product case history -...

3
Product Case History PROJECT DESCRIPTION: Somerset Hydro Electric Station contains 8 gates measuring 2.44 x 3.66 wide, which facilitate the generation of 4 megawatts of power from the Somerset Lake (133,000 hectares). The gates & tunnel were completed some 15 years ago by Altex and were due for a maintenance repaint. All products and equipment had to be brought in along the en-trance tunnel, which is only approx. 2m high x1.5m wide and some 150m long. COATING SELECTION EXPLANATION: SYSTEM: Gates: 2 x full coats of Carboguard 690, with all bolts being brush applied. Tunnel: 7.0m section steel coated with Carboguard 690 EXPOSURE: One side of the gates immersed when the gates are closed. When the gates are opened, the tunnel is immersed. www.carboline.com December 2019 Somerset Dam - Sluice Gates LOCATION: Queensland, Australia DATE OF APPLICATION: June 2017 MARKET: Water & Wastewater PROJECT SIZE: 0 Square Meters AREA COATED: Sluice Gates SUBSTRATE: Steel SURFACE PREP: SSPC-SP 10 (Near White Blast) PRODUCTS: Carboguard 690

Upload: others

Post on 08-Sep-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Product Case History - msds.carboline.commsds.carboline.com/servlet/FeedFile/3/live/3055/CaseHistory.pdf · Product Case History PROJECT DESCRIPTION: Somerset Hydro Electric Station

Product Case HistoryPROJECT DESCRIPTION:Somerset Hydro Electric Stationcontains 8 gates measuring 2.44x 3.66 wide, which facilitate thegeneration of 4 megawatts of powerfrom the Somerset Lake (133,000hectares).

The gates & tunnel were completedsome 15 years ago by Altex and weredue for a maintenance repaint.

All products and equipment had to bebrought in along the en-trance tunnel,which is only approx. 2m high x1.5mwide and some 150m long.

COATING SELECTIONEXPLANATION:SYSTEM:

Gates: 2 x full coats of Carboguard690, with all bolts being brush applied.

Tunnel: 7.0m section steel coated withCarboguard 690

EXPOSURE:

One side of the gates immersed whenthe gates are closed. When the gatesare opened, the tunnel is immersed.

www.carboline.com December 2019

Somerset Dam - Sluice GatesLOCATION: Queensland, Australia

DATE OF APPLICATION: June 2017

MARKET: Water & Wastewater

PROJECT SIZE: 0 Square Meters

AREA COATED: Sluice Gates

SUBSTRATE: Steel

SURFACE PREP: SSPC-SP 10 (Near White Blast)

PRODUCTS: Carboguard 690

Page 2: Product Case History - msds.carboline.commsds.carboline.com/servlet/FeedFile/3/live/3055/CaseHistory.pdf · Product Case History PROJECT DESCRIPTION: Somerset Hydro Electric Station

Somerset Dam - Sluice Gates

www.carboline.com December 2019

AREA COATED: Tunnel

SUBSTRATE: Steel

SURFACE PREP: SSPC-SP 10 (Near White Blast)

PRODUCTS: Carboguard 690

Page 3: Product Case History - msds.carboline.commsds.carboline.com/servlet/FeedFile/3/live/3055/CaseHistory.pdf · Product Case History PROJECT DESCRIPTION: Somerset Hydro Electric Station

Somerset Dam - Sluice Gates

www.carboline.com December 2019

ADDITIONAL PHOTOS: