Page 1: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

PROJECTS PORTFOLIO

NOVEMBER 30, 2012

Page 2: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Private investment promotion process 26 projects

PROJECTS PORTFOLIO

SECTOR N° PROJECTS

ESTIMATED INVESTMENT (US$ MILLION)

Land transport (Road and Railways) 2 6,800 Energy (Electricity & Hydrocarbons) 8 2,259 Sanitation 3 547 Agriculture 2 503 Telecommunications 2 420 Airport 1 420 Ports and Navigability 2 175 Tourism 2 11 Mining 1 n.d. Capital Markets 2 n.d. Culture 1 n.d.

Page 3: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

LAND TRANSPORT PROJECTS PORTFOLIO

SECTOR / PROJECT CURRENT STATUS ESTIMATED INVESTMENT US$ MILLION

PLANNED AWARD DATE

1. Road Concession * To be called 3,800.0 As from 2013

1.1 Road Concessions: Longitudinal de la Sierra road project Section 2- Ciudad de Dios–Cajamarca-Chiple, Dv. Chilete-Emp. PE-3N / Cajamarca – Chota – Cutervo – Chiple /Cajamarca – San Marcos – Huamachuco – Chorei - Trujillo

To be called 430 III QT 2013

Page 4: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Longitudinal de la Sierra road

Section 2 870 km

Longitudinal de la Selva road

Description: Concessions of 3 sections of Longitudinal de la Sierra road and 2 sections of Longitudinal de la Selva road. The Ministry of Transport and Communication will defined the sections in order to interconnect Peruvian villages and cities.

Likewise, the construction of these roads will allow to lay pipelines for the installation of optical fiber along them.

• Estimated investment: US$3,800 million (approximately)

• Type of concession: Co financed

• Current status: The MTC submitted the evaluation report of Section 2 of Longitudinal de la Sierra Road and request its incorporation.

• Award date: As from 2013

ROAD CONCESSIONS *

• These include sections of the Longitudinal de la Sierra, Longitudinal de la Selva road.

TO BE CALLED

Page 5: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Description: Concessions for the construction, operation and maintenance of Section 2 Longitudinal de la Sierra road. Estimated 870 km long.

Estimated investment: US$430 million

• Type of concession: Co financed

• Current status: The project is under evaluation by MEF. The call for tender will be made after its conclusion.

• Award date: III QT 2013

ROAD CONCESSIONS: LONGITUDINAL DE LA SIERRA ROAD PROJECT SECTION 2:

Cities: CIUDAD DE DIOS–CAJAMARCA-CHIPLE, DV. CHILETE-

EMP. PE-3N CAJAMARCA – CHOTA – CUTERVO – CHIPLE CAJAMARCA – SAN MARCOS – HUAMACHUCO – CHOREI

– TRUJILLO

TO BE CALLED

Page 6: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

RAILROAD PROJECT PORTFOLIO

PROJECT CURRENT STATUS ESTIMATED INVESTMENT

US$ MILLION (VAT not included)

PLANNED AWARD DATE

1. Lima and Callao electric mass transportation system- Line 2 To be called 3,000 IV QT 2013

Page 7: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

LIMA AND CALLAO ELECTRIC MASS TRANSPORTATION SYSTEM- LINE 2

Location: Lima and Callao.

Description: Concession to design, finance, build, supply of electromechanical equipment, acquire rolling material, operate and maintain Line 2 of the electric mass transportation system. Line 2 will have an approximately extension of 35 km and, will go through 12 districts of Metropolitan Lima.

• Estimated investment : US$ 3,000 million.

• Type of concession: Co financed.

Current status: Project profile is under evaluation by the Ministry of Transport and Communication.

Award date: IV QT 2013

TO BE CALLED

BASIC NETWORK OF THE LIMA METRO

Length: 35 km approximately Route: 12 distric of Lima metropolitan

Page 8: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

HYDROCARBONS PROJECTS PORTFOLIO

PROJECT CURRENT STATUS ESTIMATED INVESTMENT US$ MILLION PLANNED AWARD DATE

1. Supply System of LPG for Lima and Callao

Call for tender was made 124 I QT 2013

2. Mass use of natural gas nationwide Call for tender was made 206 II QT 2013

3. Supply system of LNG for domestic market To be called 252 II QT 2013

Page 9: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Location: Southern zone of Lima

Description: Concession to design, finance, build, operate, and maintain the LPG transport system from the producer facilities (Pisco) to Lima province border.

