III. Major Experiences
▪ Equipment
▪ Skid & Module
▪ Construction
▪ Filter Housing
▪ Experience List
I. COMPANY INTRODUCTION
PTK CO.,LTD
Company PTK CO., LTD CEO Kee-beum, Park
Foundation Aug. 01, 2000 Capital 1M US$ (2020)
Employees 80 persons Sales 40M US$ (2019)
Head Office632, Namyangman-ro, Ujeong-eup,
Hwasung-si, Gyeonggi-doWebsite www.ptk.co.kr
I. COMPANY INTRODUCTION
OVERVIEW
■ 1st Factory (Head Office)
Site Area : 11,805m²
Building Area : 2,410m²
Outdoor Area : 9,395m²
■ 2nd Factory
Site Area : 14,046m²
Building Area : 4,560m²
Outdoor Area : 9,486m²
PTK CO.,LTD
2019. 02 New 2nd-Factory in Operation, Located in Jangan-myeon Hwaseong-si
2018. 10 Renewal of ASME “U, U2” Certification (Initially certified in Nov. 2006)
2018. 04Renewal of Certifications : OHSAS 18001(Safety Management) & ISO 9001 & 14001.(Initially Certified in Nov. 2004)
2017. 02 ‘Bio Business Team’ Organized
2016. 12Selected as a Partner for tasks : ‘Development of Coal Syngas Purification and Conversion Technology for IGFC Application’
2016. 11 Certification of DNV. GL & Lloyd’s Acquired.
2016. 08 Approved by KOREA HYDRO & NUCLEAR POWER CO.,LTD’s as a BOP Vendor
2015. 11Took part in a Project by Korea Institute of Marine Science Technology Promotion -‘Development of Technology for Bio-hydrogen Production using Hyperthermophilic Archaea’
2015. 04Registered as a Qualified Supplier to Integration of 5 Power Plant Companies(KOSPO, KWP, KOSEP, KOMIPO and EWP)
2014. 12Equipment Successfully Supplied to ‘Construction of Tae-an IGCC Test Bed Owned by KoreaWestern Power’
2010. 12 Registration of Construction Business Granted : Mechanical Construction
2008. 03Renamed to PTK Co., Ltd. / New Plant Site in Hwaseong-si Acquired and Headquartered Technical Research Institute Set up
2003. 09 Incorporation of Business, PROTECHKOREA Co., Ltd.
2000. 08 Establishment of the Company - PROTECHKOREA
HISTORY
I. COMPANY INTRODUCTION
PTK CO.,LTD
VISION
“ Global No.1”
Total Filtration, Solution & System
Company
PASSION
CHALLENGE
INNOVATION
2030
I. COMPANY INTRODUCTION
PTK CO.,LTD
Mid-Term Business Plan
I. COMPANY INTRODUCTION
1US$ =1,000 Won, Unit : Million US Dollar
Ref) CAGR (Compound Annual Growth Rate)
Sales (Plant)
Number of Employee
(Regular)
Sales (Filter)
11 14 11 13 15 16 18
13
21 29 32
37 44
52
24
35 40
45 52
60
2018 2019 2021 2022 20232017 2020
66 66 6780
8592
100
CAGR 11.68% (FY’2020 ~FY’2023)
70
PTK CO.,LTDPTK CO.,LTDPTK CO.,LTD
Offices
I. COMPANY INTRODUCTION
SEOUL
Gunsan Port
Busan Port
Ulsan Port
Mokpo Port Gwangyang Port
INCHEON AIRPORT
Hwaseong Factory
Ochang Office
Gumi Branch
Pyeongtaek Port
■ Head Office & 1st Factory632, Namyangman-ro, Uieong-eup,Hwaseong-si, Gyeonggi-do, Korea
■ Seoul Office ( R&D Center )606, Seobusaet-gil, Geumcheon-gu, Seoul, Korea
■ 2nd Factory940-61, Poseunghyangnam-ro, Jangan-myeon,Hwaseong-si, Gyeonggi-do, Korea
■ Ochang OfficeB-210, 40, Yeongudangi-ro, Ochang-eupCheongwon-gu, Cheongju-si, Chungchungbuk-do, Korea
■ Gumi Branch Office701, Halla-sigmavalley, 212 1, Gongdan-ro, Gumi-si, Gyeongbuk, Korea
PTK CO.,LTDPTK CO.,LTD
Organization
Quality /HSE
QA Team / QC Team
Administration Group
Accounting TamGeneral Affairs Team
R&D Center
R&D Center / SEOUL Office
Sub Contractor
Production Group
Production Management TeamProject Management Team
Production TeamDesign Team
Procurement Team
5 Teams (In-House)
Sales GroupPlant Sales TeamFilter Sales Team
Bio Sales TeamOversea Sales Team
C.E.O
I. COMPANY INTRODUCTION
PTK CO.,LTD
Employees
I. COMPANY INTRODUCTION
Career(Year)
Design /Technical[ R & D ]
ProductionControl
ProductionSub
Contractor(In-House)
QA/QC PurchasingProject
Manage –Ment
SalesAdmini-Stration
Total
More than15 years
7 3 3 10 3 1 1 4 2 34
More than10 years
5 5 3 11 2 1 2 6 2 37
More than5 years
3 3 3 11 2 1 4 3 30
Less than5 years
2 2 2 8 1 1 2 1 19
Total 17 13 11 40 8 4 3 16 8 120
II. BUSINESS
PTK CO.,LTDII. BUSINESS
Division
FILTERING SYSTEM
COALESCER SYSTEM
BACKWASHING SYSTEM
ELECTRONICS &
SEMICONDUCTOR
HIGH PURITY MATERIAL
ENGINEERINGPROCESS
EQUIPMENTCONSTRUCTION
SYNERGY EFFECT
PLANTDIVISION
BIODIVISION
FILTERDIVISION
PTK CO.,LTD
➢ REACTOR
➢ HEAT EXCHANGER
➢ FEEDWATER HEATER & D.H HEATER
➢ DEAERATOR
➢ TOWER & COLUMN
➢ PRESSURE VESSEL & TANKS
➢ SKID & MODULE
➢ FILTRATION SYSTEM
PROCESS EQUIPMENT
➢ TURN-KEY PACKAGE
- EQUIPMENT INSTALLATION WORK
- PIPING WORK
- STRUCTURE WORK
- INSULATION WORK
- MAINTENANCE WORK
- E & I WORK
CONSTRUCTION
➢ DESIGNING FIELD
- FINE CHEMICAL PLANT
- POWER PLANT
- BIO & PHARMACEUTICAL PLANT
- COSMETIC PLANT
➢ SCOPE OF WORK
- FRONT END ENGINEERING DESIGN
- COMPREHENSIVE DESIGN
- PROCESS
- EQUIPMENT
- PIPING
ENGINEERING
Business Area
II. BUSINESS
PTK CO.,LTDPTK CO.,LTD
CosmeticBio & Pharmaceutical
3D Modeling
• Maximize Work Efficiency Through Assembly Drawing and
Interference Review
• Piping & Structure Design Optimization
• Checking Material Flow Plan & Personnel Flow Plan
BasicDesign
▶
Process UtilityDesign
▶
PlantLayout
Comprehensive Design
• Process Flow Diagram (PFD)
• Utility Flow Diagram (UFD)
• Piping and Instrument Diagram (P&ID)
• Equipment Design (Strength Calculation & Shop Drawing)
GMP Manufacturing facility[Good Manufacturing Practice]
• Engineering & Project Management Service
• Economical Design
• Economical Design Centered on Process & Utility
• Differentiated GMP Through Efficient Process Management
■ Engineering Service
Business Area
Fine Chemical
II. BUSINESS
PTK CO.,LTDPTK CO.,LTDPTK CO.,LTD
Certifications
II. BUSINESS
Registered on KHNP’s
Approved BOP VenderCertification of a Qualified Supplier Etc.
