preventive maintenance electrical form
TRANSCRIPT
PREVENTIVE MAINTENANCEELECTRICAL PANEL BOARDS
Panel Board Type : A/C L/P P/P S/B ATM PUMPS FIRE SECURITY
Sl. No. Check List Freq. Condition Action Taken
1. Clean P/B interior & exterior .
2. Check & Tighten loose screws.
3. Check for burn wires.
4. Check sub- c/b for loose connections.
5. Record voltage between phases.
6. Record load amperes.
7. Record voltage between Earthling & Neutral.
8. Check P/B for overhaul performance.
VOLTAGE RECORDEDL1 - L2 L2 - L3 L1 - L3 Neutral -Ground
AMPERE RECORDEDL1 L2 L3 Neutral -Ground
_________________almajal ServiceMASTER
Technician ‘s Name : _________________Signature : ________________
Project Manager’s Name :________________Signature :_________________
Client RepresentativeManager’s Name :__________________Signature : _________________
Stamp:
Remarks
P.M. Frequency ________________ Last PM Date: ________________
Current PM WO No.__________ Date:_______ Start _________ Finish__________
Equipment DataEquipment No.:_____________ P/B Type : ______________ Make: ____________________Model No.: _________________Main C/B Amp Rating: ______
Property Data
Branch Name ____________
Location ________________
Branch Code_____________
PREVENTIVE MAINTENANCELIGHTING & OTHER ELECTRICAL SYSTEM
Sl. No. Check List Freq. Condition Action Taken
1.Check / replaced busted lamps inside and outside the Branch.
2. Check / clean lamps diffusers or plastic covers.
3. Check all switches and outlets.
4.Check / clean exhaust fan’s blade & covers in Bathroom and Kitchen.
5.Check all outside Signboard and Timer for normal working conditions.
6.Check all other related electrical system in the outside area.
_________________Contractor
Technician ‘s Name : _________________Signature : ________________
Project Manager’s Name :________________Signature :_________________
Client's Representative
Manager’s Name :__________________Signature : _________________
Stamp:
Remarks
P.M. Frequency ________________ Last PM
Date: ________________
Current PM WO No.__________ Date:_______ Start _________ Finish__________
Equipment DataEquipment No.:_____________ Type : ____________________ Make: ____________________Model No.: _________________Capacity / Rating: ___________
Property Data
Branch Name ____________
Location ________________
Branch Code_____________