proceeding of an ordinary board meeting of … · 30.11.2017 issued work order to cai·1-y out...

9
PROCEEDING OF AN ORDINARY BOARD MEETING OF CANTONMENT BOARD. NASIRABAD HELD ON 16.03.2018 AT 11:00 HOURS AT .C.. O NfERENCE HALL OF CANTONMENT BOARD. NASIRMAD. MEMBERS PRESENT; l. Brig. Rajeev Chauhan , 2. S_h. Yogesh Soni .., .) . Sh. H. S. l\Ieena, I.D.E.S. 4. Col. J ay Shanka1· Prasad. 5. Col. B.S. Ahluwalia. 6. Major A.S. Jha, GE 7. Sb . Abu Sufi.van Chauhan, ADl\f-II w 8. Sb. Rohitash 9. Sh. Anii·udh 10. Sh. Ajay Bohai·a 11. Smt. Tai·annum Akhtai· J 2. Smt. Anita 1 3. Kum. Seema 14. Sh. Shaiwan Lal MEMBERS NOT PRESENT. 1. Brig. S.K Sharma , SE. MO 2. Col. A.K. Karil' SPECIAL INVITEE NOT PRESENT: 1. Sh. Bhup ende r Y adav 2. Sb. Raghu Shai ·ma 3. Sh. Ram Narayan Gurjar, President Vice-President J\Iember-Secretru·y Nominated Member Nominated l\Iember Ex-Officio Member Nominated Member Elected Member Elected l'vfember Elected J\ 1em her Elected Memb er · Elected .l\Iember Elected Member Elected Member Ex-Officio l\fomber Nominated · Me mber MP , Ajmer Constituencies (Rajya Sabha). MP , Aj mer Constituencies MLA, Nasirabad Constituencies. Page 1of9

Upload: others

Post on 28-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

~

PROCEEDING OF AN ORDINARY BOARD MEETING OF CANTONMENT BOARD. NASIRABAD HELD ON 16.03.2018 AT 11:00 HOURS AT .C..ONfERENCE HALL OF CANTONMENT BOARD. NASIRMAD.

MEMBERS PRESENT;

l. Brig. Rajeev Chauhan,

2. S_h . Yogesh Soni .., .) . Sh. H. S. l\Ieena, I.D.E.S.

4. Col. J ay Shanka1· Prasad.

5. Col. B.S. Ahluwalia.

6. Major A.S. Jha, GE

7. Sb. Abu Sufi.van Chauhan, ADl\f-II • w

8. Sb. Rohitash

9. Sh. Anii·udh

10. Sh. Ajay Bohai·a

11. Smt. Tai·annum Akhtai·

J 2. Smt. Anita

13. Kum. Seema

14. Sh. Shaiwan Lal

MEMBERS NOT PRESENT.

1. Brig. S.K Sharma, SE.MO

2. Col. A.K. Karil'

SPECIAL INVITEE NOT PRESENT:

1. Sh. Bhupender Y adav

2. Sb. Raghu Shai·ma

3. Sh. Ram Narayan Gurjar,

President

Vice-President

J\Iember-Secretru·y

Nominated Member

Nominated l\Iember

Ex-Officio Member

Nominated Member

Elected Member

Elected l'vfember

Elected J\1em her

Elected Member ·

Elected .l\Iember

Elected Member

Elected Member

Ex-Officio l\fomber

Nominated ·Member

MP, Ajmer Constituencies

(Rajya Sabha).

MP, Ajmer Constituencies

MLA, Nasirabad Constituencies.

Page 1of9

Page 2: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

Oath:- Before commencing ordinai-y Boru·d meeting Brig. Rajeev Chouhan, President

Can tonment Board took oath of allegiance to the Constitu tion as r equfred under Section 17 of the Cantonments Act, 2006. Oath is kept in file.

Sh. Vi.render Singh yadav, S.D.M. Nasirabad a t tended the meeting in place of Sh . Abu Sufiyan Chouhan, A.D.M. II. Nominated member vi.de Dist. Collector , Ajmcr L.No SM/2642-47/ dt . 15.03.2018.