The project involves the following: • A pipe of 250 km approximately from Pisco to a terminal located

between Lurin and Conchan. An initial transport of 1,000 tonnes of LPG daily is estimated.

• A terminal for storage and attention to be placed between Lurin and Conchan.

• Pumping station, measurement equipment, valve, pig traps and communication equipments.

• Estimated investment (VAT not included): US$ 124 million.

• Type of concession: Self- sustained.

• Competition factor: The lowest cost of total service

• Concession term: 20 years plus the construction period (28 months).

Current status: Ccontract second version is under elaboration. Award date: I QT 2013.

SUPPLY SYSTEM OF LPG FOR LIMA AND CALLAO

THE CALL FOR TENDER WAS MADE

Page 10: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

MASS USE OF NATURAL GAS NATIONWIDE

Cities to be supplied : Arequipa, Cajamarca, Chiclayo, Lambayeque, Chimbote, Huaraz, Moquegua, Ilo, Tacna, Trujillo and Pacasmayo. For concession purposes, those cities will be grouped in two groups

Description: The distribution system of natural gas includes: Land or sea transport of liquid or compressed natural gas from

the gas liquefaction plant Pampa Melchorita — 170km. South of Lima—to the cities to be supplied.

Regasification in the border of the above- mentioned cities. Supply of natural gas to final users through gas pipelines.

• Estimated investment (VAT not included): US$ 206 million. • Type of concession: Self-sustained. • Competition factor: Commitment of the largest number of users

connected • Concession term: 20 years.

Current status: The contract first version and the Tender Documents are published on Proinversion’s web site.

Award date: II QT 2013.

THE CALL FOR TENDER WAS MADE

Planta licuefacción Pampa Melchorita

OCEAN PACIFIC

BRAZIL

Page 11: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

LNG SUPPLY SYSTEM FOR DOMESTIC MARKET

Location: Pampa Melchorita, Cañete.

Description: Concession to design, finance, build, operate and maintain a supply system that will allow to have a reserve of liquid natural gas produced at the gas liquefaction plant of Pampa Melchorita. - 170 km south of Lima - and re gasify it for emergency periods. The reserve will be used if necessary mainly to supply thermal plants located in Chilca - 64 km south of Lima.

• Estimated Investment : US$ 252 million.

• Type of concession: Self-sustained.

• Competition factor: The lowest cost of total service.

• Concession term: 30 years.

Current status: Technical studies are under elaboration.

Award date: II QT 2013 PACIFIC OCEAN Planta licuefacción Pampa Melchorita

CAÑETE

THE CALL FOR TENDER WAS MADE

PACIFIC OCEAN

BRAZIL

Page 12: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

ENERGY (ELECTRICITY) PROJECTS PORTFOLIO

PROJECT CURRENT STATUS ESTIMATED

INVESTMENT US$ MILLION

PLANNED AWARD DATE

TRANSMISSION LINES 1. 220 kW Moyobamba – Yurimaguas - Nauta-Iquitos Transmission Line

Call for tender was made 345.0 I QT 2013

2. 220 kW Machu Picchu – Quencoro – Onocora -Tintaya Transmission Line

Call for tender was made 181 IV QT 2012

3.- Mantaro-Marcona- Socabaya-Montalvo 500 Kv Transmission Line

To be called 372 III QT 2013

HYDROELECTRIC POWER STATIONS 5. Hydroelectric power stations (Molloco power station)

Call for tender was made 698 IV QT 2012

THERMAL POWER STATIONS 6. Energy supply to the city of Iquitos (70 Mw) To be called 81 I QT 2013

Page 13: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

T.L. MOYOBAMBA – IQUITOS EN 220 kV

Location: Loreto and San Martín. Description: Concession to design, finance, build, operate and

maintain the line in order to increase the electricity transmission capacity to the eastern zone of Peru (Departments of Loreto and San Martin) and interconnect the electricity systems in these departments with the National Grid. It will have an approximately length of 600 km and capacity of 145 MVA.

• Estimated Investment : US$ 345 million.

• Type of concession: Self sustained.

• Competition factor: The lowest cost of total service

• Concession term: 30 years plus the construction period (52 months).

