priority area 5: to manage environmental risks péter bakonyi & olimpia negru hungary romania

31
EU Strategy for the Danube Region Priority Area 5: To Manage Environmental Risks Péter Bakonyi & Olimpia Negru Hungary Romania

Upload: todd-parrish

Post on 28-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

EU Strategy for the Danube Region

Priority Area 5: To Manage Environmental Risks

Péter Bakonyi & Olimpia NegruHungary Romania

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

EUSDR – Basic DocumentsCOMMUNICATION from the Commission to the

European Parliament, the Council, the European Economic and Social Committee and the Committee of The Regions

ACTION Plan (Accompanying document to the COMMUNICATION)

06/11/2012 Budapest, Annual Stakeholder Seminar

EUSDR – Basic Documents

Communication Targets

Action Plan Actions

06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

Structure of the EUSDREUSDR

Pillar AConnecting

Pillar BEnvironme

nt

PA 4Water

Quality

PA 5Risks

Action 1

Action 2

Action …

Action …

Action 8

PA 6Biodiversit

y

Pillar CProsperity

Pillar DStrengtheni

ng

06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

Targets (Pillar B)Communication from the Commission to the European Parliament, the Council, The European Economic and Social Committee and the Committee of the Regions [COM(2010) 715]

“The Commission strongly believes that setting targets is essential, to focus and prioritise efforts. These should be further developed with stakeholders, immediately following adoption of this Communication and finalised before the European Council in June

2011. Targets will apply to Member States; non Member States will be encouraged to strive towards them in the light of their specific circumstances. The targets will be monitored closely in the context of Commission reporting.”

06/11/2012 Budapest, Annual Stakeholder Seminar

Targets (Pillar B)1. Achieve the environmental targets set out in the Danube River Basin Management

Plan;2. Reduce the nutrient levels in the Danube River to allow the recovery of the Black

Sea ecosystems to conditions similar to 1960;3. Complete and adopt the Delta management Plan by 2013;

4. Implement Danube wide flood risk management plans - due in 2015 under the Floods Directive – to include significant reduction of flood risk by 2021, also taking into account potential impacts of climate change;

5. Draw up effective management plans for all Natura 2000 sites;6. Secure viable populations of Danube sturgeon species and other indigenous fish

species by 2020, combating invasive species;7. Reduce by 25% the area affected by soil erosion exceeding 10 tonnes per hectare

by 2020.

06/11/2012 Budapest, Annual Stakeholder Seminar

PA 5 Final Targets4. Implement Danube wide flood risk management plans - due in

2015 under the Floods Directive – to include significant reduction of flood risk by 2021, also taking into account potential impacts of climate change;

8. Update of the Accidental Risk Spots inventory at the Danube River Basin level by 2013

9. To address the challenges of water scarcity and droughts based on the 2013 update of the Danube Basin Analysis and the ongoing work in the field of climate adaptation, in the Danube River Basin Management Plan to be adopted by 2015

06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

Actions (managing flood risks)1. To develop and adopt one single overarching floods

management plan2. To support wetland and floodplain restoration as an effective

mean of enhancing flood protection3. To extend the coverage of the European Floods Alert System

(EFAS) system to the whole Danube River

06/11/2012 Budapest, Annual Stakeholder Seminar

Actions (managing industrial risks)4. To strengthen operational cooperation among the

emergency response authorities5. To continuously update the existing database of accident risk

spots (ARS Inventory)6. To develop rapid response procedures and plans in case of

industrial accidental river pollution

06/11/2012 Budapest, Annual Stakeholder Seminar

Actions (managing climate change)7. Anticipate regional and local impacts of climate change

through research8. To develop spatial planning and construction activities in

the context of climate change and increased threats of floods

06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps1. To develop and adopt one single overarching floods

management plan- Milestone n°1: Preliminary flood risk assessment on level A - Milestone n°2: Preparation of flood hazard and flood risk maps- Milestone n°3: Preparation of flood risk management plan for

Non-Member States- Milestone n°4: Preparation of flood risk management plan

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps2. To support wetland and floodplain restoration as an

effective mean of enhancing flood protection- Milestone n°1: Successful implementation of the Morava-Thaya

Basin initiatives- Milestone n°2: Development of a Master Plan for the restoration

of Floodplains of the Danube and its tributaries from spring to its discharge into the Black Sea

- Milestone n°3: Organisation of national and regional workshops concerning the Danube Floodplain restoration

