produced water from coalbed methane production: water law issues and developments
DESCRIPTION
PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS. Zach C. Miller Davis Graham & Stubbs LLP Denver, Colorado December 14, 2007. TWO PENDING CBM WATER LAW CASES. COLORADO – VANCE v. SIMPSON Ruling Against State Engineer – July 2007 - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/1.jpg)
PRODUCED WATER FROM COALBED METHANE PRODUCTION:
WATER LAW ISSUES AND DEVELOPMENTS
Zach C. MillerDavis Graham & Stubbs LLP
Denver, Colorado
December 14, 2007
![Page 2: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/2.jpg)
TWO PENDING CBM WATER LAW CASES
COLORADO – VANCE v. SIMPSON• Ruling Against State Engineer – July 2007• Supreme Court Appeal Pending
WYOMING – WEST v. TYRELL• Filed June 2007• Early Stages
![Page 3: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/3.jpg)
![Page 4: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/4.jpg)
![Page 5: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/5.jpg)
![Page 6: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/6.jpg)
![Page 7: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/7.jpg)
![Page 8: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/8.jpg)
SEO/DWR CBM STREAM DEPLETION STUDIES
• San Juan Basin– Final Report – May 2006– Est. Depletions: 56 AF O/P; 150 AF Total
• Raton Basin– Draft Report – Nov. 2007
• Piceance Basin – Pending• On SEO Website
![Page 9: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/9.jpg)
![Page 10: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/10.jpg)
![Page 11: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/11.jpg)
![Page 12: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/12.jpg)
![Page 13: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/13.jpg)
![Page 14: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/14.jpg)
![Page 15: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/15.jpg)
STATE ENGINEER’S OFFICE/DWR REGULATES:
• Permitting of Water Wells• Administration of Tributary Water Rights in
Priority• Approval of Substitute Supply Plans• Prevention of Material Injury to Water
Rights from Non-Water Right Water Diversions
• Conferral in Water Court Matters
![Page 16: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/16.jpg)
![Page 17: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/17.jpg)
ROLE OF WATER COURT
• Designated District Court in River Basin• Exclusive Jurisdiction Over “Water Matters”• Decree New or Changed Water Rights• Approve Augmentation Plans• Prevent Material Injury to Water Rights
![Page 18: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/18.jpg)
COLORADO WATER LAW PRIMER• Prior Appropriation Doctrine: First in Time, First in
Right• “Beneficial Use” = “Appropriation” = “Water Right”• Administered in Priority When Shortages• SEO Authority to Issue Well Permits• SEO Authority to Prevent Material Injury• Augmentation and Substitute Supply Plans• Water Court Approval of New or Changed Rights
and Augmentation Plans
![Page 19: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/19.jpg)
SPECIAL STATUS OF “NONTRIBUTARY” GROUND WATER
• Not Deplete Natural Stream At Annual Rate > 0.1% of Annual Rate of Withdrawal in 100 Years
• Presumed Tributary Unless Rebutted• Governed Solely By Statute• Not Subject to Prior Appropriation Doctrine• Generally Allocated by Overlying Land Ownership• Generally Need SEO Well Permit• Special Mineral Extraction Statute: Not Need
SEO Permit “Unless Water Will be Beneficially Used” (37-90-137(7)
![Page 20: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/20.jpg)
![Page 21: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/21.jpg)
![Page 22: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/22.jpg)
![Page 23: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/23.jpg)
VANCE v. SIMPSON CASE
• Dec. Jdmt. Action in Div. 7 Water Court
• Filed December 2005
• Two Landowners vs. State Engineer
• Intervenor: BP America Production Co.
![Page 24: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/24.jpg)
VANCE PLAINTIFFS’ CLAIMS
• CBM Produced Water Withdrawal = “Beneficial Use”
• Ergo, CBM Well = Water “Well” Requiring SEO Permit
• Water Court Decree and Aug. Plans Required
• SEO Must Curtail Pumping Until Permits Issued
![Page 25: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/25.jpg)
VANCE CASE COVERAGE AND EXCLUSIONS
• Only CBM Wells in Water Division 7 (San Juan River Basin)
• CBM Wells Within So. Ute Reservation With Any Tribal Interest Are Excluded/Not Covered
![Page 26: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/26.jpg)
WATER COURT SJ RULING – 7/07
• COGCC Not Have Exclusive Jurisdiction/Authority• CBM Produced Water Withdrawal = “Beneficial
Use”• SEO Required to Issue Water Well Permits• Aug. or Supply Plans Required Where/When Out of
Priority• Presume Produced Water Is Tributary Unless
Proven Nontributary• No Deference to SEO Guidance Documents• Granted “Relief Requested In Complaint”• Silent Re Nontrib and Tribal Wells
![Page 27: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/27.jpg)
POST-DECISION STATUS• Direct Supreme Court Appeal by State & BP• Ruling Stayed by WC Pending Appeal• WC Declined to Clarify Ruling, Except Costs• Cost Claim Pending• Appeal Not Briefed• Designation of Record
![Page 28: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/28.jpg)
PRESENT EFFECT OF WC RULING
• Ruling Stayed Pending Supreme Court Decision• Not Cover/Address:
– CBM Wells with So. Ute Interests– CBM Wells Outside San Juan Basin– Non-CBM Oil and Gas Wells
• Precedential Effect or Supreme Court Ruling?• Possible Legislative Fix?
– Cf. Gravel Pit Case/Statute• To Be Continued!
![Page 29: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/29.jpg)
WEST v. TYRELL LAWSUIT - WYOMING
• Dec. Jdmt Action Filed June 2007• 2 Landowners v. State Engineer• Intervenors (Pending): Devon & Pennaco• Hearing on Disputed Intervention• “Flip-Side” of Vance Case
![Page 30: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/30.jpg)
WYOMING SEO POLICY/PRACTICE – 4/04
• Consider CBM Produced Water Withdrawal a “Beneficial Use” and Require Water Permit
• Water Permits Generally Issued Without Aug. Plans and No Court Involvement
• Simpler/Quicker Permit Processing Than Colorado
![Page 31: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/31.jpg)
WEST PLAINTIFFS’ CLAIMS• WY Constitution: No Appropriation Shall Be
Denied, “Except When Such Denial Is Demanded By The Public Interest”
• SEO Fails to Evaluate “Public Interest”• SEO Must Require No-Injury Proof• SEO Must Provide for Public Comment and
Hearing• SEO Must Pass Rules for CBM Water Permits
![Page 32: PRODUCED WATER FROM COALBED METHANE PRODUCTION: WATER LAW ISSUES AND DEVELOPMENTS](https://reader035.vdocuments.mx/reader035/viewer/2022062501/56816773550346895ddc636b/html5/thumbnails/32.jpg)
OTHER WATER-RELATED DEVELOPMENTS
• Proposed New COGCC Rules– Water Monitoring and Protection
• Wyoming CBM Task Force– Drainage Ditch Legislation
• EPA CBM ELG-Setting Project– Voluntary/Mandatory “Surveys”– Critical to Provide Input
• Colorado Water Legislation?• Keep a Close Watch On!