KOREA HYDRO & NUCLEAR POWER CO.,LTD’s Approved BOP Vender
(Feed Water Pump, Turbine Exhaust Duct, ASME VIII Heat Exchanger, Bearing Oil
Cooler, Pressure Vessel & Tank)
A Qualified Partner of Mitsubishi Hitachi Power Systems, Ltd.
for Supplying( Pressure Vessel, Tank [excluding
for nuclear])
Shop Fab. Pr. Vessel & Tank ASME VIII / ASME VIII Heat Exchanger
Special facility Manufacturing License/ Specialty Contractor Construction/ INNO-BIZ/ Founded
Corporate R&D Center/ Enterprise specializing in parts materials/ Bright Prospect Enterprise Approval
ASME STAMP
( U / U2 STAMP )
NATIONAL
BOARD CERT.
ISO 9001,14001
OHSAS18001
DNV GL &
Lloyd’s REGISTERCSEL
PTK CO.,LTDPTK CO.,LTD
POWER PLANT
OVERSEAS
Clients
INDUSTRIAL
CHEMICAL
EPC
II. BUSINESS
PTK CO.,LTD
■ 1st Factory
Weight
Thickness
Length
Diameter
Maximum Capacity
: 1,800 Tons / Year
: 100 mm (3.4 inch)
: 25 m (984.3 inch)
: 5 m (196.8 inch)
Production Facilities & Capacity
Clean Room
17m (L) × 9m (W) × 6m (H)
Over Head Crane 2ton (1EA)
Air Shower Booth
Crane
80m (L) × 30m (W) × 13m (Lifting Height)
Gantry Crane 20+5ton (1EA), 15+5ton (1EA)
Over Head Crane 7.5+5ton (1EA), 10+5ton (1EA), 5ton
Fabrication & Machining
R/T Room
7m (L) × 5m (W) × 5m (H)
Motor auto opening and closing
II. BUSINESS
PTK CO.,LTD
■ 2nd Factory
Weight
Thickness
Length
Diameter
Maximum Capacity
: 2,500 Tons / Year
: 100 mm (3.4 inch)
: 25 m (984.3 inch)
: 5 m (196.8 inch)
Overhead Crane
A-Block : 93m (L) × 27m (W) × 13m (Lifting Height)
30ton (1EA), 10+5ton (2EA), 3ton (1EA)
B-Block : 59m (L) × 27m (W) × 15m (Lifting Height)
30+10ton (2EA), 5ton (1EA)
Fabrication & Machining
RT Room
19m (L) × 7m (W) × 5m (H)
Motor auto opening and closing
Gantry Crane
93m (L) × 32m (W) × 13m (Lifting Height)
30ton (2EA)
II. 사업 소개 ( BUSINESS INTRODUCTION )
Production Facilities & Capacity
PTK CO.,LTDPTK CO.,LTD
DIGITAL VIBRATION METER
FERRITE TESTER TELEBRINELLER HARDNESS TESTER ULTRASONIC THICKNESS TESTER
UNIVERSAL TESTING M/C
DEAD WEIGHTER PMI TESTER
He DETECTOR
LABORATORY
PARTICLE COUNTER
II. BUSINESS
III. MAJOR EXPERIENCES
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT - REACTOR
PROJECTNAME
BIO-HYDROGEN PRODUCTION USING SYSTEM
CUSTOMERKYONGDONG ENGINEERINGCo., Ltd.
LOCATION KOREA (TAEAN)
DESIGNCONDITION
0.88 (Mpa) @ 80ºC (SHELL)0.6 (Mpa) @ 100ºC (COIL)
MATERIAL A516-70 + SAKAPHEN COATING
SIZE 12t x I.D2,400 x 9,830L (T.L)
EMPTY WEIGHT 18,840 kg
DELIVERY Mar. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT - REACTOR
PROJECTNAME
CJ A-2 PROJECT
CUSTOMERMIWON SPECIALTY CHEMICALCo., Ltd.
LOCATION KOREA (CHUNGJU)
DESIGNCONDITION
F.V/3.06 (kg/cm²) @ 150ºC (SHELL)F.V/3.06 (kg/cm²) @ 143ºC (JACKET)
MATERIALA240-316L (SHELL)A240-304 (JACKET)
SIZE 15t x I.D2,400 x 2,745L (T.L) (13m³)
EMPTY WEIGHT 10,500 kg
DELIVERY Mar. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT - REACTOR
PROJECTNAME
CJ A-4 PROJECT
CUSTOMERMIWON SPECIALTY CHEMICALCo., Ltd.