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps3. To extend the coverage of the European Floods Alert System

(EFAS) system to the whole Danube River- Milestone n°. 1: Establishment of the three operational EFAS centres

for hydrological data collection, computation, and dissemination- Milestone n°. 2: Operational running of EFAS- Milestone n°. 3: Contact the relevant hydrological authorities in

Bosnia and Herzegovina - Milestone n°. 4: Annual training on EFAS- Milestone n°. 5: Bi-monthly bulletins distributed to all EFAS partners- Milestone n°. 6: Specific ICPDR training workshop on EFAS- Milestone n°. 7: Find financing possibilities for EFAS beyond 2013

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps4. To strengthen operational cooperation among the

emergency response authorities- Not available as yet

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps5. To continuously update the existing database of accident

risk spots (ARS Inventory)- Milestone n°1: ICPDR Accident Risk Spot Inventories (templates, data

collection)- Milestone n°2: ICPDR Accident Risk Spot Inventories Maps- Milestone n°3: ICPDR Guidelines and good practices for Tailing

Management Facilities

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps6. To develop rapid response procedures and plans in case of

industrial accidental river pollution- Milestone n°1: AEWS system upgrade and refining - Milestone n°2: Regular AEWS maintenance- Milestone n°3: International standardization of AEWS

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps7. Anticipate regional and local impacts of climate change

through research- Milestone n°1: Danube Climate Adaptation Study - Milestone n°2: Danube Climate Adaptation Workshop - Milestone n°3: Danube Climate Adaptation Strategy - Milestone n°4: Check the Danube Climate Adaptation Strategy for

completeness

06/11/2012 Budapest, Annual Stakeholder Seminar

Roadmaps8. To develop spatial planning and construction activities in

the context of climate change and increased threats of floods

- Milestone n°1: Explore areas stricken by droughts and water shortage- Milestone n°2: Measurement of land use aspects of protection against

flood, and developing recommendations for the application of land use aspects in flood risk management plans

- Milestone n°3: Development of spatial planning research program and methodology for the sake of harmful effects mitigation of climate change

- Milestone n°4: Principles of climate-friendly city structure and integration of climate-aware architecture solutions in the regulation of different sectors

06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

ProjectsLetter of Recommendation

- HYDROFOR: Systems of optimal forest management for enhancing the hydrological role of forests in preventing the floods in Bodrog river catchment (submitted by the NGO «FORZA, Agency for Sustainable Development of the Carpathian Region»)

- Sava FRMP: Flood Risk Management Plan for the Sava River Basin (submitted by the International Sava River Basin Commission)

- SOFTWARE: Sustainable Operational Flood Forecasting in Real-Time and Water Resources Management (submitted by the International Sava River Basin Commission)

- WACOSS: Water Pollution Contingency Management Plan for the Sava River Basin (submitted by the International Sava River Basin Commission)

- Danube Floodplain (submitted by the Ministry of Environment and Forests, Romania and WWF).

06/11/2012 Budapest, Annual Stakeholder Seminar

ProjectsEUSDR Relevant Label

- Monitor II: Practical Use of MONITORing in Natural Disaster Management

- CC-WaterS: Climate Change and Impacts on Water Supply- Transboundary Risk Management in the Danube Delta - Danube Floodrisk: Stakeholder oriented f lood risk assessment for

the Danube floodplains- Restoration of the Lower Morava floodplains- MoRe - Revitalisierung der March/Morava: Maßnahmendetailplan

entsprechend EU Wasser- und Naturschutz-Richlinien- SEERISK: Joint Disaster Management risk assessment and

preparedness in the Danube macro region.06/11/2012 Budapest, Annual Stakeholder Seminar

OutlineEUSDR – Basic DocumentsStructure of the EUSDRPriority Area 5

TargetsActionsRoadmaps

ProjectsTasks ahead

06/11/2012 Budapest, Annual Stakeholder Seminar

Tasks AheadDevelop new (regional) projects be prepared for years 2014-2021

Review the roadmaps, actions and targetsDevelop new actions (with roadmaps)Develop new targets

06/11/2012 Budapest, Annual Stakeholder Seminar

PA 5 Information

http://groupspaces.com/EnvironmentalRisks/http://groupspaces.com/EnvironmentalRisks/files/

http://www.danube-region.eu/

06/11/2012 Budapest, Annual Stakeholder Seminar

Thank you for your attention!