Current Status: The third contract version was published on Proinversion’s web site.

Award date: I QT 2013.

THE CALL FOR TENDER WAS MADE

Moyobamba

Iquitos

600 Km

PACIFIC OCEAN

BRAZIL

Page 14: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Location: Department of Cusco

Description: Concession to design, finance, build, operate and maintain the line (300 km) to increase the transmission capacity of electric power to the southern area of the country, and reinforce the bidirectional connection between the subsystems of the area and allow the future connection of new charges and/or electric power plants.

• Estimated investment: US$ 181 million.

• Type of concession: Self –sustained

• Competition factor: The lowest cost of total service

• Concession term: 30 years plus the construction period (38 months).

Current status: The contact final version is published on Proinversión’s web site.

Award date: IV QT 2012.

220 kW MACHU PICCHU – QUENCORO - ONOCORA -TINTAYA TRANSMISSION LINE

THE CALL FOR TENDER WAS MADE

PACIFIC OCEAN

BRAZIL

300 Km

Page 15: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

ENERGY FROM HYDROELECTRIC POWER STATIONS (MOLLOCO HYDROELECTRIC POWER STATION)

Location: Department of Arequipa.

Description: The project comprises the design, construction, finance, operation and maintenance of a hydroelectric power stations with a total energy capacity of 300 MW.

The company Generación Electrica de Arequipa S.A. – EGASA will transfer it’s definitive concession rights, the corresponding studies, the support for the land use rights and the project social license to the awardee.

• Estimated Investment: US$ 698 million. • Type of concession: Self sustained. Competition factor: Largest energy production committed to Generación Eléctrica de Arequipa S.A. - EGASA company (State company).

Current status: The contract final version (investment commitment, business coordination and assets acquisition) was published on Proinversion web site.

Award date: IV QT 2012.

THE CALL FOR TENDER WAS MADE

PACIFIC OCEAN

Page 16: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Location: Huancavelica, Ica, Arequipa and Moquegua. Description: Concession to design, finance, build, operate and maintain the line with an approximately length of 900 km. and a capacity of 1600 MVA. Its operation will allow the energy generated in the center to be transfered to the South of the country to meet the growing demand In this last area the electrical demand in the next 5 years will be increased by close to 1000 MW due to the investments in mining. • Estimated investment: US$ 372 million. • Type of concession: Self sustaining.

• Concession term: 30 years plus the construction period (44 months).

Current status: Under process.

Award date: III QT 2013

MANTARO-MARCONA-SOCABAYA-MONTALVO 500 kV TRANSMISSION LINE

900 km

Huancavelica

Moquegua

TO BE CALLED

Page 17: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

PACIFIC OCEAN

BRAZIL

ENERGY SUPPLY TO THE CITY OF IQUITOS 70 MW

Iquitos

Location: Iquitos.

Description: Concession of the supply of power and energy to the national grid, in its first stage, it will run based on a regular supply that will end once the operation of Moyobamba – Iquitos transmission line begins.

The project comprises design, financing, construction, operation and maintenance of the new thermoelectric power stations to be placed in Iquitos (70 MW) are considered. In the second stage the supply will be as a stand-by reserve.

• Estimated investment: US$ 81 million.

• Type of concession: Self-sustained.

• Competition factor: Lowest payment offered per power, once the plant operates as stand-by reserve.

• Concession term: 20 years plus the construction period (24 months).

Current status: The contract’s second version is published on Proinversion web site.

Award date: I QT 2013.

THE CALL FOR TENDER WAS MADE

Page 18: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

AIRPORT PROJECT PORTFOLIO

PROJECT CURRENT STATUS ESTIMATED INVESTMENT US$ MILLION

PLANNED AWARD DATE

New international airport of Chinchero -Cusco

The call for tender was made 420.0 IV QT 2013

Page 19: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

NEW INTERNATIONAL AIRPORT OF CHINCHERO – CUSCO

Location: Cusco.

Description: Concession of the design, construction, financing, administration, operation, maintenance and exploitation of the new international airport of Chinchero – Cusco.

• Estimated investment: US$ 420 million

(infrastructure works only) • Type of concession: Co financed • Concession term: 40 years • Competition factor: Lowest co- finance required

Current status: The pre investments studies are to begin.

Award date: IV QT 2013.