LOCATION KOREA (CHUNGJU)
DESIGNCONDITION
F.V/5.1 (kg/cm²) @ 150ºC (SHELL)F.V/5.1 (kg/cm²) @ 150ºC (JACKET)
MATERIALA240-316L (SHELL)A240-304 (JACKET)
SIZE 32t x I.D2,500 x 3,100L (T.L) (15m³)
EMPTY WEIGHT 17,150 kg
DELIVERY Jul. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
PROJECT NAME BUNDANG #1&2 BLOCK PROJECT
CUSTOMER KOREA SOUTH-EAST POWER
LOCATION KOREA (BUNDANG)
DESIGNCONDITION
HIGH PRESSURE D.H HEATERF.V/5.5 (kg/cm²) @ 180ºC (SHELL)16 (kg/cm²) @ 160ºC (TUBE)LOW PRESSURE D.H HEATERF.V/2.55 (kg/cm²) @ 140ºC (SHELL)16 (kg/cm²) @ 140ºC (JACKET)
MATERIAL A516-70 (SHELL) / A249-TP304 (TUBE)
SIZE
HIGH PRESSURE D.H HEATER22t x I.D2,900 x 16,394 (T.L)LOW PRESSURE D.H HEATER18t x I.D2,364 x 15,690L (T.L)
EMPTY WEIGHT H,P HEATER - 97,820 kg / L.P HEATER - 62,220 kg
DELIVERY Dec. 2018
1. EQUIPMENT - D.H HEATER
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT – HEAT EXCHANGER
PROJECTNAME
DAESAN EXPANSION PROJECT
CUSTOMER LOTTE MCC
LOCATION KOREA (DAESAN)
DESIGNCONDITION
18 (kg/cm²) @ 225ºC (SHELL)1 (kg/cm²) @ 260ºC (TUBE)
MATERIAL A516-70 (SHELL) / A179 (TUBE)
SIZE 19t x I.D2,200 x 2,990 (T.L)
EMPTY WEIGHT 29,900 kg
DELIVERY Oct. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT – HEAT EXCHANGER
PROJECTNAME
BANG PAKONG & SOUTH BANGKOKFIN TUBE BUNDLE PROJECT
CUSTOMER HAMON CSD DIVISION
LOCATION THAILAND
DESIGNCONDITION
9 (Bar) @ 88ºC (TUBE)
MATERIALA36 + GAL. (FRAME) /B338-Gr.2 & B221 Gr.1060 (TUBE & FIN)
SIZE (L) 12,600 x (W) 460 x (H) 653
EMPTY WEIGHT 1,712 kg
DELIVERY Nov. 2018
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT – TOWER & COLUMN
PROJECTNAME
K4 PROJECT
CUSTOMERSAMNAM PETROCHEMICALCo., Ltd.
LOCATION KOREA (YEOSU)
DESIGNCONDITION
19 (kg/cm²) @ 70ºC
MATERIAL A240-316L
SIZE 35t x I.D2,770 x 19,950L (T.L)
EMPTY WEIGHT 119,500 kg
DELIVERY Jun. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT – PRESSURE VESSEL & TANK
PROJECTNAME
NEW MERCURY REMOVAL UNIT (MRU TRAIN 9) PROJECT
CUSTOMER JGC CORPORATION (PALL)
LOCATION MALAYSIA
DESIGNCONDITION
75 (Bar) @ 75ºC
MATERIAL A516-60N + HIC
SIZE 52t x I.D1,110 x 4,790L (T.L)
EMPTY WEIGHT 18,900 kg
DELIVERY Jun. 2019
PROJECTNAME
#1~4 SLURRY DESULFURIZATIONTANK PROJECT
CUSTOMER KOREA SOUTH-EAST POWER
LOCATION KOREA (INCHEON)
DESIGNCONDITION
ATM (Bar) @ 60ºC
MATERIAL SS400 + FLAKE GLASS LINING
SIZE 6t x I.D9,100 x 10,600L (T.L)
EMPTY WEIGHT 27,846 kg
DELIVERY Jun. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT – PRESSURE VESSEL & TANK
PROJECTNAME
YANBU-2 PROJECT
CUSTOMERHANHWA E&C(ATLASCOPCO MFG.)
LOCATION SAUDI ARABIA
DESIGNCONDITION
13.25 (kg/cm²) @ 80ºC
MATERIAL SA516-70
SIZE 23t x I.D3,460 x 17,000L (T.L)
EMPTY WEIGHT 45,000 kg
DELIVERY Feb. 2013
PROJECTNAME
HCA PROJECT
CUSTOMERSHINKO E&M(KAO, INC.)
LOCATION PHILIPPINE
DESIGNCONDITION
1.9 (kg/cm²) @ 300ºC
MATERIAL A240-304
SIZE 9t x I.D2,900 x 4,000L (T.L)
EMPTY WEIGHT 4,400 kg
DELIVERY Oct. 2017
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
1. EQUIPMENT – PRESSURE VESSEL & TANK
PROJECTNAME
ARAMCO SADARA MFC PROJECT
CUSTOMER DAELIM (KOLON WATERTECH)
LOCATION SAUDI ARABIA
DESIGNCONDITION
10 (Bar) @ 82ºC
MATERIAL SA516-70
SIZE 20t x I.D3,200 x 8,950L (T.L)
EMPTY WEIGHT 39,520 kg
DELIVERY Apr. 2013
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
2. SKID & MODULE
PROJECTNAME
UzGTL COALESCER SKID PACKAGE
CUSTOMERHYUNDAI ENGINEERING(PALL)
LOCATION UZBEKISTAN
MATERIAL A240-317L
ITEMPRESSURE VESSELPIPINGBASE FRAME
DELIVERY On Going
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
2. SKID & MODULE
PROJECTNAME
ALCHEMY AMP REACTOR SKID
CUSTOMER VERSUM MATERIALS
LOCATION KOREA (AN-SAN)
MATERIAL A240-316L
ITEM
PRESSURE VESSELPIPINGBASE FRAMEI/E
DELIVERY Aug. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
2. SKID & MODULE
PROJECTNAME
CA2 150KT EXPANSION PROJECT
CUSTOMERLG CHEMICAL(TSURUMI MFG.)
LOCATION KOREA
MATERIAL A516-70
ITEM
PRESSURE VESSELSHELL & TUBE HEAT EXCHANGERPIPINGBASE FRAME
DELIVERY Mar. 2019
PROJECTNAME
SBPL PROJECT
CUSTOMERDAELIM(TSURUMI MFG.)
LOCATION PHILIPPINES
MATERIAL A516-70
ITEM
PRESSURE VESSELPLATE HEAT EXCHANGERPIPINGBASE FRAME
DELIVERY May 2017
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
2. SKID & MODULE
PROJECTNAME
K.O.C PIPE LINE PROJECT
CUSTOMER HYUNDAI ENGINIEERING
LOCATION KUWAIT
MATERIAL A516-70
ITEMPRESSURE VESSELPIPINGBASE FRAME
DELIVERY Jun. 2012
PROJECTNAME
KUMHO P&B CHEMICAL KPA IV PROJECT
CUSTOMERDAELIM(TSURUMI MFG.)
