ASX ANNOUNCEMENT 9 July 2020 Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000, Australia Tel. +61 8 6559 5800 | Email: [email protected] | so4.com.au | ABN 98 117 085 748 PROCUREMENT UPDATE Salt Lake Potash Limited (SO4 or the Company) is pleased to provide an update on procurement, with all major long-lead items for the process plant and non-process infrastructure tracking in line with or ahead of the project schedule. HIGHLIGHTS The Lake Way Project is now over 90% procured with all key vendor contracts executed. There are no known impacts to schedule from COVID-19. The largest procurement package, the process plant crystalliser, commenced transit to Australia at the end of June and is expected to arrive at Fremantle Port in late July, weeks ahead of schedule. Other major plant components including centrifuges, attritioners, floatation cells, sizing screens, thickeners, rotary drier, impact crushers, lump breakers and conveyer belts have all been ordered. Over coming weeks structural steel will start being erected onsite and a number of key plant components will arrive. The Project remains on track for first SOP sales in the March 2021 quarter. TONY SWIERICZUK, Chief Executive Officer During the June quarter our procurement and engineering teams have been busy finalising contracts with suppliers and completing detailed engineering of the plant and non process infrastructure. So far we have seen no impact to the project schedule from COVID-19 as we push towards first production in the March quarter of next year.” This announcement has been authorised for release by the Managing Director, Mr Tony Swiericzuk. ENQUIRIES Tony Swiericzuk | Richard Knights Telephone: +61 (8) 6559 5800

Upload: others

Post on 10-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROCUREMENT UPDATE HIGHLIGHTS - investi · 2020. 7. 8. · ASX ANNOUNCEMENT 9 July 2020 Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000,

ASX ANNOUNCEMENT 9 July 2020

Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000, Australia

Tel. +61 8 6559 5800 | Email: [email protected] | so4.com.au | ABN 98 117 085 748

PROCUREMENT UPDATE

Salt Lake Potash Limited (SO4 or the Company) is pleased to provide an update on

procurement, with all major long-lead items for the process plant and non-process

infrastructure tracking in line with or ahead of the project schedule.

HIGHLIGHTS

The Lake Way Project is now over 90% procured with all key vendor contracts executed.

There are no known impacts to schedule from COVID-19.

The largest procurement package, the process plant crystalliser, commenced transit to

Australia at the end of June and is expected to arrive at Fremantle Port in late July, weeks

ahead of schedule.

Other major plant components including centrifuges, attritioners, floatation cells, sizing

screens, thickeners, rotary drier, impact crushers, lump breakers and conveyer belts have all

been ordered.

Over coming weeks structural steel will start being erected onsite and a number of key plant

components will arrive.

The Project remains on track for first SOP sales in the March 2021 quarter.

TONY SWIERICZUK, Chief Executive Officer

“During the June quarter our procurement and engineering teams have been busy finalising

contracts with suppliers and completing detailed engineering of the plant and non process

infrastructure. So far we have seen no impact to the project schedule from COVID-19 as we push

towards first production in the March quarter of next year.”

This announcement has been authorised for release by the Managing Director, Mr Tony Swiericzuk.

ENQ UI RIES

Tony Swiericzuk | Richard Knights

Telephone: +61 (8) 6559 5800

Page 2: PROCUREMENT UPDATE HIGHLIGHTS - investi · 2020. 7. 8. · ASX ANNOUNCEMENT 9 July 2020 Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000,

AS X AN N OU N C EM EN T 9 J u l y 2 0 2 0

2 S A L T L A K E P O T A S H L T D

KEY PLANT COMPONENTS PROCURED

Figure 1: Crystalliser loading onto ship in Guangdong province, China

Page 3: PROCUREMENT UPDATE HIGHLIGHTS - investi · 2020. 7. 8. · ASX ANNOUNCEMENT 9 July 2020 Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000,

AS X AN N OU N C EM EN T 9 J u l y 2 0 2 0

3 S A L T L A K E P O T A S H L T D

Figure 2: Crystalliser components in ship hold

Figure 3: Crystalliser components in ship hold

Page 4: PROCUREMENT UPDATE HIGHLIGHTS - investi · 2020. 7. 8. · ASX ANNOUNCEMENT 9 July 2020 Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000,

AS X AN N OU N C EM EN T 9 J u l y 2 0 2 0

4 S A L T L A K E P O T A S H L T D

Figure 4: Rotary dryer on factory floor in Green Bay, Wisconsin, USA

Figure 5: Drive assemblies for the Attritioner Cell being assembled in Puslinch, Ontario, Canada

Page 5: PROCUREMENT UPDATE HIGHLIGHTS - investi · 2020. 7. 8. · ASX ANNOUNCEMENT 9 July 2020 Salt Lake Potash Limited | ASX/AIM SO4 | Ground Floor, 239 Adelaide Terrace, Perth WA 6000,

AS X AN N OU N C EM EN T 9 J u l y 2 0 2 0

5 S A L T L A K E P O T A S H L T D

Figure 6: Centrifuges in Huddersfield, Yorkshire, United Kingdom

Forward Looking Statements

This announcement may include forward-looking statements. These forward-looking statements are based on Salt Lake

Potash Limited’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject

to risks, uncertainties and other factors, many of which are outside the control of Salt Lake Potash Limited, which could

cause actual results to differ materially from such statements. Salt Lake Potash Limited makes no undertaking to

subsequently update or revise the forward-looking statements made in this announcement, to reflect the circumstances or

events after the date of that announcement.