processing evaluation of sirgassirgas--con …
TRANSCRIPT
PROCESSING EVALUATION OF PROCESSING EVALUATION OF SIRGASSIRGAS--CON NETWORK BY IBGE CON NETWORK BY IBGE
ANALYSIS CENTERANALYSIS CENTERSonia Maria Alves Costa
Alberto Luis da SilvaJhonnes Alberto Vaz
IAG2009 04/09/2009 – Buenos Aires / Argentina
ContentContent
� Motivation
� SIRGAS-CON Network
� SIRGAS Analysis Centres
� Processing Strategy� Processing Strategy
� Results
� Time Series of Coordinates
� Summary and Future Work
MotivationMotivation
� IBGE is responsible for the definition, maintenance and
provide the access to the National Spatial Reference System
���� Brazilian Geodetic System - SGB ;
� 1997: Started the establishment of the active geodetic
network ���� Brazilian Network for Continuous Monitoring of
GNSS (RBMC) ���� The main Reference Frame in the country
� 2005: Adoption of Geocentric Reference System for the
Americas – SIRGAS, SIRGAS2000
� 2006: Network expansion from 24 to 66 (july 2009)
SIRGAS Processing CenterSIRGAS Processing Center–– IBGEIBGE
� The network maintenance and control is done through the
daily data processing.
� Monitoring the temporal variation of the coordinate s
together with the data quality;
� Data processing since January 2003 (GPS week 1199);
� Software: Bernese GPS Software 5.0 – BPE;
� Results: Daily and weekly (combined) loosely constrained
solutions in SINEX format (IBG wwww 7.SNX).
SIRGASSIRGAS--CON NetworkCON Network
� Currently, SIRGAS Reference Frame is realized by a
network of continuously operating GNSS stations with
high precision coordinates (associated to a specific
reference epoch) and their changes over time (station
velocities)velocities)
� Composed of more than 190 stations, (46 are part of the
IGS network).
� SIRGAS Analysis Centers: american institutions with the
task to provide control of the permanent stations and
maintenance of SIRGAS Reference Frame;
SIRGAS Analysis CentersSIRGAS Analysis Centers
�Local Processing Centers:
� Instituto Brasileiro de Geografia e Estatística - IB GE;
� Instituto Geográfico Agustín Codazzi – IGAC;
� Instituto de Geodésia e Geodinâmica da Universidade
Nacional de Cuyo, IGG -CIMA;Nacional de Cuyo, IGG -CIMA;
�IGS Regional Analysis Center – IGS-RNAAC-SIR:
� Deutsches Geodätisches Forschungsintitut – DGFI;
�Combination Centers:
� Instituto Brasileiro de Geografia e Estatística – IB GE;
� Deutsches Geodätisches Forschungsintitut – DGFI;
SIRGASSIRGAS--CON NetworkCON Network
� Due to the increasing number of SIRGAS-CON stations, it
was divided in two levels :
� (1) SIRGAS-CON-C ����Core network, the densification of the
ITRF in Latin America, with stable fundamental stations tha t
guarantee the consistency and precision of SIRGAS over
time.
� (2) SIRGAS-CON-D ���� a network composed of several
national densifications, including the reference station s of
SIRGAS-CON-C.
� SIRGAS-CON Realization
(status : August 2009)
Source: www.sirgas.org www.sirgas.org
SIRGAS Analysis Centers (2/2)SIRGAS Analysis Centers (2/2)
�Experimental Processing Centers:
� Serviço Geográfico Militar do Uruguai – SGM-UY;
� Laboratório de Geodésia Física e Satelital, Univers idade
de Zulia – LGFS-LUZ;
� Instituto Geográfico Militar do Equador, IGM -Ec;� Instituto Geográfico Militar do Equador, IGM -Ec;
� Instituto Nacional de Estatística e Geografia, INEG I
(México)
� Instituto Geográfico Nacional da Argentina (IGN-Ar)
� > 100 stations:
31 IGS stations
> 70 regional stations
Currently Processed Stations - IBGE
Zenith delay estimated each 2 hours (12 daily corrections p/station)
Zenith delay estimated each 2 hours (12 daily corrections p/station)
Troposphere
Niell dry componentNiell dry componentA priori troposphere model
IGS final - IGS05EOP week
IGS final - ITRF2000/IGb00EOP week
Orbits/EOP
SHORTESTSHORTESTBaseline formation strategy
03º10ºElevation angle
30 sec30 secSampling rate
Bernese 5.0 ( BPE mode)Bernese 5.0 ( BPE mode)Software used
Double DifferenceDouble DifferenceObservations
After week 1400Week 1199 to 1400Processing Date
Processing Strategy
All stations constrained (σσσσ=±±±±1m)OUTPUT FILES: SINEX
4 IGS stations - (BRAZ, LPGS, RIOG and SANT) are used to constrain the weekly solution(σσσσ=±±±±1mm)OUTPUT FILES: SINEX
Weekly solutions