LOCATION KOREA (YEOSU)
MATERIAL A240-316L
ITEM
PRESSURE VESSELSHELL & TUBE HEAT EXCHANGERPIPINGBASE FRAME
DELIVERY Mar. 2015
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
3. CONSTRUCTION - COSMETIC
PROJECTNAME
COSBON JUNGOK PLANT
CUSTOMER COSBON Co., Ltd.
LOCATION KOREA (HWASEONG)
MATERIAL A240-316L
ITEMTURN-KEY(ENGINEERING, PIPING, EQUIPMENT)
DELIVERY Aug. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
3. CONSTRUCTION - COSMETIC
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
3. CONSTRUCTION – BIO PLANT
PROJECTNAME
BIO-HYDROGEN PRODUCTION USING SYSTEM
CUSTOMERKOREA WASTERN POWER(KYONGDONG ENGINEERING Co., Ltd.)
LOCATION KOREA (TAEAN)
MATERIAL A516-70 / A240-316L / A240-304
ITEMTURN-KEY(ENGINEERING, CIVIL, STRUCTURE, PIPING, EQUIPMENT)
DELIVERY Aug. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
3. CONSTRUCTION – BIO PLANT
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
3. CONSTRUCTION – POWER PLANT
PROJECTNAME
#1~4 SLURRY DESULFURIZATIONTANK PROJECT
CUSTOMER KOREA SOUTH-EAST POWER
LOCATION KOREA (INCHOEN)
MATERIAL SS400 + FLAKE GLASS LINING
ITEM(ENGINEERING, CIVIL, STRUCTURE, PIPING, EQUIPMENT)
DELIVERY Jun. 2019
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
4. FILTER HOUSING
III. MAJOR EXPERIENCE
PTK CO.,LTDPTK CO.,LTD
4. FILTER HOUSING
III. MAJOR EXPERIENCE
PTK CO.,LTD
1. VESSEL – 1/5
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
1 DAELIM410,000 MTY mPE
PLANT(KOREA)
VESSELKOREA
REGULATIONA516-70 2.4 6 / 6 1,200 2,500 15 21 110
OnGoing
2 GS CALTEXMFC
(KOREA)VESSEL
KOREAREGULATION
A516-70 2.6 8 / 8 1,200 2,800 17 22 120On
Going
3MIWON
SPECIALTYCHEMICAL
CHUNG-JU60m³
EXPANSION(KOREA)
JACKETREACTOR
KOREAREGULATION
A240-316L 17.2 14 / 16 2,500 4,480 25 5 300On
Going
4HAEYANG CITY
GAS(AIR LIQUIDE)
KWANGJU HYDROGEN
H2 BUFFER TANK(KOREA)
VESSELKOREA
REGULATIONA516-70 - 1 / 1 1,200 3,300 54 110 40
OnGoing
5 NOV
PROCESS EQUIPMENT
LLOG EXPLORATIONKING’S QUAY
(MEXICO)
VESSEL“U2” & “U”
STAMPA516-70 76.7 11 / 12 1219 12,660 64 156 66
OnGoing
6MIWON
COMMERCIAL
JEON-JU 2nd
FACTORYIPA DISTILLATION
COLUMN(KOREA)
VESSELKOREA
REGULATIONA240-304 6.7 12 / 14 1,000 16,925 8 0.3 / F.V 250
OnGoing
7LOTTE FINE CHEMICAL
MECELLOSE F PLANTHEMICELL REACTOR
(KOREA)VESSEL
KOREA REGULATION
A516-60+ RUBBER
LINING5.6 1 / 1 2,800 3,600 10 F.W 110
OnGoing
8HYOSUNG VINA
CHEMICAL
HSVC1 PP4DRYING UNIT(VIETNAM)
VESSEL - A516-70 8.6 12 / 16 1,400 6,200 28 40.79 280Jul.
2019
9HYOSUNG VINA
CHEMICAL
HSVC1 PP4REFRIGERATION
UNIT(VIETNAM)
VESSEL - A516-70 3.3 14 / 17 1,000 5,500 15 23 120Jul.
2019
DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
10SAMNAM
PETROCHEMICALK-4
(KOREA)VESSEL
KOREAREGLATION
A240-316L 119.5 1 / 1 3,000 24,840 35 19 70Jun.2019
11JGC
(PALL)MRU TRAIN-9(MALAYSIA)
VESSEL DOSHA516-60 +
HIC15.4 1 / 2 1,110 4,790 52 75 75
Jun.2019
12PRAXAIR
(PALL)SEC P2
(KOREA)VESSEL
KOREAREGULATION
A240-316L 0.9 13 / 24 850 1,475 8 12 121Jun.2019
13KOREA SOUTH-EAST POWER
#1~4 SLURRYDESULFURIZATION
TANK(KOREA)
VESSEL - SS400 27.9 1 / 1 9,100 10,600 6 ATM 60Jun.2019
14 LG CHEMICALNCC EXPANSION
(KOREA)VESSEL
KOREAREGULATION
A240-304 1 1 / 2 700 1,840 8 22.8 120May2019
15VERSUM
MATERIALS
ALCHEMYAMP & CSP
(KOREA)
VESSEL & COLUMN
KOREAREGULATION
A240-316L 6.1 14 / 20744 /892
19,130 12 1 65May2019
16VERSUM
MATERIALS
GABLEEXPANSION
(KOREA)VESSEL
KOREAREGULATION
A240-316L 5.4 12 / 14 2,200 4,300 10 2 100May2019
17 OILSANDS PLANT
YEONCHON OILSANDS PLANT
PILOT(KOREA)
VESSELKOREA
REGULATIONA516-70 2.1 5 / 5 1,200 4,000 10 3.5 120
Feb.2019
18LOTTE FINE CHEMICAL
ELECTOROLYTIC CELL EQUIPMENT
(KOREA)VESSEL -
B265-2B162
0.1 2 / 2 314 818.8 4 1.2 100Feb.2019
19JGC
(PALL)PKI PFM
(PHILIPPINES)VESSEL - A240-304 0.8 5 / 6 599.6 1,228 5 7 90
Feb.2019
1. VESSEL – 2/5 DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
20MIWON
COMMERCIAL
CYRDISTILLATIONEXPNASION
(KOREA)
VESSELKOREA
REGULATIONA240-304 2.1 4 / 5 1,100 3,022 12 3 100
Nov.2018
21LOTTE FINECHEMICAL
ANYCOAT EXTENSION
(KOREA)VESSEL
KOREAREGULATION
A240-304 0.9 1 / 2 1,450 1,800 5 ATM 100Oct.2018
22TOYO ENG.