THE CALL FOR TENDER WAS MADE

Page 20: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

PORT PROJECTS PORTFOLIO

PROJECT CURRENT STATUS ESTIMATED INVESTMENT US$ MILLION

PLANNED AWARD DATE

1. General San Martin port terminal The called for tender was made 101 III QT 2013

2. Upgrading and maintenance of navigability conditions of Rivers Huallaga, Ucayali, Marañon and Amazonas

To be called 74 IV QT 2013

Page 21: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

GENERAL SAN MARTÍN PORT TERMINAL

Location: Ica. Description: Concession for the design, construction,

financing, maintenance and operation of General San Martín port terminal. Estimated investment: US$ 101 million. Type of concession: Self- sustained. Competition factor: Under evaluation Concession term: 30 years.

Current status: The promotion plan waiting to be approved..

Award date: III QT 2013

THE CALL FOR TENDER WAS MADE

Page 22: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

PACIFIC OCEAN

UPGRADING AND MAINTENANCE OF NAVIGABILITY CONDITIONS OF RIVERS HUALLAGA, UCAYALI, MARAÑON AND AMAZONAS

Location: Loreto and Ucayali

Description: Development of dredging works, rivers information signs, in order to assure the navigability and therefore the traffic between the port terminals of Yurimaguas, Pucallpa and Iquitos.

• Estimated investment (VAT not included): US$ 74 million.

• Type of concession: Co-financed.

• Concession term: 20 years.

Current Status: The promotion plan waiting to be approved.

Award date: IV QT 2013.

TO BE CALLED

Page 23: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

SECTOR / PROJECT CURRENT STATUS ESTIMATED

INVESTMENT US$ MILLION

PLANNED AWARD DATE

1. 1710 – 1770 MHz and 2110 – 2170 MHz Band Nationwide

The call for tender was made

To be defined III QT 2013

2. National optical fiber backbone network To be called 420 IV QT 2013

TELECOMMUNICATION PROJECTS PORTFOLIO

Page 24: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

1710-1770 MHZ AND 2110-2170 MHZ BAND NATIONWIDE

Location: Nationwide Description: The project involves the selection of a private

telecommunication operators that will be in charge of providing Public Telecommunication Services in Blocks A and B of the 1710-1770 MHz and 2110-2170 MHz bands. The same bidder will not be able to award both bands blocs.

The band technical specifications make possible to provide advanced wireless services (mobile broadband, voice communication, new applications, high-speed and high-capacity interactive and multimedia services )

• Concession term: 20 years, renewable.

• Type of concession: Self-sustained

• Competition factor: Under evaluation. Current status: The transaction advisor began the valuation

studies. Award date: III QT 2013.

THE CALL FOR TENDER WAS MADE

Page 25: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

NATIONAL OPTICAL FIBER BACKBONE NETWORK

Location: Nationwide. Over 10,000 km of optical fiber will be developed.

Description: The goal of the project is to expand a broadband in Peru through the installation of optical fiber in the Capital of 195 Provinces of the country.

The backbone network will belong to the Peruvian State. It will be operated by a neutral operator, without discriminating the companies that require the service. Charges, quality and permanence will be controlled.

The bidders may choose the best routes in order to improve their technical proposals (support network: pole, energy networks, etc) and economic proposals (lowest co- financing).

Estimated investment : US$ 420 million.

Type of concession: Co-financed.

Current status: Pre-investment studies are under formulation stage by the MTC.

Award date: IV QT 2013.

TO BE CALLED

Pacific Ocean

• Preliminary figure to be confirmed by pre-investment studies. • FITEL studies have not defined the number of capitals to be served.

Page 26: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

AGRICULTURE AND IRRIGATION PROJECTS PORTFOLIO

PROJECTS CURRENT STATUS ESTIMATED

INVESTMENT US$ MILLION

PLANNED AWARD DATE

1. Chavimochic irrigation project To be called 499 III QT 2013

2. Majes Siguas project Land Sale in Majes I (1,000 ha)

Call for tender was made 4 II QT 2013

Page 27: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

CHAVIMOCHIC IRRIGATION PROJECT

Location: Department of La Libertad Description: To complement the development of Chavimochic project in order to

incorporate 53,000 ha of new lands into the irrigation system and improve irrigation system of 48,000 ha in the valley and inter valleys of Chao, Virú, Moche and Chicama. To date, public investment in stages I and II of the project totals US$ 960 million.