1. MONTHLY INCOME & EXPANDI TURE:-

To consider mon thly income and expenditure for the month of February, 2018.

rNCOME OF FEBRUARY - 2018 EXPENDITURE QF FF;BRJ.!ARY - 201§

HEAD I N~Ol\lE HEAD EXPENDITJ.!RE

A-Gen .Adm. Pay OfC.E.O. 32 725 (A)( l) OPENING BALANCE 66.11,439

A-(2)Gen . Gcn.Adnun (Pay of 3.49. 156

Adm. Establishment)

A-(3)Gen . Allow11ncoa 41,000 Adm. Tenrunal Taii -

A-(4)Gcn . Adm. Contingenc1e1> Bl. lJG5

Property Tax 5.800 B(l)a Termmal Tax Estt.

B(J)b Termmol Tax C-Ono . Tax on Trade 22.161

B(2)a Other Taxes Esn. 69 7'.~.J

. B(2)b Other Taxes Cona . L1ghtmj! Tax 2.977

B(3)a estt. 52.613

Water Tax 4.548 8 (3)B CONTG . D(l)d Water Supply .

Wnrnr Charges 3.lJ4.735 D( l)e Store -0 (2)8 Building .UG 848

Sen'l.Cc Charges . 0 (2)b Road'& . D(2)c Dramagc .

Dog Tax -0(2)e Srore Supply Payme nt -l,80.2-12

D(2)f M.J.Sc. Public Repair . 7 l.li6R Pound -

D(3)(a)(b) EstL & Contin. 2,03.038

E (2)b L ighting conti. 18.13:! H.C./B.S.Fee .

E (-l )a Market & Sla ugh rer E .. u. 2G,7fi l

E (5)a Pound esu Rent from Lea:.e .

E (5)b Pound Contig.

E(6)a GardenEsn I l.00 270 Ren t from C/F Build.mg :J9.24fi

E(6)b Garden Esn conh GO,;lG8

Licence Fee!" . F (4)a Civil Consy. Esu . 12.63.6 11

Sale Proceed of Night Soil . F (-l)b Civil Consy. Cont1 9, 17. 11 0 nnd Sweeping

Mill. Consy. Receipt 12.21 .502 F(5)a W11ter Supp.Estt . l,50.158

Fines F(5)b Water Supp Conti ~.60.101

Pag e 2 of 9

Page 3: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

Marnage & Contracror 200 F(7)a Epedcm1c Estt. .J J ,318

regiscrauun F'ee I

Distram Fee 800 F(8)b Fn1r & fast1val contg. . Copymgfee 60 F(9)a Mil l.<Xtnl«ln ·cncy E~n. 1.66, 12G

Sale of wnter F(9)b Milt.conf;t>rvency Conn. 2,53,707

G( l )b Conlg (Day Care Center) 58. 11 I

Int. on Tm·estment :.!. 77,275 G(l)c Public T nsmurion (Contnbuuon)

I Pension Fund 50.69,79:.!

Other Item (l\lisc's) 37.068 H (2) Cho.ritable and McdicaJ ln~n.

• Ordmnn· Grant·ln-_.\1d . J Sun•cr of Land

\\"athdrawal from saving 1.50.00.000 K (1) PHED~lr~S Water Supply 22 l!l,i17

bank

I{ (2) Ad\'ance

Elec. Clrn 1·gcs biJJ to A\ 'VN 7.50,f);~ I

L-(3) 8 Elecuon . Depo~1t 25.025 L-(3) c ' conmbution for abas .

L(4) l Smuoncry . L(-1) 2 Prmtang

L(4) 3 Po1Jtagu H:-1 1

L(4) 5 Book & Periodicale "

L(4) 7 Legnl Charges 2 WO

L(4) 9 . .\ud1t Fee& -L(4) 10 ~lase &-<:penchture l 10 -176

1~(4) 11 Eswblisbment AU & RC -L(4) 12 .\U & RC Contingencies . L(5) e Rent of Class ·c• Land . M(l) b lm·estmcnt -l\1(4) .\d\'llTICCS Iii 000

M(5) Dcpos1te -Closing Bala.nee 1,02,33,601

TOTAL 2,35,62,836 TOTAL .. , .. 5.62.836

EXPENDITURE DETAILS UNDER BUDGET HEAD " D"

BUDGET HEAD D-1 {ORIGINAL WORKS}

SUB- BUDGET READ REVISED EXPENDITURE RESIDUAL AMOUNT HEAD SANCTIONED FEBRUARY -

BUDGET 2017-18 2018

D {l) a BCILDING 20,00,000 20,00.000

D (1) b ROADS . . D (1) c DRAINAGE .

D (1) d WATER SUPPLY - -D (1) e STORES 18,50,000 . 18.50.000

D (l) f 1\ITSC PL""BLIC 1,50,00,000 1,50,00.000 u\IPROVEMENTS -

Page 3 of 9

Page 4: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

BUDGET HEAD D-2 (MAINTENANCE & REPAIRS>

SUB- BUDGET HEAD REVISED EXPENDITURE RESIDUAL AMOUNT HEAD SANCTIONED FEBRUARY-

BUDGET 2018 2017-18

D {2) a BUILDING 23,46,017 4,16,848 19,29,169

D (2) b ROADS -t.3,04,337 - 43,0-1,337

D (2) c DRAINAGE 55,00,000 - 55,00,000

D (2) d WATER SUPPLY 40,00,000 - 40,00,000

D (2) e STORES 30,49,727 4,80,242 25,69,485

D (2) f MISC PUBLIC 45,57,751 74,568 44,83,183 IMPROVEMENTS

RESOLUTION:- Considered and approved. Boa.rd resolved that recovery i·ate of taxes and water charges are relatively low. Recovery percentage are at much lower level than the annual demand reflected in Budget demand for 2017-18. Tax & Revenue Branch be warned to adopt all procedural steps to raise the recovery percentage and be vigilant to avoid adverse financial situation faced by Boai·d due to large dependence on grant-in-aid and lower r evenue generation.

2. INSTALLATION OF ADDITIONAL STREET LIGHTS:-

Reference C.B Resolution No. 07 dt. 09.11.2017.

The Boai·d vide its resolution referred to above have a.heady approved the work of installation of new street lights service line and 70 Nos. 30 watt L.E.D fitting with complete accessories on electric poles from pe trol pump to Muslim graveyai·d and neai· Shrinagai· road amounting to Rs. 6,30,460.54 only.

Accordingly an agreement executed between Cantonment Board, N asirabad and MIS A.R. Enterprises H.No.3997 Nasirabad on 28.11.2017.

Cantonment Board, Nasirabad vide ~.No. NCB/street light/2017-18/287/dt. 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order.

Elected member of v\7 ard No. 5 requested to provide service line, clamp, stay and L.E.D lights on the poles already existing within Muslim graveyard.

If such additional work is cal'l'ied out expenditure will not exceed from the ceiling of sanctioned amount of Rs. 6,30,460.54/- as earlier approved by the Board.

Relevant file is placed on the table.

To decide further action.

Page .Jof 9

Page 5: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

RESOLUTION:- Considered and resolved th-lit service line, clamp, stay and L.E.D. lights on 19 poles, existing within ·Muslim grdvcyard and about 15 poles along r oads towru:ds Chri tian graveyard be installed over and above 70 poles earlier decided by Board. Furt her expenditw·e should noL be exceed from the ceiling of sanctioned amount of Rs. 6,30,460.54/-as earlier approved. Installation work should be completed by 31.03.2018 positively.

3. ENGAGEMENT OF MEN - PQWER ANJ) TRACTOR - TROLLY IN ARMX a REAONCONTRATBASlS

Reference circular agenda No. NCB!l\fily. Consy/2017-18/373/ dt. 27.02.2018

To note and approve aforesaid circulation agenda by which majority of member s approved extension period upto May, 2018 with regard to engagement of 14 men­power and two tractoT-trollies for Military consy. services at the rates men tioned in circulation agenda.

Relevant file is placed on the table.

RESOLUTION:- Noted and approved.

4. RE-APPROPRIATION :MINOR..HEAD TO M1NOR HEAD:::

To consider and approve Te-appropriation from minor bead to minor head under rule 20 of the Cantonment Accounts Code, 1924 as under :-

S.No From Budget Head To Budget Head Amount

1. B(2)1 Ternu nal Tax Estt. B(l )b Terminal Tax Rs. •13750/-Continl!encies B (2) Other Taxes Rs. 1,05.400/-Contm genc1es

Total Rs. 1,49,150/-2. E(2)b Lighung Contmgencies E(G)b Garden Contingencies Rs. Ll ii,000/-

3. A(3) Allowa nces A(4) General Administrntion Rs. 30,000/-Contine;encies

4 L (4)1 Staoonery L( t) 3 Official postage and Rs_ 2.000/-postage Labels

RESOLUTION:- Considered and approved.