(PALL)NPEFD
(INDONESIA)VESSEL - A516-70 0.9 1 / 1 600 1,450 6 9.5 150
Jul.2018
23SUN FLUORO
SYSTEMMPCA(USA)
VESSEL “U” STAMP A240-304L 13.5 7 / 40 660 1,854 6 10.55 80Jul.
2018
24MIWON
SPECIALTYCHEMICAL
CHUNG-JU 13m³
EXPANSION(KOREA)
JACKETREACTOR
KOREAREGULATION
A240-316L 10 16 / 22 2,400 2,900 25 3.0 / F.V 143May2018
25SAMSUNG
ELECTRONICS
PYEONG-TAEKEXPANSION
(KOREA)VESSEL
KOREAREGULATION
A240-304 2 6 / 32 898.4 1,490 8 7.96 40Jan.2018
26LOTTE FINE CHEMICAL
LFC REVAMPING
(KOREA)
STORAGE TANK
KOREAREGULATION
A283-CRUBBERLINING
15 3 / 3 6,600 7,900 6 F.L 90Nov.2017
27SUN FLUORO
SYSTEMFFEM AZ
(USA)VESSEL - A240-304 0.5 1 / 18 650 540 5 1.94 50
Oct.2017
28SAMSUNG
ELECTRONICS
CHEON-ANEXPANSION
(KOREA)VESSEL
KOREAREGULATION
A240-304 0.3 2 / 8 498 720 5 10 75Sep.2017
29LG FUEL CELL
SYSTEMS
SOFCVESSEL(KOREA)
VESSELKOREA
REGULATIONA240-321 2.7 2 / 2 1,251 1,560 15 5.1 550
Aug.2017
1. VESSEL – 3/5 DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJOR DIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
30 CJ E&CMALAYSIAEXPANSION(MALAYSIA)
VESSEL DOSH A240-304L 1.3 7 / 38 1,000 1,885 6 2.3 150Jul.
2017
31 CJ E&CINDONESIAEXPANSION(INDONESIA)
VESSEL - A240-304L 0.5 1 / 6 550 800 4 10.2 150Jun.2017
32SUN FLUORO
SYSTEM
FUJI FILMGLOBAL(USA)
VESSEL - A240-304 8.7 3 / 9 3,660 5,000 9 10 ATMMay2017
33 BASFTORUBILLION
(KOREA)VESSEL
KOREAREGULATION
A240-304 14.6 4 / 4 2,300 7,200 25 24.47 60Jan.2017
34 HYUNDAI ENG.MKAN
STATIONARY(UZBEKISTAN)
VESSEL “U” STAMP A240-316L 10.3 19 / 31 2,000 3,050 7 6.12 85Oct.2016
35DSME(PALL)
MARSCARGO (ENGLAND)
VESSEL LLOYD'S A516-70 4.1 2 / 32 1,550 3,880 13 16.32 65May2016
36DAELIM IND.(ATLASCOPCO
MFG.)
SOHAR(OMAN)
VESSEL - A312-304 0.1 1 / 1 10” 885 Sch.10S 9.9 100Dec.2015
37 HYUNDAI ENG.TACE
(TURKMENISTAN)VESSEL “U” STAMP A240-304 6.5 1 / 1 1,200 19,168 8 11 -196 ~ 65
Aug.2015
38SAMSUNG
FINE CHEMICALBRAIN FILTER
(KOREA)
RUBBERLININGVESSEL
KOREA REGULATION
A516-70 6.7 2 / 2 1,980 2,507 10 4.38 90Aug.2015
39DAELIM
IND.
SOHARREFINERY(OMAN)
VESSEL - A516-70 4.9 22 / 38 1,250 3,050 19 27.5 90Jul.
2015
40 IAETAEAN IGCC
(KOREA)VESSEL
(GASIFIER etc.)KOREA
REGULATIONA516-70 / A240-316L
27.5 2 / 2 1,280 10118 25 40 275Dec.2014
1. VESSEL – 4/5 DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
41 POSCO E&CSNG PJT(KOREA)
VESSELKOREA
REGULATIONA240-304 45 10 / 10 900 20,100 20 40 100
Sep.2014
42 HYUNDAI ENG.RPLC
(VENEZULA)REFRACTORY
STACK- A516-70 112.0 1 / 1 2,700 46,700 25 - 343
Apr.2014
43LOTTE E&C
(LOTTE CHEMICAL)R-1 MSR
(MALAYSIA)VESSEL DOSH A516-70 15.6 52 / 60 3,200 9,000 12 8 80
Feb.2014
44 HYUNDAI ENG.UGCC WATERTREAT MENT(UZBEKISTAN)
STORAGETANK
-A516-60 +
EPOXY5.4 18 / 18 4,000 4350 6 F.L 65
Jun.2014
45SAMSUNG
FINE CHEMICALECH NO2(KOREA)
VESSELKOREA
REGULATIONA240-304 4.0 1 / 1 2,000 5,500 6 1.9 60
Apr.2013
46 CHEIL INDUSTRIESGUMI ACF(KOREA)
VESSELKOREA
REGULATIONA240-316L 3.0 2 / 3 650 672 8 1.7 60
Mar.2013
47 DAELIM IND.ARAMCO
SADARA MFC(SAUDI ARABIA)
VESSEL “U” STAMP A516-70 39.5 2 / 5 3,200 8,950 20 10.2 / F.V 82Mar.2013
48HYOSUNG
GOOD SPRINGS
SHIRAZ THIRD AMMOINA &
UREA COMPLEX(IRAN)
VESSEL - A240-304 1.0 2 / 7 1,100 1,598 6 5.1 50Mar.2013
49HANHWA E&C(ATLASCOPCO
MFG.)