Constraint all the stations (σσσσ=±±±±1m)OUTPUT FILES: SINEX
Constraint solution in station BRAZ (σσσσ=±±±±1mm)OUTPUT FILES: SINEX
Daily solutions
IGS05_RIGSb00Coordinates and Velocities
Absolute (IGS_05)Absolute (IGS_05) and RelativePhase Center Variation
FES2004GOT00.2Ocean Loading Model
QIF strategy with GIM from CODEQIF strategy with GIM from CODEAmbiguity
daily corrections p/station)A priori sigmas applied with respect to prediction model Niell(wet component)-first parameter +/- 5 m absolute and +/-5 cm relative
daily corrections p/station)A priori sigmas applied with respect to prediction model Niell(wet component)-first parameter +/- 5 m absolute and +/- 5 cm relative
East
6
8
10
(mm
)
North
0
2
4
6
8
10
1495
1497
1499
1501
1503
1505
1507
1509
1511
1513
1515
1517
1519
1521
1523
1525
1527
1529
1531
1533
1535
GPS week
(mm
)
Residuals RMS (weekly solutions) – IBGE X IGS05
North
East
1 mm
Up
0
2
4
6
8
10
1495
1497
1499
1501
1503
1505
1507
1509
1511
1513
1515
1517
1519
1521
1523
1525
1527
1529
1531
1533
1535
GPS week
(mm
)
0
2
4
6
1495
1497
1499
1501
1503
1505
1507
1509
1511
1513
1515
1517
1519
1521
1523
1525
1527
1529
1531
1533
1535
GPS week
(mm
)
Up
2 mm
5 mm
Residuals RMS (weekly solutions) – IBGE X DGFI
Weekly Root Mean Square ���� IBGE X DGFI
North
East
2 mm
Up
GPS week
2 mm
4 mm
Residuals RMS (weekly solutions) – IBGE X CIMAWeekly Root Mean Square ���� IBGE X CIMA
North
East
2 mm
2 mm
Up
GPS week
2 mm
4 mm
Residuals RMS (weekly solutions) – IBGE X IGAC
Weekly R oot M ean Square ���� IBGE X IGAC
North
East
2 mm
GPS week
Up
2 mm
4 mm
Estimated VelocitiesEstimated VelocitiesRIOD
SANT
Estimated VelocitiesEstimated Velocities�IBGE X VEMOS:
What is our interest ?What is our interest ?
�Seasonal movements;
�Local behavior (monument stability);
�Discontinuities or jumps in the coordinates time se ries;�Discontinuities or jumps in the coordinates time se ries;
Time Series – station POAL
Horizontal difference before and after antenna change = 1,7 cm
Time Series – station VARG
North
East
Horizontal difference First jump ~ 2,5 cm
Second jump ~ 4,4 cm
GPS week
East
Up
?
Time Series – station UBAT
North
East
Horizontal difference First jump ~ 4 cm
?Up
GPS week
Time Series – station NAUS
East
North
Up
East
GPS week
Distance between two stations
����
13 km
����
13 km
GPS
-4,0
-3,0
-2,0
-1,0
0,0
1,0
2,0
3,0
4,0
5,0
28/12/2005 28/06/2006 28/12/2006 28/06/2007 28/12/2007 28/06/2008 28/12/2008
Var
iaçã
o (c
m)
Linígrafo
-800,0
-600,0
-400,0
-200,0
0,0
200,0
400,0
600,0
800,0
28/12/2005 28/06/2006 28/12/2006 28/06/2007 28/12/2007 28/06/2008 28/12/2008
Var
iaçã
o (c
m)
Time Series – NAUS x hydrometric station
28/12/2005 28/06/2006 28/12/2006 28/06/2007 28/12/2007 28/06/2008 28/12/2008
Data
28/12/2005 28/06/2006 28/12/2006 28/06/2007 28/12/2007 28/06/2008 28/12/2008
Data
Linígrafo x GPS
28/12/2005 28/06/2006 28/12/2006 28/06/2007 28/12/2007 28/06/2008 28/12/2008
Data
Var
iaçã
o (c
m)
Linígrafo
GPS
Linígrafo x GPS - (Normalizado entre 1 e -1)
-1,0
-0,6
-0,2
0,2
0,6
1,0
28/12/2005 28/06/2006 28/12/2006 28/06/2007 28/12/2007 28/06/2008 28/12/2008
Data
Var
iaçã
o (c
m)
Linígrafo
GPS
~ 13 km
∆h ~ 8 cm / ano
Time Series – NAUS x hydrometric station
∆N ~ 12 m / ano
ResultsResults :: ftp://geoftp.ibge.gov.br/SIRGAS/
EXPERIMENTALEXPERIMENTAL
GraficosGraficos
CombinacaoCombinacao
Plots of the stations ´́́́time series and velocity
estimation
weekly report
weekly report from the combination
RelatoriosRelatorios
ResultadosResultados
SINEX (loosely)
CombinacaoCombinacaoProcessamentoProcessamento
CombinacaoCombinacaoProcessamentoProcessamento
SINEX (loosely and constrained)
weekly report
annual report
SummarySummary
� GPS processing is essential for the reference frame control
and maintenance;
� Results are consistent with the other processing centers;
� The velocity vectors and the temporal behavior of each
station will be better defined and reliable, due to thestation will be better defined and reliable, due to the
increasing number of processed weeks
FutureFuture WorkWork
�New processing strategy (ambiguities resolution)�website;
Thank you for your attention!Thank you for your attention!
For more information: [email protected] more information: [email protected]
www.ibge.gov.br
IAG2009 04/09/2009 – Buenos Aires / Argentina