,. PROCEEDINGS OF THE MANAGING DIRECTOR KE RA.L A ST ATE COAST AL ARE A DE VELOPMENT CORPORATION LIMITED THIRUVANANTHAPURAM (Present: Sr i.P.I.Sheik Pareeth} \ Sub:- KSCADC - Duties and responsibilities of officials of KSCADC& HE[ in the implementation of KIIFB pro jects Order No.2284/F/2017 /KSCADC Dated 06.05.2019 The Kerala Infrastructure Investment Fund Board has sanctioned · arious pro jects to be implemented in the state through Fisheries Department. The duties and responsibilities of various officers in the execution of Harbour :i: ro jects and Shore protection works near harbours, wherein the Kerala State Coastal Area Develo pment Corporation (KSCADC) as PMU is fixed as per the details below in the areas where the HED is considered as the PIU. AlJ ma jor pro jects m the coastal · area which includes, harboui s, fish landing centres, groyne etc are implemented through HED by availing furn s from KIIFB through the designated Special Purpose Vehicle (SPV). Kerala State ~oastal Area Development Corporation. Other ma jor work entrusted to KSCADC i1 eludes educational and health infrastructure developments, modernization pf fish markets, Hospital, Fisheries and Social infrastructure developments etc. in the coastal area of the State. For the execution of works, various procedures including prepare tion of Technical Sanction estimate, Issuance of Technical Sanction, E-tendering pf work, ~ Approval of Tender, awarding of work etc have to be completed in pre scribed timeframe in an eff ective manner. Considering the matter in detail, the following duties and responsibilities are fixed for the Officers of HED (PIU) & KSCADC (PMU) for the smooth implementation of pro jects under KIIFB assistance. SI. No Activ ity Responsible Of fices/Of ficers 1 Investigation of pro jects 2 Preparation of DPR Pre-f easibility study by HED Detailed investigation model study e c. to be arranged by KSCADC 3 Uploading of the DPR to KIIFB Harbour Engineering Departrr ent 4 Obtaining statutory clearances from concerned Departments/ Agency Managing Director, Chief EnE ineer and supporting staff of Kerala Sta e Coastal Area Development Corporatioi~. Harbour Engineering Departn ent 5 Concerned Agency throu ~h their i technical staff m the relevant I jurisdiction. (HEDJ . 1----+-----------------t-<---------''---....._ ::--:- -1r:- - ---"""'."7 Managing Director, Chief En, ineer and 1 supporting staff of Kerala Sta e Coastal ; Area Development Corporatio 1. _; 6 Revision of DPR as per Technical Appraisal Report (TAR) from KIIFB Uploading of the report on T AR and revised DPR to KIIFB

Upload: others

Post on 12-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROCEEDINGS OF THE MANAGING DIRECTOR KERA.LA ...go.hed.kerala.gov.in/uploads/38058.pdfKerala State Coastal Area Deve lopment CQrporation Managing Director, Chief En 1 ineer of Kerala

,.

PROCEEDINGS OF THE MANAGING DIRECTOR KERA.LA STATE COASTAL AREA DEVELOPMENT CORPORATION LIMITED

THIRUVANANTHAPURAM (Present: Sri.P.I.Sheik Pareeth}

\ Sub:- KSCADC - Duties and responsibilities of officials of KSCADC& HE[ in the

implementation of KIIFB projects

Order No.2284/F/2017 /KSCADC Dated 06.05.2019

The Kerala Infrastructure Investment Fund Board has sanctioned · arious projects to be implemented in the state through Fisheries Department. The duties and responsibilities of various officers in the execution of Harbour :i: rojects and Shore protection works near harbours, wherein the Kerala State Coastal Area Development Corporation (KSCADC) as PMU is fixed as per the details below in the areas where the HED is considered as the PIU.

AlJ major projects m the coastal · area which includes, harboui s, fish landing centres, groyne etc are implemented through HED by availing furn s from KIIFB through the designated Special Purpose Vehicle (SPV). Kerala State ~oastal Area Development Corporation. Other major work entrusted to KSCADC i1 eludes educational and health infrastructure developments, modernization pf fish markets, Hospital, Fisheries and Social infrastructure developments etc. in the coastal area of the State.

For the execution of works, various procedures including prepare tion of Technical Sanction estimate, Issuance of Technical Sanction, E-tendering pf work,

~ Approval of Tender, awarding of work etc have to be completed in pre scribed timeframe in an effective manner.

