

◦ 3 Ф ( Sealed & Non-Sealed), above 200 kVA & up to

& including 2500kVA

◦ 1 Ф, sealed type, up to & including 25kVA

Page 15: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SALIENT FEATURES

IS 1180 (P-1):2014 – contd..

DTs have been divided into three

categories based on their Energy

Efficiency Levels:

◦ Energy Efficiency Level-I

◦ Energy Efficiency Level-II

◦ Energy Efficiency Level-III

Page 16: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SALIENT FEATURES

IS 1180 (P-1):2014 – contd..

DTs have been divided into two

types based on the construction:

◦ Non-Sealed Type– Provision for exchange of Air

between the transformer and Atmosphere, Having

breather and conservator

◦ Sealed Type- No provision for exchange of Air

between the transformer and Atmosphere, Does not

have a conservator

Page 17: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SAMPLING GUIDELINES

Nominal System

Voltage

Standard Ratings

Up to and including 200

kVA, 3 Phase Above 200kVA and up to

& including 2500 kVA, 3

Phase

3.3 kV One sample of highest

rating One sample of highest

rating

6.6 kV -do- -do-

11 kV -do- -do-

Above 11 kV &Up to

& including 22 kV -do- -do-

Above 22 kV & Up to

& including 33 kV -do- -do-

For 3-Phase Distribution Transformers

Page 18: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SAMPLING GUIDELINES

Nominal System

Voltage

Standard Ratings

11 kV One sample of highest rating

22 kV -do-

33 kV -do-

For 1-Phase Distribution Transformers

Page 19: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

SAMPLING GUIDELINES

contd..

Based on Basic Insulation Level (BIL) consideration

Separate samples for Sealed and Non-sealed type

Relaxation for lower energy efficiency levels, if higher energy efficiency level DT is tested and found passing

Page 20: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

CONFORMITY OF RAW

MATERIAL

◦ Compliance of CRGO Electrical Steel as per IS 3024(Clause 9.1 a)

◦ Compliance of Copper/Aluminium conductor (Clause 9.1 c)

◦ Compliance of Kraft Paper (Cl. 9.1 d), Press Board (Cl. 9.1 e) and Gasket (Cl. 15.4)

◦ Compliance of Transformer Oil (clause 10) as per IS 335

◦ Compliance of Bushings (clause 12) as per IS 2099 /7421 & relevant part of IS 3347

Page 21: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

CRGO Steel as per

IS 3024

Conventional Grain Oriented (CGO)

High Permeability Grain Oriented (HPGO)

Domain Refined (DR) in HPGO

16 BIS licences under operation in the world

7 licences having DR grade in the scope of licence

Page 22: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

TESTING FACILITIES

3 BIS Recognized Laboratories for IS

1180(Part 1)

◦ CPRI, Bangalore

◦ CPRI, Bhopal

◦ ERDA, Vadodra

Page 23: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

PRESENT APPLICATION

STATUS

A total of 33 applications had been

received as per 1989 version.

After amendment to the QC order,

the applicants have been informed to

take action for obtaining BIS licence

as per the 2014 version.

Page 24: Product Certification Licensing Procedure in BISieema.org/wp-content/uploads/2015/05/LFE_A_K_Maharana.pdf · procedure, etc” –theOxford Dictionary ... inspection within 15 days

THANK YOU

Central Marks Department-1

Bureau of Indian Standards

9, Bahadur Shah Zafar Marg

New Delhi – 110002

email: [email protected]