5. ES.TABLISUMENT A.C.P . TO ELIGIBLE EMPLOYEES

To consider office note of Accountant dated 07.03_2018 about 3rd ACP to under mentioned employee w.e.f. the date noted against each in terms of Govt. of Rajasthan Finance department (Rule Division) as i sued vide notification No. G-14 (88) finance (Rules)/2008 dated 05.07.2013 and applicable to cantonment Boa1·d Employee as mentioned below:-

Pag~ 5 of 9

Page 6: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

S.No. I Name/Father name Desi~tion Date of Completion of Appointment 27 year

1. Sh. Chetan S/o Sh. Gopi Safaiwala 08.03.1991 08.03.2018

2. Sb. f\1angal S/o Sh. Janwar1 Safaiwala 08.03.1991 08.03.2018

3. Sh. Jagd.tsh Slo Sh. Mittu Safaiwala 08.03.1991 08.03.2018

·1. Smt. Vimla W/o Sh . Sheetal Das Safaiwali 08.03.1991 08.03.2018

Report of Accountant dated 07 .03.2018 is placed on the table alongwith relevant ervice record of individuals.

To decide furt her action.

RESOLUTION:- Considered and resolved that detailed proposal be sent to higher authorities for obtaining necessary sanction immediately.

6. TRAFFIC MANAGEMENT IN NAS!RABAD GANTT:-

Reference Station Hqrs. Nasirabad L.No. 212/9/Civ-Cantt/dt. 11th January,2018 r eceived alongwith L.No. 40 dt. 05.01.2018 from S.H.O City Thana , Nasirabad.

It has often been brought to not ice of the board that lot of venders, locaJ shopkeepers have kept items I commodities on roadside I footpaths resulting in reduction of width of road affecting traffic management adversely and causing inconvenience to general public.

Relevant letter is placed on the table.

To decide further action.

RESOLUTION:- Considered and resolved by the Board that detailed Traffic :Management Plan be put up in place for effective management of traffic in Cantonment. The ame be put up before the Boai·d in the next Board meeting for approval. Fuither various aspects such as, no parking zones, vending and no vending zones, designated, parking places, removal of temporary and permanent road side encroachments in main bazai· area, speed breakers for prevention of accidents, penalty provisions for violations etc. and any other relevant issue be taken into account before :finalization of Traffic Management Plan.

Fui'ther all relevant stake holde1·s such as elected mem hers, local administration and police, shopkeeper s associations etc. be consulted for mor e effective prepru·ation and implementation of T1·af:fic l\Ianagement Plan.

Page 6of9

Page 7: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

7. BUILDING BYE-LAWS:-

Reference public Notice No.NCB/2017-18/6&9-A/ dt. 28.12.2017. I

To inform the Board that public Notice with regard to draft building bye-laws in respect of Nasirabad Cantt. was published and pasted on all Notice boards by inviting objection/sugge tion from general public within 30 days from the date of publication of aforesaid public Notice.

Afte1· the expiry of 30 days time no objection/suggestion received in this office by 28.01.2018.

Therefore Board"s final approval is required.

Relevant file is placed on the table.

RESOLUTION:- Considered and finally approved.

SUPPLIMENTARY AGENDA ITEMS WITH THE PERMISSION OF CHA!R

8. RE PLACEMENT OF EXISTING STAFF CAR AMBASSADOR WITH SCORPlO S 7 2WD 140 BHP <Mahindra & Mahindra}

Reference circulation agenda No. NOB/Staff Cru:/2017-18/397 /dt. 13th Mai·ch 2018.

To note and approve af01·esaid Circulation agenda by which majority of members approved replacement of existing Staff Car Ambassador with Scorpio S7 2WD 140 BHP (.Mahindra & Mahindra ) . Rates procm·ed from GEM (Gove1·nment e-Market) portal for pw·chase of aforesaid make vehicle is R::;. 11,06,374/- and budgetary provisions for 2017-18 (R) under the budget head D(l)e exists.

RESOLUTION:- Matter considered along with report of Army l\Icch. v\To1·kshop 6340 which confirmed that sustenance of current fleet is a challenging proposition in the absence of genuine spare paits and accessories. Moreover due to closure of OEM further affecting the reliability of fleet.

Since budgetary provisions for pm·chase of new Scorpio - S7 2\iVD 140 BHP already exists for 2017-18 (R) under budget head D(l) e. Therefore Scorpio 87 2WD 140 BHP @ R . 11,06,374/- be pw·chased immediately. Applicable G.S.T, C.S.T, I.G.S.T and transportation chai·ges etc. is also approved.

