APPLICATION TO BIS
Apply to BIS in specified application form
Pay fees:
◦ Rs 1000.00 – APPLICATION FEES
◦ Rs 7000.00 – 1 DAY VISIT CHARGES
◦ Testing charge/Advance MF/Lic Fee- Optional
Get acknowledgement across the counter
along with application number
CM/A- XXXXXXX
PROCEDURES
NORMAL PROCEDURE - 60 + Testing time
SIMPLIFIED PROCEDURE - 30 + Expected
Test time
TATKAL PROCEDURE - 30 + Reduced Test
Time
NORMAL PROCEDURE
Recording Of Application
Inspection By BIS
Sampling By BIS
Testing By BIS
All Is In Order
Grant Of Licence- No Review**
NORMAL PROCEDURE
“a document specifying nationally or
internationally agreed properties of
manufactured goods, principles for
procedure, etc” – Oxford Dictionary
“a document, established by consensus
and approved by a recognized body, that
provides, for common and repeated use,
rules, guidelines or characteristics for
activities or their results” – ISO Guide 2
Sl. No Activity Time Norms under Normal Scheme
I Recording of application/ Rejection On the date of receipt of application
II Scrutiny of application + informing
discrepancies/ date of preliminary
inspection
Within 7 days after recording of application, the
concerned officer shall fix the date for preliminary
inspection within 15 days from the date of recording of
the application. The concerned officer shall also examine
the application and inform the applicant about any
deficiency / missing information, if any, in the application
and / or enclosures attached therewith. Applicant shall be
advised to ensure compliance and make
information/documents available during PI. No other
documents/information shall be insisted for before PI.
III Preliminary inspection visit By IO within 15 days of recording of application . In case
of request from the applicant for postponement of the
visit for preliminary inspection, such request shall be
granted up to a maximum period of another 15 days.
IV Submission of IR by IO to BO &
preparation of draft red form in case
pending actions are not required
By IO within 7 working days of recording of application
NORMAL PROCEDURE
“a document specifying nationally or
internationally agreed properties of
manufactured goods, principles for
procedure, etc” – Oxford Dictionary
“a document, established by consensus
and approved by a recognized body, that
provides, for common and repeated use,
rules, guidelines or characteristics for
activities or their results” – ISO Guide 2
Sl.
No
Activity Time Norms under Normal Scheme
V Grant of licence, in case GOL is
based on factory testing
At the earliest possible
VI Deposit of sample to Sample
Cell of BO (in case GOL is
based on independent testing)
If carried by IO (light sample less than 10 Kg) by next
working day
If despatched by Courier/ Transporters IO to ensure
it reaches the concerned lab within 7 working days.
VII Completion of testing &
submission of report by Sample
Cell
Within time limits set for normal procedure. In case
no limit has been specified it shall be taken as 45 days
from the date of receipt by T&C as per the
acknowledgement by T&C.
VIII Grant of licence if the sample is
tested for all applicable
requirements & found
passing/communicate to
applicant in case of failure
Within 3/20 working days of uploading of TR by T&C.
(Normally IO shall put up the case within 3 days of
the receipt of TR adherence to time norms circular).
20 days have been allowed for BO to
approve/seek clarification/verification visits, if any,
from the applicant for deficiencies if any in PI/TRs and
clarifications are required from applicant).
TATKAL PROCEDURE
Recording of application
Inspection by BIS
Sampling by BIS
Testing by BIS
All is in order
Grant of licence- no review**
TATKAL PROCEDURE
“a document specifying nationally or
internationally agreed properties of
manufactured goods, principles for
procedure, etc” – Oxford Dictionary
“a document, established by consensus
and approved by a recognized body, that
provides, for common and repeated use,
rules, guidelines or characteristics for
activities or their results” – ISO Guide 2
Sl.