YANBU-2(SAUDI ARABIA)
VESSEL “U” STAMP A516-70 45.0 2 / 6 3,460 17,000 23 13.25 80Feb.2013
50LOTTE E&C
(LOTTE CHEMICAL)G PROJECT(KOREA)
COLUMNVESSEL
REACTOR
KOREA REGULATION
A516-70 8.0 32 / 32 3,000 4,500 9 3.5 / F.V 177May2012
1. VESSEL – 5/5 DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
2. HEAT EXCHANGER – 1/3
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJOR DIMENSIONS
DESIGN CONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
1 POSCO E&C
POHANG No.19BY PRODUCT
GAS CCPP(KOREA)
SHELL & TUBEKOREA
REGULATIONB338-2 12 2 / 2 1,250 4,500 13 10.2 75
OnGoing
2 EXXON MOBILCRISP
PROJECT(SPAIN)
SHELL & TUBE - A179 - 6 / 6 1,524 7,620 16 11.6 413On
Going
3 DAELIM
410,000 MTYmPE
PLANT(KOREA)
SHELL & TUBEKOREA
REGULATIONA334-6 16.8 4 / 4 1,350 4,600 14 21 110
OnGoing
4 DAELIMMFC
(KOREA)SHELL & TUBE
KOREAREGULATION
B111-C70600 10.9 4 / 4 1,000 6,000 13 22 / F.V 120On
Going
5 LOTTE MCCDAESAN MMA
(KOREA)SHELL & TUBE
KOREAREGULATION
A179 29.9 1 / 1 2,200 2,990 19 18 260Oct.2019
6HYOSUNG VINA
CHEMICAL
HSVC1 PP4DRYING
UNIT(VIETNAM)
SHELL & TUBE - A334-6 11.7 12 / 16 1,050 5,600 14 23 120Jul.
2019
7HYOSUNG VINA
CHEMICAL
HSVC1 PP4REFRIGERATION
UNIT(VIETNAM)
SHELL & TUBE - A179 1.4 14 / 17 337 4,000 10 7 200Jul.
2019
8VERSUM
MATERIALS
ALCHEMYAMP & CSP
(KOREA)SHELL & TUBE
KOREAREGULATION
A213-316L 0.6 7 / 8 12” 3,077 SCH.40 10 65May2019
9VERSUM
MATERIALS
GABLEEXPANSION
(KOREA)SHELL & TUBE
KOREAREGULATION
A213-316L 0.4 1 / 1 8” 1,584 SCH.40 10 200May2019
DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJOR DIMENSIONS
DESIGN CONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
10KOREA SOUTH-EAST POWER
GOSEONG HAITHERMAL
POWER PLANT(KOREA)
SHELL & TUBEKOREA
REGULATIONA213-316L 0.3 4 / 8 10” 2,208 SCH.40 13 195
Mar.2019
11 LOTTE MCCDAESAN MMA
(KOREA)TUBE BUNDLE
KOREAREGULATION
A213-304 - 1 / 1 410 3,339 9 7 40Feb.2019
12MIWON
COMMERCIAL
CYRDISTILLATIONEXPNASION
(KOREA)
SHELL & TUBEKOREA
REGULATIONA213-304 1.2 4 / 5 400 4,125 5 5 100
Nov.2018
13 HAMON CSDSOUTH
BANGKOK(THAILAND)
FIN TUBE BUNDLE
-B338-2 /
B221-10601.8 1 / 24
(L) 825(W) 270
13.918 12 1.32 80Nov.2018
14 HAMON CSDBANG PAKONG
(THAILAND)FIN TUBE BUNDLE
-B338-2 /
B221-10601.8 1 / 24
(L) 652(W) 380
12,548 12 6.1 88Nov.2018
15KOREA SOUTH-EAST POWER
Bundang#1 Block(KOREA)
HPDISTRICT HEATER
KOREAREGULATION
A516-70 /SA249-TP304
93 1 / 1 2,900 16,400 22 16 160Oct.2018
16KOREA SOUTH-EAST POWER
Bundang#2 Block(KOREA)
LPDISTRICT HEATER
KOREAREGULATION
A516-70 /SA249-TP304
63 1 / 1 2,400 15,400 16 16 140Oct.2018
17KOREA HYDRO & NUCLEAR POWER
Sub Oil Cooler(KOREA)
DOUBLETUBE TYPE
KOREAREGULATION
C7060T / C1220T
- 1 / 6 10” 1,050 Sch.40 2 77Jan.2018
18KOREA HYDRO &NUCLEAR POWER
Air Cooler(KOREA)
FIN TUBEKOREA
REGULATIONC1220T /
AL1.5 1 / 8
(L)2,160(W)350
3,302 6 15.1 60Sep.2017
19KOREA SOUTH-EAST POWER
CCW / WBVP(KOREA)
SHELL & TUBEKOREA
REGULATION
B111-70600 / B171-C46400
CLAD16.5 1 / 6 1,500 6,000 13 8.5 40
May2017
20KOREA EAST-WEST POWER
CVP HEAT(KOREA)
SHELL & TUBEKOREA
REGULATIONB338-GR.2 1.0 1 / 2 303.2 3,050 Sch.40 10.5 / F.V 150
Mar.2017
2. HEAT EXCHANGER – 2/3 DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJOR DIMENSIONS
DESIGN CONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
21 HYUNDAI ENG.UGCC WATERTREAT MENT(UZBEKISTAN)
SHELL & TUBE - A213-304L 3.1 1 / 2 850 2,200 12 10.2 80Jun.2014
22LOTTE E&C
(LOTTE CHEMICAL)R-1 MSR
(MALAYSIA)SHELL & TUBE DOSH A213-304 21.5 25 / 28 1,600 5,000 10 8.0 200
Feb.2014
23 HYOSUNGTF-2
(KOREA)SHELL & TUBE
KOREAREGULATION
A213-304 1.1 11 / 11 16” 3,004 Sch.40 7 50Nov.2013
24 CJ CHEILJEDANGCJ BIO C
(USA)SHELL & TUBE “U” STAMP A213-304L 1.0 2 / 52 558.8 3,000 6 3.52 149
Nov.2012
25LOTTE E&C
(LOTTE CHEMICAL)G PROJECT(KOREA)
SHELL & TUBEKOREA
REGULATIONA179 1.6 15 / 15 400 3,000 9 8 185
May2012
26HANSOL
CHEMICALHP-3
(KOREA)SHELL & TUBE
KOREAREGULATION
A240-304L 18.0 16 / 16 1,640 4,500 8 7.8 70Jan.2012
2. HEAT EXCHANGER – 3/3 DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
3. SKID & PACKAGE – 1/2
NO. CLIENT PROJECTMAJOR
MATERIALITEM YEAR REMARKS
1 NOV
PRODUCED WATER TREATMENTLLOG EXPLORATION
KING’S QUAY(MEXICO)
A516-70VESSEL
STRUCTUREPIPING
OnGoing
2 VERSUM MATERIALSALCHEMY
AMP & CSP(KOREA)
A240-316L
REACTORPIPING
BASE FRAMES/T HEAT EXCHANGER
OnGoing
3HYUNDAI ENG.