The concession of the project includes: 1) Construction of works of the III stage:

• Reservoir of 360 cubic meter capacity in the Palo Redondo • Third line of Virú siphon • Moche – Chicama - Urricama canal of 113 km length

2) Development of an automation and improvement system, in order to improve the control and efficiency of the project operation.

3) Operation and maintenance of the Chavimochic Irrigation System ( Stages I, II and III)

4) Water services supply for the following users: population (Drinkable water and sewerage services of la Libertad – SEDALIB), agriculture (valleys and inter valleys of the Project) and hydro energy (hydroelectric power stations).

• Estimated investment : US$ 499 million (III Stage works) • Type of concession: Co- financed. • Concession term: 24 years

Current status: The pre investment studies are under elaboration. Award date: III QT 2013

TO BE CALLED

La Libertad

Page 28: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

MAJES-SIGUAS PROJECT LAND SALE OF 1000 ha LOCATED IN MAJES I

Location: Arequipa. Description: Sale of 02 plots of untilled lands of 500

ha each, with water right of up to 13,500 m3/ha/year. The plots are located in the lower area of Pampa de

Majes (110 km from Arequipa city). They are accessed by km 890 of Panamericana Sur highway.

These lands have competitive agro-ecological conditions to develop export products such as grapes, artichokes, paprika, garlic, onion, etc).

The Award grants to the respective awardees the right to exercise the Option to Purchase another contiguous lot of similar extension, on condition to obtain water from Majes irrigation surpluses (valid for up to 03 years) • Referential base price: US$ 4,000/ha

• Estimated investment: US$ 4 million.

• Current status: The process is under coordination with the Regional Government of Arequipa.

Award date: II QT 2013

POR CONVOCAR

Arequipa

Majes-Siguas project

THE CALL FOR TENDER WAS MADE

*Preliminary figures, subject to the technical studies

Page 29: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

PROJECT CURRENT STATUS ESTIMATED

INVESTMENT US $ MILLION

PLANNED AWARD DATE

1. Provision of sanitation services for the southern districts of Lima

To be called 102 IV QT 2013

2. Regulation works for Chillón River To be called 45 I QT 2014

3.- Main works and conduction of drinkable water supply for Lima To be called 400 I QT 2014

SANITATION PROJECTS PORTFOLIO

Page 30: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

PROVISION OF SANITATION SERVICES FOR THE SOUTHERN DISTRICTS OF LIMA

Location: Districts of Santa María, San Bartolo, Punta Negra and Punta Hermosa of Lima Province.

Description: The project involves the design, finance, construction and operation of the systems: (i) desalination of sea water, (ii) water storage and distribution drinkable water, (iii) sewerage, and, (iv) treatment and final disposition of treated waste water.

• Estimated investment: US$ 102 million.

• Type of concession: Self sustained.

Current status of the process: To be called

Award date: IV QT 2013.

POR CONVOCAR TO BE CALLED

Page 31: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

REGULATION WORKS FOR CHILLÓN RIVER

Location: Lima.

Description: The project involves the design, finance, construction, operation and maintain of dam works (40 MMC approximately) of Chillón river basin.

• Estimated investment : US$ 45 million.

• Type of concession: Self sustaining.

• Concession term: 20 to 30 years.

Current status: Preliminary studies are to called – I QT 2013.

Award date: I QT 2014

POR CONVOCAR TO BE CALLED

Page 32: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

MAIN WORKS AND CONDUCTION OF DRINKABLE WATER SUPPLY FOR LIMA

Location: Junín and Lima.

Description: The project comprises the design, finance, built, operate and maintain of : i) extension of Pomacocha and Huallacocha Bajo dam (approx. 100 MMC), ii) diversion works of Pomacocha – Río Blanco (approx. 10 km of trans Andean tunnel), iii) water purification plant (5 m3/s) and vi) Ramal Sur conduction line (approx. 25,6 km). • Estimated Investment: US$ 400 million. • Type of concession: Self sustaining.

• Concession term: 20 to 30 years.

Current Status: Preliminary studies are to called – I QT 2013.