Considering the matter in detail, the following duties and responsibilities are fixed for the Officers of HED (PIU) & KSCADC (PMU) for the smooth implementation of projects under KIIFB assistance.

SI. No

Activity Responsible Offices/Officers

1 Investigation of projects

2 Preparation of DPR

Pre-feasibility study by HED Detailed investigation model study e c. to be arranged by KSCADC

3 Uploading of the DPR to KIIFB Harbour Engineering Departrr ent

4 Obtaining statutory clearances from concerned Departments/ Agency

Managing Director, Chief EnE ineer and supporting staff of Kerala Sta e Coastal Area Development Corporatioi~. Harbour Engineering Departn ent

5 Concerned Agency throu ~h their i technical staff m the relevant I jurisdiction. (HEDJ . 1----+-----------------t-<---------''---....._ ::--:--1r:-----"""'."7 Managing Director, Chief En, ineer and

1 supporting staff of Kerala Sta e Coastal ; Area Development Corporatio 1. _;

6

Revision of DPR as per Technical Appraisal Report (TAR) from KIIFB

Uploading of the report on TAR and revised DPR to KIIFB

Page 2: PROCEEDINGS OF THE MANAGING DIRECTOR KERA.LA ...go.hed.kerala.gov.in/uploads/38058.pdfKerala State Coastal Area Deve lopment CQrporation Managing Director, Chief En 1 ineer of Kerala

·/

7 Preparation of WBS for issuing TS Technical wing of KSCADC on receipt of financial sanction

8 Scrutiny of updated DPR for TS Managing Director, Chief Engineer and l supporting staff of Kerala State Coastal 1 Area Development Corporation

9 Issue of Technical Sanction Technical Committee with MD, KSCADC (Chairman), CE, KSCADC (Convenor), CE, HED [Member}, External member from the O / o of CE, Irrigation

10 Preparation of Bid document and Managing Director, Chief Engineer of tendering Kerala State Coastal Area Development

Corporation 11 - Tender evaluation, award of work Managing Director, Chief Engineer of

and execution of agreement Kerala State Coastal Area Development Corporation. Subject to ratification of the Director Board of KSCADC

12 Project Execution Engineering wing of concerned agency/ department for the relevant jurisdiction

13 Project Quality assurance 1st and 2nd tier Quality control by HED. 3rd tier audit by KSCADC

14 Project Monitoring Field monitoring by HED, WBS based monitoring by KSCADC.

15 Verifying and check measuring Concerned Division of the HED. contractor's claims and passing the bills for payment as per approved WBS_

16 Uploading and verifying the passed Managing Director, Chief Engineer and bills to KIIFB supporting staff of Kerala State Coastal

Area Development Corporation

17 Approval & recommendation of Technical Committee with MD, deviation proposal for sanction KSCADC {Chairman), CE, KSCADC from KIIFB (Convenor), CE, HED (Member),

External member from the O/o of CE, Irrigation

18 Uploading deviation proposal to Managing Director, Chief Engineer of KIIFB Kerala State Coastal Area Development

Corporation

19 Preparation of proposals for utility Harbour Engineering Department shifting, land acquisition and other activities for site clearance

20 Preparing proposals for extension Harbour Engineering Department of time including revision of WBS if necessary

Page 3: PROCEEDINGS OF THE MANAGING DIRECTOR KERA.LA ...go.hed.kerala.gov.in/uploads/38058.pdfKerala State Coastal Area Deve lopment CQrporation Managing Director, Chief En 1 ineer of Kerala

V _,

! 21 Recommendation for extension of time and revision of WBS to KIIFB

22 Uploading extension of time and revision of WBS proposal to KIIFB

\ ~

Managing Director, Chief Engineer, Kerala State Coastal Area Deve lopment CQrporation Managing Director, Chief En1 ineer of Kerala State Coastal Area Development Corporation

23 Preparing the Project completion Harbour Engineering Department report {PCR) including schedule versus executed quantity, completion drawings and commencement of DLP

24 Scrutiny and Submitting PCR Harbour Engineering Departrr ent before technical committee

25 Recommendation of Project Closure to KIIFB

26 Legal matters

Managing Director of Kerala S ate Coastal Area Development Co 'poration Legal Consultant of PMU/PS J_