(PALL)
UZGTLCOALESCER SKID PACKAGE
(UZBEKISTAN)A240-317L
PRESSURE VESSELPIPING
BASE FRAME
OnGoing
4TAEKWANG INDUSTRIAL
(TSURUMI MFG.)VCM M PROJECT A106-B
VESSELPIPING
BASE FRAMES/T HEAT EXCHANGER
OnGoing
5 LG CHEMICALCDC TCU SKID
PROJECT(KOREA)
A240-316LS/T HEAT EXCHANGER
PIPINGBASE FRAME
Nov.2019
6 REKYUNG CHEMCOSBON JUNGOK PLANT
(KOREA)A240-316L
TURN-KEY(ENGINEERING, PIPING,
EQUIPMENT)
Oct.2019
7 KOREA WESTERN POWERBIO-HYDROGEN PRODUCTION
USING SYSTEM(KOREA)
A240-316LA516-70
FRP
TURN-KEY(ENGINEERING, CIVIL, STRUCTURE, PIPING,
EQUIPMENT)
Aug.2019
8 LG CHEMICALCA2 150KT EXPANSION
(KOREA)A516-70
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
Mar.2019
DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
3. SKID & PACKAGE – 2/2
NO. CLIENT PROJECTMAJOR
MATERIALITEM YEAR REMARKS
9DOOSAN
HEAVY INDUSTRIES(ATLASCOPCO MFG.)
SONG HAU-1 THERMAL POWER PLANT DRYER PACKAGE
(VIETNAM)A516-70
PRESSURE VESSELPIPING
BASE FRAME
Sep.2018
“U” STAMP
10 SK PLASMAANDONG L PROJECT
TCM PACKAGE(KOREA)
A240-304
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
May2017
11SAMSUNG
ELECTRONICS
SDC TANG-JEONG PIPING & SKID PACKAGE
(KOREA)A240-304
S/T HEAT EXCHANGERFIN TUBE HEAT EXCHANGER
PRESSURE VESSELPIPING
BASE FRAME
Apr.2017
12AIR PRODUCTS
KOREA(PALL)
SDC T7-1 RETROFITPIPING & SKID PACKAGE
(KOREA)A240-316L
PRESSURE VESSELPIPING
BASE FRAME
Apr.2017
13HUNDAI
HEAVY INDUSTRIES(ATLASCOPCO MFG.)
JEDDAH SOUTHAIRAIR DRYER PACKAGE
(SAUDI ARABIA)A516-70
PRESSURE VESSELPIPING
BASE FRAME
May2014
“U” STAMP
14GS E&C
(TSURUMI MFG.)
TAEAN IGCC VACUUMSYSTEM PACKAGE
(KOREA)A240-304
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
Dec.2013
15SAMSUNG C & T
(ATLASCOPCO MFG.)EMAL PHASE-II CCPP
(KOREA)A516-70
PRESSURE VESSELPIPING
BASE FRAME
Oct.2013
DOMESTIC
III. MAJOR EXPERIENCE
PTK CO.,LTD
1. VESSEL – 1/2
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
1TOYOENG.
PT.NIPPON SHOKUBAI
i-III PROJECT(INDONESIA)
VESSEL - A240-304 1.1 4 / 7 1,100 1,037 8 10 120On
Going
2 CHIYODAKUREHA KPS
(JAPAN)VESSEL - A240-316L 2.8 13 / 13 1,900 3,500 10 18 / F.V 90
OnGoing
3 JGCHARMONY (JAPAN)
VESSEL - A516-70 4.2 68 / 68 1,300 2,200 18 3.5 / F.V 320On
Going
4 CHIYODACHIBA ARKON
PLANT(JAPAN)
VESSELJAPAN
REGULATIONA240-304 1.8 10 / 11 1,800 2,000 5 ATM 50
OnGoing
5 MHPSLAMMA#11
(HONGKONG)STORAGE
TANK- A283-C 5 3 / 3 4,000 5,500 8 1.04 90
OnGoing
6 MHIGCGV(USA)
VESSEL “U” STAMP A516-70 3.8 2 / 4 1,400 3,070 12 12 150Oct.2019
7 JGCCORAL SOUTHDEVELOPMENT(MOZAMBIQUE)
VESSEL“U” STAMP& LLOYD'S
A516-70 7.7 6 / 9 900 3,800 35 86.68 80Jul.
2019
8 MHPSLAMMA#10
(HONGKONG)STORAGE
TANK- A283-C 5 3 / 3 4,000 5,500 8 1.04 90
Aug.2018
9SHINKO E&M
(KOBE STEEL, LTD.)HCL
(CHINA)VESSEL CSEL A516-70 5.8 13 / 19 1,700 3,850 12 10 65
Jun.2018
10 MHPSNAVOI#2
(UZBEKISTAN)STORAGE
TANK- A240-304 2 1 / 1 1,200 3,400 8 ATM 60
Jun.2018
11SHINKO E&M
(KAO, INC.)HCA
(PHILIPPINE)VESSEL - SA240-304 4.4 20 / 20 2,900 4,000 9 1.9 300
Oct.2017
JAPAN
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
12 JGCHMD SOUTH
SATELLITE(ALGERIA)
VESSEL - A516-70 0.8 2 / 14 382.4 1,340.5 12 19.38 90Sep.2017
13 MHIEXXON MOBIL
BPEX(USA)
VESSEL “U” STAMP A516-70 3.7 2 / 3 1,398 3,070 12 12 150Jul.
2017
14 CHIYODA
AMIC ANDTOHO TITANIUM
YNP(SAUDI ARABIA)
VESSEL - A516-70 2.2 34 / 85 1,700 3,000 9 9.9 120Sep.2016
15NPPON
SHOKUBAIEUROPE
NSE3 2AAPLANT
(BELGIUM)VESSEL PED A240-304 0.9 4 / 9 1,100 1,213 8 10.2 120
Apr.2016
16 MESEXXON MOBILAURORA EOS(SINGAPORE)
VESSEL -A790
-S322050.2 23 / 43 10” 780 Sch.40 8.2 110
Feb.2016
17TSUKISHIMA
KIKAIKPR-D
(KOREA)JACKET
REACTORKOREA
REGULATIONA240-316L 8.5 4 / 6 1,600 2,887 14 2.4 90
Nov.2015
18 CHIYODATUFC
(THAILAND)VESSEL - A516-70 2.4 1 / 1 1,039 2,897 14 18.5 40
Nov.2015
19 MHITK-3 & 4(JAPAN)
VESSEL - A240-304 0.3 1 / 4 604 1,010 3 5.1 90Aug.2015
20 CHIYODAPHASE 2C
EXPANSION(SINGAPORE)
VESSEL - A516-70 0.9 2 / 3 797 1422 8 12.36 93Jun.2014
21TOYOENG.