Award date: I QT 2014

POR CONVOCAR TO BE CALLED

Page 33: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

SECTOR/ PROJECT CURRENT STATUS ESTIMATED INVESTMENT

US$ MILLION (Vat included)

PLANNED AWARD DATE

1.- Kuelap Cable car To be called 11 IV QT 2013

2.- Chaco La Puntilla Lot E The called for tender was made ------ IV QT 2012

TOURIST PROJECT PORTFOLIO

Page 34: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

KUELAP CABLE CAR

Location: District of Tingo, province of Luya, department of Amazonas.

Description: Concession to design, finance, build, equip and operate the cable cars system for a fast and modern access to Kuelap Fortress.

The cable cars route will be 4,400 meters in order to overcome the distance of 965 meters between Tingo locality and Kuelap fortress.

• Estimated investment : US$ 11 million

• Type of concession : Co- financed

• Concession term: 20 – 25 years.

Current status: The base of the cable car system location is under evaluation.

Award date: IV QT 2013.

TO BE CALLED

Page 35: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

CHACO - LA PUNTILLA LOT E

Location: District of Paracas, Province of Pisco, Department of Ica.

Description: Concession to operate and maintain the Touristic Marine’s infrastructure that will be built on Lot E of the Chaco – La Puntilla tourist project.

The main objective of the Touristic Marine is to provide suitable services for the touristic trip to Ballestas islands through a proper touristic quay and complementary services.

• Type of concession : self sustained.

• Competition factor: Higher compensation to the State

• Concession term: 20 years

Current status: The contract first version is published on Proinversion’s web site .

Award date: IV QT 2012

THE CALL FOR TENDER WAS MADE

Page 36: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

SECTOR/ PROJECT CURRENT STATUS ESTIMATED INVESTMENT US$ MILLION

ESTIMATED AWARD DATE

Management of the National Grand Theater

The call for tender was made ------ II QT 2013

CULTURE PROJECT PORTFOLIO

Page 37: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

Location: Lima.

Description: Private- Public Partnership that includes the management of the Theater, with participation of private investment in order to provide high quality performance for which it was designed, built and implemented.

Main characteristics

• The NGT has a capacity of 1400 persons and counts with 7 floors and 4 basements.

• The stage measures 60 meters deep, one of the largest worldwide.

• The orchestra pit will include mobile platform and high technology.

• Adaptable state-of-the-art sound system and mobile stages that allow to meet all different types of shows and the performance of up to 3 shows in the same day.

Type of the concession: Mix concession ( co-financed with compensation to State)

• Competition factor: Higher compensation and lowest co-financed.

• Concession term: 20 years

Current status: The Tender Documents and the contract’s project are published on Proinversion’s web site.

Award date: II QT 2013.

MANAGEMENT OF THE NATIONAL GRAND THEATER - NGT

Play Lobitos

Page 38: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

MINING PROJECTS PORTFOLIO

1

PACIFIC OCEAN

BRAZIL

PROJECT CURRENT STATUS

ESTIMATED INVESTMENT US$ MILLION

PLANNED AWARD DATE

1. Concession of Remaining Michiquillay Project

To be called To be defined IV QT 2013 Cajamarca

Page 39: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

CONCESSION OF REMAINING MICHIQUILLAY PROJECT

Location: District of Encañada – Community of Michiquillay, province of Cajamarca, department of Cajamarca, 47 km north west of Cajamarca; and 908 km of Lima.

Description: The project involves the transfer to the private sector of two remaining deposits of Michiquillay of 14, 927 ha.

These deposits have limestone reserves, in three different geological formation, with over 15 billion MT.

The limestone quality is good reaching over 97% of CaCO3 with low content of impurity mainly SiO2,Al2O3, Fe2O3, MgO and others. Due to its strategic location near to Yanacocha mine and other gold and copper projects, the prospect will also permit the exploration of these minerals.

• Type of concession: Contract of Transfer Option.

Award date: IV QT 2013.

TO BE CALLED

CAJAMARCA

Page 40: Private investment promotion process – short term 2012 - 2013 November 30, 2012)

SECTOR/ PROJECT CURRENT STATUS ESTIMATED INVESTMENT US$ MILLION

ESTIMATED AWARD DATE

1. Sale of shares held by FONAFE (Telefonica del Peru S.A.and Edegel companies)

To be called Auction III QT 2013

2. Sale of Shares of the Agro industrial company Cayaltí To be called Auction II QT 2013