No
Activity Time Norms under Tatkal Licensing shceme
I Recording of application/ Rejection On the date of receipt of application
II Scrutiny of application + informing
discrepancies/ date of preliminary
inspection
Within 3 days after recording of application, the concerned
officer shall fix the date for preliminary inspection /
verification inspection within 15 days from the date of
recording of the application. The concerned
officer shall also examine the application and inform the
applicant about any deficiency / missing information, if any, in
the application and / or enclosures attached therewith.
Applicant shall be advised to ensure compliance and make
information/documents available during PI. No other
documents/information shall be insisted for before PI.
III Preliminary inspection visit By IO within 15 working days of recording of application. In
case of request from the applicant for postponement of the
visit for preliminary inspection / verification, such request
shall be granted up to a maximum period of another 7
days
IV Submission of IR by IO to BO By IO within 5 working days.
TATKAL PROCEDURE
“a document specifying nationally or
internationally agreed properties of
manufactured goods, principles for
procedure, etc” – Oxford Dictionary
“a document, established by consensus
and approved by a recognized body, that
provides, for common and repeated use,
rules, guidelines or characteristics for
activities or their results” – ISO Guide 2
Sl.
No
Activity Time Norms under Tatkal Licensing shceme
V Grant of licence , in case GOL is
based on factory testing
At the earliest possible
VI Deposit of sample to Sample Cell of
BO (in case GOL is based on
independent testing)
If carried by IO (light sample less than 10 Kg) by next working
day
If despatched by Courier/ Transporters IO to ensure it
reaches the concerned lab within 5 working days.
VII Completion of testing & submission
of report by Sample Cell
Within time limits set for priority samples. In case no limit has
been specified it shall be taken as 45 days from the date of
receipt by T&C as per the acknowledgement by T&C.
VIII Grant of licence if the sample is
tested for all applicable requirements
& found passing/communicate to
applicant in case of failure
Within 10 working days of receipt of test report from in-
charge sample Cell.
(Normally IO shall put up the case within 3 days of the
receipt of TR (adherence to time norms circular). Additional
5 days have been allowed for BO to approve/seek clarification,
if any, from the applicant for deficiencies if any in TRs and
clarifications are required from applicant).
TATKAL PROCEDURE
“a document specifying nationally or
internationally agreed properties of
manufactured goods, principles for
procedure, etc” – Oxford Dictionary
“a document, established by consensus
and approved by a recognized body, that
provides, for common and repeated use,
rules, guidelines or characteristics for
activities or their results” – ISO Guide 2
Sl.
No
Activity Time Norms under Tatkal Licensing shceme
V Grant of licence , in case GOL is
based on factory testing
At the earliest possible
VI Deposit of sample to Sample Cell of
BO (in case GOL is based on
independent testing)
If carried by IO (light sample less than 10 Kg) by next working
day
If despatched by Courier/ Transporters IO to ensure it
reaches the concerned lab within 5 working days.
VII Completion of testing & submission
of report by Sample Cell
Within time limits set for priority samples. In case no limit has
been specified it shall be taken as 45 days from the date of
receipt by T&C as per the acknowledgement by T&C.
VIII Grant of licence if the sample is
tested for all applicable requirements
& found passing/communicate to
applicant in case of failure
Within 10 working days of receipt of test report from in-
charge sample Cell.
(Normally IO shall put up the case within 3 days of the
receipt of TR (adherence to time norms circular). Additional
5 days have been allowed for BO to approve/seek clarification,
if any, from the applicant for deficiencies if any in TRs and
clarifications are required from applicant).
SIMPLIFIED PROCEDURE
Sampling By Applicant
Testing By Applicant
Recording Of Application
Inspection By BIS
sampling by BIS*
Grant Of Licence-
Testing By BIS*
Review of sample drawn*
All is in order- licence to continue
SIMPLIFIED PROCEDURE
Sl.
No
Activity Time Norms under Simplified Procedure
I Recording of application/
Rejection
On the date of receipt of application
II Scrutiny of application +
informing discrepancies/ date of
preliminary inspection
Within 15 days of recording of application, the concerned
officer shall fix the date and undertake the verification visit.
