price construction- oilfield construction

3
Price Construction is dedicated to providing the highest quality of workmanship to each and every customer. We take pride in our work and the finished product is our proof. Throughout our 50 year history we have successfully constructed highways, production facilities, oilfield roads & locations, commercial site pads, wind and solar farms, subdivisions, airport runways along with providing aggregates, paving materials and transportation services. Our approach has been and will continue to be straightforward and simple – hire the best people in the industry, give them the best tools, equipment and technology available to create an environment for continued education and growth. Quality, efficiency and safety guide everything we do. www.PriceConstruction.com Containments Material Production Material Delivery Environmental 2701 E Hwy 350 Big Spring, TX 79720 (432) 267-1691 Field Services Locations & Roads Frac Ponds Clearing & Grubbing Oilfield Construction Since 1962

Upload: jake-whitehead

Post on 23-Jul-2015

109 views

Category:

Documents


9 download

TRANSCRIPT

Page 1: Price Construction- Oilfield Construction

Price Construction is dedicated to providing the highest quality of workmanship to each and every customer. We take pride in our work and the finished product is our proof. Throughout our 50 year history we have successfully constructed highways, production facilities, oilfield roads & locations, commercial site pads, wind and solar farms, subdivisions, airport runways along with providing aggregates, paving materials and transportation services. Our approach has been and will continue to be straightforward and simple – hire the best people in the industry, give them the best tools, equipment and technology available to create an environment for continued education and growth. Quality, efficiency and safety guide everything we do.

www.PriceConstruction.com

ContainmentsMaterial ProductionMaterial DeliveryEnvironmental

2701 E Hwy 350 Big Spring, TX 79720 (432) 267-1691

Field ServicesLocations & RoadsFrac PondsClearing & Grubbing

Oilfield Construction

Since 1962

Page 2: Price Construction- Oilfield Construction

www.PriceConstruction.com

Company History and Overview of Operations Price Construction has been building highways, oilfield roads & locations, commercial site pads, wind and solar farms, subdivisions and airports along with providing aggregates, paving materials and transportation services for 50 years. The Company began operating in 1962 as a partnership and was incorporated in 1972. Our strategy of growing the Company organically and maintaining a strong balance sheet has served us well through the oilfield and construction industry cycles. We have maintained a low debt structure and rarely use our bank lines of credit to support working capital needs. Through our affiliate, Laredo Paving, Inc. we produce and provide construction materials and transportation services for our own self-performed projects, as well as, for third party customers.

To provide better support to our clients that cover a large part of the state of Texas generally, and most of the Permian Basin, in particular, we have job and quarry/material locations throughout the state of Texas.

We utilize a fleet of over 1,000 pieces of heavy equipment, including bull dozers, excavators, motor graders, loaders, compaction rollers, portable rock crushers, asphalt distributors, hot mix pavers, portable hot-mix plants and trucks, as well as, portable light plants, generators, pumps and other ancillary equipment to complete our projects. We have found over the years that owning and controlling a large subset of the equipment needed to perform our contract project work has served us and our clients well.

We have the in-house resources to perform material exploration and QCQA testing. We currently have approximately 300 employees, including professional civil engineers, supervisors, estimators, project equipment managers, truck drivers, project managers and contract managers, as well as administrative maintenance and survey personnel.

We have successfully performed work for the Texas Department of Transportation for many years and currently have a bonding capacity of $100 Million.

Project and Fleet Management To manage the demands of today’s business, we use state-of-the-art project scheduling software to support timely successful completion of our project in line with client budgets and completion schedules. We also use commercially available, modern software technology for estimating, dispatching, job cost management, equipment fleet management and GPS tracking software to support our self-performed projects throughout of system.

Qualification Statement

Price Construction, Ltd. and Affiliates2701 E Hwy 350Big Spring, TX 79720Phone: (432) 267-1691Facsimile: (432) 267-1694Internet: PriceConstruction.comE-Mail: [email protected] Established: 1962 (as partnership)Officers:Bobby W. Price P.E., President and GM

Number of EmployeesSalaried Management Employees: 24Field: 250-500, varying with season and work loadService Area Texas and New MexicoServices performed: Supervision, facility construction demolition, earthwork, paving, concrete, oilfield site prep, roustabout services, heavy civil, construction materialsSuretyUS $100 Million

Page 3: Price Construction- Oilfield Construction

Equipment Class Equipment Type RateDozers D5K Dozer $110.00

D6T Dozer $165.00 D8T Dozer $300.00

Motor Graders 140 Motor Grader $140.00

Loaders Cat 980 Loader $190.00

Cat 950 Loader $160.00

Cat 928 Loader $140.00

Cat 257B Skid Steer $85.00

Excavators Cat 336 Excavator $185.00 Cat 329 Excavator $175.00 Cat 320 Excavator w/Grubber $165.00

Scrapers Cat 623 Scraper 23CY $225.00 Backhoes Cat 420 4x4 Backhoe $95.00

Rollers 84" Vibratory Padfoot or Smooth Drum Roller $85.00 Cranes 100 Ton Lattice Boom Track Crane $400.00

30 Ton Hydraulic Rough Terrain Crane $180.00Trucks 12 CY Bobtail Dump Truck $85.00

18 CY Belly Dump $110.00 35 Ton Fixed Neck Truck/Lowboy $110.0050 Ton Heavy Haul Truck $165.00 60 Ton Heavy Haul Truck $195.005500 Gal Tanker Truck $110.004000 Gal Water Truck $85.00

Pickup Trucks Foreman w/Pickup $65.00

Crew Pickup / Per hour $38.50 Crew Pickup / Day $200.00

Field Services Facility Construction Crew (3Men) $145.00 Facility Construction Crew (4Men) $170.00 Welder w/Truck $95.00 Welder w/Helper $135.00 Crane Rigger w/ Pickup $85.00

Miscellaneous Cat Tractor with Towable Crusher $400.00Cat 6000# Skytrack Lift $30.00

Man Lift $30.00 1” to 4” Poly Pipe Fusion Machine (Day) $50.00 Machine Attachments $40.00

Air Compressor w/ Breaker $60.00All Rates based on maximum of 60 hrs./week. Additional charges for hours greater than 60 per week, nights, or holidays.

Laser control on Dozers or Motor Graders is $20.00/hr.

All Rates are with Operator where applicable, Portal to Portal with 4 hour minimum

Rates are Subject to Change. A Fuel Surcharge Will be Applied for Diesel Above $3.75/Gal Q1-2013

2701 E Hwy 350 Big Spring, TX 79720 (432) 267-1691Big Spring l Midland l Hobbs l Fort Stockton

Hourly Rate Card

Superior Quality Superior Service