Ambassador Staff car No. RJ-Ol-U-0276 should be put to p\lblic auction via due procedui·e, after purcha e of Scorpio.

Pnae 7 of 9

Page 8: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

9. OBSERVANCE OF FOUNDATION DA -

Reference C.B. Res. No. 05 dt. 28.12.2017 .

To inform the Board that Nasirabad Cantonment will complet e its 200 year s establishment yea1· in the month of June, 2018. Therefor e, Boal'd have to constiwte a committee in this rega1·d for planning of above events.

RESOLUTION:- Considered and r e olved that a committee comprising of Sh. Yoge h Soni, Vice Presiden t, Sh. Rohitash elecLed member , Kum. Seema elected member , Sh. H.S. Ivleena, I.D.E .S. Member-Secretai:y and Ivlajor A.S. Jha, ex-officio member be constituted to observe planning of above events. S.D.M. nominated member , who was made pai·t of the commi t tee expressed non-availability due to his busy schedule and commitments.

Committee will submit repor t on the matte1· r egai·ding planning and other aiTangements, event in one month for Board's approval.

IO.ISSUE OF NO OBJECTION CERTIFICATE:-

Refer ence Secretai'}' Krishi Upaj Mandi Samiti (grain), Ajmer L. No. 1821 dt . 11.01.2018.

To consider matter for issue of No objection certifica te for construction of toilet for the facility of genera l public at subhashgunj mandi, Nasirabad.

Cantonmen t Over seer inspected the site and found tha t nea1· main gate permission to construct toilet may be accorded.

Relevant file is placed on the table.

To decide further action

0

RESOLUTION:- Considered and resolved that in the interest of gener al public N.O.C. for construction of two toilets be given . Further C.E.O. Nasirabad Cantt. will decide site on which toilets ai·e proposed to be consti·ucted, before giving N.O.C.

Page 80{ 9

Page 9: PROCEEDING OF AN ORDINARY BOARD MEETING OF … · 30.11.2017 issued work order to cai·1-y out aforesaid work within 120 days from the date of receipt of work order. Elected member

11.EXIENSION OF TIME PERIQD~FOR IijSTALLATION OF 700 L.E.Ds:-

f Refer ence G.B. Res. No. 06 dt 25.09.2017 and G.B. Res. No. 04 dt. 13.02.2018.

It is informed to th e Board that M/s H .B. Elech·ical f.:l A-313 Palam Vihar, Gurgaon was en trusted to carry out supply and installation of 700 L.E .D. Strnet lights in Nasi.rabad Gantt. vi.de this office letter No. NGB/street lighl/2017-18/384/dt . 08.03.2018 tln·ough e-mail. It was mentioned in aforesaid letter that task should be

completed by 15.03.2018, failing which security amount will be forfitted.

Electr ic and Water supply foreman informed vi.a his note sheet d t. 15.03.2108 that l\I/s H .B . Electricals A-313 Palam Yihar . Gurgaon has failed to supply and installation work of L.E .D light by the evening of 15.03.2018.

Mis H.B. Electricals A-313 Palam Vihar, Gurgaon inf01·med this office via e-mail

r eceived on 15.03.2018 at 7:04 PM, with the request that he m ay kindly be given time extension till 25.03.2018 for supply and installation of L.E.D lights.

100% LEDization work is manda tory to be caITied out during fi nancial year 2017-18 as per direction s of higher a uthority.

Relevant file is placed on the table.

To decide ftu'ther action .

RESOLUTION:- Boa1·d con sidered the matter in detail and resolved that l\I/s H.B

Electricals should ensure to get tested/checked L .E .D lights rega1·ding their brigh tness from all elected members before thefr installation. Boru·d r esolved that Mis H .B Electricals A-313 palam vi.hru', Gurgaon be en trusted to can y out supply and installation of 700 L.E.D street ligh ts by 25.03.2018 complete in all respect. Failing which secui·ity amount be forfeitted.

(H.S. l\1eena) l\1e01ber-Secretary

Gantt.Board, Nasirabad Dt. 16.03.2018

True

· ~~ o .,,cJ s~pdt.

Gantt Boru·d, Nasirabad.

(Brig. Rajccv Chauhan) P1·esident,

Gantt. Boa1·d, Nasirabad Dt. 16.03.2018

Page 9of9