ETHYDCOETHYLENE(EGYPT)
VESSEL - A516-70 0.8 4 / 5 660 1,630 12 11.5 / F.V 150May2014
22TOYOENG.
Net 14(USA)
VESSEL “U” STAMP A240-304 0.3 4 / 9 397 1090 5 12.24 100Nov.2013
1. VESSEL – 2/2 JAPAN
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECT DESCRIPTION CERTIFICATEMAJOR
MATERIAL
MAJORUNIT
WEIGHT(Ton)
KIND /SET
MAJORDIMENSIONS
DESIGNCONDITIONS
YEARI.D
(mm)LENGTH(mm)
TH’K(mm)
Pressure(kg/cm2G)
Temp.(˚C)
1 TSURUMI MFG.POSEUNGBIOMASS(KOREA)
SHELL & TUBEKOREA
REGULATIONA213-316 0.5 1 / 1 10” 2,900 Sch.40 6.2 60
Apr.2017
2 TSURUMI MFG.DAIREN
CHEMICAL(TAIWAN)
SHELL & TUBE - A213-304 0.3 1 / 1 10” 1,800 Sch.10 10.2 60Mar.2017
3 CHIYODA
AMIC AND TOHO TITANIUM
YNP(SAUDI ARABIA)
SHELL & TUBE - A179 2.8 2 / 2 400 2,100 8 1.94 150Sep.2016
4 MHITHUNGSIAO(TAIWAN)
SHELL & TUBE - B338-2 0.5 2 / 13 500 3,000 8 3.1 50Apr.2016
5 CTCIMMA PMMA
PART II(SAUDI ARABIA)
SHELL & TUBE “U” STAMP A213-304 0.6 1 / 3 390 2,000 4 6.3 90Aug.2015
6 TSURUMI MFG.
THAI BINH2 THERMAL POWER
(VIETNAM)
SHELL & TUBE “U” STAMP B338-2 0.5 2 / 13 14” 3,500 Sch.40 10.2 60Jul.
2015
7 TSURUMI MFG.TALIN POWER
PLANT RENEWAL(TAIWAN)
SHELL & TUBE “U” STAMP B338-2 0.7 2 / 12 12” 3,500 Sch.10 5.1 45Mar.2015
8 MKKK2W PROJECT(THAILAND)
FIN TUBE -A179 /
AL0.2 2 / 2 700 650 6 17 220
Mar.2012
2. HEAT EXCHANGER JAPAN
III. MAJOR EXPERIENCE
PTK CO.,LTD
3. SKID & PACKAGE – 1/2
NO. CLIENT PROJECTMAJOR
MATERIALITEM YEAR REMARKS
1 MHPSLAMMA#11 LUBE OIL PURIFIER
UNIT(HONG KONG)
A516-70PRESSURE VESSEL
PIPINGBASE FRAME
On Going
2 HITACHI ZOSENUFNV SCR SYSTEM
PIPING & SKID PACKAGE(INDIA)
A312-304 /A106-B
SCR REACTORPIPING
BASE FRAME
May2019
3 HITACHI ZOSENMOKA SCR SYSTEM
PIPING & SKID PACKAGE(JAPAN)
A312-304 /A106-B
PIPINGBASE FRAME
Aug.2018
4JGC
(TSURUMI MFG.)
SEC210 – 1 x 105MW COAL FIRED POWER PIPING & SKID PACKAGE
(PHILIPPINE)A106-B
S/T HEAT EXCHANGERPIPING
BASE FRAME
Oct.2017
5 HITACHI ZOSENISHIKARIWAN SCR SYSTEMPIPING & SKID PACKAGE
(JAPAN)
A312-304 /A106-B
PIPINGBASE FRAME
Jul.2017
6 MHPSBIBIYANA PACKAGE
(BANGLADESH)A516-70
PRESSURE VESSELPIPING
BASE FRAME
Dec.2016
7VOITH FUJIHYDRO K.K
AKIHA NO.1 UNIT2(JAPAN)
A312-304 PIPINGNov.2016
8 CHIYODAAMIC AND TOHO TITANIUM
YNP PACKAGE(SAUDI ARABIA)
A283-CPRESSURE VESSEL
FIRE EXTINGUISH BOXJul.
2016
9DAICEN
MEMBRANE
MINERAL WATERSKID PACKAGE
(JAPAN)A240-304
STORAGE TANKPIPING
BASE FRAME
Mar.2016
10 MESEXXON MOBIL
AURORA EOS PACKAGE(SINGAPORE)
A240-304PRESSURE VESSEL
PIPINGBASE FRAME
Feb.2016
JAPAN
III. MAJOR EXPERIENCE
PTK CO.,LTD
NO. CLIENT PROJECTMAJOR
MATERIALITEM YEAR REMARKS
11 MHIRSAE CATALYTIC COMBUSTION
UNIT PACKAGE(RUSSIA)
A240-304
REACTORSTART-UP HEATER
STACK(I.D1,524 x 12t X 39,700L)
Jan.2014
“U” STAMP
12 TSURUMI MFG.TAEAN IGCC VACUUM
SYSTEM PACKAGE(KOREA)
A240-304
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
Dec.2013
13 TSURUMI MFG.PYEONGTAEK#2 CCPP VACUUM
SYSTEM PACKAGE(KOREA)
TITANIUM MATERIAL
(B338-GR.2)
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
Dec.2013
14 TSURUMI MFG.ULSAN#4 VACUUMSYSTEM PACKAGE
(KOREA)
TITANIUM MATERIAL
(B338-GR.2)
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
Oct.2013
15 TSURUMI MFG.DANGJIN#9,10 CVP VACUUM
SYSTEM PACKAGE(KOREA)
TITANIUM MATERIAL
(B338-GR.2)
S/T HEAT EXCHANGERPRESSURE VESSEL
PIPINGBASE FRAME
Oct.2013
3. SKID & PACKAGE – 2/2 JAPAN
III. MAJOR EXPERIENCE
PTK CO.,LTD
Thank You
www.ptk.co.kr