The concerned
officer shall complete also examine the application and inform
the applicant about any deficiency / missing information, if any,
in the application and / or enclosures attached therewith.
Applicant shall be advised to ensure compliance and make
information/documents available during verification visit. No
other documents/information shall be insisted for before
verification visit.
III Preliminary inspection visit By IO within 15 working days of recording of application. In
case of request from the applicant for postponement of the
visit for preliminary inspection / verification, such request shall
be granted up to a maximum period of another 7 days
IV Submission of IR by IO to BO By IO within 5 working days.
V Grant of licence Within 7 working days of receipt of IR
BIS GUIDELINES
GUIDELINES FOR CERTIFICATION
OF DISTRIBUTION
TRANSFORMERS
SALIENT FEATURES
IS 1180 (P-1):2014
DTs have been categorized into
three groups based on their ratings:
◦ 3 Ф ( Sealed & Non-Sealed), up to & including
200kVA
◦ 3 Ф ( Sealed & Non-Sealed), above 200 kVA & up to
& including 2500kVA
◦ 1 Ф, sealed type, up to & including 25kVA
SALIENT FEATURES
IS 1180 (P-1):2014 – contd..
DTs have been divided into three
categories based on their Energy
Efficiency Levels:
◦ Energy Efficiency Level-I
◦ Energy Efficiency Level-II
◦ Energy Efficiency Level-III
SALIENT FEATURES
IS 1180 (P-1):2014 – contd..
DTs have been divided into two
types based on the construction:
◦ Non-Sealed Type– Provision for exchange of Air
between the transformer and Atmosphere, Having
breather and conservator
◦ Sealed Type- No provision for exchange of Air
between the transformer and Atmosphere, Does not
have a conservator
SAMPLING GUIDELINES
Nominal System
Voltage
Standard Ratings
Up to and including 200
kVA, 3 Phase Above 200kVA and up to
& including 2500 kVA, 3
Phase
3.3 kV One sample of highest
rating One sample of highest
rating
6.6 kV -do- -do-
11 kV -do- -do-
Above 11 kV &Up to
& including 22 kV -do- -do-
Above 22 kV & Up to
& including 33 kV -do- -do-
For 3-Phase Distribution Transformers
SAMPLING GUIDELINES
Nominal System
Voltage
Standard Ratings
11 kV One sample of highest rating
22 kV -do-
33 kV -do-
For 1-Phase Distribution Transformers
SAMPLING GUIDELINES
contd..
Based on Basic Insulation Level (BIL) consideration
Separate samples for Sealed and Non-sealed type
Relaxation for lower energy efficiency levels, if higher energy efficiency level DT is tested and found passing
CONFORMITY OF RAW
MATERIAL
◦ Compliance of CRGO Electrical Steel as per IS 3024(Clause 9.1 a)
◦ Compliance of Copper/Aluminium conductor (Clause 9.1 c)
◦ Compliance of Kraft Paper (Cl. 9.1 d), Press Board (Cl. 9.1 e) and Gasket (Cl. 15.4)
◦ Compliance of Transformer Oil (clause 10) as per IS 335
◦ Compliance of Bushings (clause 12) as per IS 2099 /7421 & relevant part of IS 3347
CRGO Steel as per
IS 3024
Conventional Grain Oriented (CGO)
High Permeability Grain Oriented (HPGO)
Domain Refined (DR) in HPGO
16 BIS licences under operation in the world
7 licences having DR grade in the scope of licence
TESTING FACILITIES
3 BIS Recognized Laboratories for IS
1180(Part 1)
◦ CPRI, Bangalore
◦ CPRI, Bhopal
◦ ERDA, Vadodra
PRESENT APPLICATION
STATUS
A total of 33 applications had been
received as per 1989 version.
After amendment to the QC order,
the applicants have been informed to
take action for obtaining BIS licence
as per the 2014 version.
THANK YOU
Central Marks Department-1
Bureau of Indian Standards
9, Bahadur Shah Zafar Marg
New Delhi – 110002
email: [email protected]